Denial of hail and storm damage claim for motel roof and interior
Summary
The insurer declined a storm and hail claim for a motel's roof and interior, citing maintenance and wear and tear. AFCA upheld the decline for the main building but ordered cover for the Building 2 roof tiles, unit 18 interior and some Building 3 tiles, with the scope to be established.
The applicant must first establish a covered loss, and the storm-created opening and maintenance exclusions apply only where the damage was not caused by a covered event.
Issues
- Claim denial primary · upheld
“The FSP is obliged to cover the Applicants for the costs associated with replacing the damaged roof tiles on Building 2, as well as the internal moisture damage assessed in unit 18.”
- Claim amount dispute secondary · unclear
“There is a significant difference between the quantity of damaged tiles referred to by both experts; the FSP is to establish the scope of damage.”
Subjects and remedies
small businesspay claimreassess claim
Text of the determination
Case No: 226149 Determination Page 1 of 10
Case number: 226149
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
31 March 2011
Background
1. The Applicants took out a Building Property Insurance policy on 29 May 2009
covering the insured property for damage resulting from defined events up to
$1,250,000 and accidental damage up to $100,000.
2. The Applicants lodged a claim against the said policy for damage they claimed
to have occurred as a result of a severe hail storm which took place on or about
9 November 2009.
3. The FSP after completing its assessment of the loss concluded that the
damage was not as a result of a defined event and as such was excluded from
cover in line with the terms of the policy.
4. The Applicants remain dissatisfied with the outcome of the claim and believe
the damage claimed is as a result of an insured event. As such the Applicants
are seeking indemnity for the loss for an estimated cost of repairs for $13,700.
Summary of Applicant’s Position
5. The Applicants maintain that they clearly remember the date of loss. When
travelling from Gunnedah to the insured property they noticed from about 20km
out that all the paddocks looked like snow fields, as was the case with the
insured property.
6. The Applicants have submitted a clipping from the local new spaper “C Times”,
which covered the intensity of the storm. Further that the Volunteer Rescue
Squad (VRS) received many calls from residents regarding property damage,
flooding and blocking up of gutters in the area.
7. The roof of the property and surrounding areas were snow white as a result of
being covered by a layer of thick hail. This in turn prevented the rainwater to
run off the roof and resulted in weight stressing the roof and blocking of the roof
valleys.
Determination
Case No: 226149 Determination Page 2 of 10
8. The Applicants maintain that the kitchen was completely flooded with water
entering through the ceiling which also resulted in the cracking of the gyprock
ceiling as well as water flowing down the sides of the walls.
9. Water had also come down into the hallway and lounge room areas through the
electrical (light) fittings. There were two storms on the date of loss and both
contributed to the resultant damage to the insured property.
10. The Applicants maintain that they had never seen such an i ntense and heavy
storm before and the sheer volume of rain and hail was incredible. Further
damage in the form of discolouration of the roof tiles from rooms 1 to 17 has
also occurred which the roof tiler defined as “ ammonia damage ” from the hail.
11. Unit 18 had also suffered water damage as a consequence of rain entering the
ceiling and causing water stains and mildew in the room.
12. At the time of lodging the claim the FSP’s representative had assured the
Applicants that the loss was claimable and as such quotes from a professional
painter and a tiler were obtained.
13. The FSP also made the commitment to send out a builder to assess the
damage which eventually in the Applicants’ opinion turned out to be an
assessor working for the FSP and a quote was never provided to the
Applicants.
14. The builder “K” appointed by the FSP did not seem to be a pleasant man and
upon being offered a cup of coffee accused the Applicants of trying to bribe
him. K went around the property and took pictures of the damage however
failed to give the Applicants any feedback in this regard.
15. Further that K has made reference to leaves in the roof gutters however as it
was nine months after the date of loss, the Applicants fail to see the relevance
of this and believe it to be unreasonable to take this into consideration. The
Applicants maintain that they had employed a person to regularly clean the
gutters and premises.
