Home / Financial Firm (Unknown - Insurer) / Determination 224499
Determination 224499
Concrete patio damage claim denied as faulty design and workmanship
Summary
The applicants claimed for a concrete patio that settled after heavy rain in January 2010, and the insurer denied it as caused by faulty design and workmanship. AFCA accepted the insurer's engineering evidence and found the damage was not covered.
The policy covers storm and rainwater but excludes loss caused by design fault, structural defect or faulty workmanship, and the rain only exacerbated a construction defect.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 224499 Determination Page 1 of 4
Case number: 224499
General Insurance - Domestic Insurance - Home Building - Denial of claim
8 June 2011
Background
1. The Applicants held a home building and contents policy with the Financial
Services Provider (FSP) from 13 March 2007.
2. The Applicants lodged a claim with the FSP for damage to a concrete patio
following a period of heavy rain in January 2010.
3. The FSP has denied the claim on the grounds that the damage was caused by
faulty design and workmanship.
4. On 25 February 2011 the Case Manager made a Recommendation that the
Financial Services Provider (FSP) is not required to indemnify the Applicants
for the claimed loss.
5. The Applicants have rejected the Recommendation and pursuant to the Terms
of Reference of the Service, the matter has been referred to me for
Determination.
Summary of Applicants ’ Position
6. The Applicants say that the heavy rain has caused the damage to the concrete
patio slabs and seek cover under the terms of the policy.
Summary of FSP’s Position
7. The FSP alleges that faulty design and workmanship was the cause of the
damage to the concrete patio and that the damage claimed was not caused by
an event under the terms of the policy.
8. The relevant policy provisions are:
“ storm – is an atmospheric disturbance evidenced by violent wind (including cyclones
and tornadoes) that may be accompanied by lightning, rain, hail or snow, Storm is not
persistent rain by itself.
...
What we will cover under your home insurance
Determination
Case No: 224499 Determination Page 2 of 4
Home is the private residential building at the address shown on the insurance
certificate and includes:
...
verandahs, patios
...
Insured event
Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water pipe, drain or dutter
Surface run-off rainwater from surrounding areas that occurs within 24 hours of a
storm or heavy rain.
Including loss or damage caused by erosion, subsidence, landslide, mudslide, or any
other earth movement that occurs within 72 hours of a storm or heavy rain and as a
result of that storm or heavy rain.
We will NOT cover:
...
loss or damage caused by rain, hail or wind entering your home due to:
a design fault, structural defect or faulty workmanship
...
loss or damage to:
fences, gates and retaining walls
garden borders, driveways, paths or gardens
...
We will not cover
...
Defects, faulty workmanship, lack of maintenance
loss or damage or he incurring of legal liability caused by a design fault,
structural defect or faulty worksmanship that you knew about and did not fix
before the loss or damage occurred
...
Earth movement
loss or damage or the incurring of legal liability caused by erosion, vibration,
subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth
movement.
But subject to the policy terms and conditions, we will cover loss or damage
caused by earth movement that occurs within 72 hours and as a direct result of
the following insured events:
Earthquake,
Explosion, or
Storm and rainwater. ”
Case No: 224499 Determination Page 3 of 4
Issue
9. Whether the FSP is required to indemnify the Applicants for their loss under the
terms of the policy.
Reasons for Decision
10. As noted in the Recommendation, a full exchange of information has occurred
and each party has had the opportunity of addressing the issues raised by the
other party.
11. Since the Recommendation, the Applica nts, under cover of letter dated 22 April
2011 has made a further submission noting errors in the correspondence from
the FSP as to the identity of the original contractor and noting that the quote
from the engineer “U” refe rs to water runoff from the damaged area.
12. The FSP has made a further submission dated 8 April 2011 noting, among
other things, that the quote from the engineer “U” was incorrectly dated 21
September 2009 but in fact completed on 18 March 2011. I note that the
Applicants have not commented on this issue and that a reading of the relevant
quote makes clear that the site inspection, the subject of the quote, was
performed in March 2011.
13. The FSP submits that the quote by the Applicants’ expert “U” does not address
or chaIlenge the expert evid ence provided by the FSP’s expert “C” as to the
cause of damage to the concrete slabs.
14. The evidence relied upon by the FSP is set out in paragraph 14 of the
Recommendation and for the sake of completeness, I restate the relevant
material. The engineer “C” reported:
“The residence is a two storey brick veneer construction with a concrete slab -on
ground, plastered internal walls and a tile roof. The timber retaining wall was
constructed in 2002 and backfilled by the insured. The back fill that was used
was of a clay nature.
The concrete slab was then constructed approximately 12 months later by the
insured. The slabs properties were 100mm thick with a single layer of mesh and
expansion joints were provided to foot print of the slab which was at the rear of
the residence. The top of slab once constructed coincided roughly with the top of
the retaining wall.
...
The wall was showing signs of rotation with out of plumpness from the vertical in
the order of 18mm. There were wales that were showing signs of bowing under
the earth pressures, wales towards the base of the walls where pressures are
greatest.
...
There were slopes toward the walls that put additional loads that the wall was
probably not designed.
...
Case No: 224499 Determination Page 4 of 4
In addition to slab panels opening up and being out of level relative to adjacent
panels, there is considerable settlement at the slab – retaining wall interface. The
rotation of retaining walls and soil creep has produced slab to settle
...
It is our opinion that the general poor construction methods adopted have been
the only cause of the settle and out of level of the slab panels. It has not been
the cause of a single event.
...
The stencil type of concrete used in this case is not a flexible pavement and
should never have been constructed to the top of this retaining wall. If a rigid
pavement was required here and this lateral movement of the wall could not be
tolerated, then a stiffer wall should have been designed for the higher loads. It
has to be emphasized that the posts are very highly stressed and that the use of
undersized posts will cause excessive deflection.”
15. Upon reviewing the report provided by the Applicants’ expert “U” , save for
noting that the report referred to a lot of water runoff over the slabs, the report
is directed to the work required to stabilise the slab. I do not find anything in the
report by “U” that deals with the actual cause of the damage to the slabs.
16. In the circumstances, I accept the opinion of the FSP’s expert “C” that the
destabilising of the slab was caused by faulty design and construction and not
excessive water from rain which may have merely exacerbated the problem.
Determination
17. I determine that the FSP is not required to indemnify the Applicants for their
loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.