Determination 220360

Storm damage claim - scope of works and quantum dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$60,110
Non-financial loss—
Amount claimed$175,000
SourceAFCA PDF

Summary

A holiday park operator claimed a $175,000 cash settlement for storm damage to park buildings, disputing the FSP's scope of works and its partial liability for foundation-related damage. AFCA found the FSP liable for storm damage on a composite estimate with a 22.5% margin, set at $57,609.75, plus $2,500 temporary repairs and statutory interest, and rejected the loss assessor fee and claim-pursuit costs.

The FSP is liable only for damage caused by the storm event under the defined events cover, excluding foundation movement damage, applying the independent engineer's findings to the composite estimate.

Issues

Subjects and remedies

natural disastersmall businesspay claimpay compensationpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 220360 Determination Page 1 of 11 Case Number: 220360 General Insurance – Business Insurance Policy – Holiday Park Buildings – Storm and rainwater damage – Extent of damage - Quantum dispute 26 June 2011 Background 1. The Applicant insured his Holiday Park buildings under a Business Insurance Policy against loss or damage caused by defined events for a sum insured of $891,500 with a $250 policy excess. The policy also provided Accidental Damage cover in the amount of $100,000. 2. On or about 25 November 2009, the locality of the insured premises suffered a severe wind and thunderstorm storm. The insured property suffered damage to:  Residence, reception area and office;  Radio room;  Cabins;  House roof;  Roof mounted evaporative air conditioner;  Games room;  Main toilet block; and  Disused toilet block. 3. The Financial Services Provider (FSP) accepted that the Applicant ‟s property had been damaged by the defined event „storm‟. In a report dated 11 December 2009, a loss assessor stated that some of the damage to the Applicant ‟s property appeared to not have been caused by the storm. 4. Following this report, the FSP appointed a consulting engineer, „S‟, to report upon the cause of damage to brickwork associated with the office, observatory/radio room and caravan park toilet blocks. The engineer reported that some of the damage to the buildings was associated with seasonal ground movement although some of the cracks had worsened since the storm. 5. Based upon the engineer‟s report, the FSP‟s loss assessor prepared a Scope of Works (SOW) limiting the repairs to the non-structural aspects except for the roof of the two storey radio room. 6. On 16 March 2010, builder „B‟ submitted a quote for the cost of repairs based upon the SOW for the amount of $51,277.82. This was later increased to Determination Case No: 220360 Determination Page 2 of 11 $63,215.70. The Applicant has disputed the engineer‟s opinion that some of the damage had not resulted from the storm. 7. The Applicant engaged the services of builder „D‟ to provide a quote for repairs. On the 28 July 2010, the builder submitted an estimate for the amount of $106,260. However, this estimate applied to only the Applicant ‟s residence, office and reception area. 8. In response to this quote, the FSP requested engineer S to review the two builders‟ quotes. The engineer considered builder D‟s quote was excessive and that builder B‟s quote was more realistic. 9. In an email dated 27 August 2010 to the FSP, the Applicant submitted a cash settlement claim for the amount of $175,000 „...in full settlement of your obligatio ns in regard to rectification works.‟ 10. On 15 September 2010, the FSP offered to cash settle the claim for $63,215.70 less GST, that is, $57,468.83 which was rejected by the Applicant. 11. The terms of settlement of the claim reached a stalemate. Summary of Applicant ’s Position 12. The scope of works (SOW) prepared by the FSP‟s loss assessor does not properly address rectification of damage caused by the storm. The SOW does not include the following matters:  Electrical works – replacing two switchboards;  Residence roof – roof and wall has parted;  The FSP‟s engineer‟s SOW recommendations would not be viable to rectify the damage. It would be structurally unsound and unsafe if rectification was limited to the nature of works envisaged by the SOW;  Accommodation and temporary offices – time allowance too short;  Damage to some of the cabins has been ignored. 13. In view of the FSP‟s refusal to contemplate any changes to the SOW, he engaged the services of consulting engineer, „H‟ , to prepare a report on the damage to the insured property and a SOW for the required repairs. 14. When reporting on the damage to the amenities buildings, engineer H stated: “ Amenities. The amenities buildings show obvious signs of wind damage superimposed on pre-existing foundation movement. Some of the wall cracking is obvious foundation movement (and these would be typically horizontal and vertical cracking in the wing walls and step cracking in the side walls adjacent to the endwalls and arches at the endwalls), but the majority of the cracking on the side walls is typical of high uplift forces causing rotations in the brick piers and tension failure of a plug of brickwork.‟ Residence/Office. The dwelling/office has similarly experienced high uplift forces which have resulted in the complete loss of the roof of the radio roo, Case No: 220360 Determination Page 3 of 11 fracturing of the bedding to the roof tiles, springing of flashings and general loss of weather tightness.” 15. The engineer prepared a SOW for:  East amenities building;  West amenities building;  Residence/office;  Cabin 3;  Cabin 16;  Cabin 21; and  Cabin 22. 