16. There were no cracks in the kitchen ceiling and room 18 was in prefect
condition prior to the storms. Hailstones remained present in the gutters for
three days after the storms, also that they had weathered storms prior to the
date of loss and never had any such problems.
17. The damage is as a result of the large volume of hail clogging the gutters which
eventually caused the gutters to overflow with rain water. In respect to tree
branches breaking roof tiles the Applicants maintain that this is not the case as
there were no branches remotely big enough to cause such damage.
18. The Applicants are seeking indemnity for the costs associated with the repair
and painting of the kitchen, hallway and lounge room area. Further the repairs
to the tiled roof in the reception area and units in addition to the repair or
replacement of the fading roof tiles from rooms 1 to 17. The Applicants are not
claiming for repair to the dip in the roof in rooms six and seven.
Case No: 226149 Determination Page 3 of 10
Summary of FSP’s Position
19. The FSP relies on the following policy provisions:
“Page 12 – Part B - Business Insurance Policy Terms and Conditions
1 – BUSINESS INSURANCE
Section A – Business Property Cover
Defined Events Cover
We cover you for loss or damage at the Business Premises caused by the following
Defined Events:
7 . storm and rainwater, but we will not pay for loss or damage:
f . caused by water seeping or percolating through walls, floors or roofs; or
g . caused by water that does not enter the Building through an opening made by the
storm.
…
Page 15 – What you are not covered for
1. We will not pay for loss or damage caused by:
h. wear, tear, fading or gradual deterioration; ”
20. The Applicants contacted the FSP and lodged a claim for loss as a result of a
severe storm consisting of violent wind, heavy rain, hailstones, lightning and
thunder on or about 9 November 2009.
21. The Bureau of Meteorology website confirms thunderstorms in the area on 6
November 2009 as well as 12 and 13 November 2009. There is no dispute that
a severe storm did pass over the area in question on the date of loss.
22. The Applicants bear the onus to establish that they have suffered a loss
covered under the terms and conditions of the policy.
23. Even if the matter was to be considered under the defined event “B ursting,
leaking, discharging or overflowing a fixed apparatus, the cover excludes the
cost of replacing the fixed apparatus. The FSP maintains that this is not an
alteration to the original decision however is to highlight that this would not fall
within cover provided by the policy.
24. Under the defined event “Storm and rainwater” the cover excludes loss or
damage when there is no storm created opening and or by water seeping or
percolating through walls, floors and roofs.
25. The terms of the policy exclude from cover loss or damage resulting from wear,
tear, fading and gradual deterioration.
26. The building expert after completing his assessment of the roof void above the
kitchen advised that there was extensive damage to the sarking membrane
beneath the roof tiles due to wear, tear and previous activities of tradesman.
Further there has also been water spillage into this area from the valley gutter
above.
Case No: 226149 Determination Page 4 of 10
27. There is a copper refrigeration supply line installed across the ceiling joints,
which due to a lack of lagging on the pipe, had frosted over and was constantly
dripping moisture onto the ceiling lining.
28. As a result of the external roof inspection above the kitchen area, the expert
noted the valley gutter contained considerable leaf material which had caused a
blockage where the valley gutter adjoins the metal roof below.
29. The corrugated metal roof sheeting at the top of the edges had been turned
down instead of up. The expert considers this has allowed wind driven rain to
blow over the top edge of the roof sheeting and enter the roof void.
30. Further that on inspection of the tiled roof and having lifted the tiles above the
kitchen area, the top of the sarking contained a moisture related track where
moisture had been running down the surface of the material. The moisture
according to the building expert had entered at the ridge and got into the roof
void where the sarking material had been torn.
31. The ridge cap pointing was in a deteriorated condition which has occurred over
a prolonged period of time and requires replacement in order to repel moisture
effectively.
32. The roof void above the laundry and adjacent to unit 7 revealed that the
strutting beams beneath the under-purlins to the roof have distorted and
caused the roof to sag. The beams had twisted sideways as a consequence of
defective installation as no side support has been installed. This in the expert ’ s
opinion was not storm related damage rather as a consequence of defective
construction methods.
