Scope of ceiling damage from storm and defective repairs limited by FSP as pre-existing defect
Text of the determination
Case No: 220026 Determination Page 1 of 8
Case number: 220026
General Insurance - Domestic Insurance – Home Building- Storm Damage –
Defective Repairs – FSP Decision
02 March 2011
Background
1. The Applicant holds a Home Building insurance policy with the Financial
Services Provider (FSP) covering his property constructed in 2003. The policy
was incepted on 1 August 2005 and the policy term relevant to this claim is 1
August 2006 to 1 August 2007.
2. On 11 December 2006 the Applicant lodged a claim with the FSP for damage
resulting from a severe hail storm on 3 December 2006.
3. After assessing the damage, the FSP proceeded to authorise repairs which
were completed in April/May 2007. In August 2007 the insured dwelling
suffered further damage due to water ingress resulting from defective repairs
carried out by the FSP’s appointed repairer.
4. The FSP approved further repairs to the insured dwelling, however not to the
full extent claimed by the Applicant. The FSP cites exclusion provisions present
in the policy in coming to this decision. It contends that the excluded damage is
as a consequence of construction issues present prior to the insured event.
5. The Applicant disputes the FSP’s final determination and believes that the
damage in dispute is as a result of the defective repairs and failure to follow
good industry practice by the FSP and its appointed experts.
Summary of Applicant ’s Position
6. The insured dwelling at the time of loss was a near new structure, which had no
incidents of water ingress, sagging of plasterboards or presence of mould since
being constructed in 2003.
7. After having accepted that the insured dwelling had suffered extensive damage
as a result of a severe hail storm, the Applicant states that the FSP selected the
cheaper of two quotes and approved the repairer “M” to carry out the required
repairs.
Determination
Case No: 220026 Determination Page 2 of 8
8. In August 2007 during a further storm event, the insured property suffered
substantial water ingress. Upon investigating the cause of the water ingress
which had never taken place before, it was established that the repairs carried
out by “ M ” in April/May 2007 were defective and not up to an acceptable
industry standard.
9. The Applicant has raised concerns in relation to the process followed by the
FSP and its appointed experts. It is his contention that the FSP has been
negligent in its handling of the situation as no steps were taken in line with the
industry accepted practice, to immediately dry out the dwelling in an effort to
minimise any further effects of the water ingress. A report from a master water
restorer “P” has been submitted by the Applicant to substantiate his concerns in
this regard.
10. The Applicant alleges that his concerns pertaining to the resultant damage from
the water ingress were completely ignored by the FSP until such time that he
proceeded to employ the services of independent experts.
11. As opposed to the FSP’s interpretation of its expert’s reports, the Applicant
believes none of these reports unequivocally conclude that the reverse peaking
of the ceilings is solely as a result of the absence of back boarding to the ceiling
plaster sheets.
12. Further, contrary to what the FSP contends in its submission to this Service, the
Applicant states that the dispute revolves more so around the upper first level
ceilings as opposed to the lower ceilings. He has noted that the FSP on 29
September 2009 accepted liability to replace the lower level (rumpus) ceiling
and therefore that it no longer forms part of this dispute.
13. The Applicant states that apart from the FSP’s appointed experts “C” and “R”,
every other expert he has discussed this matter with or employed, has
concluded that the cause of the sagging of the ceilings is directly linked to the
water ingress and resultant moisture and condensation build up inside the
dwelling.
14. The Applicant does not accept “C” as an i ndependent expert as it has been
appointed by the FSP. He further alleges that it would have a broader
relationship with the FSP and receives significant income as a benefit of this
relationship.
15. It is the Applicant’s belief that in essence, this dispute p ertains to whether the
FSP is prepared to stand by the guarantee it provides under the terms of the
contract for repairs authorised and carried out by experts it appoints to carry out
remedial works.
Summary of FSP’s Position
16. The FSP relies on the following policy provisions:
“ Page 15 – Types of cover you can choose
Case No: 220026 Determination Page 3 of 8
This policy lets you insure your Home and Contents. You decide which covers you
need. If we agree to insure you and you pay us a premium, the cover or covers you
have chosen will be shown on your Certificate of Insurance.
Home Cover
When we insure your Home, we will cover it for loss of or damage which:
is caused by an Insured Event and
happens in the period of insurance . ”
“Page 52 – Home claims are paid
Home, Contents, Personal effects or Lan dlord’s Fixtures and Fittings claims
We choose how your claim is settled. If we agree to pay a claim for loss, theft or
damage to your Home, Contents, Personal effects or Landlord’s Fixtures and Fittings,
we will decide if we will:
…
We will not:
× …
× fix a fault that existed before the loss or damage occurred
× ….”
17. The FSP accepts the Applicant’s valid argument in relation to the occurrence of
damage as a consequence of the insured event (hail storm) as well as the
defective repairs completed by its appointed repairer. It therefore authorised the
required external repairs following the August 2007 storm which have been
completed. In addition it offered to rectify the internal damage sustained as a
result of the water ingress. However, it is not prepared in line with the terms of
the policy to repair a defect that existed prior to the event and which was
exhibited in all ceilings of the dwelling.
