Boat owners claimed after their carbon fibre mast snapped in April 2010, shortly after the insurer's approved repairer rebuilt it following an earlier claim. AFCA found the FSP liable to indemnify the full loss, including resultant vessel damage, because its authorised repairer caused the failure and the FSP had authorised the work, and ordered interest on repair advances.

The insurer that authorised and controlled repairs remains responsible for their quality and must act with the utmost good faith under section 13 of the Insurance Contracts Act, so it cannot avoid the claim.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 226569 Determination Page 1 of 8 Case number: 226569 General Insurance - Domestic Insurance - Personal and Domestic Property- Pleasure Craft - FSP Decision - Denial of Claim 16 March 2012 Background 1. The Applicants held a boat insurance policy with the Financial Services Provider (FSP) from 24 August 2007 to 24 August 2009. The policy was issued by an Underwriting Agency (N). 2. The Applicants lodged a claim with the FSP when the vessel, a 2007 Schionning Catamaran, sustained extensive damage when its mast snapped whilst sailing on 24 April 2010. 3. The FSP denied the Applicants ‟ claim on the grounds that the claim did not occur within the policy period which expired on 24 August 2009 and that the damaged mast was replaced by the Applicants ‟ chosen repairer in relation to a previous claim. 4. The Applicants believe the damage to the mast relates to the previous claim accepted and authorised by the FSP and thereby, expect the FSP to honour the current claim. Summary of Applicants ’ position 5. In relation to the previous claim, the Applicants say they obtained a quote from repairer (SF) on request by the loss assessor and they never volunteered this information nor indicated that SF was their preferred repairer. 6. The FSP authorised, approved and paid for the replacement of the mast and thereby, any issues relating to the construction and rigging of the replacement mast falls within the FSP‟s responsibility. 7. The Applicants were not aware of any inherent defect, structural fault or faulty workmanship of the mast. 8. The Applicants‟ current claim was incorrectly and prematurely denied by N with no evidence to support its decision. Determination Case No: 226569 Determination Page 2 of 8 Summary of FSP’s position 9. The FSP says the Applicants‟ current claim does not fall within its policy period as its cover expired on 24 August 2009. 10. The Product Disclosure Statement does not provide warranty for any items replaced under the claim/policy. 11. The FSP discharged its obligation when it paid for the replacement mast, repaired and returned the vessel to the Applicants in February 2010 after successful completion of sea trials under the previous claim. 12. The replacement mast was built and stepped by the Applicants‟ chosen repairer SF and the FSP was not informed of and did not approve any changes to the design of the replacement mast built by SF. 13. The assessor had no involvement in the repair/replacement process other than approving SF‟s s taged invoices for payment. 14. An expert report from a naval architect and yacht designer (F) identified two factors (among others) which caused the loss being change in design using original rigging and not consulting Schionning regarding the appropriate specifications required when stepping the replacement mast. Issue 15. Whether the FSP is entitled to deny the Applicants ‟ claim. Reasons for decision 16. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, an industry representative and a consumer representative. 18. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 19. The onus of proof rests on the Applicants to establish that, on the balance of probabilities, they have suffered a loss caused by an insured risk. Once the Applicants have established that the loss was caused by a risk insured under their policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. Case No: 226569 Determination Page 3 of 8 20. The Applicants ‟ boat insurance policy was issued by N from 24 August 2007 to 24 August 2010 and they were unaware of the fact that the policy was initially underwritten by the FSP until 24 August 2009 and there onwards by another insurer (L). 21. Even though the policy was underwritten by two insurers, the Product Disclosure Statement remained unchanged. 22. On 31 May 2008, the carbon fibre mast of the vessel was struck by lightning causing extensive damage to both the mast and the vessel ‟ s equipment. 23. Subsequent to the lodgement of the claim, N appointed an assessor to investigate the circumstances surrounding the loss and to assess the claim. 24. The Applicants say the loss assessor requested them to obtain repair quotes and as a result they organised a quote from repairer SF. 25. On the assessor‟s advice, t he FSP accepted the Applicants ‟ claim and there is no dispute that the loss assessor authorised (verbally) SF to proceed with the construction and stepping of the replacement mast. The loss assessor also approved repairs to other parts of the damaged vessel. 26. Unbeknown to the FSP, the Panel notes the design of the replacement mast was changed. Nevertheless, the new design was one approved by Schionning (the original designer of the vessel). 27. The repair work was project managed by SF‟s Managing Director. He subcontracted the construction/building of the mast to an independent company WR. 28. The mast was built, stepped and various sea trials were organised by SF and by February 2010 the repaired vessel with the replaced mast was returned to the Applicants. 29. Thereafter, on 24 April 2010, the Applicants ‟ vessel sustained accidental damage when its mast snapped whilst sailing. 30. At the time, the policy was underwritten by L and N denied the Applicants ‟ claim on the ground the damage was caused by inherent defects , structural faults, faulty workmanship or faulty design which are excluded by the policy. 31. The internal dispute resolution review by N maintained the denial of the claim. 