Home / Financial Firm (Unknown - Insurer) / Determination 221001

Determination 221001

Water damage claim: floor repair amount, furniture and loss of rent

FirmFinancial Firm (Unknown - Insurer)
Decided2011-06-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$57,604
Non-financial loss—
Amount claimed$107,243
SourceAFCA PDF

Summary

The landlord claimed for water damage from a washing machine hose, disputing the floor repair figure, furniture and rental losses. AFCA ordered payment of $27,500 for floors, $4,993.75 for furniture and $25,110 for rent including the offer already made, plus interest on the floor and furniture sums.

The insurer had to pay the later repair quote and contribute to rent losses because its delays were unreasonable, but rent was payable only while the property was uninhabitable and the applicant had to mitigate.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 221001 Determination Page 1 of 9 Case number: 221001 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 30 May 2011 Background 1. The Applicant‟s property was insured with the Financial Services Provider (FSP) under a home building and contents policy. 2. The property was damaged as a result of water escaping from a washing machine hose that became disconnected from a tap. 3. A claim for property damage as well as for loss of rent was lodged with the FSP who, over a course of time, accepted liability and sought to cash settle the claim. 4. The Applicant believes the amounts paid by the FSP to date as well as its current offer do not adequately address his losses. Summary of Applicant’s Position 5. The FSP has not dealt with his claim efficiently. Its prior payments and settlement offers do not adequately address all of the damage the property sustained. He is unable to reinstate his property to its pre-loss condition based on the amount offered/paid. He cannot earn rental at his normal rates. He has lost and continues to lose rental. 6. He is entitled to $107,242.95, derived as follows: Rental losses $48,930.00 Floor repair cost $27,500.00 Furniture replacement $4,993.75 Previously approved (less $1,540 for electrical inspection) $25,819.20 Total $107,242.95 Rental loss 7. The policy terms clearly states that he is entitled to loss of rent until the property is repaired. Determination Case No: 221001 Determination Page 2 of 9 8. The property attracts $150 a night during the wet season (between October and April) and $285 a night during the dry season (between May and September). 9. Following the occurrence of damage, some bookings were cancelled while some were heavily discounted. 10. Maintaining the property in good condition is paramount to maintain continued occupancy and repeat business. 11. He is entitled to $48,930 for rental losses, derived as follows: 83 nights @ $150 a night $12,450 128 nights @ $285 a night $36,480 $48,930 Flooring damage 12. Whilst the FSP had agreed to pay him $15,592.50 to repair the floors, a 23 August letter advises that it would cost $27,500 to repair the floor. He should be entitled to $27,500 because it was a more recent quote. Furniture damage 13. He has provided the FSP a $4,993.75 quote for the damaged furniture. Summary of FSP’s Position 14. It is only obliged to meet the rental losses for the period the property was inhabitable. This would be the time the property was infested by mould and bacteria, and during the currency floor repairs. 15. The property could be occupied (and was in fact occupied) for the other periods the Applicant is seeking rental losses. The Applicant also did not provide evidence of his rental losses. 16. It accepts that the property was infested by mould and bacteria from 6 February 2010 until 30 March 2010 (when the property was cleaned). It agrees to pay for rental losses occurring from 6 February to 6 April 2010. 17. It estimates that floor repairs will take about 2 weeks and is prepared to cover rental losses for this period. 18. It is prepared to pay $11,200 for rental losses during these periods. 19. The FSP relies on the following policy provisions: “ Loss of rent for landlords If a listed event causes loss or damage to your home and we agree your tenants cannot live in it and need to move out while it is being repaired or rebuilt. Case No: 221001 Determination Page 3 of 9 Covered under Buildings Insurance  the rent you lose during the reasonable time it should take to repair or rebuild your home. We pay these costs for up to 12 months. We pay this on top of the buildings sum insured. ” 20. Its offer of $15,592.50 for the floor damage is based on the Applicant‟s own builder‟s quote. The Applicant accepted the offer. 