Text of the determination
Case No: 225330 Determination Page 1 of 12
Case number: 225330
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
31 March 2011
Background
1. The Applicants held a home building insurance policy with the Financial
Services Provider (FSP) from 14 June 2006.
2. On 25 June 2010 part of the western wall of the Applicants home collapsed
during a storm and strong winds. The collapsed wall fell into the Applicants‟
neighbour‟s yard damaging part of that property.
3. On 28 June 2010 the Applicants advised the FSP that the wall was dangerous
and required attention as soon as possible.
4. On 30 June 2010 the FSP‟s assessor attended the property. Because of
structural problems the assessor contacted the council. On 2 July 2010, the
council issued an Emergency Order which required the Applicants to move out
of the property until remedial works specified by the council were completed.
Make safe repairs were carried out which included propping the remaining wall,
utilising the neighbour‟s back yard.
5. The FSP arranged for an engineer to report on the likely causes for the wall
failure.
6. The FSP accepted that storm contributed to the cause of the fallen parapet
section of the wall and accepted liability for that part of the claim. The FSP
denied the cost of repairing the remainder of the wall on the ground that the
condition of the wall was not caused by an insured event.
7. The FSP accepted the costs for temporary accommodation arranged for the
Applicants, during investigation of the claim.
8. On 22 October 2010 the FSP informed the Applicants that it would cover the
cost of repairs to the top section of the wall and offered payment in the sum of
$6,000 to them. Their claim for the remainder of the wall was denied. The FSP
determined that the remainder of the wall had been damaged by long term
corrosion and failure of cavity wall ties with the outward rotation of the wall
having occurred over a long period of time. As the damage was not caused by
an insured event, the Applicants were responsible for rectifying that damage.
The Applicants were advised that the FSP would cease payment of temporary
accommodation benefits from 29 October 2010.
Determination
Case No: 225330 Determination Page 2 of 12
9. Following further investigation, the FSP obtained quotations for (a) repairing the
top section of the wall and (b) for the entire wall, from two contractors as
follows:
Collapsed section of wall Entire wall
4D $11,825 4D $116,391
TH $16,200 TH $93,532
10. The FSP offered settlement of the claim as follows:
Top section of wall $11,825
50% of load bearing wall $46,766
50% of three months rental costs for the estimated period for
completion of the repairs. $ 4,159
$62,750
11. The offer of $4,159 for three months temporary rental accommodation is based
on 50% of the average comparable rental for the estimated repair period. It is
additional to the emergency accommodation costs provided until 31 December
2010.
12. The Applicants claim they are entitled to payment for the cost of repairing the
entire wall including the collapsed section plus any additional costs required to
comply with government building regulations which may apply.
13. The Applicants have further claimed for temporary accommodation costs until
completion of the work to repair the wall.
14. The Applicants seek compensation for delay, stress and inconvenience
suffered by them caused by the FSP ‟ s management of the claim.
Summary of Applicant’s Position
Wall damage
15. The damage occurred on 25 June 2010. The date is inconsistent with the
engineer‟s report which refers to the date of the damage being 30 June – 1 July
2010. The damage occurred to the western wall of their living room which is
inconsistent with the engineer‟s report which refers to the living room east wall.
16. The damage was initially reported to the FSP o n 25 June and not 28 June as
noted by the FSP.
Case No: 225330 Determination Page 3 of 12
17. As there is a significant difference between the quotes obtained by the FSP,
they request a breakdown of the quote on which the FSP based its offer.
18. They seek clarification as to whether the quotes include extra costs which may
be required to comply with any local council or government authority and costs
of demolition and removal of debris.
19. They contend that they were not aware of and a reasonable person could not
be expected to be aware of the defect or imperfection of the property. A
reasonable person could not be expected to have been aware of the corrosion
of the cavity wall ties. It is unreasonable to expect that they could have known
about any settlement as the cause was not apparent. They refer to the
engineer‟s report which did not find any conclusive cause for t he settlement of
the western wall.
20. The Applicants claim that pursuant to section 46 of the Insurance Contracts Act
1984 (the Act) the FSP is unable to rely on the exclusion clauses relating to
maintenance, wear and tear, structural defects or soil settleme nt. On the basis
that section 46 of the Act prohibits the FSP from relying on the exclusion
clauses, they contend that they are entitled to compensation for the entire wall
including the collapsed top section.
21. They note wind speed on 17 June 2010, a week before the loss, peaked at
93kmh and winds were measured in a westerly direction, which they consider
may have contributed to the collapse. Wind speeds were greater on 24 and 25
June 2010, being 61kmh and 65kmh, than the dates of 30 June and 1 July
relied on by the engineer.
