Home / Financial Firm (Unknown - Insurer) / Determination 222399

Determination 222399

Cracking to strata units attributed to drought and soil movement, burst water main contribution disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2011-06-08
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The unit owners claimed for wall and floor cracking that developed over three months, which they attributed partly to a burst water main. AFCA found drought-related settlement was excluded but the leaking main also contributed, and ordered the insurer to pay 60% of repair costs, amount to be negotiated.

Where covered and excluded causes operate consecutively rather than concurrently, the panel apportioned liability and fixed the insurer's share at 60% of repair costs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 222399 Determination Page 1 of 9 Case number: 222399 General Insurance - Domestic Insurance - Home Building – Structural cracking to buildings – Water damage - policy exclusions – subsidence; earth movement 31 May 2011 Background 1. The applicants insured their home units, units 21 and 22, under a Residential Strata Insurance Plan against accidental loss or damage. The two units were part of a twenty year old brick townhouses complex. 2. During the period December 2008 to March 2009, the units experienced significant cracking to the external and internal walls and tiled flooring. In or about August 2007, a water main burst in a laneway at the rear of units 21 and 22; however, there was no report of any water damage to the insured units. 3. In August 2009, the applicants submitted a claim for cracking to their units over a three month period which they contend was contributed to by the burst water main. 4. The Financial Services provider (FSP) has denied indemnity to the applicants on the grounds that the cracking was caused by earth settlement and shrinkage. It states that other properties in the immediate location also displayed visible signs of cracking damage. 5. The policy of insurance excludes damage caused by normal settling, earth movement and shrinkage. Summary of Applicants ’ Position 6. Units 21 and 22 are part of a townhouses complex located at 133-145 C Street. There is a right-of-way at the rear of properties located in C Street and B Street. A property at number 58 B Street, which backs o nto units 21 and 22 has also sustained extensive cracking. 7. Significant cracking occurred to units 21 and 22 and 58 B Street at around the same time between December 2008 to March 2009. As a result, the applicants commissioned a geotechnical engineer, “DL”, to carry out an assessment to determine the cause of the significant damage. Independently and without knowledge of the damage to units 21 and 22, the owner of 58 B Street commissioned a structural engineer, “KL” to assess the damage to his property. Determination Case No: 222399 Determination Page 2 of 9 8. KL was initially unaware of the burst water main when he inspected the property in B Street in May 2009. However, in a subsequent report dated 5 May 2010 he stated that the burst pipe would have certainly contributed to the walls cracking at 58 B Street and at the same time it would have affected the applicants’ units. 9. The applicants contend that the water main in the right-of-way behind units 21 and 22 and 58 B Street was leaking for a lengthy period of time prior to August 2007 when the pipe was repaired. Their geological engineer, DL, contends that the leaking water main saturated the soil thus changing the equilibrium of moisture in the soil over a long period of time. When the pipe was repaired in August 2007 the soils subsequently dried out over the next twelve months which then caused significant damage to the three properties. They are not aware of any cracking occurring to units 23 and 24 or other units in the 133-145 C Street complex nor in other B Street properties. 10. The DL geotechnical report states that the previously leaking and subsequent repair to the water main contributed directly to the movement and distress that has occurred in the three buildings. 11. They disagree that normal settling caused the significant and severe cracking over a 3 month period. 12. The FSP appointed consulting engineers, H, to report on the damage. H refers to Building Standards that applied from 1996, whereas the damaged properties were built about 1989. Therefore, the 1988 Building Standards would have applied to their build ing and H’s reference to the edge beams not meeting the 1996 standard is irrelevant. 13. As there was no significant cracking before 2008, it is apparent the slabs have been designed and constructed to comply with the Building Standard of the day. 14. The engineer from H stated during his site visit that the cracking to unit 21 is the worst he had seen. This indicates the cracking is not due to typical ground movement experienced in their locality. 