Home / Financial Firm (Unknown - Insurer) / Determination 224777
Determination 224777
Earthquake damage claim denied as caused by differential settlement of footings
Summary
The applicants claimed for earthquake-related cracking to their home. The FSP accepted storm damage but denied the earthquake damage as caused by differential settlement. AFCA found two concurrent causes and ordered the FSP to pay 50% of the rectification cost.
Where a covered cause and an excluded cause operate consecutively as proximate causes, the effective or dominant cause test is applied, and the FSP was held liable for half the loss in what is fair in all the circumstances.
Issues
- Claim denial primary · upheld
“the Panel determines that the FSP is liable for 50% of the cost to rectify the damage claimed.”
- Poor communication secondary · unclear
“The Applicants' complaint in relation to the FSP's standard of communication... has been referred to the Code Compliance Manager.”
Subjects and remedies
natural disasterpay claim
Text of the determination
224777 Determination Page 1 of 5
Case number: 224777
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
18 March 2011
Background
1. On 23 April 2010 the Applicants lodged a claim under their home insurance
policy for damage to their home caused by storm and earthquake.
2. The Financial Services Provider (FSP) accepted the claim for damage caused
by the storm, but denied the claim for damage caused by earthquake. The FSP
considered the damage was caused by differential settlement of the footings
due to seasonal changes and the earthquake highlighted a pre -existing
problem of the house, which could not be attributed to the earthquake.
Summary of Applicants ’ Position
3. There were two earthquakes and cracks appeared afterwards.
4. They have lived in the house for 19 years and during this time there has never
been a „pre - existing‟ condition.
5. The house bore no evidence of „settlement‟. There has never been a problem
with cracking or movement since they commenced living in the house.
6. During the time they have lived in the house they have experienced wet, dry,
hot, cold and drought conditions.
7. The damage occurred within a few days of the earthquakes. As such they
believe the earthquake had a significant effect in causing that damage.
8. The Applicants complained that the communications by the FSP during the
claims process was appalling.
Summary of FSP’s Position
9. An engineer was appointed to report on the cause of the damage. The
engineer reported the damage was caused by differential settlement due to
seasonal changes in moisture content of the foundation material.
Determination
224777 Determination Page 2 of 5
10. The Applicants‟ home was located approximately 70 kilometres from the
epicentre of the earthquakes. Earthquakes having an intensity of 2.9ML would
not have caused structural damage and wo uld have a diminishing effect the
further the distance from the epicentre.
11. The FSP relies on the following policy provisions:
“When we will not pay a claim under Part A – Buildings and/or Contents
…
This policy does not cover loss, liability. Injury or damage:
…
3. caused by or arising from soil movement including erosion, mudslide or
subsidence unless it is directly caused by and occurs within 72 hours of an:
explosion;
earthquake; or
storm;
4. caused by or arising from shrinkage or expansion of earth or land;
…
15. caused by or arising from settling, shrinkage or expansion in buildings
foundations, pavements or walls.
…
Parts A and B
When we will not pay a claim under this policy
1. This policy does not cover loss, liability, injury or damage;
f. Wear and tear
arising out of depreciation, gradual deterioration, wear and tear;”
Issues
12. Whether the damage was caused by differential settlement due to seasonal
changes in moisture content of the foundation material, rather than by
earthquake.
Reasons for Decision
13. The FSP seeks to rely on clauses in the policy to deny the claim and therefore
has the burden of establishing, on the balance of probabilities, that the terms of
the relevant clauses apply to defeat the claim.
14. The FSP relies substantially on a report provided by an e ngineer commissioned
by it to inspect the Applicants‟ property and determine the cause for the
cracking.
224777 Determination Page 3 of 5
15. The engineer‟s report of 9 June 2010 provided the following relevant
information:
The nearest earthquake which occurred near Lang Lang in the middle a nd
late June 2009 occurred in the Korumburra area.
The earthquakes occurred in late August 2009 with a reading of ML 2.9 at
the epicentre in the first earthquake and a reading of 2.4 ML for the
second earthquake. Two aftershocks occurred in November with readings
of ML 1.2 and ML 1.7.
Normally a reading of ML 5 is required to result in structural damage to a
building.
The intensity of an earthquake diminishes the further the distance away
from the epicentre. Lower readings would therefore have occurred in
Melbourne.
