Home / Financial Firm (Unknown - Insurer) / Determination 220138
Determination 220138
Denial of rental property building claim for footing settlement
Summary
Cracking and footing settlement at a rental house were denied as earth movement and tree roots. AFCA found the insurer must indemnify 80% of repair costs, plus loss of rent, interest and a contribution to professional costs.
The insurer did not discharge its onus to prove the earth movement and tree root exclusions applied, given the expert evidence of leaking pipes and soil softening.
Issues
- Claim denial primary · upheld“the FSP is required to indemnify the Applicant to the extent of 80% of his loss, with the Applicant to bear 20% of the loss”
- Inadequate claim investigation secondary · upheld“the Panel finds MP's evidence not as specific to the Applicant's circumstances”
- Product terms interpretation secondary · upheld“the Panel is persuaded by JG's opinion ... the FSP has failed to prove the exclusion applies”
Subjects and remedies
home or building damagepay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 220138 Determination Page 1 of 13
Case number: 220138
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Earth movement
4 October 2011
Background
1. The Applicant held a landlord insurance policy with the Financial Services
Provider (FSP) for a number of rental properties. One of these rental premises
(the property) sustained damage. The relevant period of insurance operated
from 29 September 2008 until 29 September 2009. The property was insured
for a sum of $319,100 for the building, $13,200 for contents and $13,200 for
loss of rent. Claims were subject to a $100 excess.
2. On 17 April 2009 the Applicant reported a claim in which he advised the
property sustained water damage, which caused a ceiling to partially collapse
and a wall to subsequently crack.
3. The FSP engaged a loss adjuster and an external engineer to review the cause
of damage. Based on the engineer’s report, the FSP denied the claim as he
identified the building movement and resultant cracking has been a function of
seasonal and environmental drying influences on reactive foundation soil
beneath part of the property. These factors are not covered by the policy.
Further and in the alternative, no damage to the property arose from an insured
event, namely the escape of water from broken pipes.
4. The Applicant has not accepted this decision and has obtained his own expert
evidence that supports the proposition that the damage was caused by an
insured event.
Summary of Applicant ’s Position
5. The Applicant is represented by a loss adjuster who has provided submissions
on his behalf.
6. The applicable policy wording relevant to this claim are as follows:
“We will cover your buildings and your contents for any accidental damage or
accidental loss including that caused by:
…
Liquid that escapes from a fixed pipe or something attached to a pipe, fixed
gutter, fixed tank or a drain”
Determination
Case No: 220138 Determination Page 2 of 13
7. The Applicant purchased the home on 30 June 2003 as an investment property
and rented this out to tenants. At the time of the purchase, the home was well
maintained, in good condition and free of cracks. In approximately October
2007, the Applicant engaged an agent to assume responsibility for the
management of the property. The agent arranged for tenants to occupy the
property and had them sign a rental agreement in November 2007. The tenants
were a family of five and subsequently moved out of the home on 4 April 2009
following the damage.
8. The agent provided regular and detailed inspection reports of the home
throughout this tenancy and these reports have been provided to the Service.
They are significant as they detail the extent of cracking observed at the time of
inspection. Importantly, it was identified that the cracking was initially minor and
this progressed quickly as time went on. The agent substantiated this in an
email dated 20 July 2010.
9. The FSP has heavily relied upon a number of reports provided by an
engineering expert (MP). The first report was dated 18 June 2009 and although
the second report was completed on 3 August 2009, this was also dated 18
June 2009 due to a typographical error. These two reports were completed
without the benefit of any testing of the property’s pipe work. The first report
noted the following:
“The pattern of cracking and the floor levels within the western wing suggest a
settlement of this wing away from the rest of the dwelling. …
… a function of tree - induced drying on the reactive foundation soils …
… will expand significantly if their moi sture content increases and shrink
significantly if their moisture content reduces. These volumetric heaving and
shrinkage movements will lead to vertically upward heaving and downward
settlement movements respectively, at the soil surface. Such movements would
be highly likely to influence the behaviour of buildings constructed on such soils.