15. The applicants have submitted a copy of a rainfall graph for the period 2000 to 2009 prepared by the FSP’s loss assessor. The graph indicates that the longest period of sustained lowest rainfall occurred around the last six months of 2003. There were no claims for significant cracking around that time. This indicates that the units were built to accommodate such a range in rainfall patterns. Therefore, the sudden and severe cracking to units 21 and 22 and at 58 B Street in the December 2008 to March 2009 period appears directly attributable to the leaking water main. 16. In a ddition to the FSP’s contention that drought conditions were the cause of the damage to the properties, it also contends that a tree at the front of unit 21 contributed to the cracking of units 21, 22. They have received oral advice from another geotechnical engineer that the tree was an unlikely contributor to the damage as the tree roots typically only extend to the canopy line. Case No: 222399 Determination Page 3 of 9 17. They have insurance to cover for damage caused by sudden and unexpected events. The severe cracking experienced between December 2008 and March 2009 was a sudden and unexpected event and not due to normal settling that would exhibit slow movement and ongoing cracking over a period of time. 18. They agree that long term drying shrinkage has caused cracking to units 21 and 22 and other properties in the area over a period of time. However, they are not making a claim against long term drying and shrinkage that causes cracks to open and creep slowly over a period of time. 19. Their claim is for the sudden and unexpected severe cracking over a three month period to units 21 and 22. This damage is clearly directly linked to the adjacent leaking, burst water main in the rear right-of-way. 20. Written reports submitted by a geotechnical engineer and a structural engineer, and an oral opinion from another geotechnical engineer, support the opinion that the burst water main contributed to the cracking damage to units 21 and 22 and the house at number 58 B Street over the three month period from December 2008 to March 2009. Summary of FSP’s Position 21. The FSP accepts that a water main at the rear of units 21 and 22 burst and was repaired around August 2007. However, it does not accept that the leaking water main was the substantive reason for the cracking experienced in the units. 22. Its loss adjuster appointed consulting engineers (engineer) to inspect and report on the damage to the units. The engineer reported that the cracking was the result of a number of factors unrelated to the burst water main. These factors included differential settlement of the slab due to seasonal weather changes, the shallowness of the edge beams, brittleness of the structure and a large tree in the front of unit 21. 23. In its report dated 9 October 2009 the engineer stated, in part: “Therefore, in our opinion, the cracking and moveme nt evident throughout the units is a result of differential settlement of the slab due to the recent drought conditions, and accentuated by tree root drying from the mature tree in front of Unit 21 and the shallowness of the edge beams, and also as a result of the brittleness of the structure. It is also our opinion that the cracking and movement has not resulted from water escaping from the burst water main that occurred within the Council laneway around August 2007”. The applicants appointed a geotechnical engineer to report on the damage. In his report dated 17 July 2009 he stated:  It was evident that tree drying settlements had occurred beneath the south eastern section of the building (unit 21); Case No: 222399 Determination Page 4 of 9  Given the recent increase in the development of the cracking, that the movement and therefore distress has also been partially influenced by the relative seasonal dryness over recent years.  The seasonal dryness was unlikely to have caused the distress on its own, however, it is likely to have acted as a trigger for the distress by reducing the amount of available water in the soil thereby exaggerating the drying effect of surrounding trees.  The previously leaking and subsequent repairs to the water main is also likely to have contributed directly to the movement and distress that has occurred. The geotechnical engineer’s anecdotal comments as to the leaking water main contributing to the cracking, is made without any forensic investigation. The applicants also seek to rely on exception 1(g)(ii) to the exclusion (damage caused by subsidence, shrinkage or other earth movement) without any scientific basis for a connection between the bursting of the water main over two years ago and the current cracking. The FSP notes that its loss adjuster reported that a detached garage structure immediately adjacent to the burst main did not show any evidence of structural settlement cracking. The owner of 58 B Street commissioned a structural engineer to report on the damage to his building. The engineer reported on 6 May 2009 that the wall cracking was due to foundation/footing movements which are caused by:  Drought  Climate change parameters. The report does not apply directly to the applicants’ units. However, it is an in dependent view which supports the FSP’s position that the cracking experienced in the general vicinity of the units was not due to the water main. The applicants have stated that