33. The FSP maintains that the roof had not been damaged by storm and the
damage is as a result of maintenance related issues which are the
responsibility of the Applicants. The entire claim is therefore excluded from
cover in line with the provision of the policy excluding water damage that has
not entered through an opening created by the storm.
Issue
34. Whether the FSP is entitled to decline the Applicants’ claim in its entirety in line
with the terms of the Policy.
Reasons for Decision
35. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
I have reviewed the submissions of the parties in relation to the terms and conditions
of the policy.
Case No: 226149 Determination Page 5 of 10
36. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
37. It is not in disputed that on or about 9 November 2009 the insured property was
exposed to a severe thunderstorm consisting of violent wind, heavy rain,
hailstones, lightning and thunder.
38. The Applicants claim that the insured property has suffered extensive damage
as a consequence of the severe hail storm and as such the FSP is obliged to
cover them for the costs of repairs.
39. Further that the extent of the damaged claimed is limited to:
Repair and repainting of the kitchen, hallway and lounge room areas.
Repair of the roof area over the main reception and units.
Replacement of the faded roof tiles on over units 1 to 17.
40. The Applicants maintain that they are not seeking indemnity for the dip in the
roof over units six and seven.
41. The FSP having appointed an expert to assess the insured property and
damage claimed has concluded that the damage is as a result of maintenance
related issues and is not as a consequence of any of the listed defined events.
42. The FSP maintains that there are no storm created openings through which the
moisture has entered the property and caused the claimed damage. Further
that the terms of the policy do not cover damage which occurs as a
consequence of maintenance related issue and or wear, tear and gradual
deterioration.
43. It is established law that in order to seek indemnity under the provisions of the
policy the onus rests on the Applicant to first establish, on the balance of
probabilities the loss claimed is covered by the terms of the policy. Once this
has been established, the onus shifts to the FSP to establish, that it is not
responsible to indemnify the Applicant for the loss because of or in line with a
provision or exclusion present in the terms of the policy.
44. Having reviewed the evidence made available by the parties I note that the
damage in dispute is spread over three main areas and in an effort to simplify
this determination I will address each area in dispute individually.
45. Further I am of the opinion that it is necessary for the purpose of this
determination to keep in mind that it was not until slightly over eight months
from the date of loss that the FSP’s expert was appointed to carry out his
assessment of the extent and cause for the damage.
Case No: 226149 Determination Page 6 of 10
Main Building (Kitchen, hallway and lounge room – internal and external
damage)
46. The FSP’s appointed expert notes in his report:
“ Page 3-4
I proceeded to inspect the roof void above the kitchen and hallway where the
water has been previously entering. The area above the damaged kitchen ceiling
lining revealed that the sarking membrane beneath the roof tiles has suffered
extensive damage due to wear and tear and the activity of tradesmen. This
includes a tear to the material of 1m in length and 100mm diameter puncture
where a roof batten has been pushed through the material.
The areas where the sarking material has been damaged correspond to the
moisture related damage to the ceilings below in the hallway and kitchen. There
has been spillage from the valley gutter above the damaged kitchen ceiling
lining.
…
I proceeded to inspect the terracotta tiles to the roof and observed that when
they were lifted in the area above the damaged kitchen ceiling the top of the
sarking contained a moisture related track where the moisture had been running
down the surface of the material. The moisture had entered at the ridge and
entered the roof void where the sarking material had been torn.
The ridge cap pointing has suffered degradation over a prolonged period of time
and now requires replacement in order to repel moisture effectively.
The terracotta tiles contained considerable leaf material to the grooves where the
tiles overlap. This has resulted in a constraint to the flow of water in the grooves
and caused the moisture to enter the void beneath the roof tiles and
subsequently enter the roof void where the sarking material is defective.
