Home / Financial Firm (Unknown - Insurer) / Determination 223789
Determination 223789
Claim denial - flood exclusion
Summary
The applicant claimed water damage to his home from the 2010 Roma flood, which the FSP denied under the flood exclusion. AFCA accepted expert hydrological evidence that the water entering the home was floodwater and found the FSP had clearly informed him of the exclusion.
The insurer proved on expert hydrological evidence that the damage was flood as defined, and the policy wording and index adequately informed the insured under section 35 of the Insurance Contracts Act.
Issues
- Claim denial primary · not upheld
“the Panel considers the FSP has discharged the onus to show the damage resulted from the action of flood water”
- Failure to disclose secondary · not upheld
“the Panel considers the FSP has discharged the onus that rests with it to clearly inform the Applicant, in accordance with section 35 of the Act”
Subjects and remedies
disabilityelderly or capacitynatural disasterno remedy
Text of the determination
Case No: 223789 Determination Page 1 of 9
Case number: 223789
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/condition
18 April 2011
Background
1. On 2 March 2010 the Applicant‟s home was inundated with water following
intense rainfalls in the area.
2. The Financial Services Provider (FSP) denied liability for a claim under the
Personal Insurance section of the Applicant‟s Farm Insurance policy on the
ground the damage was caused by flood as defined by the policy.
3. The Applicant maintains that water initially entered his home at about 10.00am
and at about 1.00pm there was a sudden rise in the water level. The Applicant
contends the initial inundation of water in his home was surface run-off rain
water which is covered by the policy.
4. The Applicant further argues the FSP breached section 35 of the Insurance
Contracts Act 1984 (the Act) by failing to clearly inform him of the effect of the
relevant terms of the policy.
Summary of Applicant’s Position
5. The Applicant‟s submission has been presented by his lawyer. References to
the Applicant in this determination will include the lawyer‟s submission.
6. The Applicant refers to and has provided an analysis of the following
hydrologist‟s reports:
Hydrologist “ WM ‟s” report dated March 2010. The Applicant contends this
report is general in nature and should not be regarded as providing an
accurate description of flood behaviour at any particular property.
Hydrologist “ EG ‟s” report dated 18 June 2010.
Hydrologist “ WM ‟s” report dated August 2010
7. The Applicant refers to a statutory declaration completed by “ DF ” . “ DF ” stated
that water entered the Applicant‟s home shortly before 10.00am. There were
two distinct events. First the water entered the property from the rear and was
reasonably shallow. Secondly, at about 1.00pm there was a sudden rise in
water level.
Determination
Case No: 223789 Determination Page 2 of 9
8. The Applicant refers to a statutory declaration completed by “ HA ” . “ HA ” stated
that while on the phone to “ DF ” at approximately 10.00am, “ DF ” advised her
that the Applicant‟s home had been in undated.
9. The hydrologist‟s reports and the witnesses‟ evidence places serious doubts on
the FSP‟s assertion that the damage was caused by flood. As such, the FSP
has not satisfied the onus of proving the flood exclusion applies.
10. If a finding is made that the Applicant‟s home was initially in undated with storm
water runoff, then the proximate cause of the damage suffered by the Applicant
was storm water runoff and not the late arriving flood water.
11. In this case the policy should respond to the claim.
12. Section 35(2) of the Act requires the FSP to prove that it clearly informed the
Applicant that the effect of the contract was that flood cover was excluded from
the cover.
13. The Applicant notes:
The policy is 73 pages long.
The relevant exclusion appears as one word on a two line entry on page
22 of the policy.
That entry must then be read in conjunction with the definition of flood
which appears on page 10 of the policy.
Elsewhere in the policy, floods are excluded as part of specific frozen food
cover under home cover (page 178) and farm property cover (page 40).
However, flood cover is specifically included under transit cover (page 61)
whilst flood and storm damage is excluded for machinery breakdown
cover (page 63) and electrical equipment cover (page 65).
There is otherwise no specific warning as to flood exclusion in the
preamble to the policy in the exclusion section of the policy or otherwise.
14. The Applicant submits, given the above that it cannot be said that the flood
exclusion is in “clear and unambiguou s language and in a manner in which a
person of average intelligence and education is likely to have little difficulty in
finding and understanding if that person reads the policy in question.” (See
Marsh v CGU Insurance Limited (2004) NTCA 1 at 11).
15. The Applicant notes that it is simply not sufficient for the FSP to have satisfied
the onus of clearly informing him of the effect of the flood exclusion by notifying
him of that exclusion in a one line entry on one page of a 73 page document
which in turn must be read in conjunction with a definition on another page and
which is inconsistent with or could easily be confused with other clauses
relevant to the insurability of flood damage in other parts of the policy
document.
