Determination 222143

Denial of claim for mismatched bathroom tiles and loss of rent

FirmFinancial Firm (Unknown - Insurer)
Decided2011-04-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's bathroom tiles were replaced by a contractor engaged by the body corporate and she complained the tiles did not match and claimed loss of rent from the insurer. AFCA found the policy did not cover the claim and the FSP was not obliged to indemnify her.

The FSP is liable for workmanship only where it instructed the work, and the claim arose from the body corporate's instruction, not an insured event under the policy.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 222143 Determination Page 1 of 2 Case number: 222143 General Insurance - Domestic Insurance - Home Building Damage to tiles in Applicant’s unit previously repaired by unrelated contractor - FSP Decision - Denial of claim 27 April 2011 Background 1. Pursuant to a commercial insurance policy which she held with the Financial Services Provider (FSP), prior to 26 May 2010, it had been necessary for tiles around the baths edge in the Applicant’s unit, to be replaced. The tiles had been replaced by a contractor appointed by the body corporate. 2. The Applicant was dissatisfied with the outcome following the installation of the new tiles. She considered that they did not match the existing tiles. 3. She claims against the FSP that the FSP should be responsible for the cost to redo the repair works. She also claims for a loss of rent which she allegedly suffers. 4. The FSP has denied the claim. It asserts that the policy does not provide cover in this situation. 5. This matter has been the subject of a Recommendation by a Case Manager within this Service. After considering all of the material on the file, the relative positions advanced by the Applicant and the FSP and various provisions contained within the policy of insurance, the Case Manager recommended that the FSP is entitled to deny the Applicant’s claim for the mismatched tiles and loss of rent. 6. The Applicant has rejected the Recommendation. In the letter advising that she rejected the Recommendation, she said the following: “I have no further reasons. I thought my explanation of my position was quite explicit.” I still maintain my claim comes under “this policy i nsures you for physical loss of or physical damage to: a building, if “building” is shown on the certificate of insurance.” 7. Having considered carefully all of the material which had been accumulated in this matter, both prior to and since the Recommendatio n by the Case Manager, I am absolutely certain that the Case Manager’s Recommendation was correct. I therefore direct that a copy of his Recommendation be attached to this Determination. Determination Case No: 222143 Determination Page 2 of 2 Reasons for Decision 8. I consider that the Applicant has brought this claim pursuant to a misunderstanding as to the coverage provided by the policy. 9. The immediat e cause of the Applicant’s loss is not damage to her building, which, in certain circumstances, might have been covered pursuant to the terms of the policy. I use the words “might” advisedly because on the material available on the file, it does not appear that the damage which led to the replacement of the tiles, was caused by a ruptured or leaking pipe. 10. However, that is not the question for Determination at this stage. The Applicant plainly raised the issue with the manager of the body corporate who in turn arranged for a contractor to carry out work including the replacement of the tiles. 11. The Applicant believes that the replacement tiles are inappropriate and do not match the other tiles. But the mere statement of this fact is surely sufficient to demonstrate that this is not a matter for which the FSP should bear any responsibility. 12. The Applicant may well have absolutely legitimate rights to pursue remedies in respect of the mismatched tiles, but such remedies are not against the FSP. If, in other circumstances, an FSP has arranged for repairs to a dwelling and the standard of those repairs was inadequate, different considerations would apply because an FSP is obliged to guarantee the quality of the workmanship carried out upon its instruction. 13. However, in this case, the work was not carried out pursuant to the FSP’s instruction, but, it appears, upon the instruction of the body corporate manager. Determination 14. I determine that the FSP is not obliged to indemnify the Applicant in respect to her claim for mismatched tiles or loss of rent.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.