16. The disparity between the two builders‟ quotes is because builder B has quoted in accordance with the loss assessor‟s SOW whereas builder D has quoted to only reinstate the damage. 17. He has not been able to find a local builder who will quote on the loss assessor‟s SOW for the toilets rectification. In view of the builders who have inspected the damage it was considered that repairs affected in accordance with the loss assessor‟s SOW would lack structural integrity. 18. The FSP has made issue that he was contemplating replacing the existing storm damaged structure with something more elaborate. He is contemplating replacing some storm damaged buildings but this should not be allowed as an excuse for the FSP to understate the nature of rectification work required. 19. There are no costs included in his builder D‟s quote which relate to any proposed redevelopment beyond reinstatement of storm damage. In fact, in August 2010, he suggested that a builder be engaged by the FSP to complete rectification works. (This was done prior to him being aware that the FSP could avoid this option). 20. The FSP has stated that a true replacement cost for the radio room is not measureable until repairs are commenced or completed. However, it is not clear why this compels acceptance of builder B‟s quote over that of builder D. Further, safety fencing etc and temporary accommodation is in builder D‟s opinion required as the nature of the work is more extensive that that envisaged by the loss assessor‟s SOW. 21. He has also incurred clean-up costs for the amount of $9,761 which the FSP contends comprises a separate claim. Summary of FSP’s Position 22. It relies on the engineer S‟s report which is quite detailed in its explanation of the resultant damage by storm and that of seasonal earth movement. 23. When the Applicant disputed the settlement offer of $57,468.82 made on 21 September 2010, it was suggested that to obtain agreement between the Case No: 220360 Determination Page 4 of 11 parties on the SOW, a meeting take place between the loss assessor, Applicant, builder and engineer commissioned by the FSP. 24. A meeting is yet to take place. The FSP relies on the following policy/contract provisions: „ 1 – BUSINESS INSURANCE Section A – Business Property Cover What you are covered for We will cover you for loss or damage caused, during the Period of Cover, to your Business Property by the events listed under Defined Events Cover and Accidental Damage Cover. ... Defined Events Cover We cover you for loss or damage at the Business premises caused by the following Defined Events: ... 7. storm and rainwater, ... ... Accidental Damage Cover We will cover you for Accidental Damage to Your Business Property at the Business premises other than the events or items listed under What you are not covered for under Accidental Damage Cover. The maximum amount we will pay for Accidental Damage Cover for any occurrence is the accidental damage Sum Insured shown on the Schedule. What you are not covered for under Accidental Damage Cover We will not pay for claims under Accidental Damage Cover for loss or damage: 1. caused by any Defined Events covered in Defined Events Cover; 2. ... 3. caused by events or to the items listed under General Policy Exclusions on page 48; 4. ... 5. ... 6. caused by storm and rainwater, other than damage to fences made entirely from brick , stone, concrete and/or iron;‟ Issues 25. Whether the FSP has indemnified the Applicant under the terms and conditions of the policy of insurance. Case No: 220360 Determination Page 5 of 11 Reasons for Decision 26. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. 27. The storm damage to the Applicant ‟s property occurred on or about the 25 November 2009. However, the property remains in a state of disrepair which has, and will continue to, have a detrimental effect on the Applicant ‟s business. 28. Main chronology of events is as follows:  25 November 2009 – storm event;  26 November 2009 – claim lodged;  26 November 2009 – lo ss assessor‟s first attendance;  11 December 2009 – loss assessor‟s second attendance – confirmed it was arranging for an engineer‟s report;  21 December 2009 – Engineer S inspected property and completed his report on or about the 3 January 2010;  11 January 2010 – loss assessor‟s third report – confirmed engineer S due to submit his report;  25 January 2010 – loss assessor‟s fourth report – confirmed engineer‟s report had been received; loss assessor submitted a SOW;  19 February 2010 – loss assessor‟s fifth report - reported it was awaiting builders‟ quotations;  4 March 2010 – loss assessor‟s sixth report - Upon receipt of tenders for repair will seek further instructions.  26 March 2010 – loss assessor‟s seventh report – still waiting for its builder, „B‟, an d Applicant ‟s builder to submit quotes;  22 April 2010 – loss assessor‟s eighth report – had received builder B‟s quote dated 16 March 2010 – Applicant unable to obtain quote – reported Applicant considering substantial renovation of the site;  24 May 2010 – loss assessor‟s ninth report – we now await a second builder‟s estimate before proceeding any further with claim;  13 August 2010 – loss assessor receives additional quote from builder B for amendment to its first quote; Case No: 220360 Determination Page 6 of 11  26 August 2010 – loss assessor‟s te nth report – had obtained Applicant ‟s builder „D‟s‟ report dated 28 July 2010 – assessor considered D‟s quote contained additional works that do not form part of the claim;  27 August 2010 – Applicant sends email to