Home / Financial Firm (Unknown - Insurer) / Determination 223405

Determination 223405

Quality of building repairs (brick matching)

FirmFinancial Firm (Unknown - Insurer)
Decided2011-06-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicant disputed the colour match of bricks used in repairs to his home after a neighbour's vehicle impact. AFCA found the FSP had made all reasonable efforts to match the existing brickwork and had completed the repairs appropriately.

Under the policy the FSP need only make all reasonable efforts to match undamaged brickwork, and the evidence showed closely matching bricks were used where replacement was necessary.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 223405 Determination Page 1 of 3 Case number: 223405 General Insurance - Domestic Insurance - Home Building - Service - Service quality 24 June 2011 Background 1. This Determination follows the review of a Recommendation by the Applicant. 2. The Applicant’s claim is under the Applicant’s Home I nsurance policy and arises from impact damage to the Applicant’s residence on 2 July 2009. 3. According to the information exchanged, the claim arose when the Applicant’s neighbour reversed back from the road and lost control h itting the Applicant’s home, and damaging the right corner of the Applicant’s brick veneered property. 4. The FSP after obtaining a structural engineer’s report and scope of works report, authorised repairs to the building in the amount of $12,219.68. 5. The Applicant maintains that the repair work was not satisfactory and that the FSP had failed to use suitable matching bricks in the repair. The FSP denied the Applicant’s claim and maintains that it has made all reasonable efforts to match the brick work with as close a match as possible. Summary of Applicant’s Position 6. The Applicant disputes the FSP’s decision and seeks to have the property repaired with bricks of the original complexion. 7. The Applicant maintains that the repairer has used bricks that are visibly and markedly different to the existing bricks as part of the repair process. 8. It is the Applicant’s view that the repairer did not make sufficient effort to find matching bricks during the repair process. The Applicant maintains that from the very beginning he mentioned to the builders about the non-matching colour of the bricks. He maintains he warned the FSP repeatedly before they started work and was assured that the bricks used would be the closest possible match. 9. The Applicant maintains that as his house is only a few years old, if the FSP was sincere about obtaining matching brickwork they would have been able to do so. In support of this, the Applicant claims he obtained a closer match to the bricks in a house that was one street from his home and was being built at the Determination Case No: 223405 Determination Page 2 of 3 time of the repair work. Photographs of the relevant brick work have been exchanged. 10. In requesting a review of the Recommendation the Applicant claims that as the FSP was also the insurer for the driver of the vehicle that damaged his home, if he had made a claim under the driver’ s policy, the FSP would have been required to pay the cost of matching the bricks. Summary of FSP’s Position 11. It is the FSP’s submission that they have acted appropriately and have met their liability in accordance with the terms of the policy. 12. The FSP maintains that they assigned a building company to carry out a full inspection of the property and in addition o btained a structural engineer’s report and scope of works report from separate consultants. The repairs were duly authorised and completed at a cost of $12,219.68. 13. The FSP maintains the decision not to re-do the brick works repaired as they believe that they have made every effort to match the existing brickwork as much as possible. 14. The FSP relies on the relevant terms of the policy which read as follows: “ How we settle certain things When we pay your claim, we settle certain things in line with the information shown in this section: Matching materials Under building insurance we only repair the damaged parts of your home. We don’t pay for materials to match the undamaged parts of your home to create a uniform appearance.” 15. The FSP has not made any further submission in response to the request for a review of the Recommendation. Issues Whether the FSP has fulfilled its obligations under the policy in relation to the repairs to the Applicant’s home. Reasons for Decision 16. There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the materials exchanged. I have the opportunity to thoroughly review the material. In reaching a Determination in this matter I am required under the Terms of Reference to take into account what is fair in all the circumstances having Case No: 223405 Determination Page 3 of 3 regard to relevant legal principles, good industry practice, the terms of the policy, and where appropriate prior Determinations of the Service although these are not binding. 18. The dispute in this matter essentially involves whether the repairs affected by the FSP are reasonable in the circumstances taking into account the terms of the policy. 19. Whilst the policy terms are clear, and in particular specify that the FSP is only obliged to repair the damaged parts of the home and not required to match the undamaged parts of the home, it is reasonable to expect in the circumstances of a repair being effected, that all reasonable effort will be made to provide a suitable match with the undamaged portion of the property. In fact the FSP submits it has made every effort to match the new bricks to the existing brick work. 20. There is no suggestion that the workmanship in the repairs is faulty or that the repair work has not been completed to an adequate standard. Both parties have provided photographs of the brick work with the Applicant also providing photographs of some neighbouring brick work. 21. Both sets of photographs show in my view closely matching brick work. Whilst arguably the photographs of the brick work from the nearby property suggest possibly a closer match to the bricks used by the FSP closely match the existing brickwork. 22. The obligation on the FSP is not to match the brickwork but to make all reasonable efforts to match the brickwork to the existing brickwork. The evidence is that some of the existing brickwork was used in the repairs and only where there necessary, were replacement bricks utilised. As indicated, the replacement bricks, whilst not identical, are closely matching. 23. I am satisfied the FSP has met its obligations under the policy. The FSP has repaired the brickwork and only replaced bricks where necessary. I am satisfied they have made all reasonable efforts to match the existing brickwork consistent with the terms of the policy. Determination 24. Accordingly I determine that the FSP has fulfilled its obligations under the terms of the policy and has completed the repairs appropriately.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.