Temporary accommodation expenses
22. T he damage was caused by the insured event “storm”. As such, they require
payment for temporary accommodation expenses for the period the building is
being repaired. Alternatively the claim should be co nsidered on compassionate
grounds as they are unable to find a place to move into and the property is
uninhabitable.
23. They rely on section 13 of the Act “utmost good faith” which they say would
require the FSP to continue payment of their accommodation.
Compensation for delay, stress and inconvenience
24. The FSP has not effectively managed the claim, causing delay, stress and
inconvenience to them. They request the maximum amount of compensation
that the Financial Ombudsman Service FOS can award for non-financial loss
such as delay, stress and inconvenience, plus interest pursuant to Section 57
of the Insurance Contracts Act 1984.
Case No: 225330 Determination Page 4 of 12
Further Submission
25. By way of further submission the Applicants through their legal advisors have
confirmed that the Applicants have already received the sum of $58,591 in
compensation for the costs of repairing the wall. In the event that FOS finds
that only 50% of the cost of the walls should be compensated , the amount
should be calculated on quotes based from the same company. The FSP in
making its offer to settle the claim has relied on the lowest of the quotes by
mixing quotes from two different companies. Calculating the loss based on
quotes from the one company would mean if the quotes from 4D are relied
upon that the Applicants are entitled to an additional amount of $11,429.50,
whilst if the quotes from “TH” are relied upon the Applicant would be entitled to
additional amount of $4,375.
Summary of FSP’s Position
Collapsed section of wall
26. Quotes were obtained from two contractors for the collapsed section of the wall.
The quotes were genuine and could have been actioned within 21 and 20 days
of the quotes for completion of the scope of works. As such no explanation for
the quoted amount is required.
27. The contractor 4D quote falls within the range acceptable to the Applicants. As
it has accepted this amount, there is no dispute concerning this settlement
amount.
28. It submits there are multiple competing causes for the collapsed wall. As such it
has been prejudiced by the wear and tea r and corrosion of the wall and would
be entitled to reduce or refuse to pay the claim for the collapsed section of the
wall.
29. As the wall has collapsed during a storm, it has offered settlement based on a
genuine quote without applying a reduction due to the prejudice suffered.
Entire load bearing wall
30. The Applicants have failed to establish that the damage to the load bearing wall
was a result of an insured event. As such, establishing whether the neighbour‟s
extension contributed to the damage is not relevant to the dispute.
31. It relies on the engineer‟s report commissioned by it. The report concludes the
damage to the load bearing wall appears to be long term and unrelated to the
insured event. In the absence of reports to the contrary it is entitled to rely on
that report.
32. As the damage to the load bearing wall was not covered by the policy, 50%
settlement of the cost to repair that wall more than fulfils its obligations.
Case No: 225330 Determination Page 5 of 12
33. The policy terms are clear and unambiguous in that the policy specifically
excludes damage or loss caused by, arising from or involving soil movement or
settlement. Whilst the Applicant may have not been aware of the deterioration
of the wall ties there is no evidence that the damage is a result of an insured
event as defined by the policy and the policy clearly states that loss, damage,
cost or liability caused by or arising or involving “wear and tear, rust,
deterioration or corrosion ” , is specifically excluded.
34. In relation the allegation that damage was a result of strong winds the FSP
maintains the wind gust recorder on 30 June 2010 and 1 July 2010 were well
below the load required to cause a collapse, further the wind gusts where
recorded as travelling in a northerly direction which is parallel to the collapsed
wall which would have imposed even less loads than if the gusts where
travelling perpendicular to the wall.
35. The FSP concluded that whilst the strong winds may have precipitated the
collapse, the cause of the wall collapse is attributable to the complete corrosion
of the wall ties combined with the outward rotation of the wall which had
occurred over a long period of time. In the absence of contradictory expert
reports the FSP maintains that it is entitled to refuse the claim and therefore its
offer of 50% settlement of repair costs of the load bearing wall as taken from
the “T H ” quote fulfils its obligations under the terms of the policy.
Temporary accommodation
36. The council Emergency Order was issued in response to damage posed by the
“ dilapidated western external wall” . As it has been established that the damage
causing the wall to be unsafe was not related to an insured event, it is not
obligated to provide temporary emergency housing.
37. Despite the damage rendering the house unliveable being due to an uninsured
event, the FSP extended payment of temporary accommodation to 31
December 2010 and has offered the sum of $4,159 being 50% of the cost of
average comparable rental accommodation in the Applicants ‟ area to cover the
cost of temporary accommodation whilst the property is repaired.
