Determination 222690
Denial of claim - storm damage to front fence
Summary
The applicants claimed storm damage to their front fence after the FSP accepted only the front gates, offering $735 less a $500 excess. AFCA found a storm occurred, rejected the FSP's expert view that the fence was undamaged, and ordered the FSP to pay $5,175, being 50% of the lowest repair quote.
The storm was the proximate cause of the fence instability and the design and workmanship exclusion did not defeat the claim, so AFCA applied a fair apportionment of the lowest quote given the pre-existing condition.
Issues
- Claim denial primary · upheld
“I determine that the FSP indemnify the Applicants in the sum of $5,175.”
- Inadequate claim investigation secondary · upheld
“I find that the FSP's stance on this claim to be somewhat conflictual.”
Subjects and remedies
natural disasterpay claim
Text of the determination
Case No: 222690 Determination Page 1 of 6
Case number: 222690
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Storm - Insured’s Onus
29 June 2011
Background
1. The Applicants were the holders of a home building insurance policy with the
Financial Services Provider (FSP) and lodged a claim for storm damage of the
fence on 11 August 2010.
2. The FSP partially accepted the claim and accepted that wind damage to the
gates at the front of the property and offered $735 less $500 excess to the
Applicants. The FSP denied the claim for damage to the front fence on the
ground that “there is no storm damage evident”.
3. The Applicants disagree with the FSP’s decision and referred the matter to the
Service. The Applicants submitted repair quotes for the fence, the lower of
which was for $10,350.
4. After consideration of the matter, the Case Manager recommended that the
FSP indemnify the Applicants $5,175 being fifty percent of the lowest quote.
The FSP rejected the Recommendation. The Applicants initially accepted the
Recommendation but after receiving advice as to the FSP’s rejection, the
Applicants have withdrawn their acceptance and seek payment of the damage
for replacement of the fence.
5. Pursuant to the Terms of Reference of the Service, the matter has been
referred to me for Determination.
Summary of Applicants ’ Position
6. The Applicants rely on the quotation for replacement of the fence which states
that “storm damage has left fence standing but not stable. Fencin g construction
workmanship was substandard.”
7. The subject fence is less than four years old but following an alleged wind
storm, the fence became very unstable and visibly wobbled when it was
shaken.
8. The Applicants allege the FSP’s assessor somewhat peremp torily indicated
that the claim would be rejected.
Determination
Case No: 222690 Determination Page 2 of 6
Summary of FSP’s Position
9. The FSP relies on its assessor’s report and builder’s report showing that the
fence was stable, structurally sound and there was no storm damage except
with respect to the gates. Alternatively, the FSP says the storm was not the
proximate cause of the damage and it asserts that the Applicants ’ expert report
shows that the “the fence was constructed in a sub - standard manner.” The
posts were not imbedded in concrete nor were they installed at the required
depths in accordance with local council requirements.
10. The FSP relies upon the following policy provisions contained in the Product
Disclosure Statement (PDS):
Page 13 of the PDS:
“ Exclusions.
…
We do not insure you for any loss or damage that is caused by or arises from:
defects in the design, structure, materials or workmanship.
Page 62 of the PDS:
“ How we settle your claim.
…
We will pay
…
only those costs that directly apply to the part of your property that has suffered the
los s or damage.”
Issue
11. Whether the FSP is required to indemnify the Applicants for the damage to the
fence.
Reasons for Decision
12. There has been an exchange of documentation and each party has had the
opportunity to peruse and comment on the other parties’ material. I have
perused the file and I have noted in particular the submissions made by the
parties including the Applicants further submission dated 5 May 2011 and the
FSP’s further submission dated 23 May 2011. The Case Manager reviewed the
expert evidence provided by the Applicants and the FSP and for the sake of
completeness I repeat same:
Case No: 222690 Determination Page 3 of 6
“Applicants’ expert evidence
13. The Applicants have submitted a quotation by AFencing dated 24 August 2010.
The quotation estimates repair costs in the amount of $10,350 and states
among others:
“Re: Quote 2185
Cause of damage – Recent rain storms through Vic / Bellarine Peninsula
Construction type (what is it made of – with a photo) – Merbau
Hardwood
Age – 4yrs approx
…
Proposed Repair/Replacement – breakdown of costs to include: Current
fencing needs to be entirely renewed.
Driveway gate (1) ripped off supports entirely with remaining gate unstable on
its supports. Locking system destroyed during pull apart.
Garden gate not supported on hinges as ripped off locking system and has
timber blown off it.
Storm damage has left fence standing but not stable. Fencing construction
workmanship was substandard.
Area consists of sandy oil which provided no support for the posts given
heavy storms.
Current posts not imbedded in concrete and at required depth as per council
requirement for this area.
Will need new posts to be re-set into concrete. Galvanized steel needed to
repair gates and for fixings.
Council permits $600 will be needed for fencing works on this property, in
addition of as quoted. This is in line with corner block requirements set by
council.
Construction type & all materials – Merbau as per original fencing.
Galvanised steel gates/fixings. Cypress posts. Concrete for setting. Kiln dried
plint h/rails.”