32. The Panel is not satisfied that N chose to deny the Applicants ‟ claim with no evidence to support the facts it relied upon. 33. Subsequently, when the Applicants appointed a solicitor to act on their behalf, N referred the current claim to L. L appointed an investigator V to investigate the circumstances surrounding the claim who in turn appointed F to identify the cause of the loss. Case No: 226569 Determination Page 4 of 8 34. Reports by the investigators are as follows: Report by F “ Conclusion It is of our opinion that the spar failed as a result of several factors Mast Design was marginal for the adopted staying approach The mast was designed initially to have panel support generated by the spreader/truss approach. This has in the past been satisfactory for this particular design and the carbon fibre mast developed by the designer. The mast construction details had departed from the approved assembly as provided by the designer and used in the original stepping of the first mast used. The review of the Engineering show s the „wet peg‟ laminate was marginal for the application with respect to the final rigging stepup & the final rigging geometry used was marginal for the support of the mast. The location of the lower shrouds was above the midpoint of the unsupported panel and should have been lowered to the midpoint or closer to it. 1. Mast Construction & Quality Control was marginal ... Clearly the inter laminar binding was suspect in the area of failure ... Without further testing along the entire length of the spar this could not be concluded, however it would be reasonable to suggest the consolidation was poor as seen firsthand and through the various photos made available. The final EI (stiffness) check on the mast was not undertaken and this was a critical decision. The feed back to the original designer would have been invaluable in assessing whether or not the mast was suitable for the purpose and in accordance with the designers specification. It would have also made the final decision to undertake a rig geometry change tangible. 2. Standing Rigging ... For the mast to break below the lowers and 1000mm below the mid panel suggests excessive panel deflection in this area. 3. Communication to the Designer Generally speaking it is a good idea to seek the approval of any departures from an original design. This approval, ideally should be made by that original designer, if this cannot be done, then the contractor should seek other engineering services to ensure the mast and rigging is in accordance with a level of classification or criteria. ... Summary From our point of view there was not „one‟ single factor that contributed to the failure but a combination of many variables. Case No: 226569 Determination Page 5 of 8 When many elements have marginal safety factors it then becomes an issue of confidence” Report by V “ [Managing Director of SF] and [Builder of WR] were well known and respected throughout the boating industry in Western Australia ... RECOVERY & CONCLUSIONS: As the result of the inquiries made, it is our view that the primary casual factors contributing to the catastrophic failure of this mast were as a direct result of the standing rigging “lowers” not being attached to the mast in the position specified in the mast specification by the Designer, Schionning Designs. Secondly, the actual mast construction is reported as being not completed to design or construction requirements for a mast of this design. We understand that all aspects of the mast and rigging replacement were contracted to [Managing Director of SF] by Underwriters and subject to the terms of that engagement, you may consider that “ [Managing Director of SF] could now be reasonably held liable.” 35. As a result of the above findings, L admitted liability to the current claim and commenced payments. However, when it realised the loss occurred outside its period of cover and relates to a claim assessed and accepted by the FSP, L requested N to request the FSP to take over the current claim. 36. The Panel will now discuss various issues raised by the parties which will determine whether the Applicants‟ claim is one for acceptance under the policy. Role of the loss assessor 37. The Panel is surprised that the loss assessor simply chose to verbally authorise SF to proceed with the construction and stepping of the replacement mast. 38. According to the FSP, the loss assessor‟s involvement with the claim was limited to approving and recommending the staged payments from the FSP. 39. The FSP rejects the Applicants comments that the loss assessor visited WR during and after the construction of the mast. 40. The Panel is unsure as to the reasons why the role of the loss assessor was limited in such a complex claim and why he simply left the matter to be dealt and monitored by the Applicants. There is no evidence that the Applicants disapproved of his involvement at any stage. 41. Furthermore, in regard to the fact that the loss assessor was not informed of the design change of the replacement mast, the Panel notes the loss assessor was aware of the design of the original damaged mast and failed to notice or query the new design and specifications subsequent to completion of repairs. Case No: 226569 Determination Page 6 of 8 42. The Panel does not agree the FSP is entitled to transfer responsibility of monitoring and identifying technical issues or irregularities to the Applicants whilst its loss assessor simply chose to limit his involvement with mo nitoring SF‟s work. Change of design and rigging 43. The design of the replacement mast was changed to another design approved by Schionning as recommended by SF and the Applicants had no further involvement in the constructions and stepping of the replacement mast. 44. A letter from the designer states: “We have a number of carbon mast designs available to be used on our cats. Our practice is to supply the design to our client who then builds the mast blank ... We have these deflections checked by our engineer who gives an