…
We observed nothing to suggest pipe leakage, or the like, had adversely affected
the foundation soil moisture conditions. Therefore, no cracking has in our opinion
been caused by leakage or discharge.”
10. The second report provided little change to MP’s opinion.
11. The Applicant notes that the trees which MP refers to have been at their
location for 50 years and the property have been at the site for approximately
33 years. It is expected that if the trees were to have had an effect on
foundational movement, this would have been evident years ago. Further:
This would have caused damage to other homes, in particular those much
closer to the trees’ location, yet it is only the Applicant’s home that has
suffered extensive cracking; and
It is unusual to expect that such significant cracking in so short a time
period can be attributable to the trees.
Case No: 220138 Determination Page 3 of 13
12. Due to the FSP’s reluctance to engage a plumber to test the pipes, the
Applicant engaged one to do so. This plumber provided a report dated 25
August 2009 that contained the following relevant remarks:
“Hydrostatic test on stormwater found that the system does not hold any water
with the drain sealed at the street kerb. Water was seen flowing into the
adjoining property through the broken pipe approximately 1 metre upstream from
the corner of the house. …
Hydrostatic test on the sewer system found the system to be in a reasonably
sound condition due to age of the pipework and joints. Water loss of
approximately 3 to 3.5 litres per minute was noted while pipe was sealed at
connection. It is quite common for this type of pipe to leak due to poor jointing
materials used at the time of installation.”
13. The presence of water in the soil was supported by a structural and civil
engineer who provided a report dated 10 September 2009 and summarised his
findings as follows:
“I refer to my soil test showing a soil heave of 124mm … I agree that these soils
are highly reactive soils, which will expand and shrink depending on the moisture
increases and decreases. I also agree that trees have significant changes to soil
condition, however in accordance with Dr. [PM‟s] report on (trees and soil
movement) large established trees have deeper root system and are not
aggressive towards the soil change in such a short time, we are talking her at a
house that started to show very large cracks in a matter of few months. So a
movement of this nature can only be attributed to sudden change in the soil
configuration. …
I can only conclude that major water leaks have occurred on the Western side
creating such an aggressive change in the soil, causing the hinge cracking to this
dwelling.”
14. Given the longstanding nature of the dispute, the FSP eventually agreed to
engage a plumber to do a thorough investigation and testing to the external
stormwater, external sewer and internal waste pipes. The plumber engaged
provided a report dated 13 April 2010 and this showed a substantial number of
leaks within the drainage system. The significant findings were:
Laundry water pipe – “Large Leakage Recorded”.
Sewer drainage – “Large Leakage Recorded” notably to the eastern side
of the dwelling following several tests in sections of the drainage system.
Stormwater drainage – “Large Leakage Recorded” notably to the western
side of the dwelling following several tests of the drainage system.
15. The FSP obtained another report from MP who appeared to dismiss the
findings of the plumber and maintain the main cause of damage was due to the
trees. In particular, MP says that the leaks identified by the plumber were away
from the area of damage at the north western end of the house. However,
photographic evidence indicates that there is a tunnel under the western path
formed by the stormwater allowi ng water from the broken stormwater pipe on
the south western corner of the building to flow back under the path to the north
western corner of the property.
Case No: 220138 Determination Page 4 of 13
16. MP also indicated that as no one had been living at the home when the
plumber identified the leaks, these could not have been responsible for the
damage. However this conclusion is incorrect because the house was
tenanted, fully functional including use of the pipes up to and including the time
when the damage occurred.
17. A structural alignment specialist was engaged by the Applicant (LJP) who
exposed two areas on the western side of the building to the bottom of the
footing. In doing so, LJP found the soil contained moisture and was like plastic
in nature. This led him to the conclusion that the damage to the home was as a
result of discharge of “ water or liquid ” from the stormwater piping.