16. The exclusion is not prominently p laced, is not bolded and could easily be
missed by an insured unless specifically directed to it. Accordingly it cannot be
Case No: 223789 Determination Page 3 of 9
said that an insured would be “likely to have little difficulty in finding …” let
alone understanding the exclusion. To satisfy its obligations under section 35 of
the Act, the FSP must establish both requirements. The Applicant submits that
it has comprehensively failed to do so.
17. The Applicant is blind, almost deaf, 87 years old and is dependent upon a carer
who has Power of Attorney over his financial affairs.
Summary of FSP’s Position
18. The FSP relies on reports issued by hydrologists “ WN ” dated March 2010, “ EG ”
dated 18 June 2010, “ WM ” dated August 2010 and “ WM ” dated October 2010
to argue the damage caused to the Applicant‟s home was caused by flood as
defined in the policy.
19. The FSP relies on the following policy provision:
“ 1 – PERSONAL INSURANCE
Section A – Home Cover
What you are not insured for
Under Section A – Home Cover we will not pay for:
…
2 loss of or damage to your property caused by:
a. Flood, the action of water from the sea, high sea water, tidal action or
Tsunami.”
20. The FSP argues the policy is clear and unambiguous and defines flood as:
“ ”Flood” means the inundation of normally dry land by water escaping, or being
released from, the normal confines of a reservoir, natural watercourse or lake (whether
or not they have been altered or modified). Flood also includes water discharge from
any sewerage or waste water systems due to pressure induced by Flood water.”
21. Where causation turns on the question of which water entered the property first,
consistent with legal precedent, if any damage was caused by the initial entry of
stormwater inundating the floor of the house or building, the FSP is liable for
that damage even if the further damage is subsequently caused by floodwater.
22. On the other hand, if the damage was caused by the initial entry into the house
or building of floodwater or a mixture of stormwater and floodwater, then the
FSP is not liable for loss.
Issues
23. Whether damage to the Applicant‟s home was caused by flood water as
defined by the policy and
Case No: 223789 Determination Page 4 of 9
24. Whether the Applicant was clearly informed of the relevant terms of the policy
in accordance with section 35 of the Act.
Reasons for Decision
25. A full exchange of all material has taken place between each party. Each party
therefore has had the opportunity to address any issues raised.
Flood damage
26. The FSP seeks to rely on a clause in the policy to deny the claim and therefore
has the burden of establishing on the balance of probabilities that the terms of
the relevant clause apply to defeat the claim.
27. The Panel has been provided with the following hydrologist‟s reports:
“ WM ” report dated 26 March 2010.
“ AG ” report dated 18 June 2010.
“ WM ” report dated 2 August 2010.
“ WM ” report dated October 2010.
28. As the material has been exchanged, it is not intended to recite the details
contained within these reports except where considered relevant by the Panel.
29. In the Panel‟s experience, in order to establish whether water i nundation to an
insured property was flood water as defined by the policy or surface run-off
rainwater, the following information is considered necessary.
The time of the initial inundation and local topography.
The height of the flooring above ground level.
The height of the inundation above floor level.
The time the watercourse overflowed.
Witnesses‟ evidence.
30. The hydrologist “ WM ” report dated 26 March 2010 was commissioned by a
number of insurers to report on causes, severity and behaviour of the Roma
2010 flood event. The report while general in nature contained the following
information.
(report 3.2.1)
Bungi Creek recorded a peak water level of 8.10mGH at 1300 hours on 2 nd March
Bungi Creek flood level at R oma exceeded „major‟ flood trigger level for about 36
hours from 0800 hours on 2 nd March to 2000 hours on 3 rd March.
(report 5.3)
There were a number of areas within Roma town which were potentially
affected by local flooding (surface run-off) prior to the onset of mainstream
Case No: 223789 Determination Page 5 of 9
flooding (discharge from Bungi Creek). If local flooding occurred in these
areas it is likely to have been minor and quite shallow because the short
duration rainfall intensities in Roma town were not extreme.
It was possible there would have been some isolated incidences of local
flooding within the flood extent. This would have been limited to ponding
in low lying areas and streets. Isolated local flooding contained within the
approximate flood extent would have been inundated by floodwater long
before the peak of the event.
31. A diagram (5.1) shows the extent of the local flooding and mainstream flooding.
The street in which the Applicant‟s home is located is shown in the mainstream
flooded area.