assessment of as-built values against engineered expectation. This checks the build quality before the mast is stepped in case of a fault during manufacture. We have no record of this being done nor any record of the discussion about changing the lowers position ... My son [B] does recall a phone discussion around the time the mast was being built where [Managing Director of SF ] said he intended to use this rigging configuration but there was no official approval or engineering supplied by our office to support these changes, we would never officially approve such a change without consulting a composite engineer” 45. The Panel is of the opinion that more than the change of design, the issues particularly relating to the execution of building and rigging of the mast by SF caused the loss as SF failed to follow the designer specifications in completing the work. Liability towards the loss 46. The Panel notes that at the time of the loss, the loss assessor was unable to obtain other quotes from Western Australia as most repairers refused to undertake the work to build a mast with complex design. 47. Repairers from the East Coast were considered, however considering the freight expenses and other unknown variables, the loss assessor recommended to the FSP that SF be awarded the repair work: “[N] and their assessor attempted to source a more competitive quote for a replacement mast through alternative sources however their investigation failed to locate another contractor who was willing or able to provide a quote for replacement of a similar carbon fibre mast. Case No: 226569 Determination Page 7 of 8 Accordingly the assessor appointed by [N] agreed on the cost and verbally authorised replacement of the mast through [SF] on the basis that staged payments would be made once scheduled repairs had been completed and approved by both the assessor and the Applicants. [N] or their assessor did not issue a written authority to [SF]” 48. Further, V reports that SF was well respected and known throughout the boating industry in Western Australia. 49. The Panel is satisfied that the FSP was aware of the fact the actual construction of the mast was subcontracted to WR as an email from N to the FSP states: “I think its [WR] that‟s actually making the mast” 50. There is no dispute the loss assessor on behalf of the FSP authorised repairs. The Applicants were at no stage advised that any issues arising out of the construction and stepping of the mast by SF would remain their responsibility. 51. Section 13 of the Insurance Contracts Act 1984 provides that a contract of insurance is a contract based on the utmost good faith, and there is implied in each contract, a provision requiring each party to act towards the other party, in respect of any matter arising under or in relation to it, with the utmost good faith. 52. The Panel is of the opinion the FSP instead of admitting liability to the ineffective repairs carried out by its authorised repairer SF, chose to avoid liability. This demonstrates poor insurance practice and is inconsistent with its obligation to act with utmost good faith towards the Applicants. 53. When a loss occurs as a result of an insured event and the claim is accepted by the FSP, the FSP is liable to bring the Applicants‟ vessel to its pre -loss condition by repair and/or replacement. 54. However, in this case, SF failed to follow the designer specifications in building and stepping the mast which resulted in the subsequent loss event on 24 April 2010. 55. The expert evidence by F clearly identifies cause of the loss being the issues relating to the building and stepping of the mast by SF. 56. Therefore, the FSP is liable to indemnify the Applicants in relation to the current claim and it may seek recourse against SF. 57. The FSP indicates that its liability towards the current claim should be limited to the damaged mast and not the resultant damage to the vessel if its decision is overturned by the Service. 58. Since the resultant damage to the vessel was caused by and directly relates to the work performed by SF who was approved and authorised by the FSP, the FSP is liable to indemnify the Applicants for the full claim being the damage to the mast and the resultant damage to the vessel. Case No: 226569 Determination Page 8 of 8 59. In further support of the Panel‟s Determination, it notes the extensive emails between the parties are only consistent with the FSP‟s involvement throug h its assessor in the replacement of the mast. The FSP‟s policy (“What happens after you make a claim”) allows it to either manage the repairs or pay the Applicants the reasonable cost of repair. Clearly, the FSP did not choose the cash payout option. 60. Finally, the Panel notes the FSP acknowledges in its notice of response that had the mast snapped and resultant damage occurred prior to the completion of the sea trials which ceased in February 2010, it would have accepted the Applicants‟ current claim. 61. The Panel does not agree that handing over a vessel after completion of repairs necessarily relinquishes the FSP‟s responsibility towards the quality of the work performed by its appointed repairer SF. 62. Even though in a situation like this, a discharge form signed by the Applicants would have no effect on the claim, in this case, the Applicants never signed a discharge form relinquishing their rights over the repair work authorised by the FSP. 63. Therefore, the Panel is satisfied the FSP is liable to indemnify the Applicants for their loss. Determination 64. On the basis of the available information, the Panel determines that the FSP is liable to indemnify the Applicants for their loss. 65. The FSP is also to pay interest at the statutory rate on any cash advances made by the Applicants towards the repair work from 12 January 2012 (being the date of the FSP‟s notice of response to the Service ) or the date of payment (if it occurred after 12 January 2012) until the date on which the Applicants are reimbursed for their expenses.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.