38. As it is not obligated under the policy to offer any temporary accommodation, it
has acted in a more than a fair and reasonable manner and is not required to
offer any additional sum.
Compensation for stress
39. It refutes the claim was mishandled. Immediately after it was notified the house
was unsafe, emergency temporary housing was secured. Further costs were
covered while the cause and extent of the damage was ascertained.
40. While there is no evidence to show the load bearing wall was damaged by an
insured event, it offered a 50% settlement in an attempt to be fair and
reasonable.
Case No: 225330 Determination Page 6 of 12
41. Payment of a 50% settlement does not constitute grounds for further payments
in response to stress.
42. The storm may have highlighted the damage already in existence to the
western wall. However the damage did not occur as a result of a single storm
event but from wear, tear, rust, corrosion, soil movement and failure to properly
maintain and repair the property.
43. The FSP relies on the following policy provisions:
“ Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
…
No
Damage or loss caused by water entering or seeping into or otherwise entering your
building due to:
a defect or fault in the design, structure or construction of your building where you
could reasonably be expected to be aware of the defect or fault.
…
What we do not cover
- General exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
an unreasonable failure to properly maintain or repair your building
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical, electronic or other failure or breakdown, other than
as provided for under „ Damage to electric motors‟ on page 22
…
s oil movement or settlement.”
Issues
44. Whether the FSP is liable for the cost of repairing the entire wall including the
collapsed section.
45. Whether the FSP is liable for additional payment for temporary accommodation
costs in excess of $4,159.
46. Whether the FSP is liable to pay compensation for delay, stress and
inconvenience.
47. Whether the offer to settle the dispute is reasonable.
Case No: 225330 Determination Page 7 of 12
Reasons for Decision
48. There has been an exchange of material between the parties. Each party has
therefore had the opportunity to respond to the issues.
49. Prior to making my Determination of the issues I have read all the material
presented by the parties and carefully considered the arguments presented by
them.
50. The central issue in this matter is whether the cause for the damage to the wall
or any section of the wall falls within one of the events insured by the policy.
The Applicants‟ entitlement to temporary accommodation benefits rests on
whether the cause for the need to vacate their home falls within an event
insured by the policy.
Wall
51. According to the material, the damage which occurred on 25 June 2010 was
the partial collapse of the living room west wall, parapet and outer skin section.
It was later established that the remaining load bearing wall was unsafe.
52. The FSP commissioned an engineer to determine the likely causes for the
failure of the wall.
53. The engineer‟s report i s accompanied by a site plan identifying the location of
various stress points, a floor level survey, photographs, property services
information and a geotechnical investigation report.
54. The engineer found the wall, the subject of the claim, had an outward rotation
which had existed for a long period of time as evidenced by “ significant internal
repairs ”. In addition cavity wall ties had completely corroded. It follows that the
load bearing wall demonstrated serious and significant structural problems
unrelated to the storm/wind event on 25 June 2010.
55. The report concluded:
“In [engineer’s} opinion, the cause for the wall collapse is attributable to the
complete corrosion and failure of the cavity wall ties combined with the outward
rotation of the subject wall, both of which have occurred over a long period of
time.”
56. I am mindful of the Applicants ‟ remarks that the engineer‟s reliance on wind
speeds on 30 June and 1 July are in error as the damage occurred on 25 June
2010. Nevertheless, the FSP accepted wind speeds contributed to the partial
collapse of the wall, I do not consider the Applicants were prejudiced by the
dates and wind speeds referred to by the engineer.
57. I have also been provided with a report commissioned by the Applicants from a
property maintenance contractor. The contractor attended the Applicants‟
property and a lso had the opportunity to review the engineer‟s report of 16
October 2010. The following are relevant observations made by the contractor
in his report of 18 November 2010:
Case No: 225330 Determination Page 8 of 12
It would be unreasonable to assume the owner of the property would be
able to see the brick ties as these are totally concealed within the wall
cavity.
It would be universally accepted that at the time the building was
constructed, in excess of 90 years ago, the building regulations were
vastly different to current building regulations. The building has stood the
test of time and any contention that the foundations do not comply with
current building regulations should not form part of any insurance liability.
The contractor stated:
“There is acknowledgement of footing rotation, coupled with the corrosion and
failure of the cavity wall ties. I believe that it would be totally unreasonable for
[Applicant] to believe that the insurance company is liable for the pulling down
and reinstatement of the entire wall. However I believe the offer of $6,000 to be
an unacceptable amount.”