32. The hydrologist “ AG ‟s” report dated 18 June 2010 was commissioned by the
local council to provide an inception study of the March 2010 flood event in
Roma. The report concluded:
– The report prepared for the various insurers suggested that the inundation
of Roma was caused primarily by mainstrea m flooding without any
quantitative assessment of proportional contribution from local storm and
catchment wide flooding.
– The cause, severity and mechanism of this flood could not be explained in
terms of catchment and regional flooding behaviour and subsequently, the
damage to properties in Roma cannot be simply classified as the result of
mainstream flooding.
– However it is very highly likely that backwater from moderate creek
flooding in combination with overflow of the local system has resulted in
such widespread flood damage.
33. The hydrologist “ WM ‟s” report dated 2 August 2010 responds largely to the
critique made by “ AG ” of its report of 26 March. The report (5 Conclusion para
3) in discussing the stormwater runoff noted:
“The peak rainfall occurred prior to 5.00am. The discharge spike did not peak
until 1.00pm, some 8 hours later. The peak stormwater runoff from the urban
areas of Roma would have occurred within an hour or two after the peak rainfall.
34. The hydrologist “ WM ‟s” report dated 22 October 2010 made the following
comments:
3.4 Consistency with local resident information
The flood extent maps were generally consistent with information
provided by local residents, except in the vicinity of Edna and Borland
Streets.
Based on information provided by local residents, water ponded to the
north of Edna Street on the morning of 2nd March and started flowing
down Borland Street at about 0800 hours. This is not shown on the
flood extent maps.
Executive Summary
Case No: 223789 Determination Page 6 of 9
Any property inundation caused by stormwater runoff alone, whether
it originated from the catchment area to the west of Carnarvon
Highway or not, would have occurred prior to 0700 hours.
and
“Bungi Creek broke its banks to the north of the town (and east of the
Roma Airport) and flowed south along various defined drainage paths
sometime before 0800 hours.
Bungi Creek floodwater also flowed north from the southern side of
the town along Long Drain and other drainage paths (i.e. backwater
flooding before 0800 hours.)
Bungi Creek floodwaters inundating Roma from the north and south
of the town had merged before 0800 hours.
By 0800 hours Bungi Creek floodwater and local stormwater had
joined to the east of the Carnarvon Highway.
Very few properties in Roma were inundated by floodwater before
0800 hours and
Inundation of a significant number of properties by flood water
commenced before 1030 hours.”
35. The Panel is mindful of the Applicant‟s expressed concern that the FSP
submitted a third report from the hydrologist “ WM ” . However, this report was
commissioned as a result of a number of property owners claiming that their
properties in Roma were inundated by two separate inundations during the
event. The first inundation being by local stormwater runoff and the second by
floodwater from Bungi Creek. (see executive summary) .
36. The Applicant contends that two inundation events to his home occurred. As
such, the Panel considers that in order to make an informed decision the report
may be relied on.
37. The Panel has not been provided with a site specific hydrologist report for the
Applicant‟s property and must therefore rely on the evidence before it. In the
Panels opinion the following information is relevant.
Hydrologist “ AG ” in his report stated: “… it is very likely that a combinatio n
of overflow from the local system and backwater from moderate creek
flooding resulted in widespread flood damage”
In this case the hydrologist “ AG ” concedes that a combination of overflow
from Bungi Creek contributed to the widespread flooding in Roma.
The Applicant‟s home is not elevated ( Solicitor’s letter 4 March 2011)
As such, it is reasonable to conclude the home would be inundated by any
run-off rainwater prior to the arrival of floodwater.
Water inundation was observed entering the Applicant‟s ho me shortly
before 10.00am.
According to Hydrologist “ WM ” , Bungi Creek broke its banks sometime
before 0800 hours.
Case No: 223789 Determination Page 7 of 9
Hydrologist “ WM ” specifically addressed inundation of properties in Roma
by stormwater run-off. The hydrologist was clear in stating that any
property inundation by stormwater run-off alone would have occurred prior
to 0700 hours.
Figures A2, A3, A4, A5 and A6 of “ WM ” report 22 October 2010 show
depths and extent of stormwater inundation at 0600, 0700, 0800 0900 and
1000 hours on 2 March.
Examination of these figures in the context of the Applicant‟s home, reveal
the Applicant‟s street was not exposed to stormwater inunda tion at any of
these times.
38. In the Panel‟s opinion, the evidence supports a finding that the water which
entered the Applicant‟s home shortly before 10.00am was flood water which
flowed from Bungi Creek.
39. The Panel has also carefully considered the witness statements submitted by
the Applicant in support of his claim, firstly the reported observations of his
carer, and secondly from the holder of the Applicant‟s Power of Attorney with
whom the carer was discussing events at the time of the inundation.