properties away from the burst water main have not experienced cracking. However, its loss adjuster surveyed C Street on 23 September 2010 and observed a number of properties with visible cracking to external walls. In their report dated 28 October 2010 they state: “1.7 We report there is extensive evidence of movement in the neigh bourhood. On the diagonally opposite corner is a cafe and takeaway store built into an original dwelling located at 38 B Street. The operators of the business advised they have occupied this property for many years. In the past 12-18 months they have replaced two fixed glass windows which have cracked at the front due to building movements. There is extensive cracking and prior repairs all around this property.” “4.3 ...most of the buildings observable in the vicinity are suffering the same form of cracking movement, and have done so for many years.” Case No: 222399 Determination Page 5 of 9 The cracking of the applicants’ properties is due to the normal movements associated with properties built on soil with high clay content. The FSP’s expert attributes the cracking to the differential settlement of the slab due to seasonal weather changes, shallowness of the edge beams, brittleness of the structure and the large tree in front of unit 21. While the applicants’ report raised the possibility of the burst water main contributing to the cracking, the extensive cracking visible throughout the neighbourhood supports the view that the primary cause of the movement was other more general factors including trees and drought. Even if there was forensic evidence to link the cracking with the burst water main, it would at best be a partial aggravation of movement caused by the drying of the clay soils due to the severe drought experienced in Victoria. The FSP would only be liable for that part of the damage referrable to the leak. In fact there is no single piece of evidence to link the cracking to a leaking or burst water main in 2007. The damage was caused by normal settling or shrinkage or expansion in buildings and the foundation/footings of the insured property and is therefore excluded from cover under the policy of insurance. The FSP relies on the following policy/contract provisions: “Policy 1 – Insured Property What we insure We insure You up to the Sum Insured shown for Policy 1 in the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the Period of Insurance. ... Exclusions – what we do not insure 1. We will not pay for loss or damage: ... g. caused by vibration or from the removal or weakening of or interference with the support of land or buildings or any other property. Erosion, subsidence, landslide, mudslide, shrinkage, or any other Earth Movement or collapse. However, We will pay if the loss or damage is due to: i. ... ii. bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus (but not Flood). ... m. due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements.” Case No: 222399 Determination Page 6 of 9 Issues 24. Whether the damage to the applicants’ properties was caused wholly or partially by the bursting and leaking of the water main in the right-of-way at the rear of the insured properties. The onus of proof is on the applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against. Once the applicants have established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. Reasons for Decision 25. The applicants’ properties suffered cracking damage to the external walls and severe damage to the internal walls and tiled floors. Their policy of insurance covers accidental loss or damage to insured property, therefore, prima facie, they have a claim that falls within the cover provided by the policy of insurance. 26. The onus then shifts to the FSP to establish that, on the balance of probabilities, the damage was caused by an exclusion of the policy. 27. The following reports and brief outcomes have been submitted to the Panel:  Applicants – DL Geotechnical report dated 17 July 2009. Comments: the distress in the building resulted from:  Shrinkage of the clay soil as a result of the drying action of trees and shrubs;  Seasonal dryness over recent years; and  Previous leaking and subsequent repair of the water main is also likely to have contributed directly to the movement and distress to the building.  Neighbour – KL structural engineer’s report dated 6 May 2009 – First report. Possible causes of damage to the building at 58 B Street:  Current drought;  Inadequate footings; and  Climate change parameters. Second report dated 5 May 2010.  After reviewing the geotechnical report the engineer stated: This would cause me to state that this burst pipe scenario would have Case No: 222399 Determination Page 7 of 9 certainly contributed to the wall at 58 B Street also in the same way it would have affected (the applicant s’ properties). FSP – loss assessor’s report dated 6 September 2009.  Burst water main – the most obvious movement and damage should be in the garage structure rather than in the main building. This is not the case. FSP – H consulting engineer’s report dat ed 9 October 2009.  