FSP expressing frustration at delays in processing his claim – submits settlement claim for the amount of $175,000; [P139]  30 August 2010 – FSP responds to Applicant ‟s email – informs him that it will instruct its engineer S to review the q uotes from builder B and builder D for repairs to the Radio Room;  13 September 2010 – engineer S informs FSP that after reviewing photographs and previous reports it considers builder D‟s quote to be excessive;  21 September 2010 – loss assessor‟s eleventh report – no comment as to claim;  23 September 2010 – FSP confirms that its current cash settlement offer is $57,468.82 – FSP also states that if Applicant does not agree with the offer, a meeting between Applicant, loss assessor, builder B, and its engineer S be convened in an attempt to expedite the claim;  1 November 2010 – loss assessor‟s twelfth report – loss assessor advised FSP that subsequent to arranging a meeting between the parties, the Applicant ‟s engineer „H‟ had contacted them; loss assessor advised FSP it would be beneficial for the engineer to report on behalf of the Applicant;  22 December 2010 – report and scope of works submitted by engineer H. 29. It appears that the FSP has done very little, if anything, to progress the Applicant ‟s claim to a satisfactory conclusion. 30. The Applicant has informed the Financial Ombudsman Service that the damage to his property has worsened considerably over the last 20 months due to the rainwater escaping under building foundations and the action of strong wind on the damaged structures. 31. In view of the ongoing difficulties in attaining settlement of this claim, the Panel determined that an independent structural engineer (G) be appointed to examine and report on the damage to the Applicant ‟s property. Independent Engineer’s Report 32. In its report dated 14 February 2012 G records it carried out an on-site inspection of the damage and reviewed the respective engineering reports submitted by the Applicant and the FSP prior to making its report. Case No: 220360 Determination Page 7 of 11 33. The report addresses three main areas of dispute resultant from the identified damage, namely the damage to the main office/residential building and the damage to the eastern ablution block and the western ablutions block. The Main Office/residential Building 34. G reported that, at the time of inspection, the remaining damage was mainly superficial but there “was evidence of damage caused by significant wind loads being generated into the structure and ceiling by the wind loads on the now demolished radio room elevated above the main ceiling and roof line.” 35. G also reports on damage from “ water ingress and also lateral movement of the ceiling structure along with dislodgment of brickwork locally on the southern wall.” 36. In addition G reported on damage to the eastern veranda where paving had “pulled away as have the arches that are attached to the front of the building, but it found that this damage (unlike the foregoing damage described in 34 and 35 above) was not storm related but rather the result of foundation movement. 37. The Panel accep ts G‟s report as to the causes of the identified damage sustained to the office/residential building. 38. Accordingly it concludes that the FSP is liable for the cost of the repair of damage caused as identified in 34 and 35 above (which does not include any foundation work) but not any of the damage described in 36. The Ablution Blocks 39. The report goes on to describe the damage identified to the Eastern and Western ablution blocks and concludes “30% of the damage to the two ablution blocks has been caused by wind damage (storm event) and the other 70% has been caused by foundation movement…” 40. Accordingly, the Panel determines the FSP is liable for 30% of the cost of the damage identified to the two ablution blocks. Cost of Repairs 41. The Panel accepts the Scope of Works prepared by the assessor and upon which the quotes were based quoted on fairly reflects the work required under the policy to rectify the storm damage as described by engineer G.  The Panel has before it two quotes. It also has a table showing a combined estimate. The combined estimate is the work of the assessor. It contains items from each of the quotes where the higher quote has been chosen. It also includes items identified after the preparation of the original quote and therefore not included as part of the original quote. Case No: 220360 Determination Page 8 of 11 42. Having carefully considered all of the available evidence the Panel concludes the composite estimate is sufficiently adequate for it to use as a basis for its decision (rather than again calling for quotes having regard to the extended time frame of the claim) but in doing so it will admit a margin of 22.5% to the composite estimate to allow for the engineer‟s opinion "true replacement cost is not measurable until repairs are commenced or completed." and the arbitrary nature of the decision. Settlement 43. The combined estimate totals $57,468.82 which after applying the allowed 22.5% margin becomes $70,399.30 44. Included in the estimate are the quotes for the ablutions blocks quoted at $8,050.90 and $6,864 respectively making a total of $14,914.90 which after including the 22.5% margin becomes $18,270.75. 