58. No expert evidence has been presented which contradicts the findings in the
engineer‟s report. Moreover, the property maintenance contractor was of the
opinion that as a result of the failure of the cavity wall ties and rotation of the
wall, neither of which fall within the cover provided by the policy, the FSP
should not be held liable for rectifying the damage to the entire wall.
59. I am satisfied the information exchanged leads to the conclusion that the
condition of the load bearing wall was due to a number of factors including
outward rotation of the wall combined with failure of the cavity wall ties which
occurred over a long period of time.
Section 46 of the Insurance Contracts Act 1984
60. The Applicants have argued that section 46(2) of the Insurance Contracts Act
1984 applies and that the FSP should not be able to rely upon the exclusions
contained in the policy to refuse payment of the claim.
61. It is not in dispute that the cavity wall ties had deteriorated over a period of time
nor is it in dispute that the Applicants or a reasonable person in the Applicants ‟
circumstances would not have been aware that the ties had corroded.
62. Whether section 46 of the Insurance Contracts Act 1984 has application
depends on consideration of the relevant policy terms. For section 46 to apply it
is necessary to show that the relevant policy terms, that is the limitation or
exclusion, has the effect to limiting or excluding liability by reference to the
condition of a thing at a time before the contract was entered into. In this case
the exclusions do not refer to a point in time but refer to a number of conditions
including wear and tear, rust, deterioration or corrosion, soil movement or
settlement or an unreasonable failure to properly maintain or repair a building.
63. .The exclusion is not dependant and does not refer to a point in time prior to
commencement of the policy but over a period up to the time of the loss. In the
circumstances section 46 does not extend to cover the Applicants
circumstances.
Case No: 225330 Determination Page 9 of 12
Temporary accommodation costs
64. The FSP arranged for and paid the Applicants‟ accommodation for the period
during which the claim was being investigated. These costs have been paid up
to 31 December 2010. The FSP has also agreed to pay 50% of the cost of
temporary accommodation for the estimated period taken to complete the
works to rectify the wall.
65. The Applicants are now requesting that the FSP meet the full costs of their
temporary accommodation until the damage is repaired. The Applicants argue
that the damage was caused by storm and as such they are entitled to the
policy benefit.
66. Under the policy cover is provided for the cost of temporary accommodation
when the property is no longer habitable as a result of damage caused by an
insured event. Hence the policy will respond to the claim only when the home is
unable to be lived in as a result of an insured event.
67. The council Emergency Order issued on 2 July 2010 was in response to a
report p rovided by a consultant engineer “BCM” to the council. That report
stated:
“We consider that, at the time of the inspection, the remaining sections of the
west wall and the chimney, present a danger and has the potential to collapse in
either direction at any time causing extensive damage wherever it may fall.”
68. The council Emergency Order required the Applicants to leave the premises
and gave the reason why the Order was issued as:
“the dilapidated western external brick wall has collapsed’
69. The Order was cancelled by the council on 21 October 2010.
70. I am mindful of the FSP‟s assertion that the home is unable to be lived in as a
result of the council Emergency Order. However the Order has since been
lifted.
71. The repairs required to rectify the entire wall include insured damage being the
parapet wall and uninsured damage being the load bearing wall. It is apparent
that the works to rectify this damage are interdependent and inclusive.
72. Insofar as the FSP‟s offer with respect to the additional payment of temporar y
accommodation is concerned I accept that the offer made is reasonable in all of
the circumstances.
Consideration of FSP Offer
73. Having determined that the FSP ‟s argument that strong winds, whilst possibly
precipitating the collapse, were not the cause of the wall collapse, that being
attributable to corrosion and failure of the cavity wall over a long period of time,
it is necessary to consider whether the offer put by the FSP is reasonable in all
the circumstances.
Case No: 225330 Determination Page 10 of 12
74. The FSP has sought to settle the claim on the basis of 50% of the repair costs
of the load bearing wall based on the lower quotation obtained from “TH”. It has
agreed to pay for the costs of the collapsed section of the wall based on the
lower of the quotations from “4D”.
75. As I have indicated I believe that the repair of the wall including the insured
damage is interdependent and inclusive. In the circumstances I do not believe it
is appropriate to look at the quotations separately but believe the FSP should
accept e ither the quotation from “4D” or the quotation from “TH”.
76. I accept that the FSP is entitled to select the lower quotation subject to that
builder quoting on the basis that he was prepared to carry out the works quoted
and in a professional workman like manner. The evidence is that the
contractors were prepared to start this work.
