Home / Financial Firm (Unknown - Insurer) / Determination 226737

Determination 226737

Dispute over outstanding storm repair works and settlement amount after applicant ended contractor's services

FirmFinancial Firm (Unknown - Insurer)
Decided2011-05-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$75,332
SourceAFCA PDF

Summary

After a 2010 storm the applicant ended the FSP's contractor and took a cash settlement of $40,738.94, then claimed $73,832.38 more for outstanding works. AFCA limited the FSP's liability to the settlement already paid, but ordered replacement of identified damaged carpet and an investigation of insulation.

The FSP is liable for insured damage under the authorised works, limited to the quoted scope less completed works, while balcony defects and unperformed scope were excluded.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 226737 Determination Page 1 of 8 Case number: 226737 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Cat 012 20 April 2011 Background 1. On 7 March 2010 the Applicant lodged a claim under his home and contents insurance policy for damage caused during a severe storm in the area. 2. The Financial Services Provider (FSP) accepted liability for the claim and authorised a contractor to commence repairs. The Applicant subsequently withdrew the services of the contractor and requested the claim be cash settled. 3. A payment of $40,738.94 made to the Applicant was calculated as follows: Building repairs as per contractors quote $52,148.63 Plus the cost of front veranda $15,500.00 Plus resultant damage to sunroom $5,695.00 Less costs incurred by contractor $32,604.69 Balance $40,738.94 4. The FSP excluded from the claim the cost of repairing the balcony above the sunroom on the ground the damage was due to wear, tear and lack of maintenance. 5. The Applicant maintains he is entitled to pa yment of $73,832.38 for outstanding works. Summary of Applicant’s Position 6. The following issues have not been resolved:  Front balcony has not been replaced and is unsafe  The front door has not been replaced  Painting the water damaged area not commenced  Plaster board not replaced  Sunroom damage not repaired Determination Case No: 226737 Determination Page 2 of 8  Leak on 2nd balcony not repaired  Rangehood stll damaged  Downlights not replaced  Dining chairs and coffee table not replaced  Tiles damaged by FSP’s builder not replaced  Re-render walls to bedroom 1 & 2 outstanding  Replace garage roller door  Replace damaged carpet  Insulation not replaced 7. A fair and reasonable resolution is payment of $73,832.38 plus $1,500 - $2,000 dry cleaning of curtains. Summary of FSP’s Position Front veranda/balcony 8. It has since accepted responsibility for repairing the balcony. The sum of $15,500 quoted by the contractor for this work has been included in the payment made to the Applicant. Sunroom and North-West balcony 9. The contractor appointed by the Applicant asserted the grout between the tiles was in good condition. 10. The contractor appointed by it confirmed there was no grout between the tiles; there was no flashing to the junction of slate to wall; there was no flashing to protect cavity brickwork to junction of wall to balco ny and there was no evidence of: cracked tiles as a result of hail. 11. A roofing services contractor reported the leaks that occurred in the sunroom were caused by the north-west balcony above. Water-proofing membrane beneath the balcony floor tiles was either non-existence, properly installed or of poor quality. In addition there were gaps in the base of the balcony sliding door and rainwater was able to penetrate the gaps and divert into the lower roof cavity. 12. Based on this information, the north-west balcony itself is not covered as the damage was not the result of an insured and was from a structural defect or poor workmanship which is excluded from cover provided by the policy. 13. However the sum of $5,695 was included in the settlement for repairs for the resultant damage. Case No: 226737 Determination Page 3 of 8 Rangehood 14. The sum of $2,100 has been included in the settlement paid to the Applicant which formed part of the contractor’s quotation. Work not undertaken but settlement provided 15. The contractor’s report sets out the damage covered accord ing to the original quote that has not been repaired or replaced. The settlement paid the Applicant includes these items. Curtains and front door 16. These items were not brought to its attention before the matter was referred to FOS. It is now arranging for an assessment of these items. 17. The FSP relies on the following policy provisions: “ We do not cover loss or damage: … Defect, structural fault or design fault Caused by a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (eg. If there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect). … Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot unless this is covered under: – Insured event 1 (Storm and flood) – Insured event 2 (burst pipes, leaks and overflow s).” Issues 18. Whether the FSP has discharged its obligations according to the terms of the policy. Reasons for Decision 19. The FSP seeks to rely on the terms of the policy to deny parts of the claim and thereof has the burden of establishing on the balance of probabilities that the relevant terms apply to defeat the claim for the excluded items. 