40. The P anel has no reason to doubt these authors‟ belief in the veracity of their
statements as to what they saw or reported. However the Panel is faced with
expert hydrological evidence which has not been substantially refuted by any
expert evidence to the contrary.
41. In these circumstances the Panel is inclined to accept the expert evidence and
as such the Panel is persuaded on balance that the water was flood water
which flowed from Bungi Creek following its overflow after it broke its banks.
42. The policy defines “Flood” to mean the inundation of normally dry land by water
escaping, or being released from, the normal confines of a reservoir, natural
watercourse or lake (whether or not that have been altered or modified.
43. The Panel therefore considers the FSP has discharged the onus to show the
damage resulted from the action of flood water.
Clearly inform – section 35 of the Act
44. The Applicant contends that pursuant to section 35 of the Act, the FSP failed to
clearly inform him of the effect of the exclusion clause o n which it relied to deny
the claim.
45. Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation
to the contract, an insurer may not refuse to pay an amount equal to the
minimum amount of cover set out in the regulations made pursuant to the Act
unless it can prove that before the contract was entered into, the insurer clearly
informed the insured in writing of the relevant provisions of the contract, or that
the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
Case No: 223789 Determination Page 8 of 9
46. It is not in dispute that the FSP provided the Applicant with a policy wording.
The Applicant contends that provision of a policy wording alone does not
discharge the obligations placed on it by section 35 of the Act. The Applicant
argues that the construction of the policy is such that it does not satisfy the
provisions of section 35 of the Act in that it does not clearly inform him that the
effect of the contract was that flood cover was excluded under the policy.
47. The policy issued to the Applicant is a package product consisting of two parts.
Part A Important Information, and Part B Farm Insurance. Part B Farm
Insurance consists of two segments being “1 –Personal Insurance and “2 –
Farm Business Insurance”. Each of these two segments have a number of
unique sections with sub-sections.
48. The section relevant to this matter is found in:
“Part B Farm Insurance
…
1 – Personal Insurance
Section A – Home Cover
Subsections 1 & 2 – Building & Contents ”
This section contains a number of subsections which set out a range of
di fferent covers available under “Home Cover”.
49. The wording excluding flood cover is found at page 22 of the document. Page
22 follows the various sections and subsections expressing the cover available
under “Section A – Home Cover. The definition of “Flood” is found at page 10 of
the document.
50. The Panel accepts that by its very nature a package contract will consist of a
large number of pages and that information will be dispersed throughout the
document.
51. In deciding whether a document of this type is clear, it is appropriate to
examine the construction.
52. The Applicant‟s policy contains an index. This is placed on the inside of the
front page. The index is formatted as follows:
“ PART B – FARM INSURANCE 10-67
POLICY TERMS AND CONDITONS
Words with special meaning 10-11
1 – PERSONAL INSURANCE 12-37
Section A – Home Cover 12-22
Subsection 1 & 2 – Building & Contents Cover 14-19
Subsection 3 – Liability …
…
Case No: 223789 Determination Page 9 of 9
2 – FARM BUSINESS INSURANCE 38-67
…
GENERAL POLICY EXCLUSIONS 68
GENERAL POLICY CONDITONS 69-70
CLAIMS 71”
53. In the Panel ‟ s opinion the index clearly sets out the various elements of the
package including definitions, in an orderly and uncluttered manner and where
they may be found by the reader.
54. Each section of the package which provides insurance for a different class of
risk is clearly identified as such. Hence Reference to „flood‟ on pages 40 - Farm
Property Cover, 61 Transit Cover 63 Machinery Breakdown Cover and 65
Electrical Equipment apply to the unique cover provided by those sections of
the contract. Any reference to the inclusion or exclusion of flood‟ found in these
unique sections can only apply to that section and cannot be read into any
other part of the contract.
55. In addition, the Panel notes that the FSP‟s Renewal Schedule issued prior to
the relevant period of insurance comprises the payment invoice (page 1),
details of cover provided (pages 2- 7), followed by “Important Information” (page
8). This Important Information contains the following paragraph:
“ Flood Insurance
56. Your Policy does not cover damage caused by Flood to your Building and
Contents. Please read Your Policy for further detail s of cover…”
57. Having carefully considered all of the above-mentioned documentation, the
Panel considers the FSP has discharged the onus that rests with it to clearly
inform the Applicant, in accordance with section 35 of the Act.
Determination
58. For the reasons outlined above, the Panel determines that the FSP was entitled
to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.