14. The Applicants also submitted a quotation by BFencing dated 20 September
2010. The quotation states repair costs in the amount of $13,680. It also states:
“GATES X 2
STORM DAMAGE – POSTS W WOBBLE/WARP
GATES OFF HINGES
FENCE UNSTABBLE (SIC) RENEW” .
FSP’s expert evidence
15. The FSP submitted a report by its assessor dated 15 September 2010. The
assessor concluded as follows:
Case No: 222690 Determination Page 4 of 6
“After completing our initial inquiries, we confirm that the front and side boundary
fencing is in good condition with no evidence of movement, instability or damage
that could be attributed to a recent storm. We are therefore of the opinion that
the removal and replacement of the fencing is totally unnecessary and falls
outside the scope of the policy cover.
We confirm that it is possible that the entry gate and driveway gate have
sustained storm damage and we are currently obtaining quotation from
[PBuilder] for the necessary repairs.
We confirm that your insured has disputed our findings and maintains that the
entire fence requires removal and replacement in accordance with the quotation
provided by [AFencing]. In order to resolve this matter, we have requested that
[PBuilder] provide our office with a detailed report confirming the condition of the
fencing and any damage that can be reasonably attributed to storm.”
16. The FSP also submitted a report by PBuilder dated 23 September 2010. The
report quotes repair costs for the driveway gates in the amount of $735. It also
states among others:
“An inspection of the front fence to the above property was conducted on 17/9/10
in the presence of [Applicant]. The fence posts are stable and within alignment
tolerances, taking into consideration general movement of the ground to the
area. There is no sign of storm damage to the posts or horizontal timber fence
panels. At time of inspection to driveway gates the right one had been dislodged
and the left was loose at the hinges.
We would recommend that a larger fixing to the hinges be installed due to the
weight of the gates. It would appear that a combination of the inadequate hinge
fixings and high winds to the area have caused the damage to the gates…” :
Bureau of Meteorology
17. The Bureau of Meteorology’s weather observation report show the following:
11 August 2010 - maximum wind speed of 54 km/h at 17:23
12 August 2010 – maximum wind speed of 74 km/h at 00:59.
18. As noted by the Case Manager, the onus is on the Applicants to establish that a
loss has been caused by an insured event listed in the policy. Once this is
established, the onus shifts to the FSP which, if it denies the claim, must rely
upon the application of a policy exclusion, or a breach of policy condition.
19. The information put before me clearly establishes that a storm event did occur
on 11 August 2010. The FSP’s acceptance of this event is demonstrated by its
partial acceptance of the claim in respect of the damage to the front gate. I also
rely upon the report from the Bureau of Meteorology in respect of the wind
strengths referred to above on 11 August and 12 August 2010.
20. I find that the FSP’s stance on this claim to be somewhat conflictual. On the
one hand, it has accepted that a storm event occurred, and on the other, it
relies upon the expert report that the fence is in good condition with no
evidence of movement or damage that could be attributed to storm.
21. There is a clear conflict between the Applicants and the FSP’s experts.
Case No: 222690 Determination Page 5 of 6
22. In the face of that conflictual evidence, I am required to decide whether the
fence suffered damage by reason of the wind event or whether it has become
unstable as a result of defect in design, structure, material or workmanship.
23. Having considered the reports, I am inclined to acce pt the Applicants’ report in
preference to the reports of the FSP. The Applicants’ report by its expert “A”
seems to me to be more even- handed and balanced than the FSP’s reports. It
clearly states the cause of damage as being caused by storms through the area
and, most significantly, states:
“… Proposed Repair/Replacement – breakdown of costs to include : Current
fencing needs to be entirely renewed.
Driveway gate (1) ripped off supports entirely with remaining gate unstable on its
supports. Locking system destroyed during pull apart.
Garden gate not supported on hinges as ripped off locking system and has
timber blown off it.
Storm damage has left fence standing but not stable. Fencing construction
workmanship was substandard.
Area consists of sandy soil which provided no support for the posts given heavy
storms.
Current posts not imbedded in concrete and at required depth as per council
requirement for this area.
Will need new posts to be re-set into concrete. Galvanised steel needed to repair
gates and f or fixings…”
24. In my opinion the severe winds confirmed by the Bureau of Meteorology was
the proximate cause of the instability of the fence. However, the Applicants
contractor/expert concedes that the fence was pre-disposed to the wind
damage because of structural and design factors.
25. In my opinion, those factors are interdependent and not concurrent and it is not
appropriate to apply the exclusion in respect of faulty design, construction to
defeat the claim.
26. However, in view of the condition of the fence at the time of the storm, I believe
it is appropriate to apply clause 8.2 of the Terms of Reference of the Service
and determine the matter on the basis of what is reasonable in all the
circumstances.
8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute
and whether a remedy should be provided in accordance with paragraph 9, FOS
will do what in its opinion is fair in all
the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although
FOS will not be bound by these).
Case No: 222690 Determination Page 6 of 6
27. I note that the Case Manager applied a fifty percent reduction to the lowest
quote and I consider that to be an appropriate apportionment of the cost.
Determination
28. I determine that the FSP indemnify the Applicants in the sum of $5,175.