21. It was not previously notified of a claim for damaged furniture. Its officer has asked the Applicant to supply a list of items that have been disposed and damaged. It is currently seeking clarification from its officer as to whether the list was supplied. Issues 22. Whether the Applicant is entitled to indemnity for loss of rent, and if so, for how much and for how long. 23. Whether the Applicant is entitled to indemnity for the damage to the property‟s floor, and if so, how much. 24. Whether the Applicant is entitled to indemnity for damaged furniture, and if so, for how much. Reasons for Decision 25. The Panel notes that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 26. In addition to the policy provisions referred to by the FSP, the Panel has also given consideration to the following policy wordings: “ Water and oil leaks If loss or damage is caused by water… leaking or escaping from an item shown in this section. Covered ► water leaking or escaping from: – …pipes – … – appliances – for example, washing machines or dishwashers – … Furniture and furnishings for landlords – non strata scheme If a listed event causes loss or damage to the items shown below in your home that is not under a strata or similar scheme. Case No: 221001 Determination Page 4 of 9 Covered under Buildings Insurance  your furniture, furnishings or carpets in your home for tenants‟ use. The most we pay is 10% of the buildings sum insured.” 27. The Panel considers the FOS Terms of Reference relevant to this dispute are: “ 8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these). 9.2.1 Compensation for direct financial loss or damage Subject to paragraph 9.2, FOS may decide that the Financial Services Provider compensate the Applicant for direct financial loss or damage. ” 28. The Panel has also given consideration to section 13 of the Insurance Contracts Act, 1984 which provides that a contract of insurance is a contract based on the utmost good faith, and there is implied in each contract, a provision requiring each party to act towards the other party, in respect of any matter arising under or in relation to it, with the utmost good faith. 29. It is necessary to briefly comment upon the manner in which the Applicant‟s claim has been handled by the FSP as the Panel is of the opinion it has significant bearing on the issues in dispute as well as the course the Panel proposes to take to resolve the dispute. Discovery of overflow 30. It is not in dispute that a washing machine hose had detached from a tap causing an overflow of water in the Applicant‟s property. The problem was compounded by a blocked grate which did not allow the water to flow. It was not entirely clear how long was the property subjected to water overflow. The Applicant‟s builder “rumoured” that it may have been for a 6 -week period. 31. In any case, the overflow was discovered by t he Applicant‟s neighbour on/about 6 February 2010. 32. Whilst it was initially disputed that the overflow of water had caused some of the damage to the Applicant‟s property, it appears that it is no longer the case now. Claim processing 33. It is not particularly clear when the claim was lodged. Case No: 221001 Determination Page 5 of 9 34. The Applicant appears to suggest that the claim was lodged soon after discovery of the overflow but did not specify a date. He claims to have been initially advised that the FSP would be sending an assessor to inspect the damage. The inspection did not occur because he was subsequently asked to provide a report and quote from a builder some 3 to 4 weeks later. Apparently, the FSP was unable to find an assessor in the area where the property was situated. 35. The FSP has not spec ifically denied the Applicant‟s version of events, but suggested that the claim was lodged on 17 March 2010; which was some 5 to 6 weeks after discovery of the loss. However, it has not provided any evidence to substantiate this fact although it was in a better position to confirm it; as it ordinarily retains such records as a matter of course. 36. The Panel further notes that it has not provided any evidence demonstrating what steps it had taken following lodgement of the claim. It has not supplied a full set of its file and claims notes for purposes of the dispute. It only provided very limited extracts which do not shed light on when the claim was lodged and what occurred after that. 37. As the FSP has not presented any evidence on the matter, the Panel is left with little option but to accept the Applicant‟s version of the events as accurate. 38. As the Panel understands the Applicant‟s evidence, he obtained a builder‟s report and repair quote of about $141,000, and provided it to the FSP sometime in May 2010. An adjuster was apparently appointed within 48 hours. 39. It appears that the adjuster had recommended the appointment of a structural engineer. It also appears that the adjuster, structural engineer and an assessor jointly inspected the property on 13 July 2010, more than 5 months after discovery of the overflow and some 3 months after the FSP was apparently in receipt of the Applicant‟s builder‟s report. The FSP has not explained what occurred prior to the joint inspection, so the Panel is left with little option but to accept that it did not act on the claim during that period. 40. The structural engineer‟s report was issued on 17 July 2010 while the adjuster‟s first (and it appears, only) report was completed on 20 August 2010; some 5 weeks after the joint inspection. 41. On behalf of the FSP, the adjuster subsequently wrote to the Applicant on 23 August 2010, denying certain aspects of the claim and making a substantially reduced settlement offer. The Panel notes that this was more than 6 months after the event. 