Determination 224777

Earthquake damage claim denied as caused by differential settlement of footings

FirmFinancial Firm (Unknown - Insurer)
Decided2011-03-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for earthquake-related cracking to their home. The FSP accepted storm damage but denied the earthquake damage as caused by differential settlement. AFCA found two concurrent causes and ordered the FSP to pay 50% of the rectification cost.

Where a covered cause and an excluded cause operate consecutively as proximate causes, the effective or dominant cause test is applied, and the FSP was held liable for half the loss in what is fair in all the circumstances.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

224777 Determination Page 1 of 5 Case number: 224777 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 18 March 2011 Background 1. On 23 April 2010 the Applicants lodged a claim under their home insurance policy for damage to their home caused by storm and earthquake. 2. The Financial Services Provider (FSP) accepted the claim for damage caused by the storm, but denied the claim for damage caused by earthquake. The FSP considered the damage was caused by differential settlement of the footings due to seasonal changes and the earthquake highlighted a pre -existing problem of the house, which could not be attributed to the earthquake. Summary of Applicants ’ Position 3. There were two earthquakes and cracks appeared afterwards. 4. They have lived in the house for 19 years and during this time there has never been a „pre - existing‟ condition. 5. The house bore no evidence of „settlement‟. There has never been a problem with cracking or movement since they commenced living in the house. 6. During the time they have lived in the house they have experienced wet, dry, hot, cold and drought conditions. 7. The damage occurred within a few days of the earthquakes. As such they believe the earthquake had a significant effect in causing that damage. 8. The Applicants complained that the communications by the FSP during the claims process was appalling. Summary of FSP’s Position 9. An engineer was appointed to report on the cause of the damage. The engineer reported the damage was caused by differential settlement due to seasonal changes in moisture content of the foundation material. Determination 224777 Determination Page 2 of 5 10. The Applicants‟ home was located approximately 70 kilometres from the epicentre of the earthquakes. Earthquakes having an intensity of 2.9ML would not have caused structural damage and wo uld have a diminishing effect the further the distance from the epicentre. 11. The FSP relies on the following policy provisions: “When we will not pay a claim under Part A – Buildings and/or Contents … This policy does not cover loss, liability. Injury or damage: … 3. caused by or arising from soil movement including erosion, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an:  explosion;  earthquake; or  storm; 4. caused by or arising from shrinkage or expansion of earth or land; … 15. caused by or arising from settling, shrinkage or expansion in buildings foundations, pavements or walls. … Parts A and B When we will not pay a claim under this policy 1. This policy does not cover loss, liability, injury or damage; f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear;” Issues 12. Whether the damage was caused by differential settlement due to seasonal changes in moisture content of the foundation material, rather than by earthquake. Reasons for Decision 13. The FSP seeks to rely on clauses in the policy to deny the claim and therefore has the burden of establishing, on the balance of probabilities, that the terms of the relevant clauses apply to defeat the claim. 14. The FSP relies substantially on a report provided by an e ngineer commissioned by it to inspect the Applicants‟ property and determine the cause for the cracking. 224777 Determination Page 3 of 5 15. The engineer‟s report of 9 June 2010 provided the following relevant information:  The nearest earthquake which occurred near Lang Lang in the middle a nd late June 2009 occurred in the Korumburra area.  The earthquakes occurred in late August 2009 with a reading of ML 2.9 at the epicentre in the first earthquake and a reading of 2.4 ML for the second earthquake. Two aftershocks occurred in November with readings of ML 1.2 and ML 1.7.  Normally a reading of ML 5 is required to result in structural damage to a building.  The intensity of an earthquake diminishes the further the distance away from the epicentre. Lower readings would therefore have occurred in Melbourne.  The cracking and movement in the Applicants‟ home was typical of problems that can occur due to differential settlement of the footings.  Over recent years Melbourne has experienced drought conditions resulting in extremes occurring in seasonal c hanges in the moisture content of foundation material.  