Home / Financial Firm (Unknown - Insurer) / Determination 223462

Determination 223462

Water damage to timber floor claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2011-06-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed for water damage to their timber floor caused by rainwater entering the sub-floor after neighbours built a concrete path, and sought floor replacement. AFCA decided the FSP was entitled to deny the claim because the evidence did not establish extensive damage warranting replacement.

The complainants did not establish on the balance of probabilities that the water entry caused damage within an insured event, and the FSP's expert evidence was preferred.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 223462 Determination Page 1 of 5 Case number: 223462 General Insurance - Domestic Insurance - Home Contents - Water damage to floor - FSP Decision - Denial of claim 24 June 2011 Background 1. The Applicants held a home and contents policy with the Financial Services Provider (FSP) which was in force at the time of the loss. 2. The Applicants lodged a claim for water damage to their timber floor arising from rainwater flowing into their property’s sub -floor via the ventilation vents. 3. The FSP appointed experts to assess the floor in four occasions. It subsequently denied the claim on the basis that there is no damage to the floors. The Applicants dispute this decision and seek the replacement of their floor. Summary of Applicants ’ Position 4. The Applicants’ neighbours raised the ground level and concreted a pathway next to their house. This caused rainwater to enter their property’s sub - ventilation system. As a result, the hard wood floors suffered water damage. 5. The concrete path was removed and the ground level lowered in early August as requested by the local council since the construction was illegal. 6. They hired a structural engineer (“AC” ) to assess the damage and included his first report with the claim. 7. Since the lodgement of the claim, four FSP’s assessors visited the premises. The first two, who came soon after the damage happened, recommended repairs. The third assessor came in October and recommended only sanding and polishing of the floors, stating that the damage was superficial. A fourth assessor visited the premises on 16 November 2010 and concluded there was no damage to the floors and that no repairs were necessary. 8. Their floor was installed between two to five years ago, and it was of a very high standard and mirror finish. It had no gaps between the floor boards or any squeaking noises. At present, the floors squeak and creak, there are separation gaps and the floorboards move up and down when stepped on. Determination Case No: 223462 Determination Page 2 of 5 9. “AC” is of the opinion that this would only happen due to exposure to water, through expansion and contraction of the metal nails. Therefore, the Applicants consider the problem to be structural, not superficial. 10. They consider that “AC” has a more accurate view of the damage, since he was able to look at the floor deteriorating over a period of 10 months during various visits. 11. They are of the opinion that the FSP’s assessors have only assessed their floors as per general standards and prescriptions of how flooring generally behaves. They have not considered the fact that their floor was of a high standard. 12. The FSP’s assessor state s that the existing gaps are of a maximum of 0.83mm which is acceptable. They argue that the flooring has gaps of between 1.7 - 2.7mm and have provided photos to prove this. Summary of FSP’s Position 13. The Applicants’ neighbours built the concrete path with the good intention of solving pre-existing drainage issues. However, the local council ordered the removal of this concrete path, based on a report by “AC” which stated that the raised level of the pathway allowed water to flow directly into the sub-floor of the insured property. 14. It is of the opinion that “AC’s” reports are vague and contain little substance. Furthermore, “AC” does not identify actual damage to the floor ing. Further, in relation to “AC’s” second report, its assessors question “AC’s” knowledge of timber flooring as he allegedly has made some mistakes in definitions and identification of flooring issues. It says that “AC” is insufficiently qualified and that its assessors have a more experienced opinion. 15. As per its engineer reports, there was no evidence of damage to the flooring and therefore it could not accept the repairing or replacing the floor. On this basis, the FSP denied liability for the claim. 16. It says that the opinion of its timber floor expert “GS” is the most credible of all since he has viewed the flooring more recently and his accreditations support his opinion. “GS” says that if there was any moisture ingress to the timber floors, the damage has corrected itself, to the point it does not require any type of repairs or replacement. 17. It submits that the Applicants have not proved that the flooring was of a particularly high standard prior to the alleged damage. 