18. A senior engineer (JG) was engaged to provide a specialised and
comprehensive analysis of the damage to the property. He initially provided an
email dated 10 December 2009 stating the following regarding the soil:
“Note very wet soil in top 1m and so saturated in initial 500mm depth that a
sample could not be recovered as it could not be held within the steel sample
tube. In my opinion this is most likely to be a very rare case where it is possible
that a bearing capacity failure has occurred due to the saturated and soft nature
of the soil horizon immediately below the footing beam + slab soffit at least in the
area from where the soil sampling was carried out”
19. JG subsequently provided a comprehensive report dated 8 February 2010,
which was completed with the benefit of the plumbers’ reports. In conclusion,
he determined the cause of damage as follows:
“… this may be a rare case where sufficient softening of the soil at founding
depth of the footing beam has been sufficient to cause, or contribute to, the total
footing settlement along this elevation.”
20. To support JG’s credentials, the Applicant notes he is a well respected forensic
engineer with over 35 years experience in the industry. His advice and opinion
is greatly sought after both nationally and globally. His CV corroborates this and
has been provided to the Service as evidence of his vast experience and
technical knowledge.
21. LJP subsequently revisited the property to repair the leaks in the stormwater
pipe works. Their excavations revealed the following and was set out in their
report dated 12 May 2010:
A broken junction and large hole and crack in the stormwater piping at the
front south west downpipe;
A large gap providing a water passage under concrete paving heading
towards the rear north western corner;
A broken moulded elbow at the rear northern section at the tank overflow
and three holes in the pipe leading towards the western corner;
The holes appeared aged as dirt was in the pipe.
Tests revealed these pipes could not adequately carry water away from the
property. In view of these findings, LJP’s opinion was that the plumber’s testing
was inaccurate in identifying the extent of leaks.
Case No: 220138 Determination Page 5 of 13
22. JG was again engaged for a further advice, which he provided in a
comprehensive report dated 14 August 2010. His report was provided following
close examination of all reports and data and led to a similar conclusion in his
previous report, namely:
“The writer concludes that foundation settlement in this case is one of those very
rare occurrences where instead of soil heave, as would normally be anticipated
with saturated extremely reactive clay, there has been a footing settlement
because the clay has softened to the point that it has lost the capacity to bear the
imposed loading from the dwelling.”
23. In response to MP’s further report dated 29 October 2010 (that was provided to
rebut JG’s report) and MP’s comments about the rainwater tank and gutter
overflow, the Applicant refers to the agent’s inspections of the property prior to
the damage. In none of these inspections did the agent note that the tank
and/or the tank stand had fallen into the stormwater/sewer trench on the
northern side of the property. It is therefore obvious that the soil lost its bearing
capacity prior to the rainwater tank and its stand tilting.
24. In MP’s latest and last report dated 13 July 2 011, the expert summarised that
“ based on the presently available evidence, most of the building settlement
experienced predates the current o wnership ”. The dwelling is some 34 years
old and was not purchased in its present condition in 2003. Further, it had been
rented by tenants for a number of years without any structural problems until
the damage occurred in April 2009.
25. Given all of the above, the Applicant maintains that the insurance policy should
respond and is therefore seeking the following:
1. Cost of repair to the building $98,487.00
2. Loss of rent $13,200.00
3. Report costs TBA
4. Other costs TBA
5. Interest (as determined)
Summary of FSP’s Position
26. Upon the Applicant lodging a claim, the FSP engaged a loss adjuster to review
the damage. The adjuster in turn recommended engaging an engineer, MP, to
inspect the damage and report on the likely cause. The FSP states the
engineer engaged from MP is an expert in his field.
27. MP provided a report dated 18 June 2009 where he summarised his conclusion
as follows:
Case No: 220138 Determination Page 6 of 13
“We observed nothing to suggest pipe leakage, or the like, had adversely
affected the foundation soil moisture conditions. Therefore, no cracking has in
our opinion been caused by leakage or discharge.
On the contrary, based on the available evidence, building movement and the
resultant cracking has been a function of seasonal and environmental drying
influences on reactive foundation soil beneath part of the building.”
28. Based on this report, the FSP denied the claim pursuant to the following policy
condition:
“We will not cover your buildings and your contents for any accidental damage or
accidental loss caused by:
…
Settling, shrinkage or any movement of earth.
