Dispute over outstanding storm repair works and settlement amount after applicant ended contractor's services
Summary
After a 2010 storm the applicant ended the FSP's contractor and took a cash settlement of $40,738.94, then claimed $73,832.38 more for outstanding works. AFCA limited the FSP's liability to the settlement already paid, but ordered replacement of identified damaged carpet and an investigation of insulation.
The FSP is liable for insured damage under the authorised works, limited to the quoted scope less completed works, while balcony defects and unperformed scope were excluded.
Issues
- Claim amount dispute primary · not upheld
“the FSP's liability for the uncompleted insured damage is limited to $40,738.94”
- Claim denial secondary · not upheld
“the evidence does not support a finding that the condition of the north-west balcony was a result of the March 2010 storm”
- Inadequate claim investigation secondary · unclear
“The Panel has not been provided with any information in relation to insulation”
- Repairs or contractors secondary · not upheld
“The Applicant has not provided any evidence to show that these repairs are unsatisfactory or inappropriate”
Subjects and remedies
home or building damagepay claimreassess claim
Text of the determination
Case No: 226737 Determination Page 1 of 8
Case number: 226737
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Cat 012
20 April 2011
Background
1. On 7 March 2010 the Applicant lodged a claim under his home and contents
insurance policy for damage caused during a severe storm in the area.
2. The Financial Services Provider (FSP) accepted liability for the claim and
authorised a contractor to commence repairs. The Applicant subsequently
withdrew the services of the contractor and requested the claim be cash
settled.
3. A payment of $40,738.94 made to the Applicant was calculated as follows:
Building repairs as per contractors quote $52,148.63
Plus the cost of front veranda $15,500.00
Plus resultant damage to sunroom $5,695.00
Less costs incurred by contractor $32,604.69
Balance $40,738.94
4. The FSP excluded from the claim the cost of repairing the balcony above the
sunroom on the ground the damage was due to wear, tear and lack of
maintenance.
5. The Applicant maintains he is entitled to pa yment of $73,832.38 for outstanding
works.
Summary of Applicant’s Position
6. The following issues have not been resolved:
Front balcony has not been replaced and is unsafe
The front door has not been replaced
Painting the water damaged area not commenced
Plaster board not replaced
Sunroom damage not repaired
Determination
Case No: 226737 Determination Page 2 of 8
Leak on 2nd balcony not repaired
Rangehood stll damaged
Downlights not replaced
Dining chairs and coffee table not replaced
Tiles damaged by FSP’s builder not replaced
Re-render walls to bedroom 1 & 2 outstanding
Replace garage roller door
Replace damaged carpet
Insulation not replaced
7. A fair and reasonable resolution is payment of $73,832.38 plus $1,500 - $2,000
dry cleaning of curtains.
Summary of FSP’s Position
Front veranda/balcony
8. It has since accepted responsibility for repairing the balcony. The sum of
$15,500 quoted by the contractor for this work has been included in the
payment made to the Applicant.
Sunroom and North-West balcony
9. The contractor appointed by the Applicant asserted the grout between the tiles
was in good condition.
10. The contractor appointed by it confirmed there was no grout between the tiles;
there was no flashing to the junction of slate to wall; there was no flashing to
protect cavity brickwork to junction of wall to balco ny and there was no
evidence of: cracked tiles as a result of hail.
11. A roofing services contractor reported the leaks that occurred in the sunroom
were caused by the north-west balcony above. Water-proofing membrane
beneath the balcony floor tiles was either non-existence, properly installed or of
poor quality. In addition there were gaps in the base of the balcony sliding door
and rainwater was able to penetrate the gaps and divert into the lower roof
cavity.
12. Based on this information, the north-west balcony itself is not covered as the
damage was not the result of an insured and was from a structural defect or
poor workmanship which is excluded from cover provided by the policy.
13. However the sum of $5,695 was included in the settlement for repairs for the
resultant damage.
Case No: 226737 Determination Page 3 of 8
Rangehood
14. The sum of $2,100 has been included in the settlement paid to the Applicant
which formed part of the contractor’s quotation.
Work not undertaken but settlement provided
15. The contractor’s report sets out the damage covered accord ing to the original
quote that has not been repaired or replaced. The settlement paid the Applicant
includes these items.
Curtains and front door
16. These items were not brought to its attention before the matter was referred to
FOS. It is now arranging for an assessment of these items.
17. The FSP relies on the following policy provisions:
“ We do not cover loss or damage:
…
Defect, structural fault or design fault
Caused by a defect, structural fault or design fault that you knew about (or should
reasonably have known about) and did not fix before the loss or damage occurred (eg.