Stress concentrations can occur in plaster ceiling and wall linings due to differential settlement.  It was possible that additional minor stresses may have occurred in plaster ceiling and wall linings due to recent earthquakes and if the combination of stresses due to differential settlement of the footings and recent earthquakes become excessive then cracking can occur as reported.  The maximum reading for the earthquakes that occurred in Korumburra in the middle and late 2009 was 2.9ML. It would appear that the recent earthquakes highlighted a pre-existing problem that occurred in the house.  The original concrete paving was replaced about 12 years ago. It was possible the old sub-base was disturbed during this time and settlement occurred.  It is possible that additional minor stresses may have occurred in the concrete paving due to the recent earthquakes and if a combination of stresses due to settlement of the sub-base and the recent earthquakes become excessive, then cracking can occur as reported.  The maximum reading for the earthquakes that occurred in Korumburra in middle and late 2009 was 2.9ML. It would appear that the recent earthquakes highlighted a pre-existing problem that occurred in the house.  In the engineer‟s opinion the cracking of the plaster ceiling and wall linings was a result of differential settlement of the footings due to seasonal changes in moisture content of the foundation material related to the recent drought. 224777 Determination Page 4 of 5  The cracking of the paving was a result of settlement of the sub-base and these problems were not directly related to the earthquakes that occurred around middle and late 2009. The recent earthquakes have highlighted a pre-existing problem that occurred with the base. 16. It is clear that the engineer considered the damage was due to settlement of the foundation material on which the house and concrete paving was constructed. 17. However the Applicants state that they had lived in the house for about 19 years and during this time there was no evidence of cracking in the premises. They state that the damage appeared only after the earthquakes were felt by them. 18. It is public knowledge that the drought conditions to which the engineer referred in his report had existed for a long period of time resulting in reports of cracking damage to property in the Melbourne area. 19. The engineer noted that a combination of the stresses caused by differential settlement of the foundations and stresses arising from the earthquake can cause the damage claimed by the Applicants. 20. The Panel is thereof persuaded that the earthquake was a significant contributing factor in the clause for the damage. In these circumstances the Panel is of the opinion that the damage arose as a result of two proximate causes. 21. In circumstances where more than one concurrent cause has been established as responsible for the damage and rough equivalence exists as between the two potential causes and where one of these concurrent causes is covered by the policy and the other cause is excluded, it is established law that the clause excluding the cover is dominant and the claim fails. 22. However in the circumstances of this matter, the stresses caused from differential settlement of the foundations had been occurring over a period of time prior to the earthquakes, which means that one proximate cause was followed by another so they were consecutive. As Sinfein‟s Case (Full Court WA Supreme Court – 1996) so aptly paraphrased: “A proximate cause is not the first, or the last or the sole cause of the loss; it is the effective or dominant or operative cause”. 23. The policy provided cover for damage caused by earthquake. The policy also contains clauses which exclude cover when the damage is caused from soil movement. Because one proximate cause for the damage was the differential settlement of the foundations, the FSP has established that it should not be fully responsible for the claim. 24. Clause 8.2 of the FOS Terms of Reference provide as follows: 8.2 Dispute resolution criteria 224777 Determination Page 5 of 5 Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decision of FOS or a Predecessor Scheme (although FOS will not be bound by these). 25. Having regard to what is fair in all the circumstances, the Panel is of the opinion that the FSP‟s liability for the claim is 50%. 26. The Applicants‟ complaint in relation to the FSP‟s standard of communication during management of the claim has been referred to the Code Compliance Manager. Determination 27. Based on the foregoing analysis of the material, the Panel determines pursuant to clause 8.2 of the Terms of Reference that the FSP is liable for 50% of the cost to rectify the damage claimed. 28. As the FSP‟s liability is limited to a partial payment, the FSP may if it chooses, settle the claim by payment of cash to the Applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.