…
Roots from trees, plants, shrubs or grass.”
29. The Applicant in response provided additional expert information. In light of this,
the FSP re-appointed MP to conduct further enquiries. MP provided a
comprehensive report dated 20 April 2010 where the following relevant remarks
were made:
“The plumbers were able to test stormwater pipework upstream from the
southernmost excavation near the dwelling‟s north western corner. This
pipework, which includes the tank‟s overflow, was sound.
Therefore, based on these results, it appears no sewer or stormwater leakage
was found in the vicinity of the home‟s maximum settlement at its northwestern
corner.
We understand the dwelling was last occupied in April 2009 and therefore, no
water has past through the sewer pipework for approximately 12 months apart
from water used during testing. …
Please also note that the dwelling‟s northwestern corner is currently 70mm lower
than the next lowest corner and location of a downpipe towards the south, and
170mm lower than the tank inlet. This means the eaves gutter at this corner
would have to fill up to the point of overflowing before water would run into the
nearest downpipe. …
We observed that the owner has removed a large native tree from adjacent to
the dwelling‟s south w estern corner since we originally inspected the site.
No significant change in the interior movement was observed, however the
ceiling gap adjacent to the entry in the lounge appeared slightly larger and
cracking within the dining room‟s feature wall may h ave closed slightly.
The rear tank was close to empty indicating that, despite recent heavy rainfall,
roof catchment may not be reaching the tank.
The guttering near the dwelling‟s north western corner was dripping at the time of
our inspection. Closer inspection revealed rust holes and heavy degradation of
the corner fascias as shown in the image below. The excavation undertaken by
[LJP] is directly below the guttering which appears to have overflowed in the
past. This is consistent with our observation that this corner has settled.
Case No: 220138 Determination Page 7 of 13
Also in close proximity to this corner of the dwelling are two sheds on each of the
neighbouring properties. The shed to the north has no guttering and the guttering
on the outer shed to the west has rust stains, indicating the possibility of regular
overflow. …
There appears to be no pipe leaks in the immediate vicinity of the dwelling‟s
north western corner. Moisture recorded in soil samples recovered near this
corner therefore appears to have come primarily from gutter overflow. However,
the gutter would not have overflowed until after the dwelling had settled.
The degradation of the guttering and timber fascias is significant and suggests
that this overflow is not an isolated event and has been occurring for many
years. This indicates that the settlement suffered at this corner must also have
occurred a long time ago.
SUMMARY
Based on the available evidence, the building movement and resultant cracking
has been a function of seasonal and environmental drying influences on reactive
foundation soil beneath the building‟s western wing, most notably at its north
western corner. Leakage from roof guttering and runoff from nearby sheds may
explain why soil closer to the site surface was „saturated‟, but this moisture has
not caused the building settlement. In fact, the moisture may have prevented the
degree of settlement from becoming worse.”
30. Based on this, the FSP maintained its denial of the claim.
31. The Applicant later contacted it by stating that a major stormwater leak has
been identified and enclosing JG’s report dated 14 August 2010. The FSP
referred this additional information to MP who provided a further report dated
29 October 2010. This report reviewed the additional information and
summarised his findings as follows:
“We b elieve the movement is a result of the normally anticipated settlement
following reactive foundational soil drying. The factual information available to us
shows that the founding soil was not saturated and was, rather, hard and of
sufficient bearing capac ity.”
32. Upon receiving JG’s email that commented on MP’s report dated 29 October
2010, MP was engaged to provide a further response. This was completed on 7
April 2011 and MP summarised his findings as follows:
“… we believe the home‟s movement is a result o f settlement following reactive
foundation soil drying. The borehole information available to us shows that the
founding soil was not saturated and was, rather, hard and of sufficient bearing
capacity. We have therefore received no new information from the latest [JG]
report that would cause us to alter the opinions expressed in our earlier reports
on this matter.”