If there are signs that a defect previously caused damage, we will not pay a later claim
for further damage from this defect).
…
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising
damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot
unless this is covered under:
– Insured event 1 (Storm and flood)
– Insured event 2 (burst pipes, leaks and overflow s).”
Issues
18. Whether the FSP has discharged its obligations according to the terms of the
policy.
Reasons for Decision
19. The FSP seeks to rely on the terms of the policy to deny parts of the claim and
thereof has the burden of establishing on the balance of probabilities that the
relevant terms apply to defeat the claim for the excluded items.
20. The contractor appointed by the FSP to carry out the works provided a
quotation in the sum of $35,541 to complete the insured damage. The Panel
Case No: 226737 Determination Page 4 of 8
has not been provided with a copy of the scope of works on which this quote
was based.
21. According to the assessor (report dated 13 October 2010) the original quote
was adjusted as follows:
Original quote $35,541.00
Original variation sunroom, garage $14,507.63
Additional variation rangehood $2,100.00
$52,148.63
22. The FSP has since accepted responsibility for rectifying the front veranda and
the resultant sunroom damage. Thus the total sum of the contractors quotation
for damage accepted by the FSP is $73,343.63 calculated as follows:
$52,148.63
Plus front veranda $15,500.00
Plus resultant damage to sunroom $5,695.00
Total sum quoted $73,343.63
23. Following termination of the contractor’s service by the Applicant, the contractor
provided a summary of the works completed and the works outstanding.
24. The works completed included:
Demolition of front veranda
Including slate and linings. Extra work authorised on site inc underlay and lining.
Additional cleanup bins.
Sunroom
Variation had to be done twice as additional leaking from porch.
Kitchen
10 sqm plaster and insulation removal
Bed 1
patch 3sqm and paint ceiling
Bed 2
painting robe ceiling and patch paint Bed ceiling
Upstairs living
rescrew, treat stains, paint
Lower passage entry
Patch plaster, remove skirts
Electricals Disconnect/reconnect and test
Original roof secure
Roof rectification including roof tile replacement and repainting, sealing valleys
Case No: 226737 Determination Page 5 of 8
25. The cost incurred by the contractor for this work was $32,604.69.
26. The Applicant has listed a number of items which he states remain outstanding
at the time of his referral to FOS. For the sake of good order, the Panel will
consider these items in the sequence presented by the FSP.
Front veranda/ balcony
27. The FSP agreed to accept responsibility for repairing the front veranda/
balcony. The cost to carry out this work was quoted by the FSP’s appointed
contractor in the sum of $15,500.
28. This sum has been included in the total sum quoted of $73,343.63
29. The Panel therefore concludes the Applicant’s complaint in relation to this item
has been resolved.
Sunroom and north-west balcony
30. The contractor appointed by the Applicant in his report of 10 November 2010
noted:
“veranda number 3 (as noted in the attached drawing) the grout between the tiles
is in good condition and there is no leakage. However I have noticed that there
are cracked tiles on both ends where the pillars are situated. In my opinion, this
area requires the flooring/tiles to be removed and fibreglass the area and seal it.”
31. A roofing contractor commissioned by the FSP in his report states:
“leaks had occurred in the lower study and were caused by the north -west
balcony which is situated directly above this area. The water proofing membrane
beneath the balcony floor tiles is either non-existent, poorly installed or of poor
quality….
Compounding these leaks there are gaps in the base of the balcony’s sliding
door (faulty work). Rain water is able to penetrate through these gaps and divert
into the lower roof cavity.”
32. The FSP’s contractor by email dated 20 January 2011 provided the following
information:
“Sunroom
We investigated whether the water entry was possibly caused by lack of poor
flashing. (There appears to be sufficient). We also looked at the junction of the
tiles to the wall and this showed a possibility of allowing water entry. The only
other feasible area to allow water is through the tiles and in particular around two
posts. This was previously stated has been properly finished and or maintained
and could allow water entry below to the sunroom. THERE IS NO EVIDENCE
OF HAIL OR STORM DAMAGE TO THE TILES only the grout has washed away
(maintenance) and allowed further water entry.
33. Notwithstanding the contradictory evidence in relation to the condition of the
balcony tiles grout, the Panel is of the opinion that the weight of evidence is
such that it is reasonable to conclude that the condition of the balcony did not
Case No: 226737 Determination Page 6 of 8
arise because of the March 2010 storm event. In this regard the Panel notes
the Applicant’s consultant while noting the cracked tiles, did not specify how
many tiles were cracked or offer an explanation as to the probable cause for
this.