42. The Applicant disputed the settlement, leading the FSP to finally accept liability for the floor damage sometime in September 2010. 43. To date, it appears that the Applicant‟s flooring and contents claims have not been paid. Case No: 221001 Determination Page 6 of 9 44. Having reviewed the material, the Panel does not consider it reasonable that it took the FSP more than a month to initially act on the claim, 5 months to inspect the damage and 6 months to decide on the claim. These are clearly (and in fact, substantially) outside the time frames specified in the General Insurance Code of Practice when dealing with claims. 45. Whilst the Panel acknowledges that the location of the property may have some impact on the progress of the claim, the Panel does not consider it reasonable that this should result in a 6-month impact. 46. Furthermore, it offered no explanation for the delays. 47. In the Panel‟s view, the FSP‟ s processing of the claim leaves a lot to be desired. It is not only reflective of poor insurance practice; it is also inconsistent with an obligation to act with utmost good faith. Floor damage 48. The Panel understands that the FSP has now accepted responsibility for the floor claim after initially denying liability. To this end, it offered the Applicant $15,592.50, pointing out that the offer was based on the estimate provided by his builder. The Panel understands his builder‟s quote was done in April 2010 w hile the FSP‟s offer was only made in late September 2010; some 6 months later. 49. The Applicant disputes the adequacy of the offer, contending that the offer should be based on the $27,500 estimate prepared by the FSP‟s structural engineer because it is the later, and presumably, more accurate estimate. The Panel understands this estimate was done in July 2010 (about 4 months after the Applicant‟s builder‟s estimate). 50. The Panel agrees that the Applicant is entitled to the benefit of the later quote. Additionally, it is of the view that he is entitled to the benefit of any further costs increases when the relevant repair is actually carried out. 51. As previously pointed out, the FSP has not attended to the claim in a timely manner. The Panel is of the view that the FSP should be responsible for any further costs increases on this basis alone. Furthermore, the estimate prepared by its structural engineer is likely to be inaccurate by now since it is almost 10 months old. 52. The FSP sought to deny the claim on the grounds that the damage was pre- existing, and due to wear and tear and defective construction; purporting to rely on the advices of its adjuster and structural engineer. 53. The adjuster claimed that the floor damage was due to wear and tear, and “initial construction of the premises”. Its structural engineer said that the damage was pre- existing and “does not deter from structural condition”. 54. Neither explained what led them to conclude that the damage was due to wear and tear or was pre-existing. Neither explained, and the Panel has no idea, Case No: 221001 Determination Page 7 of 9 what each of them meant by their respective comments that the damage was due to “initial construction of the premises” or “does not deter from structural condition”. In any case, none of these expressions are capable of suggesti ng defective construction. 55. There is also no physical evidence provided to support propositions of wear and tear, pre-existing and faulty construction. The FSP did not appear to consider it necessary to provide the Service with clear coloured photographs. It provided black and white copies which are of little use to the Panel. It is not clear in what way these were intended to support its submission. 56. It is nothing new that persons purporting to be experts must provide a sound basis (and evidence) for their conclusions. This is not only a requirement of law it is also a requirement of the Service; as evidenced in its many previous determinations. 57. In the absence of persuasive evidence that the floor damage was pre-existing, due to wear and tear and defective co nstruction, the FSP‟s initial denial of liability was clearly untenable. Furniture claim 58. The Applicant seeks $4,993.75 for damage to some furniture; a significant reduction from the $20,000 estimate provided by his builder in April 2010. 59. As the policy covers such items, the Panel is unclear why the FSP has not addressed this aspect of the claim at all. 60. Instead, it seeks to suggest that it was unaware of this claim until sometime in September 2010 and it is “currently seeking clarification from [its adjuste r] as to whether the Applicant provided a list of the contents items in respect of which the Applicant sought cover”. 61. The Panel finds the excuse given unacceptable. The FSP has had more than reasonable time and opportunity to investigate and process this aspect of the claim. Furthermore, this loss was specified in the Applicant‟s builder‟s estimate which the FSP already had possession of long before September 2010. It was therefore on notice of this claim for much longer time than it purports to suggest. 