Storm damage to water tank and stand claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2011-06-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$4,841
SourceAFCA PDF

Summary

The applicant claimed for tank and stand damage after a claimed storm, which the FSP rejected as not caused by a listed event. AFCA accepted the assessor's finding that foundation pads subsided and determined the FSP is entitled to refuse liability.

The policy is a listed events policy requiring damage from storm, wind or rain within 72 hours, and the weather data and assessor evidence do not show such an event.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 226228 Determination Page 1 of 5 Case number: 226228 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 20 June 2011 Background 1. This Determination follows the Applicant’s request for a review of a Recommendation issued by the Financial Ombudsman Service (FOS). 2. The Applicant held a listed event Building insurance policy with the Financial Services Provider (FSP). 3. On or about 4 August 2010, the Applicant lodged a claim through his broker, for damage sustained to his property on 25 July 2010. 4. The property claim report provides the following description of loss: “storm damage to tank and stand, spouting pulled from house as a result of tank stand collapsing”. 5. The FSP following investigation of the claim rejected the claim on the grounds that it was not covered by the terms of the policy. The FSP as part of its Internal Dispute Resolution (IDR) procedure provided a response to the Applicant on 5 January 2011, to the effect that based on the two independent assessments conducted into the claim that the damage was not the result of any listed event which is covered under the policy. 6. The Applicant has disputed the decision and maintains that the damage was due to storm/strong winds. Summary of Applicant’s Position 7. Essentially, it is the Applicant’s position that the damage sustained to the house and tanks was a result of a storm/strong winds, causing the tank to move whilst empty. The Applicant was unaware that the tank had been moved during storms/strong winds and when the tank filled following heavy rain shortly after the storm this caused the tank to slide further from the tank stand pulling the associated plumbing off the fascia of the house. As the tank slid, it caused damage to a second tank which was not on the tank stand. Determination Case No: 226228 Determination Page 2 of 5 8. In the Ap plicant’s initial referral , the Applicant claimed that the tank stand had supported the full tank for the 10 years that he had been in the house and for also 10 years prior to that. 9. The Applicant maintains that when the initial assessor attended the premises, he asked no questions as to the claim, but in an email he responded to five points that were raised by the assessor. 10. The Applicant maintains that the tank was moved sometime prior to 25 July 2010, although, he could not provide the date of the particular storm. 11. In support of his request for a review of the Recommendation, the Applicant has provided a signed letter addressed to FOS from a contractor. According to the contractor, he had performed work on the tank stand approximately three years ago and did not observe any damage to the tank stand on his inspection of the stand. He believed that the tank was put off centre by the severe wind associated with a storm or storms prior to the loss and slid off the tank stand after rain had obviously increased the weight and load on the tank stand. Summary of FSP’s Position 12. The FSP maintains that the policy is a listed events policy and that the damage sustained was not as a result of a storm or strong winds. The FSP maintains that the Applicant has failed to establish on the balance of probabilities that he has suffered a loss caused by risk insured against and further, that the evidence provided by the two assessments obtained by the FSP confirm that no listed event has occurred. The FSP submitted a report from J Builder who inspected the insured property on 9 August 2010. J Builder reported that: “CLAIMED INCIDENT: Insured advised on 25/7/10 water tank stand and plumbing was damaged during storm … BUILDERS ASSESSMENT OF CAUSE: Property maintenance due to in adequate support or construction… see Comments RESULTANT DAMAGE: Timber tank stand bearers have snapped and are broken. Some cosmetic denting to tanks exist… … COMMENTS: It is apparent tank stand had been unable to support full tank, so is unlikely to be fit for the purpose it has been used for at property. Alternatively, surface water may have weakened soil beneath tank- again indicative that a more stable structure is required to accommodate a tank of this capacity approx 10,000 litres. Tank has evidence of rust, but still apparently capable of holding water. The smaller 5,000lt tank (approx) sits on the ground on an iron base.” The FSP also submitted a report by C Assessor who inspected the insured property on 15 September 2010. According to C: “Extent o f Loss/Damage: Case No: 226228 Determination Page 3 of 5 … The tank stand had clearly collapsed under the weight of the tank (approx 2.16 tonnes) however there were no signs of any damage to the tank itself, suggesting the proximate cause. A close inspection of the foundation pads … revealed two of the pads on the northern side of the stand had cracked and partially collapsed however only slightly (less than 25mm). An inspection of the timber joists which supported the tank base revealed they had been installed in an unconventional manner; they were canter-levering over the steel base a short distance. The joists on either side had snapped on the same or corresponding side of the stand (and cracked/subsided pads). The joists themselves were of 100mm by 100mm treated pine construction. They showed no signs of any rot or deterioration rather they merely appear to have snapped under the weight of the tank and its uneven loading. … As insurers are no doubt aware Victoria has received an unusually high seasonal winter rain fall,… the winter of 2010 has been the wettest for over 10 years… A search of the Bureau of Meteorology web site was conducted (copy attached) which confirms there were no localised wind events which may have also contributed to the loss. Likewise the heaviest rainfall was 11 days earlier. There was minimal rainfall on the evening of the loss (0.2mm) which is not considered sufficient to call a storm event. Our view is that the softened ground from a wetter than average winter has caused the concrete pads on which the stand is located to partially subside and collapse albeit slightly. This shift in weight has in our opinion caused the timber joists to break which in turn contributed to failure of the stand itself.” 