Home / Financial Firm (Unknown - Insurer) / Determination 220741

Determination 220741

Roof and storm damage claims refused for lack of maintenance, with recovery of earlier payment

FirmFinancial Firm (Unknown - Insurer)
Decided2011-01-05
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$746
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's shop claims for storm damage in February and March 2010 were refused because the roof and box gutter were deteriorated and not properly rectified after the 2009 claim. AFCA upheld the refusals, ordered the FSP to indemnify $746.42 of make-safe costs set off against the FSP's $3,650 refund claim, and declined the lost rent claim.

The policy excludes wear and tear and structural defects and the resultant interior damage, and the make-safe costs fall within the temporary protection cover.

Issues

Subjects and remedies

natural disastersmall businesspay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

220741 Determination 1 of 8 DETERMINATION Case Number: 220741 Small Business – storm – gradual deterioration SUMMARY OF FACTS 1. On 3 April 2009, the applicant’s premises suffered damage from water leaking through the roof. The Financial Services Provider (FSP) accepted liability under the applicant’s business insurance policy for the internal damage, but denied the claim for rectification of the roof on the grounds that the damage to the roof and guttering was a direct result of lack of maintenance, wear and tear. The claim was settled by cash payment of $3,650 less the policy excess to the applicant. 2. On 16 February 2010, the applicant lodged a further claim for water entry to the premises which occurred on or about 11 February 2010. 3. On 9 March 2010, the applicant lodged a further claim for water entry to the premises. 4. The FSP denied the two further claims on the ground that as a result of the investigations in the first claim, the applicant could reasonably be expected to be aware of the defect or faults with the roof that enabled rainwater to enter the premises. In addition, the applicant had not carried out works to rectify the extreme deterioration and wear and tear, but had undertaken rectification works which proved to be inadequate. ISSUES IN DISPUTE 5. Whether the FSP was entitled to deny liability for rectification of the roof; and 6. Whether the FSP was entitled to deny liability for the internal damage arising from the second two storm events. RELEVANT POLICY PROVISIONS “What we cover 7. Wind and/or water (including snow, sleet and hail). What we exclude Loss or damage: ….  caused by water entering the premises as result of structural defect, faulty design or faulty workmanship.  caused by wear and tear, but does not apply in respect of resulting loss or damage caused by wear and tear. Extra benefits … 5. Temporary protection any reasonable costs that are necessarily incurred by you for the temporary protection and safety of your property at your premises . … Section 5 – Business Interruption What we exclude 220741 Determination 2 of 8 Any claim for a reduction in gross income or weekly income where there is no insurance in place which has paid or will pay for the loss or damage to your property at your premises .” TERMS OF REFERENCE “ 8.2 Dispute resolution criteria Subject to paragraph 8.1 , when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these). ” REASONS FOR DECISION 8. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 9. Following the first claim in 2009, she obtained quotes to fix roof sheets to allow new box gutter and adequate rainwater to discharge, new gutter and flashings and to install a downpipe. 10. Although the FSP denied her claim for the external damage, she employed a plumber to fix the problems with the roof as outlined in their quote, including installation of a new quad gutter. 11. Due to the extended time the FSP took to report back to her , she did not have sufficient time to organise the various tradesmen to replace the roof and associated plumbing and electrical work. 12. In March 2010, a severe storm caused significant damage to the property. 13. She had provided the FSP with details of the external repairs carried out by the plumber. Statements from the assessor and a contractor support her argument that she had implemented maintenance repairs to the property. 14. The FSP employed a contractor to assess the safety of the building and refused to pay the invoice. 15. The invoices clearly show that the maintenance issues included fixing of roof sheets, new gutter and flashings, the installation of the downpipe and internal plaster repairs and painting. The FSP ’s Submission 16. The FSP has made the following comments regarding the damage in April 2009:  It relies on contractors ’ reports stating that the damage was due to lack of maintenance rather than caused by a storm. However, it made a cash payment of $3,650 to cover the internal repairs.  The applicant’s contractors’ reports from this time note that certain areas of the roof and guttering required replacement or repair. 