33. Due to the Applicant providing further comments to this latest report, MP was
again engaged to respond. MP did so in a report dated 13 July 2011 and this
was after it conducted another perimeter survey of the property. He
summarised his findings as follows:
“Based on the prese ntly available evidence, most of the building settlement
experienced predates the current ownership. This settlement has in our opinion
Case No: 220138 Determination Page 8 of 13
been a function of highly reactive, deep seated foundation soils becoming dryer
following the dwelling‟s construction.”
34. The FSP therefore maintains that given MP’s consistent findings and
observations, which were provided after considering all the relevant
information, it is entitled to rely on the exclusion clauses in the policy to deny
the Applicant’s claim.
Issues
35. Wheth er the FSP was entitled to deny the Applicant’s claim.
Reasons for Decision
36. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
37. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is
due to the circumstances, quantum and complexity of the dispute. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
38. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Applicable Legal Principles
39. The onus is on the Applicant to establish, on the balance of probabilities, that it
suffered a loss caused by a risk insured against (in this case, accidental
damage). Once this has been established on the face of the facts, the onus
shifts to the FSP to show, on the balance of probabilities, the claim falls within
an exclusion of the contract of insurance
40. This is a policy that provides cover for accidental loss or damage. The policy
has not defined the term “accidental” so the Panel is compelled to look at its
ordinary and natural meaning. The Macquarie dictionary has defined
“accidental” to be “ happening by chance or accident, or unexpectedly ”.
“Accident” is defined as “ anything that happens unexpectedly, without design,
or by chance ”.
41. Accordingly, the policy generally responds to an event that happens
unexpectedly, without design or by chance. Therefore on the basis of the
evidence provided the Applicant has established a prima facie claim under the
policy as the damage sustained to his home was accidental given it occurred
unexpectedly. Accordingly, the onus shifts to the FSP to establish that it is
Case No: 220138 Determination Page 9 of 13
entitled to deny the Applicant’s claim based on the exclusion clauses it has
quoted from.
Expert Evidence
42. The Panel has been presented with numerous expert reports in evidence
which, for the sake of brevity and conciseness, it will not attempt to set out in
great detail given both parties are in receipt of all this material and much of this
is set out above.
43. In essence, there are two engineering experts being heavily relied upon by the
parties, one being MP for the FSP and the other being JG for the Applicant.
The Applicant has also provided expert evidence from another engineer, HA,
which he is also relying on to substantiate the claim. The Panel notes HA’s
conclusions are consistent with JG.
44. In attempting to review competing expert evidence, the Panel takes into
consideration various factors. One of these is the qualifications and experience
of the experts being presented.
45. In this context, the Panel notes the Applicant has provided the CV and the
background of JG which supports the fact that he is very experienced and well
respected in his field. In contrast, the FSP has chosen not to provide any
background material or CV of its expert beyond an unsubstantiated comment
that he is an expert in his field. Although this may be the case, the Panel is not
in a position to assess the extent of MP’s qualification and expertise
comparative to JG.
46. Although this factor is not determinative in which expert the Panel will prefer, it
is still a factor the Panel will consider. Other factors of course are the contents
of the reports, the undisputed evidence and the background material relied
upon by the experts in making their findings.
47. As noted before, the Panel will also keep in mind that the onus rests with the
FSP to establish, on the balance of probabilities that the cause of the damage
to the Applicant’s home resulted from an exclusion clause.
MP‟s Reports
48. The FSP’s case rests totally on MP’s expert evidence. The Panel has carefully
reviewed MP’s evidence and notes a number of his conclusions are
inconsistent with the subsequent findings of other experts, specifically:
He made reference to there appearing to be no pipe leaks in the area of
damage yet this was contradicted by the substantive evidence provided
by the Applicant and plumbers;
MP considered the soil around the area was dry, yet this was inconsistent
to the observations of both HA and JG in their review of the soil and the
leaking pipes;
Case No: 220138 Determination Page 10 of 13
MP’s latest report concludes that the property’s settlement was due to
highly reactive, deep seated foundation soils becoming dryer following the
dwelling’s construction. The property was over 30 years old at the t ime of
the loss and yet sustained significant cracking and damage in a short
period of time to one area according to the agent’s evidence. It is difficult
to reconcile this with MP’s conclusion;
MP also made reference to trees being a factor yet as the Applicant and
JG concisely pointed out, these trees have pre - existed the house’s
dwelling and are closer to other homes which have suffered no significant
movement.