…
Page 5 - SUMMARY
I am of the opinion that the cause of the damage to the kitchen and hallway
ceilings in the main Administration building is due to the degradation of the ridge
cap pointing combined with degraded sarking and debris clogged tile grooves. In
addition to this damage the failure to remove leaf debris from the valley gutters
has caused water to repeatedly overflow into the roof void above the kitchen …
Therefore I consider this to be a maintenance related issue. ”
47. The Applicants’ appointed expert “J” in his report and quote states:
“ MOTEL UNITS 18 TO 22 AND RECEPTION/RESTERAUNT – replace 16 storm
damaged terracotta roof tiles. Rebed and point 195 Terracotta Ridge Caps.
Rebed and point 161 Terracotta gable end tiles. ”
48. I am mindful that J considers the roof tiles had been damaged from the hail
however he has failed to expand on the prior condition of the tiles and the
nature of the damage claimed to have taken place. On examination of the
photographs submitted for consideration, I am unable to identify damage to the
extent and quoted by J.
Case No: 226149 Determination Page 7 of 10
49. Further, his comments confirm the deteriorated condition of the ridge capping
and the necessity to re-bed and point the gable end tiles. This supports the
FSP’s contention that the roof was in need of maintenance prior to the date of
loss and was not in a condition to repel moisture effectively.
50. There is clear evidence of a water related track where the moisture had been
running down the surface of the material. The moisture had been entering at
the ridge and proceeded to damage the ceilings in this building. As such there
is no substantiating evidence to establish the existence of a storm made
opening.
51. As such I am not convinced it has been established, that on the balance of
probabilities, the moisture has entered the insured building through an opening
created by the storm which is a pre-requisite of cover being provided under the
terms of the policy.
52. Further it is evident that the roof was in need of maintenance work and that the
water has damaged the kitchen, hallway and lounge room ceilings by leaking
through the pre- exiting damage/tears in the sarking membrane.
Building 2 – Containing Units 18 to 22
53. The FSP’s appointed expert notes in his report:
“ Page 3-4
I proceeded to inspect the motel unit block 2 containing units 18- 22…
Accessing the interior of unit 18, I observed that there has been moisture related
damage to a section of cornice situated on the northern wall of the motel
bedroom. …
An inspection of the roof void revealed that there is damage to the sarking
directly above the areas of stained ceiling and cornice. This consists of two areas
approximately 300mm x 400mm which have been cut by tradesmen accessing
the area and an area in the north-west corner measuring 1 meter x meter where
the sarking is torn due to wear and tear.
I proceeded to inspect the terracotta roof tiles where I observed that the area
above the damaged bedroom ceiling contained three broken tiles as well as
several dead limbs and excess leaf material.
The limbs have fallen from the Apple Box tree situated to the west of the
building. These limbs were dead prior to falling from the tree and should have
been pruned as a matter of health and safety in a public area.
…
Page 5 SUMMARY
I consider the damage to unit 18 ceiling has been caused by damage and
degradation to the sarking membrane combined with the 3 broken tiles which
have allowed initial moisture ingress. These tiles have been broken, in my
opinion, by dead limbs falling from a tree which has not been properly
maintained. ”
54. The Applicants’ appointed expert “J” in his report and quote states:
Case No: 226149 Determination Page 8 of 10
“ MOTEL UNITS 18 TO 22 AND RECEPTION/RESTERAUNT – replace 16 storm
damaged terracotta roof tiles. Rebed and point 195 Terracotta Ridge Caps.
Rebed and point 161 Terracotta gable end tiles.”
55. Having considered the evidence before me I am satisfied that the damage to
interior of unit 18 is as a result of an event covered by the terms of the policy. In
my opinion there are two possibilities for the damage to the roof tiles in this
area of the insured property. The damage may have occurred as suggested by
the expert, which is due to falling branches from the tree adjacent to the
building or alternatively was as a result of the severe hail storm.