34. In this case, the Panel considers that the evidence does not support a finding
that the condition of the north-west balcony was a result of the March 2010
storm.
35. The Panel notes the FSP has accepted liability for the internal damage caused
by the ingress of water on top of the sunroom. This sum was assessed at
$5,695 and is included in the settlement offer.
Rangehood
36. The Panel notes that an allowance of $2,100 as an additional variation item
was made by the contractor appointed by the FSP to rectify the damage for
rangehood.
37. The sum was included the contractors updated quotation of $52,148.63 which
formed the basis for settlement of the claim.
Curtains and front door
38. The FSP noted that the Applicant had not included these items in his complaint
to it. As such it had not had the opportunity to consider the items when the
claim was reviewed by its IDR panel.
39. The FSP advised that since the Applicant’s referral lodged with FOS included
these two items, it has arranged for an assessment to be carried out.
40. As these items did not form part of the original dispute, the Panel considers the
FSP is entitled to assess the items to determine its liability.
Other items
41. The contractor appointed to rectify the insured damage stated that at the time
his services were terminated the works were not completed but allowed for in
the original quote included:
Electrical light fittings
All additional painting including walls, ceilings and Gloss to downstairs
including stairwell
Painting sunroom
Architraves and skirting replacement
Garage doors
Reconstruction of front veranda flooring and moulding
Case No: 226737 Determination Page 7 of 8
42. As such, the downlights, painting and garage door listed by the Applicant and
other items as listed by the contractor formed part of the scope of works on
which the quotation was based. It follows the downlights, painting and garage
door would have been repaired by the contractor and the costs included in the
quotation had the contractor been allowed to complete the job.
43. The cost allowed for the uncompleted works has been deducted from the
contractor’s quotation and credited to the Applicant.
44. The Panel is therefore satisfied that in these circumstances the FSP has no
additional responsibility for the cost of rectifying these items.
Carpet, insulation
45. According to the assessor’s report of 3 May 2010 the damage included “ carpet
to bedroom to be replaced” .
46. According to the assessor’s report of 9 July 2010, an invoice in the sum of
$1,477.30 for replacement of rugs was received and payment authorised.
However it is unclear to the Panel whether the damaged carpet referred to by
the assessor in the initial report is in fact the damaged rugs referred to on the
invoice.
47. In these circumstances the Panel considers the Applicant is entitled to
replacement of the carpets identified by the assessor in his report of 3 May
2010 as having been damaged.
48. The Panel has not been provided with any information in relation to insulation.
49. In these circumstances the Panel considers that the FSP investigate this
element of the claim and replace any damaged insulation which forms part of
the insured damage.
Quantum
50. The contractor’s original quote of $35,541 was varied to include the sunroom
and garage $14,507.63 and rangehood $2,100. The quote was further
increased to include the front balcony $15,500 and resultant damage to the
sunroom $5,695. Thus the overall quote was for the sum of $73,343.63.
51. The contractor had carried out works costing $32,343.63 at the time the
Applicant terminated his services. The cost to complete the remaining works
based on the contractor’s quote is then $40,738.94.
52. The contractor was a qualified builder prepared to carry out and complete the
works as quoted by it. The Panel is mindful of the Applicant’s concern at the
quality of works. However in the event that on completion of the job it was
established that part of the works was completed in an unsatisfactory manner,
the FSP would be required to have the unsatisfactory works rectified. Thus the
FSP provides an implied warranty for the authorised works.
Case No: 226737 Determination Page 8 of 8
53. The Applicant has not provided any evidence to show that these repairs are
unsatisfactory or inappropriate. Therefore the Panel can only conclude that the
partial repairs carried out by the builder have been completed to an appropriate
standard and the costs ascribed to them are representative of their value.
54. The Applicant chose to terminate the services of the contractor. In these
circumstances, the Panel is satisfied that the FSP’s liability for the insured
damage is limited to the amount of the o verall quote less the cost of works
completed at the time the contractor’s services were terminated.
55. As such, the FSP’s liability for the uncompleted insured damage is $40,738.94.
Determination
56. On the basis of the available information the Panel determines that:
(i) The FSP’s liability for the uncompleted insured damage is limited to
$40,738.94 subject to the following:
(ii) The FSP is to pay the cost of replacing the damaged carpet referred to in
the assessor’s report of 3 May 2010;
(iii) The FSP is to investigate the i nclusion of insulation as part of the insured
damage.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.