20. The contractor appointed by the FSP to carry out the works provided a quotation in the sum of $35,541 to complete the insured damage. The Panel Case No: 226737 Determination Page 4 of 8 has not been provided with a copy of the scope of works on which this quote was based. 21. According to the assessor (report dated 13 October 2010) the original quote was adjusted as follows: Original quote $35,541.00 Original variation sunroom, garage $14,507.63 Additional variation rangehood $2,100.00 $52,148.63 22. The FSP has since accepted responsibility for rectifying the front veranda and the resultant sunroom damage. Thus the total sum of the contractors quotation for damage accepted by the FSP is $73,343.63 calculated as follows: $52,148.63 Plus front veranda $15,500.00 Plus resultant damage to sunroom $5,695.00 Total sum quoted $73,343.63 23. Following termination of the contractor’s service by the Applicant, the contractor provided a summary of the works completed and the works outstanding. 24. The works completed included:  Demolition of front veranda Including slate and linings. Extra work authorised on site inc underlay and lining. Additional cleanup bins.  Sunroom Variation had to be done twice as additional leaking from porch.  Kitchen 10 sqm plaster and insulation removal  Bed 1 patch 3sqm and paint ceiling  Bed 2 painting robe ceiling and patch paint Bed ceiling  Upstairs living rescrew, treat stains, paint  Lower passage entry Patch plaster, remove skirts  Electricals Disconnect/reconnect and test  Original roof secure  Roof rectification including roof tile replacement and repainting, sealing valleys Case No: 226737 Determination Page 5 of 8 25. The cost incurred by the contractor for this work was $32,604.69. 26. The Applicant has listed a number of items which he states remain outstanding at the time of his referral to FOS. For the sake of good order, the Panel will consider these items in the sequence presented by the FSP. Front veranda/ balcony 27. The FSP agreed to accept responsibility for repairing the front veranda/ balcony. The cost to carry out this work was quoted by the FSP’s appointed contractor in the sum of $15,500. 28. This sum has been included in the total sum quoted of $73,343.63 29. The Panel therefore concludes the Applicant’s complaint in relation to this item has been resolved. Sunroom and north-west balcony 30. The contractor appointed by the Applicant in his report of 10 November 2010 noted: “veranda number 3 (as noted in the attached drawing) the grout between the tiles is in good condition and there is no leakage. However I have noticed that there are cracked tiles on both ends where the pillars are situated. In my opinion, this area requires the flooring/tiles to be removed and fibreglass the area and seal it.” 31. A roofing contractor commissioned by the FSP in his report states: “leaks had occurred in the lower study and were caused by the north -west balcony which is situated directly above this area. The water proofing membrane beneath the balcony floor tiles is either non-existent, poorly installed or of poor quality…. Compounding these leaks there are gaps in the base of the balcony’s sliding door (faulty work). Rain water is able to penetrate through these gaps and divert into the lower roof cavity.” 32. The FSP’s contractor by email dated 20 January 2011 provided the following information: “Sunroom We investigated whether the water entry was possibly caused by lack of poor flashing. (There appears to be sufficient). We also looked at the junction of the tiles to the wall and this showed a possibility of allowing water entry. The only other feasible area to allow water is through the tiles and in particular around two posts. This was previously stated has been properly finished and or maintained and could allow water entry below to the sunroom. THERE IS NO EVIDENCE OF HAIL OR STORM DAMAGE TO THE TILES only the grout has washed away (maintenance) and allowed further water entry. 33. Notwithstanding the contradictory evidence in relation to the condition of the balcony tiles grout, the Panel is of the opinion that the weight of evidence is such that it is reasonable to conclude that the condition of the balcony did not Case No: 226737 Determination Page 6 of 8 arise because of the March 2010 storm event. In this regard the Panel notes the Applicant’s consultant while noting the cracked tiles, did not specify how many tiles were cracked or offer an explanation as to the probable cause for this. 34. In this case, the Panel considers that the evidence does not support a finding that the condition of the north-west balcony was a result of the March 2010 storm. 