49. Conversely the Panel notes that significant parts of the Applicant’s evidence
are corroborated by other experts. For instance, the agent’s inspection reports
noting the cracking being exacerbated in a short period of time, the evidence of
leaking pipes corroborating the Applicant’s claim and, in particular, JG’s
opinion.
50. JG’s reports are very detai led, which the Panel does not propose to quote. In
these reports, JG has provided a rational and even handed approach to this
complex issue, readily acknowledging MP’s diagnosis and analysis is correct in
many aspects but identifying the fact this diagnosis is not consistent to the
circumstances peculiar to the property. In particular, JG has relied on a much
more detailed background and information both from the Applicant and various
other experts (such as plumbers) that was not available to MP in his initial
reports.
51. Further, JG has provided a conclusion which, though it may be considered
novel because of its rare occurrence, still accords and is consistent with the
particular circumstances relevant to the Applicant’s case. The Panel finds MP’s
evidence no t as specific to the Applicant’s circumstances or his reports as
detailed in its observations and comments. Although MP’s conclusion would
normally be considered reasonable in similar circumstances (as acknowledged
by JG), the Panel is persuaded by JG’s opinion that the Applicant’s case is “ one
of those very rare occurrences where instead of soil heave, as would normally
be anticipated with saturated extremely reactive clay, there has been a footing
settlement because the clay has softened to the point that it has lost the
capacity to bear the imposed loading from the dwelling .”
52. Further, JG’s opinion is also supported by another engineer, HA.
53. In determining an outcome in this dispute, the Panel reiterates that as the
Applicant has established a prima facie claim, the Applicant is entitled to be
indemnified for his loss unless the FSP is able to prove, on the balance of
probabilities, the exclusion on which it relies.
54. Having considered all of the evidence, the Panel is of the view that the
evidence provided b y the Applicant’s expert JG is more persuasive than that
provided by the FSP. However the Panel is also mindful that JG is not entirely
conclusive in that he states:
Case No: 220138 Determination Page 11 of 13
“ On the other hand, the writer‟s thesis that suffi cient wetting occurred from the
stormwater leak to saturate founding soil immediately beneath the western
elevation strip beam concrete footing ignores that fact that the usual behaviour of
a black earth soil is to heave upwards and not to settle”.
55. Further, given his hesitancy on that one point he concludes:
“Perha ps the insurer could be persuaded to have MP review this report with a
view to a possible contribution…”
56. Given that approach, the Panel is somewhat surprised that the FSP did not
consider a conciliatory approach to resolving the dispute.
57. Nevertheless, and despite JG’s reservation, the Panel is on balance more
persuaded by his evidence, with some lesser consideration to the contrary. The
Panel is therefore inclined to apply its discretion as to what is fair in all the
circumstance, as provided for in its Terms of Reference.
58. On this basis the Panel determines that the FSP is required to indemnify the
Applicant to the extent of 80% of his loss, with the Applicant to bear 20% of the
loss.
Quantum
59. The Applicant has provided an updated quote from LJP for the cost of repair to
the building and is seeking reimbursement of same, being $98,487. It is not
clear whether these repairs have been undertaken at this stage. If so, in the
absence of any evidence to the contrary this quote should form the basis of
settlement. If repairs have not been carried out, the parties are required to work
together to establish the estimated cost of repairs and settle on that basis,
subject to the terms of the policy.
60. The Panel does not propose to award interest on this component of the claim
given the FSP is absorbing any additional costs incurred due to the time period
that has lapsed since the damage occurred.
61. The Applicant is also seeking loss of rent in the sum of $13,200, which is the
maximum allowable amount under the policy. The FSP believes any amount
should be limited to the time period required for the repairs to be completed
although it has not nominated what this time period would be.