62. In the absence of a reasonable excuse why this aspect of the claim has not been addressed, the Panel is left with little option but to conclude that the Applicant is entitled to indemnity for such loss based on the quote he supplied. Rental loss 63. Insofar as loss of rent is concerned, the policy is clear in that a policyholder is entitled to rental losses for the reasonable period it takes to repair the property. The precondition for cover to arise is also clearly expressed in that the property must have sustai ned damage as a result of a “listed event” and must be uninhabitable as a result. Case No: 221001 Determination Page 8 of 9 64. The FSP was prepared to accept that the property was uninhabitable between the time of the loss and the time it was cleaned of mould and bacteria (ie. from 6 February 2010 to 30 March 2010) although the property was in fact occupied for 12 days during this time. It was also prepared to accept that it would be uninhabitable for an estimated 2 weeks for repairs to be carried out. At all other times, it maintains that the property was in fact, or could be, habitable. 65. On that basis, the FSP offered a settlement of $11,200 which it derived as follows: 6 February 2010 to 6 April 2010 @ $150 per night (save for the 12 days the property was actually rented out) $7,200 2 weeks to repair the property @ $285 per night $3,990 Total (rounded to the nearest $100) $11,200 66. Whilst the Applicant correctly points out that he is entitled to cover until the property is repaired, he has not demonstrated that his property was uninhabitable. On the contrary, the evidence at hand shows that it was, in fact, habitable although the Panel accepts that the conditions were arguably not as ideal as they ought to have been. 67. It is clear that the property was habitable and the policy wording is specific in that he is only entitled to rental loss if the property is uninhabitable. 68. In the circumstances, the Panel is satisfied that the FSP was correct to say that the policy would only respond to the two periods it had identified. 69. Having said that, the Panel is mindful that the FSP has not dealt with the claim in a timely manner, or in a manner consistent with good insurance practice and its obligation to act with utmost good faith. It has adopted a somewhat lax approach in dealing with the claim causing the Applicant to incur rental losses. 70. In the Panel‟s view the delays in resolving this claim could well have contributed to the extent of lost rental income and the Panel considers it fair in all the circumstances that the FSP should contribute to such losses pursuant to clause 9.2 of the Terms of Reference. 71. However, the FSP cannot be held wholly responsible for the loss of income, as clearly the premises were to some extent habitable and it is not sufficient for the Applicant to elect not to pursue further rentals pending resolution of his dispute with the FSP; the Applicant has a responsibility under his policy to mitigate his losses. 72. The Applicant‟s evidence is that he usually charges $150 a night during the wet season (ie. between October and April) and $285 a night during the dry season (May and September). He has also provided a rental schedule depicting the rents he has collected from September 2009 to July 2010. 73. The Applicant has also submitted that it would be reasonable to assume unoccupancy until 30 September 2010. Case No: 221001 Determination Page 9 of 9 74. There is no evidence as to what usually is or would be the rate of occupancy for the premises, and the schedule provided offers little guidance. On this basis, the Panel is inclined to the view that full occupancy over the whole period is unlikely and an occupancy rate of „two - thirds‟ would not be unreasonable. 75. The Panel therefore determines that in addition to its offer of $11,200 for the period detailed in the FSP‟s submission, it should also contribute to the Applicant‟s continued loss. 76. The FSP‟s offer was for the period to 6 April 2010 plus two further weeks at $285 per night. Therefore assuming a total unoccupancy through until 30 September (after deducting the two weeks as above) a 66.6% occupancy rate would result in a further 16 days at $100 and a further 92 days at $285, which totals $27,820. 77. However, given the Applicant‟s failure to mitigate his loss , the Panel determines he should bear an equal proportion of that loss; each party will bear half the cost of the loss, being $13,910. Determination 78. Therefore, the Panel determines: (a) The FSP is to indemnify the Applicant for the damage to the property‟s floor, and in the event it elects to settle this aspect of his claim in cash, it is to pay him the sum of $27,500; (b) The FSP is to pay the Applicant the sum of $4,993.75 for his damaged furniture; (c) The FSP is to contribute to the Applicant‟s rental losses by way of payment of $13,910 in addition to its offer of $11,200 being a total of $25,110; and (d) The FSP is to pay interest on the amounts set in (a) and (b) above from 8 November 2010, being the date of its IDR letter, until settlement. Given that rental income would be cumulative over the period, the Panel determines that interest will not be payable on this amount.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.