35. The Panel notes the FSP has accepted liability for the internal damage caused by the ingress of water on top of the sunroom. This sum was assessed at $5,695 and is included in the settlement offer. Rangehood 36. The Panel notes that an allowance of $2,100 as an additional variation item was made by the contractor appointed by the FSP to rectify the damage for rangehood. 37. The sum was included the contractors updated quotation of $52,148.63 which formed the basis for settlement of the claim. Curtains and front door 38. The FSP noted that the Applicant had not included these items in his complaint to it. As such it had not had the opportunity to consider the items when the claim was reviewed by its IDR panel. 39. The FSP advised that since the Applicant’s referral lodged with FOS included these two items, it has arranged for an assessment to be carried out. 40. As these items did not form part of the original dispute, the Panel considers the FSP is entitled to assess the items to determine its liability. Other items 41. The contractor appointed to rectify the insured damage stated that at the time his services were terminated the works were not completed but allowed for in the original quote included:  Electrical light fittings  All additional painting including walls, ceilings and Gloss to downstairs including stairwell  Painting sunroom  Architraves and skirting replacement  Garage doors  Reconstruction of front veranda flooring and moulding Case No: 226737 Determination Page 7 of 8 42. As such, the downlights, painting and garage door listed by the Applicant and other items as listed by the contractor formed part of the scope of works on which the quotation was based. It follows the downlights, painting and garage door would have been repaired by the contractor and the costs included in the quotation had the contractor been allowed to complete the job. 43. The cost allowed for the uncompleted works has been deducted from the contractor’s quotation and credited to the Applicant. 44. The Panel is therefore satisfied that in these circumstances the FSP has no additional responsibility for the cost of rectifying these items. Carpet, insulation 45. According to the assessor’s report of 3 May 2010 the damage included “ carpet to bedroom to be replaced” . 46. According to the assessor’s report of 9 July 2010, an invoice in the sum of $1,477.30 for replacement of rugs was received and payment authorised. However it is unclear to the Panel whether the damaged carpet referred to by the assessor in the initial report is in fact the damaged rugs referred to on the invoice. 47. In these circumstances the Panel considers the Applicant is entitled to replacement of the carpets identified by the assessor in his report of 3 May 2010 as having been damaged. 48. The Panel has not been provided with any information in relation to insulation. 49. In these circumstances the Panel considers that the FSP investigate this element of the claim and replace any damaged insulation which forms part of the insured damage. Quantum 50. The contractor’s original quote of $35,541 was varied to include the sunroom and garage $14,507.63 and rangehood $2,100. The quote was further increased to include the front balcony $15,500 and resultant damage to the sunroom $5,695. Thus the overall quote was for the sum of $73,343.63. 51. The contractor had carried out works costing $32,343.63 at the time the Applicant terminated his services. The cost to complete the remaining works based on the contractor’s quote is then $40,738.94. 52. The contractor was a qualified builder prepared to carry out and complete the works as quoted by it. The Panel is mindful of the Applicant’s concern at the quality of works. However in the event that on completion of the job it was established that part of the works was completed in an unsatisfactory manner, the FSP would be required to have the unsatisfactory works rectified. Thus the FSP provides an implied warranty for the authorised works. Case No: 226737 Determination Page 8 of 8 53. The Applicant has not provided any evidence to show that these repairs are unsatisfactory or inappropriate. Therefore the Panel can only conclude that the partial repairs carried out by the builder have been completed to an appropriate standard and the costs ascribed to them are representative of their value. 54. The Applicant chose to terminate the services of the contractor. In these circumstances, the Panel is satisfied that the FSP’s liability for the insured damage is limited to the amount of the o verall quote less the cost of works completed at the time the contractor’s services were terminated. 55. As such, the FSP’s liability for the uncompleted insured damage is $40,738.94. Determination 56. On the basis of the available information the Panel determines that: (i) The FSP’s liability for the uncompleted insured damage is limited to $40,738.94 subject to the following: (ii) The FSP is to pay the cost of replacing the damaged carpet referred to in the assessor’s report of 3 May 2010; (iii) The FSP is to investigate the i nclusion of insulation as part of the insured damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.