62. The Panel notes the relevant policy wording regarding this benefit states the
following:
“We will pay when your buildings, or sections of your buildings, are unable to be
lived in after the accidental damage or accidental loss has occurred. …
We will pay the amount that is equal to the rent for the period when no one can
live in your buildings or sections of your buildings”
63. This provision contains no limitation that the time period allowed for should be
limited to that needed to complete the repairs. Further and in the alternative, if
Case No: 220138 Determination Page 12 of 13
such wording did exist, the Panel would not be prepared to limit this settlement
given the fact the FSP has breached its policy by failing to accept the claim.
64. Accordingly, the Panel accepts the Applicant is entitled to the maximum amount
of loss of rent plus interest.
65. The Panel notes that under clause 9.4 of the Terms of Reference, they are
empowered to award up to $3,000, unless exceptional circumstances apply, to
the Applicant’s professional costs. The relevant clause states the following:
“FOS may decide that the Financial Services Provider contribute to the legal or
other professional costs or travel costs incurred by the Applicant in the course of
the Dispute. Unless exceptional circumstances apply, FOS will not require the
Financial Services Provider to contribute more than $3,000 to these costs.”
66. The Operational Guidelines to this clause states the following:
“ When FOS might require FSP to contribute to Applicant’s costs
An Applicant can seek a contribution from the FSP to professional or travel costs the
Applicant incurred in the course of the Dispute. FOS decides whether the FSP should
make such a contribution by considering what is fair in the circumstances. FOS makes
this decision taking into account:
the complexity of the Dispute;
for legal costs, whether the Dispute raised legal issues on which, notwithstanding
FOS’s involvement, the Applicant reasonably needed advice;
[not relevant]
whether the Applicant incurred costs because they genuinely required expert
assistance.
…
Exceptional circumstances may exist where a Dispute is particularly complex because
it involves, for example:
multiple complex financial calculations by the Applicant;
challenges the authenticity of multiple documents;
complex legal issues in areas where there is uncertainty in the law; or
substantial financial exposure for the parties having regard to FOS’s monetary
jurisdictional limits.”
67. The Panel considers this matter involved sufficiently complex technical issues
regarding the cause of damage to the Applicant’s home which is evident by the
numerous expert reports supplied in this matter. In particular, the Panel and the
Applicant were greatly assisted by JG’s reports, the other expert reports , and
the substantive submissions made by t he Applicant’s representative.
68. The Applicant has provided indicative expert costs which total $27,699.73.
Accordingly, the Panel accepts special circumstances apply to warrant an
award beyond the $3,000 cap. The Panel therefore considers that the FSP
should pay the following professional costs, subject to production of suitable tax
invoices:
JG – 100% of costs $7,169.80
Case No: 220138 Determination Page 13 of 13
LJP – 100% of costs $2,043.00
69. Both JG and LJP were of great assistance in progressing this matter so their
costs are allowed in full.
70. In addition, although the Applicant’s representative provided some useful
guidance to the Applicant, his input was less critical to the Panel as according ly
a proportion of his costs are allowed:
IAS – 50% of costs $9,243.47.
Determination
71. On the basis of the available information the Panel determines that the FSP
pay to the Applicant:
80% of the cost of repairs to the building on the basis set out above;
Loss of rent in the amount of $13,200;
Interest on the sum of $13,200 in accordance with the Insurance
Contracts Act (1984) from 6 May 2010 (being the date of its final letter
confirming denial) to the date when payment is effected
Its professional costs up to a maximum of $18,456.27 detailed above,
subject to appropriate tax invoices being produced.
72. In the event the Applicant accepts this Determination, these amounts should be
paid within 21 days of the FSP being notified of its acceptance and in receipt of
the appropriate tax invoices. In the event the FSP requires a binding release to
be signed first, then the FSP should:
Ensure a release is sent to the Applicant within 7 days of being notified of
the Applicant’s acceptance and receiving all of the tax invoices of the
Applicant’s costs; and
Pay the relevant amount within 7 days after it has recei ved an
appropriately signed release.