220741 Determination 3 of 8 17. The FSP has made the following comments regarding the damage in February 2010:  The applicant reported that on 11 February 2010 the property suffered internal damage as a result of a storm.  It is clear from a report obtained by it that the applicant had not carried out adequate repairs when it was damaged in April 2009.  Reports show that contrary to the applicant’s assertion, the defective middle box gutter was not replaced. The work carried out by the plumber contracted by the applicant was not adequate in light of the works required and led to the additional damage. 18. The FSP has made the following comments regarding the damage in March 2010:  An investigation found the roof was extensive ly degraded and apart from a new section, all other elements appeared to be in extremely poor condition.  The collapse of part of the ceiling in building number 61 and damage to the plasterboard bulkhead in the archway between the two buildings had worsened since April 2009 and February 2010.  Taking into account the various reports , it is apparent that the damage resulted from the poor condition of the roof and associated plumbing which the applicant had not adequately rectified despite advice the previous year from contractors.  Had the box gutter and associated roofing been rectified in 2009, the overflow into the buildings would not have occurred. It is therefore entitled to deny the second and third claims for repairs to the buildings.  The evidence also established that the applicant had been paid for repairs which were also claimed by the applicant’s former husband under a policy with another insurer.  It therefore is entitled to seek reimbursement from the applicant for the payment made.  The applicant’s claim for loss of rent does not succeed as the lost rent would not have occurred had the roof been properly maintained. Consideration of each party’s submission 19. The FSP seeks to rely on clauses in the policy to deny the claims and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clauses apply to defeat the claims. 20. Following the April 2009 incident, the FSP commissioned a contractor “TS” to inspect and report on the cause of the damage. The contractor’s report of 20 May 2009 contained the following information: - The roofing consists of two corrugated iron gable roofs separated by a box gutter. 220741 Determination 4 of 8 - The gutter on the eastern side (street side) is completely rusted out and requires replacement. The painted iron roof is also in need of general maintenance. - There is evidence of water pooling in the middle of the centre gutter. This area of gutter has insufficient grading or fall to allow adequate rainwater run-off and is directly above the internal damage to the plaster bulkhead in the store. - The cause of the loss was most likely an overflow of the gutters due to heavy rain and insufficient gutter fall or even a blocked downpipe. - There is no evidence of any recent storm damage or any storm-created opening. 21. Captioned photographs submitted by the contractor have helped me to understand the roof and middle gutter configuration. 22. Following the February 2010 claim, the FSP commissioned the same contractor “TS” to report on the cause and extent of the damage. The contractor provided the following information in his report of 5 March 2010: - A new quad gutter had been installed. - During their inspection, a brief shower occurred and they were able to witness water pooling in the middle of the centre box gutter. - This area of gutter had insufficient grading or fall to allow adequate rainwater run-off and was most likely the cause of the internal damage. - The worsening internal damage was linked to the same cause as the 2009 claim. 23. Captioned photographs taken by the contractor show the middle box gutter with water pooling before the rain started, rainwater pooling during the brief shower, rainwater lapping over the top of roof sheets, the gutter filling with rainwater due to inadequate fall/grading, and the gutter filling up with water likely to get under the left hand side of the gutter. 24. A photograph is included, showing the new quad gutter with the caption that it is not related to the cause of the resultant damage. 25. Following the March 2010 claim, the contractor “TS” in a report dated 14 March 2010 noted: - there was no storm damage to the roof or a storm-created opening. - the condition of the roof is the same as when inspected on 5/3/10. - damage to the main shop area occurred due to overflow of the middle box gutter which had inadequate fall and is severely deteriorated. - damage to the rear of the shop was due to gutter overflow on the rear lean-to as the gutters, downpipes and spreaders could not cope with the volume of water due to the construction of the roof plumbing system. - damage to the north-western rear room in the adjoining building not part of the shop was due to pvc pipe spreading a vast amount of water over the deteriorated corrugated iron roof resulting in the dropping of the plaster ceiling below. 