18. The FSP does not accept the opinion of the expert “I” appointed by the
Applicant, that the cause of the damage in disp ute is as a result of moisture and
condensation introduced by water ingress as a result of the defective repairs.
19. It concurs with “C’s” evidence that had the damage come about as a result of
“I’s” theory, there would have been excessive mould, not only in the area of
concern but in all parts of the dwelling. The FSP believes the photo submitted
by the Applicant showing mould build up is of a window sill and not the ceiling;
as such it has no relevance to the dispute.
20. The Applicant has not disputed having received the policy terms and conditions
and the FSP submits that these are explained in a clear and unambiguous
manner.
21. There is an onus on the Applicant to first establish that he has suffered a loss
which on the balance of probabilities is covered under the terms of the policy,
however, the FSP believes that the Applicant, in this instance, has not satisfied
this onus.
Case No: 220026 Determination Page 4 of 8
22. The FSP confirms that it is happy to stand by its offer to complete that portion
of the internal repairs for which it considers itself liable and which it has
assessed to be covered under the terms of the policy, and which is estimated to
cost over $90,000, or to cash settle the Applicant on the basis of an updated
quotation for the cost of such repairs. (I note that this aspect does not require
any action by this Service).
Issues
23. Whether the FSP in line with the terms of the policy is accurate in its decision to
limit the extent of indemnity offered to the Applicant under the claim.
Reasons for Decision
24. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
25. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
26. It is the Applicant’s responsibility to prima facie establish that the lo ss claimed
was, on the balance of probability, caused as a result of an event covered by
the terms of the policy. If the Applicant succeeds in doing this, the onus shifts to
the FSP to show that it is excluded from cover under the terms of the policy.
27. I note that there is no dispute between the parties that the external damage to
the dwelling was covered under the terms of the policy and has been attended
to by the FSP. As a result of defective repairs initially carried out by the repairer
appointed by the FSP, the insured dwelling suffered substantial internal
damage as a consequence of water ingress.
28. Essentially, the dispute before me is limited to only a portion of the internal
damage which the Applicant alleges is also as a result of the defective repairs
and the FSP’s contractor’s subsequent failures. However the FSP does not
believe that the damage in dispute is claim related, and submits that it was
present prior to the insured event and/or defective repairs. Therefore, the scope
of this determination will be limited to the disputed portion of the claimed
damage.
29. In an effort to substantiate their respective positions, the parties to the dispute
have employed the services of a number of experts. The events of the claim
lodged in December 2006 and August 2007 have been well documented
through the numerous reports submitted by each of the appointed experts.
30. On review of the expert reports and submissions of the parties to the dispute, I
note that the damage in dispute is limited to the “Inverted type peaking”
Case No: 220026 Determination Page 5 of 8
(peaking) to the plaster board ceilings and fastener popping of ceiling sheet
fasteners, in particular to the ceilings in the kitchen, living area and located on
the upper level first floor.
31. The FSP, based on the expert evidence it has obtained, has come to the
conclusion that the peaking found to be prevalent at the insured dwelling is as a
result of the original builder failing to install backblocks to the ceiling plaster
boards. The report dated 7 December 2009 prepared by “C” states in part:
“ Page 6 of 7
…
…
The lack or absence of back blocking can also be a contributing factor of
peaking. Back blocking is a system where pieces of plasterboard are
laminated on site to the back surface of sheets, behind joints using either
base coat or cornice cement. Backblocks are used on recess joints in ceilings
as reinforcement against stressed joints resulting from building movement and
/ or timber shrinkage which can cause peaking and cracking. Back blocking is
recommended by all plasterboard manufacturers …
…
Taking into consideration the design of the roof structure, it is assumed that the
back blocking has not been performed in this particular instance. ”
In a report dated 12 May 2010 and after parts of the roof were removed by a
builder [R]in order to en able better inspection of the ceiling cavities “C”
states in part:
“Page 5 of 5
…
Based on our observations made, and further considerations given after the
perusal of the building report provided by R, we believe the absence of back
blocking to the joints of the plasterboard ceiling linings, to be the direct cause of
the inverted type peaking and fastener popping detected.
…”
32. The Applicant, to the contrary, is of the belief that the peaking to the internal
ceilings is as a result of the build up of moisture and condensation inside the
insured dwelling, due to the water ingress which occurred as a result of the
FSP’s appointed repairer’s defective repairs. Further, that this moisture and
condensation has caused greater damage because of the FSP and its
appo inted experts’ failure to take immediate action to arrange for the dwelling to
be dried out.
33. The Applicant has come to this conclusion taking into consideration the advice
provided to him by the original builder of the house and the independent
experts appointed by him to inspect and report on the damage in dispute. The
original builder “K”, in a scathing report dated 28 May 2010, said :
“As a result of this damage [FSP] did NOTHING to even ATTEMPT to dry out the
home which would have prevented further damage due to damp and
condensation from the storm inside the home. The condensation is not only in
Case No: 220026 Determination Page 6 of 8
the ceiling linings, it will affect the furniture TV and all of his electrical equipment
carpets etc” .