18. As per the photographs of gaps between floorboards that the Applicants have shown, the FSP cannot comment as it is not established where these photos were taken. It is of the opinion that these photos do not substantiate that the floor requires replacement against the evidence of a person as qualified as “GS”. Case No: 223462 Determination Page 3 of 5 19. The FSP relies on the following policy provisions: “ Listed Events cover We will cover your buildings or contents for loss or damage as a result of the incidents listed on the following pages. ” Issue 20. Whether the FSP is entitled to deny liability for the Applicant s’ claim under the terms and conditions of the policy. Reasons for Decision 21. As advised to the parties, due to the nature of the dispute and the amount claimed, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 22. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 23. I have reviewed the submissions of the parties in relation to the dispute and the terms and conditions of the policy. I observe there is no dispute that the Applicants’ neighbours built a concrete path and that this may have contribute d to water entering the sub- floor of the Applicants’ property. 24. The central issue of the dispute is to determine whether the water entering the sub- floor has caused damage to the insured property’s flooring and whether this would be covered by the policy. 25. In these circumstances, when making a claim under an insurance policy, the responsibility rests with the policyholder to establish, on the balance of probabilities, that the cause of the loss claimed falls within the cover provided by the policy. The responsibility then shifts to the insurer to establish the application of any provision on which it relies to deny or limit the claim. 26. Both parties have provided extensive material assessing the condition of the floor. 27. On one hand, the Applicants hired “AC”, a s tructural engineer, to evaluate the flooring. He initially inspected the flooring soon after the concrete path was built. He found that the floor had suffered water damage resulting in cupping, squeaking and slight separation of the floorboards. He is of the opinion this damage is consistent with water entering the sub-flooring and flowing over the concrete slab that supports the floorboards. He recommended replacing the floorboards. Case No: 223462 Determination Page 4 of 5 28. In his second report, “AC” observes the evolution of the damage approxima tely nine months later. He notes there still is crowning, squeaking and separation gaps in the floorboards, consistent with water damage. He also notes the floor is still serviceable but has some flaws. 29. On the other hand, the FSP’s initial two assessments, performed by its building assessor “ECR” established that there might have been some water damage to the floorboards but that it would only require re-sanding and re-finishing. The FSP after evaluating these reports and “AC’s” report, decided to hire its engineer “RZ” and its floor expert “GS” who evaluated the damage a couple of months after the concrete path issue was solved. 30. Both “RZ” and “GS” did not find any evidence of major damage and are of the opinion that the gaps, squeaking and minor crowning are consistent with flooring standards. “RZ” also notes that any damage might happen regardless of the concrete path, since the previous set out of the pathway was more porous and that water would still seep through to the sub -flooring of the insured property. 31. “GS” also states that there is a possibility there has been humidity damage to the flooring but in any case, this issue has corrected itself over the dry season. 32. Both parties question each other ’s points of view. The FSP says that “GS” is best qualified to give an opinion about timber flooring, and I believe this is effectively reflected on his accreditations. The Applicants point out that an inspection of damage many months after the event that caused it is not going to reflect the real extent of damage and its evolution. 33. In any case, the Applicants argue that their flooring was of a very high standard and although it is agreed that at present the floor is still of a certain standard, it is not the same as it was prior to the water damage. 34. Considering the point of view of each party and their expert reports, I cannot conclude that there is extensive damage to the flooring. From the photographic evidence, I do not see any issues that might merit the replacement of the whole floor. I understand that the Applicants say they had a floor of a particular finish and standard, however this has not been established, other than by two statutory declarations. 35. On the basis of the evidence before me and on the balance of probabilities, I am not persuaded that the Applicants have established there is any damage to their flooring, or that the claim falls under an insured event according to the policy wording. There is no persuasive satisfactory evidence to show that the standard of the flooring has been degraded. Any water caused change in the appearance and functionality of the floor board can only be described as very minimal. 36. In this case, I am more inclined towards the FSP’s position as it has provided various reports from different experts and it has been shown that o ne of them in particular has extensive qualifications regarding timber flooring in Australia. Case No: 223462 Determination Page 5 of 5 Determination 37. On the basis of the available information, I determine that the FSP is entitled to deny liability for the Applicants’ claim according to the terms a nd conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.