45. As the FSP is answerable for only 30% of the ablution block damage its portion is confined to $5,481.22 thus $12,789.53 being the 70% portion for which it is not liable must be removed from the $70,399,30 bringing the composite estimate total to $57,609.75 46. The Panel determines the FSP is liable in the amount of $57,609.75 in full settlement of the cost of repairs for damage covered under the policy to the residence/office and the two ablutions blocks. Other Items 47. The Applicant has drawn attention to a number of additional items which he states remain outstanding. The item are:  Contents. Curtains, carpets, and bedding for which the Applicant claims replacement. 48. In its report of 26/11/2009 the assessor reports the carpet cleaner as “being in attendance”. It also reported, on 25/1/2010, “the insured is still arranging for the assessment of contents items including dry cleaning and laundering of materials. 49. In the event these matters are still outstanding the Applicant is to make a formal claim with substantiation for the FSP‟s consideration. 50. In the event the matter is not resolved either party may approach the Service for a further determination. Electrical appliances 51. The Panel notes the assessors reported on 25/1/2010 “Electrical items have been checked and no damage was found; we await the invoice and report from our technicians (name of contractors).” Contractors invoice authorised 4/3/2010. Case No: 220360 Determination Page 9 of 11 52. On the available evidence the Panel determines the FSP is not liable for electrical appliances. Cabin cladding 53. The Applicant refers to damage to park cabin cladding and roofing. The assessor reported there was damage to the flashing of one cabin. It was reported “the flashings had not been repla ced, however, temporarily repaired by their son who is a caravan mechanic. [Cabin 3] 54. In its report of 25 January 2010, it reported “water damage was found to a ceiling of a second cabin.” [Cabin 16.] 55. The cost of damage to cabin 16 was included in the combined estimate costed at $800 (repaint ceilings). 56. The Panel determines the FSP remains liable for the cost of replacing the temporarily repaired flashing on Cabin 3. Further, it determines the FSP is to assess and determine its liability for the dented wall sheets, capping and air conditioners on cabins 21 and 23. 57. In the event the matter is not resolved either party may approach the Service for further determination. Removal of debris 58. The Applicant claims “cleanup costs” in the amount of $9,761. 59. The Panel is not aware of the nature of the cleanup costs claimed but it notes the Applicant has stated the FSP advised the matter comprises a separate claim. 60. If the costs are the subject of a separate claim the FSP is to formally advise the Applicant why that is the case and the Applicant will need to claim accordingly. 61. If the claim is related to matters the subject of this claim the FSP must make a determination of its liability and within 14 days of receipt of this Determination advise the Applicant of its decision. 62. In the event the matter remains in dispute either party may approach the Service for further determination. Loss assessor and engineers cost FOS Terms of Reference “ 9.4 Applicant ’s costs in pursuing the matter FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute. Unless exceptional circumstances apply, FOS will not require the Financial Services Provider to contribute more than $3,000 to these costs.” Case No: 220360 Determination Page 10 of 11 63. The Applicant repeatedly disputed the scope of works prepared by the Assessor and the opinion of the FSP‟s engineer without success. In the circumstance the Panel considers it was necessary for the Applicant to engage an engineer to provide a detailed analysis of the damage and/or the specific extent of works required for rectification. 64. In addition they engaged a loss assessor “to assist with the preparation and settlement of their insurance claim”. However the FSP denied th e appointment was necessary arguing the drawn out settlement was due to the Applicant ‟s delay in providing a builder‟s quote and there were no technical matters requiring attention. The Panel notes the FSP‟s arguments and also that the appointment was made after the matter had been submitted to the Service for review. 65. The Panel determines the FSP is required to reimburse the Applicant for his engineer‟s fee subject to proof of payment by the Applicant and subject to a limit of $3,000. The Panel determines the FSF is not liable for the loss assessor‟s fee. Temporary repairs to office/residence immediately following the storm $2,500. 66. The Panel is surprised that this matter appears not to have been put to the FSP before the Applicant raised it in his letter to the Service dated 26 March 2012. 67. However, having regard to the nature of the damage sustained to the residence/office, the Panel considers the sum claimed to be acceptable and directs payment by the FSP unless payment for tempo rary repairs has been otherwise made. Hire of container to provide temporary storage facility. 68. The assessor reported “Shipping container has been hired to relocate office contents whilst more permanent repairs are completed.” 69. The Panel determines the FSP is liable for the costs of hire of the shipping container. Costs in pursuing the claim $3,750 70. The Applicant is claiming for various faxes, phone calls, photocopies and other administrate costs in pursuing his claim through the Service. 71. There is no policy provision under which the Applicant can claim such costs and the Service does not have the power to award them. 72. The Panel determines the FSP is not liable to reimburse the Applicant for such expenses. Case No: 220360 Determination Page 11 of 11 Determination 73. The FSP is liable for interest at the statutory rate on the sum of $57,609.75 from 15 September 2010 until settlement is affected.