The cracking and movement in the Applicants‟ home was typical of
problems that can occur due to differential settlement of the footings.
Over recent years Melbourne has experienced drought conditions
resulting in extremes occurring in seasonal c hanges in the moisture
content of foundation material.
Stress concentrations can occur in plaster ceiling and wall linings due to
differential settlement.
It was possible that additional minor stresses may have occurred in
plaster ceiling and wall linings due to recent earthquakes and if the
combination of stresses due to differential settlement of the footings and
recent earthquakes become excessive then cracking can occur as
reported.
The maximum reading for the earthquakes that occurred in Korumburra in
the middle and late 2009 was 2.9ML. It would appear that the recent
earthquakes highlighted a pre-existing problem that occurred in the
house.
The original concrete paving was replaced about 12 years ago. It was
possible the old sub-base was disturbed during this time and settlement
occurred.
It is possible that additional minor stresses may have occurred in the
concrete paving due to the recent earthquakes and if a combination of
stresses due to settlement of the sub-base and the recent earthquakes
become excessive, then cracking can occur as reported.
The maximum reading for the earthquakes that occurred in Korumburra in
middle and late 2009 was 2.9ML. It would appear that the recent
earthquakes highlighted a pre-existing problem that occurred in the
house.
In the engineer‟s opinion the cracking of the plaster ceiling and wall linings
was a result of differential settlement of the footings due to seasonal
changes in moisture content of the foundation material related to the
recent drought.
224777 Determination Page 4 of 5
The cracking of the paving was a result of settlement of the sub-base and
these problems were not directly related to the earthquakes that occurred
around middle and late 2009. The recent earthquakes have highlighted a
pre-existing problem that occurred with the base.
16. It is clear that the engineer considered the damage was due to settlement of
the foundation material on which the house and concrete paving was
constructed.
17. However the Applicants state that they had lived in the house for about 19
years and during this time there was no evidence of cracking in the premises.
They state that the damage appeared only after the earthquakes were felt by
them.
18. It is public knowledge that the drought conditions to which the engineer referred
in his report had existed for a long period of time resulting in reports of cracking
damage to property in the Melbourne area.
19. The engineer noted that a combination of the stresses caused by differential
settlement of the foundations and stresses arising from the earthquake can
cause the damage claimed by the Applicants.
20. The Panel is thereof persuaded that the earthquake was a significant
contributing factor in the clause for the damage. In these circumstances the
Panel is of the opinion that the damage arose as a result of two proximate
causes.
21. In circumstances where more than one concurrent cause has been established
as responsible for the damage and rough equivalence exists as between the
two potential causes and where one of these concurrent causes is covered by
the policy and the other cause is excluded, it is established law that the clause
excluding the cover is dominant and the claim fails.
22. However in the circumstances of this matter, the stresses caused from
differential settlement of the foundations had been occurring over a period of
time prior to the earthquakes, which means that one proximate cause was
followed by another so they were consecutive. As Sinfein‟s Case (Full Court
WA Supreme Court – 1996) so aptly paraphrased: “A proximate cause is not
the first, or the last or the sole cause of the loss; it is the effective or dominant
or operative cause”.
23. The policy provided cover for damage caused by earthquake. The policy also
contains clauses which exclude cover when the damage is caused from soil
movement. Because one proximate cause for the damage was the differential
settlement of the foundations, the FSP has established that it should not be
fully responsible for the claim.
24. Clause 8.2 of the FOS Terms of Reference provide as follows:
8.2 Dispute resolution criteria
224777 Determination Page 5 of 5
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decision of FOS or a Predecessor Scheme (although
FOS will not be bound by these).
25. Having regard to what is fair in all the circumstances, the Panel is of the opinion
that the FSP‟s liability for the claim is 50%.
26. The Applicants‟ complaint in relation to the FSP‟s standard of communication
during management of the claim has been referred to the Code Compliance
Manager.
Determination
27. Based on the foregoing analysis of the material, the Panel determines pursuant
to clause 8.2 of the Terms of Reference that the FSP is liable for 50% of the
cost to rectify the damage claimed.
28. As the FSP‟s liability is limited to a partial payment, the FSP may if it chooses,
settle the claim by payment of cash to the Applicants.