56. Under any circumstance the damage would be covered by the insured events
“Storm and rain” and or “Impact by a falling tree or part of a tree”. I am not
convinced by the expert’s opinion in respect to the fallen branches being a
maintenance issue. He attended the insured property eight months after the
incident and as is not in a position to make such an inference with any
reasonable accuracy.
57. The experts have concluded that the ridge caps in this area of the insured
building were in a deteriorated condition and which occurred gradually over an
extended period of time.
58. Therefore having established that the roof tiles were damaged by an event
covered under the terms of the policy, the FSP is obliged to cover the resultant
loss in line with the terms of the policy.
Building 3 - Units 1 to 17
59. The FSP’s appointed expert in his report states:
“ Page 4
I proceeded to inspect the external roof area… however a complete inspection of
the building’s roof revealed approximately 40 tiles which have minor damage in
the form of chipped edges and 4 broken tiles which require replacement.
The broken edges of the chipped tiles revealed ingrained mould to the edges,
which I consider has occurred over a prolonged period of time.
The ridge capping to this roof has suffered degradation to the pointing which has
also occurred over a prolonged period of time and now requires replacement. …”
60. The Applicants’ appointed expert “J” in his report and quote states:
“MOTEL UNITS 1 TO 17 – To replace 92 hail damaged concrete tiles Rebed and
point 168 CONCRET ridge caps Rebed and point 230 gable end tile s.”
61. I am satisfied that the roof sagging issue is not as a result of an insured event
and is as a consequence of the building defect detailed in the report submitted
by the FSP’s appointed expert. I further note that the Applicants have confirmed
that indemnity for this portion of the loss has not been claimed.
Case No: 226149 Determination Page 9 of 10
62. The Applicants’ appointed expert has claimed that there are 92 hail damaged
roof tiles. Also that the ridge capping and gable end tiles need to be re-bed and
re-pointed.
63. The FSP’s appointed expert in respect to the roof tiles accepts that there are 40
tiles with minor damage and a further 4 broken tiles which require replacement,
however that the ingrained mould to the edges is indicative of the damage
being present for possibly two years and as such pre-dates the date of loss.
64. Having considered the evidence before me I am satisfied that there are a
significant number of damaged tiles in this area of the insured property. The
FSP’s appointed expert has made reference to mould on the tiles and that this
is indicative of the damage being old and not as a result of the storm event.
65. I note in the pictures that there is indeed the presence of mould on the roof tiles
however this is not limited to building 3 or to just broken tiles. Rather there is
mould on the roof tiles of all three buildings including the undamaged tiles. As
such in all probability the damage tiles had mould on them prior to being
damaged.
66. There is a significant difference between the quantity of damaged tiles referred
to by both of the experts and as such I am not in a position to clearly outline the
responsibility of the FSP in this regard.
67. However in line with what is considered fair in all circumstances the FSP is to
establish the scope of damage in this respect and cover the Applicants for the
cost of replacing the damaged tiles.
68. Further any cost of repairs associated with re-bedding and pointing of the ridge
capping are excluded from cover as it is clear the capping was in a poor state
of repair prior to the date of loss.
69. In respect to the Applicants’ belief that the FSP is obliged to cover them for
costs associated with the replacement of faded roof tiles over units 1 to 17, the
provisions of the policy clearly exclude from cover loss or damage as a result of
fading.
Determination
70. Accordingly, I determine that in line with the terms of the policy and having
considered the evidence made available by the parties to this dispute that:
The FSP is not obliged to cover the Applicants for the cost of repairs
associated with quoted internal and external repairs to the Main building.
The FSP is obliged to cover the Applicants for the costs associated with
replacing the damaged roof tiles on Building 2, as well as the internal
moisture damage assessed in unit 18.
Case No: 226149 Determination Page 10 of 10
The FSP upon satisfying itself of the number of damaged tiles requiring
replacement on the roof of Building 3 is required to cover the Applicants
for the cost of replacing the tiles.
The FSP in line with the terms of the policy is not obliged to provide
indemnity for costs associated with replacement of the alleged faded
tiles over units 1 to 17.