And, later in that report
“Regardless of how many reports [FSP] now gets done years down the track the
damage was caused by [FSP] and their negligence in not ensuring the matter
was dealt with efficiently and correctly in the first place, by simply drying out the
building BEFORE further damage occurred. ”
34. The master water restorer’s expert report submitted by the Applicant dated 18
August 2010 and completed by “P” is to similar effect. It states in part:
“…
The insurance company failed to issue flood remediation directions Outlined in
the IICRC S500 Standard for Water Damage Restoration page 35 section 9.8,
allowing the structure to remain saturated and locked up for a long period.
Subsequently the Hygroscopic materials are permanently damaged beyond
repair.
The Gyprock must be replaced in line with 12.4.2.1 of the standard.
Had the correct procedure been followed this structure could have been restored
to pre loss condition at minimal expense.
Hence this damage in no way reflects unfavourable [sic] on the initial Builder, to
the contrary the insurance company failed in its duty to Follow correct
procedures causing the existing damage.”
Also, in a further report from “I” dated 23 October 2009, the expert states:
“Page 2 of 3
…
It is a known consequence of water ingress and the associated moisture and
condensation build up inside of a dwelling, especially a dwelling that has
plasterboard linings, that the plasterboard sheeting and the frame onto which
they are fixed, will take up the moisture in a number of ways, should the cause of
the moisture ingress not be dealt with as soon as possible and should the
dwelling not be ventilated/dried out as soon as possible.
…
The reverse peaking of the plasterboard ceilings, in the first instance, appears to
be due to the water / moisture ingress and the retention of same within the
dwelling.
The reverse peaking observed on the top level, but not limited to this area is
consistent with the failure to adequately ventilate the building as part of the
rectification process and as part of the ongoing rectification process, until the
moisture levels in the dwelling, reached an equilibrium.
…
SUMMARY
The main factor that had caused the reverse peaking of the ceiling sheeting
within the dwelling, would in my opinion, be initially caused by the build up of the
moisture levels within the dwelling and the associated condensation along with
Case No: 220026 Determination Page 7 of 8
the convection currents in the air within the dwelling, carrying the moisture laden
air to other areas of the dwelling.
…”
35. Having considered all the expert reports submitted b y the parties to this
dispute, I must say that each expert in coming to their own conclusion has
relied upon the facts before utilising their undisputed knowledge and
experience. I have had regard to all the expert evidence submitted by both
parties.
36. I am satisfied that the Applicant has established that the insured event and
water ingress resulting from the subsequent defective repairs have contributed
towards the loss by the introduction of moisture and condensation.
37. The FSP has failed to address the App licant’s allegation made on several
occasions in relation to the failure to take any action in an attempt to dry out the
dwelling, which I accept and am aware is an industry accepted practice in such
circumstances. In the absence of any evidence to the contrary, I am convinced
that the failure to dry out the dwelling has also contributed to the damage in
dispute. The allegations by the FSP that there is little or no mould [which would
be expected to be present if much of the house was affected by moisture] have,
in my view, been rebutted by the Applicant. Accordingly the FSP should accept
responsibility for its failure in this regard.
38. On review of the expert’s evidence, it has not been establish ed that the
absence of back blocking is a building defect. The F SP’s experts have merely
stated that the decision to use back blocking or not is the choice of the builder
and dependant on a number of factors including but not limited to humidity
levels in the area. For this to be considered a building defect, it would have to
be established that the builder, under all the circumstances, was required to
make use of this building technique and has failed to do so in this instance.
This has not been established in this case.
39. A point which strikes me as significant, when co nsidering the “failure to install
back blocking” issue is that prior to the December 2006 storm and the
subsequent inadequate repairs, there had been no problem exhibited at all.
Various suggestions have been made by the FSP’s experts as to other possible
inadequacies in the original construction. Ultimately, all of these points have
come to nothing.
40. In the circumstances, the Applicant has satisfied me, on the balance of
probabilities that he is entitled to reimbursement by the FSP for all of the
remedial work including the repairs and rectification of the ceilings which are
subject to inverted peaking.
Determination
41. I determine that the FSP reimburse the Applicant for all of the damage specified
by the Applicant.
Case No: 220026 Determination Page 8 of 8
42. There has been much delay in this matter, not all of which has been the
responsibility of the FSP. Nevertheless, the damage arose in August 2007 and
the FSP has had the benefit of its money since that date. I am satisfied that
prompt action by the FSP could have seen the damage rectified speedily (and
at much less cost). Ultimately, I consider that the Applicant was correct in his
refusal to allow the majority of the work to be carried out pending the resolution
of this dispute. In the circumstances, I determine that the FSP shall pay to the
Applicant interest at the statutory rate from 31 August 2008 until the date of
completion of the repairs, or if the FSP proceeds to make a cash settlement,
until the date of such settlement. I confirm that the award of i nterest applies
only to the costs of the repairs with which I have dealt in this Determination.