220741 Determination 5 of 8 26. The applicant obtained a quotation d ated 7 May 2009 from a plumber “PP” to carry out rectification works. The quotation was for the following works: “supply and install custom zincalume flashings to box gutter and roof area Cut back roof sheets and fix down to allow rainwater to discharge from valley gutter Install rainhead and install extra downpipe to help discharge rainwater from valley gutter.” 27. The applicant submitted an invoice dated 9 June 2009 from the plumbing contractor “PP” for the works quoted on 7 May 2009, plus installation of a new quad gutter across the front and down the side of the shop. 28. I also refer to a contractor’s ( “MP’s” ) quotation obtained by the applicant in April 2009, which noted “ there are several issues with the roof above 61 & many areas where the roof may be leaking.” “MP” recommended upgrading sections of the roof and replacement of the middle box gutter. 29. By email to the applicant dated 23 March 2010 , the FSP’s assessor commented on his inspection of the premises. He found the roof was extremely degraded, and in the room behind the shop he could see rust holes in the roof above the partially collapsed ceiling directly under the end section of the box gutter. He could see holes in the iron roof sheeting above the small rear bedroom which suggested re-sheeting at some stage with used iron. 30. Photographs taken by the assessor show interior damage, rust holes in iron sheets, and holes in iron sheeting. The photographs also show a weatherboard section of the premises which clearly demonstra tes lack of maintenance and deterioration of the timber weatherboards. 31. The policy provides cover for loss or damage to the property caused by wind and water. For the claim to succeed there must be evidence that the damage claimed was caused by water. 32. The evidence has established that no damage had been caused to the roof materials by the storms in 2009 and February and March 2010. The condition of the roof was described by the contractor as in need of general maintenance. The contractor further noted there was no evidence of storm-related damage to the roof or a storm-created opening. 33. I therefore conclude that the condition of the roof was due to deterioration and lack of maintenance and not from any storm-related events. It follows that the cost of replacing or rectifying the roof does not fall within the cover provided by the policy. 34. The evidence has also established to my satisfaction that the dominant cause of the internal damage was the deteriorated condition of the roof. In particular, the middle box gutter which had an inadequate fall and demonstrably had overflowed into the rooms below. 35. While the policy provides cover for loss or damage caused by water damage, the policy goes further and does not cover any loss or damage caused by water entering the premises as a result of a structural defect. The policy further excludes loss or damage caused by wear and tear but not the resultant damage. 220741 Determination 6 of 8 36. It has been established the ingress of water into the premises was due to an incorrectly installed box gutter between the two roofs and the deteriorated condition of the roof. In these circumstances, in my opinion, the resultant interior damage claimed by the applicant was due to structural defects and wear and tear. 37. However as the applicant was not aware of these problems prior to the 2009 claim, the FSP admitted liability for the internal damage and paid the applicant for the cost of rectifying that damage. 38. Following the 2009 claim, the applicant obtained two quotations to rectify the roof problems. Significantly, plumber “MP” reported there were several issues with the roof and that it was leaking in many areas. “MP” recommended upgrading the roof to the right hand side including the box gutter in the middle which wa s rusted. “MP’s” quote included installation of a box gutter between the two roofs. This quote was unsuccessful. 39. The applicant therefore was aware of the problems associated with the roof and the middle box gutter in 2009 and accepted a quote to rectify some of the problems. Rectification of the problems associated with the middle box gutter or replacement of the roof had not been included in the quote or works carried out by the applicant’s plumber “PP”. The FSP’s assess or noted that in light of “MP’s” quotation, the works authorised by the applicant were totally inadequate and did nothing to rectify the main problem which was overflow from the middle box gutter. 40. The evidence has established that the internal damage claimed in February and March 2010 was directly caused by problems with the middle box gutter and the leaking roof. These problems were known to the applicant prior to the 2010 claims but not included in the repairs she authorised following the 2009 claim. 