13. In response to the request for a review of the Recommendation, the FSP maintains that the Applicant has provided no information to support his dispute. Insofar as the statement from the contractor, the FSP maintains it has no letter head and offers no evidence to support the claimant’s allegation. 14. The FSP relies upon the information presented and maintains:  There is no evidence to suggest the tank was off centre.  The Bureau Of Meteorology (BOM) website confirms that there were no wind events which could have contributed to the loss.  There was no evidence of storm or wind within 72 hours of discovering the loss.  Heaviest rain fall was 11 days earlier and only recorded 0.2mm, which does not constitute storm damage.  There is no evidence provided by the insured that a listed event has occurred. Issue Whether the FSP is entitled to deny the Applicant’s claim for storm damage to tanks, tank stand, spouting and plumbing. Case No: 226228 Determination Page 4 of 5 Reasons for Decision 15. There has been a full exchange of the material between the parties and I am satisfied that each party had the opportunity of addressing the issues that have been raised in the material exchanged. 16. There is no dispute that the Applicant had received a copy of the policy documentation, nor is it in dispute that the Applicant was aware of the extent of cover. 17. There is no dispute that the Applicant has suffered damage as a result of the movement of the water tank. There is also no dispute that the Applicant has provided a reasonable quotation with respect to the cost of replacing the tank of $4,841.43. 18. The policy documentation clearly establishes the policy as a listed events policy. As indicated in the Recommendation, pages 21 -24 of the Product Disclosure Statement (PDS), headed section “1 – building and contents – listed events cover” enumerates the events insured under the policy. In this claim the relevant events are as follows: Storm, rainwater, hail or wind. ... Landslide of subsidence. However, the cover only applies if the loss or damage occurs within 72 hours of, and as a direct result of, one of the following listed events:  Storm, tsunami, rainwater, hail, snow and or wind.” 19. In order to come within the terms of the policy, it is therefore necessary for the Applicant to establish on the balance of probabilities that the events that have caused the damage involve either a storm, rainwater, hail or wind or in the event of landslide or subsidence and that this occurred within 72 hours of and as a direct result of storm, rainwater or wind. 20. I have carefully read the material exchanged and in particular the builder and assessor ’ s reports provided by the FSP and contractor ’ s report provided by the Applicant. I note that whilst the contractor confirmed that he repaired the tank stand in August 2007 and installed concrete pads for each of the four legs of the tank stand which were laser levelled, he has not commented on the findings in the asses sor’s report of September 2010, that two of the concrete pads had partially collapsed. 21. I have also considered the BOM July 2010 daily weather observations and note there was no storm activity at the Applicant’s property or in the vicinity on either 25 July 2010, or in the 72 hours beforehand. It appears that there may have Case No: 226228 Determination Page 5 of 5 been a storm on or about 14 July 2010, when there were wind gusts of up to 51km per hour and 25.4mm of rain. 22. Neither the builder’s report , nor the assessor’s report provided by the FSP supports the theory that the tank had moved due to strong wind or storm. In fact the asse ssor’s report which is a comprehensive and detailed report of his findings supports the view that the damage occurred when the foundation pads to the tank cracked and subsided causing the uneven distribution of weight from the tank and ultimate collapse of the tank stand. 23. In my view, having considered the information exchanged I accept the findings of the assessor and accept that there is no evidence of any obvious storm damage having occurred to the tank or stands. There is no evidence that the subsidence of the tank was due to storm activity, nor is there any evidence to support a finding that the tank stand had moved due to strong winds or severe storm within the 72 hours of the event. 24. The Applicant has the onus of establishing on the balance of probabilities a claim that falls within the terms of the policy and in this case a claim that falls within one of the listed events. I am persuaded by the assessor’s report to the view that the damage was most likely caused as a result of the cracking and subsidence of the foundation pads, an event that does not fall within the terms of the policy. Determination 25. I determine that the Applicant has not meet the onus on him to establish on the balance of probabilities a claim that falls within the terms of the policy. Accordingly, I determine and that the FSP is entitled to refuse liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.