Cracking and movement has not resulted from water escaping from a burst water main – a burst water main would have been of a very short duration and is well away from where the cracking and movement occurred. FSP – loss adjuster’s report dated 3 September 2009.  Comments – existence of a large tree could be affecting the moisture content of the clay foundation;  The existence and subsequent repair of a leaking water main may also have affected the moisture levels in the clay foundations.  Either of these situations will have caused movement in the foundation clays allowing the footings to move. 28. The FSP has stated that its loss assessor surveyed the surrounding locality and found that the buildings, although not near the leaking water main, displayed evidence of some cracking to the external walls. However, the Panel notes that these buildings appeared to be over 80 years old and the loss assessor only conducted a superficial inspection of the external walls. The Panel is not surprised that these buildings have evidence of cracking. However, the applicants’ buildings are about 20 years old and the greatest damage has been to the internal walls. 29. The consulting engineer appointed by the FSP stated in his report that a burst water main would have been of a very short duration and is well away from where the cracking and movement occurred. 30. The consulting engineer has not offered an explanation as to how he arrived at the decision that the “...burst water main” would have been of a very short duration. The main could also have been leaking gradually over a long period of time before the failure of the pipe resulted in more severe leaking. 31. Further, the leaking main was in very close proximity to the insured buildings and the property at number 58 B Street. Determination 32. There is general consensus that the drying out of the foundation soils contributed to the movement and cracking of the applicants’ properties. Case No: 222399 Determination Page 8 of 9 However, there is also evidence that the leaking/burst water main may also have contributed to the damage. 33. Units 21 and 22 are part of a block of four units at 133-145 C Street. FOS has been informed by the owner of unit 21 that the damage to his unit and unit 22 is mainly to the interior of the building. The damage to the double brick external walls is very minor. FOS was also informed by the unit owner that he contacted the owners/occupants of units 23 and 24 who informed him that their units were not damaged. 34. The applicants have stated that their properties had displayed signs of minor internal cracking over a long period of time. However, between December 2008 and March 2009 their properties developed severe internal cracking. 35. The geophysical engineer, structural engineer and FSP’s loss adjuster are of the opinion that the leaking water main contributed to the damage to the applicants’ property. 36. The FSP ’s loss assessor and consulting engineer are of the opinion that the leaking water main did not contribute to the damage. However, as mentioned above, the Panel questions the consultant engineer ’s opinion. 37. Based upon the evidence submitted, the Panel finds that initially there was damage to the applicants’ properties caused by the drying out of the foundation soils which event is excluded from the cover provided by the policy of insurance. However, the Panel also finds that the leaking water from the damaged water main also contributed to the damage which is an event that falls within the cover provided by the policy. 38. In circumstances where more than one concurrent cause is covered by the policy and the other is excluded, it is established law that the clause excluding the cover is dominant and the claim fails. 39. However, in the circumstances of this case, the initial cracking of the applicants’ properties occurred prior to the sudden severe cracking of the walls and tiled floors which mean that one proximate cause was followed by another, so that they were consecutive. That is, the damage caused by the leaking water main, which is covered under the policy, was subsequent to the excluded cause of the minor cracking. 40. In the circumstances, the Panel considers that it is only fair and reasonable that liability be adjusted to take into account the possible loss due to structural damage caused by the drought. 41. Accordingly, having regard to the severity of the cracking that developed between December 2008 and March 2009, the Panel determines that the FSP contributes 60% of the cost of repairs to the external and internal walls and cracked tiled floors. In reaching this conclusion, the Panel is mindful the FSP bears the onus of proof, demonstrating the applicability of an exclusion in order to defeat the claim. Case No: 222399 Determination Page 9 of 9 42. A detailed assessment of the damage to the buildings, and a Scope of Works (SoW), has not been completed so that there is no estimate as to the cost of repairs. Therefore the Panel recommends that the parties negotiate the matter of repairs, and if there is any further dispute regarding the SoW and ensuing quantum, the matter may be referred back to the Panel.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.