41. In these circumstances, I accept that the FSP was entitled to rely on the terms of the policy to deny the claims for internal damage arising from the February and March 2010 storms. FSP’s recovery of claim payment made to applicant 42. The FSP contends that the damage claimed in the April 2009 event and paid for by the FSP had not been repaired and that a claim had been made on another insurer for the same damage which had been repaired by that insurer in about June/July 2009. 43. The FSP claims that the damage paid by the other insurer to the repairer was also claimed under the FSP’s policy. The FSP submits that the applicant has ultimately been compensated for the same area of damage twice by two different insurers and seeks to recover the payment of $3,650 less the policy excess of $250 made by it to the applicant. 44. The applicant submitted a letter from builder “KS” stating that it had received authorisation from the other insurer and that her claim was approved and the builder had been authorised to proceed with the repair works. The scope of works included: “repair flush joint to plaster ceiling aprox 4.0Lm Prepare & paint plaster ceiling to main shop area aprox 80m2: ” 220741 Determination 7 of 8 45. In an email dated 24 March 2010, the applicant explained that her former husband had arranged to have the repairs completed. 46. A Completion of Work Certificate was issued by the builder on 12 January 2009 and signed by the applicant on 26 June 2009. A Tax Invoice dated 7 July 2009 for the quoted works was also provided. 47. The payment of $3,650 to the applicant following the April 2009 claim was based on a quotation by the FSP’s builder “TS” which included: “Scrape back all damaged plaster to ceiling and bulkhead Carry out minor repairs to plaster Paint bulkhead and ceiling on eastern side of shop (no allowance at this stage for after hour’s works).” 48. In a letter to the applicant dated 2 June 2010, t he FSP’s assessor sta ted that the other insurer’s claim number suggested the claim occurred sometime in the year ending June 2009, which was some time before the policy with the FSP commenced on 31 January 2010. The builder informed him that the repairs had been completed a few days before the invoice was issued on 7 July 2009. 49. I have some difficulty linking the dates referred to by the assessor to the material presented by it. The FSP informed FOS the applicant’s policy commenced on 31 January 2009 and expired on 31 January 2011. The applicant ’ s first claim under the policy was made in February 2009 following which the FSP paid the sum of $3,650 to the applicant. It therefore seems that the assessor’s reference to the policy commencing on 31 January 2010 is in error. 50. If, as the assessor states, the claim with the other insurer was made before June 2009, then clearly it was made while the FSP’s policy was in force. 51. In any event, the evidence leads to the conclusion that the FSP paid for works which were authorised by the applicant’s former husband with another insurer. Those repairs were completed and invoiced to the other insurer. 52. In these circumstances, the FSP is entitled to a refund of the monies paid to the applicant in good faith. Make safe repairs 53. The applicant states the FSP arranged for make safe repairs to her premises and refused to pay the contractor's invoice of $746.42. The invoice dated 29 June 2009 refers to works carried out to the interior plaster following storm damage. 54. The FSP has not responded to this issue. 55. The policy provides cover for temporary p rotection for any reasonable costs that are necessarily incurred by the policyholder for the temporary protection and safety of the property. 56. The applicant stated she was unsure why the contractor was organised as she had already contacted the SES. 57. In these circumstances, having regard to what is fair and reasonable and good insurance practice, I consider that the applicant is entitled to be indemnified for these costs. 220741 Determination 8 of 8 Loss of rent 58. The applicant also claimed for rent lost as a result of the storm events in 2010. 59. However, the policy provides that any claim for gross income or weekly income is not covered where there is no insurance in place which has paid or will pay for the loss or damage to the property. 60. It has been established to my satisfaction that the applicant’s pol icy does not respond to the claims made in 2010. 61. I therefore consider the applicant’s claim for lost rent does not succeed. CONCLUSION 62. Accordingly, I determine the FSP was entitled to deny the property damage claims made in February and March 2010 and the loss of rent claim following these events. 63. I further determine the applicant is entitled to be indemnified for the cost of the make safe repairs authorised by the FSP in the sum of $746.42. It is fair in the circumstances that this sum be set off against the sum of $3,650 refundable by the applicant pursuant to paragraph 52 above.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.