77. “TH” has quoted the sum of $16,200 to cover the costs of repair of the
collapsed section of the wall and a further $93,532 to cover the costs of the
entire wall. Calculating 50% of the $93,532 equals an amount of $46,776.
78. Based on this calculation I believe it is fair and reasonable that the FSP pay the
Applicants the total sum of $62,966 representing 50% costs of the repair of the
entire wall plus costs of the collapsed wall section. As the FSP has paid the
sum of $58,591 to the Applicants then the balance outstanding and payable to
the Applicants is $4,375.
79. The Applicants have also sought clarification as to whether the quote on which
the FSP has based its offer includes extra costs to comply with local council or
government authority regulations and in particular compliance with current code
for concrete strip footings. That is unclear from the information exchanged. I
believe the Applicants request is reasonable and having regard to what is fair
and reasonable in the circumstances I find that in the event that the Applicants
incur extra costs to comply with local government and government regulations
when rectifying the wall that the FSP contribute 50% to those extra costs,
subject to satisfactory evidence being submitted by the Applicants.
Compensation for delay stress and inconvenience.
80. The Applicants contend that the FSP did not manage the claim effectively,
causing delay, stress and inconvenience. The Applicants contend they
continued to live in unsafe conditions in the house for the first week since the
damage was reported.
81. The Terms of Reference provide under clause 9.3 that an Applicant may be
compensated for non financial loss where there has been an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or
interference with the Applicants ‟ expectation of enjoyment or piece of mind. The
maximum amount of compensation for non financial loss amounts to $3,000 per
claim made.
82. The information is that the Applicants ‟ relationship with their neighbours
become strained and that the female Applicant had sought advice and stress
Case No: 225330 Determination Page 11 of 12
leave. The Applicants have provided evidence to show that the load bearing
wall was considered unsafe on or about 30 June 2010 and the emergency
orders requiring the Applicants to vacate the premises were issued on 2 July
2010. Based on information provided it appears the Applicants were informed
that accommodation costs would be covered.
83. The evidence establishes that it took approximately three and a half months
before the FSP obtained an engineer‟s report and it was not until a letter dated
22 October 2010 that the Applicants were informed that the temporary
accommodation would cease on 29 October 2010.
84. The Applicants are a married couple with two children aged 3 and 13 years.
The female Applicant received Family Assistance payments and works part-
time as a sales assistant. The male Applicant is unemployed and cares for their
youngest child.
85. I have been provided with a copy of a medical certificate dated 5 January 2011
certifying that the medical practitioner has seen the female Applicant on
multiple occasions since July 2010 for anxiety. She was prescribed medication
to treat the condition. The medical practitioner noted the female Applicant
ascribed her symptoms to the damage to her house.
86. The evidence has established to my satisfaction that the bulk of the damage
being the load bearing wall was not covered by the policy, Nevertheless, it is
my opinion that with such serious damage to the house, a period of four months
to obtain expert evidence is unreasonable.
87. I am of the opinion that the ongoing nature of the issues during those four
months at least, contributed to strained relations with the next door neighbours
and added to the female Applicant‟s stress levels.
88. I am further of the opinion that to provide the Applicant with five days notice that
payment of their temporary accommodation costs would cease was
unreasonable and had the potential to place the Applicants in a serious
financial position further stressing the Applicants.
89. Whilst I accept the FSP has subsequently agreed to pay the temporary
accommodation costs through to 31 December 2010 in my opinion the FSP
should have been aware of the Applicants financial circumstances and should
have conducted the claim in such a manor that minimised the potential to add
to what was already a stressful situation.
90. I have taken into account the FSP‟s offer to pay for part of the uninsured
damage and additional accommodation costs. Nevertheless I am satisfied the
Applicants have suffered an unusual degree of inconvenience and delay
91. For these reasons, pursuant to clause 9.3 b) i), I consider the Applicants are
entitled to compensation in the sum of $1,500.
Case No: 225330 Determination Page 12 of 12
Determination
92. Based on the above analysis of the evidence I determine;
1. The FSP is liable to pay an additional sum of $4,375 in settlement of the
claim for damage sustained to the collapsed wall section and entire wall.
Should additional cost be incurred due to local government and
government regulations the FSP is to pay 50% of these costs.
2. The FSP is not liable to pay interest.
3. The FSP‟s offer to pay the sum of $4,159 representing 50% of an
additional three months rental costs is reasonable in the circumstances,
those costs being incurred during the period taken to rectify the damage.
4. Pursuant to clause 9.3 (b)(i) of the Terms of Reference the FSP is to pay
the Applicants the sum of $1,500 compensation.