Background
1. The Applicant held a home policy with the Financial Services Provider (FSP).
2. In 2008, the Applicant lodged a claim for damage to the insured property as the
result of storm activity. The Applicant arranged for a roof plumber to attend to
the damaged tiles on the roof and the FSP settled the claim, which included
internal damage.
3. In June 2010, the Applicant contacted the FSP to advise she had recently
arranged to have a solar heating system installed and the contractor advised
her there was extensive damage to the roof tiles which required rectification
and she believed it related to the 2008 storm claim.
4. The FSP assessed the property and determined approximately 120 tiles were
affected. The FSP agreed to cover the claim and an investigation into sourcing
replacement tiles occurred. However, it was found the tiles, which had been
manufactured in Indonesia, were no longer available.
5. The FSP proposed to use tiles as close to the original as possible. However,
the Applicant argued the entire roof required replacement and the FSP‟s own
contractor had stated so. The FSP did not agree to replacing all the roof tiles,
noting the policy did not allow for the matching of materials. It advised it would
cover the cost of moving tiles to achieve a uniform match to the exposed roof
areas and place the new tiles on an area of the roof that was not so visible.
6. The FSP maintains the policy did not make an allowance to replacing
undamaged materials to achieve a match and would therefore only replace the
damaged tiles.
Summary of Applicant ’s Position
7. In 2008, the FSP‟s loss adjustor did not conduct an inspection of the roof to
check for damage. She argues this was poor in the circumstances and led to
the current situation. She notes her contractor only attended to the roof area
above where the leak occurred as she was aware she had to mitigate the loss,
but the contractor did not undertake a full inspection of the roof.
Determination
Case No: 219835 Determination Page 2 of 8
8. Since 2008, the sarking under the tiles has prevented water entering the home
as a result of the damage.
9. The roof tiles (manufactured in Indonesia) are no longer available.
10. The FSP‟s expert inspected the roof (in 2010) and reported the roof required
replacement. Another expert reported there were cracked tiles over 90% of the
roof and it required replacement and it would not quote to repair the roof as it
would not be watertight and would not work as a long term solution.
11. The company, who did an inspection report in 2005, reported the roof was in
good condition. She arranged for the same company to inspect the roof in 2010
and it recommended all the tiles be replaced as to use tiles that did not match
the original would result in a second rate finish which would diminish t he
attractiveness and value of the home.
12. She submits the FSP‟s submission concentrates on the issue of matching
materials, when the central issue is that all the roof tiles require replacement
due to the damage from the storm.
13. She submits the FSP makes baseless submissions to discredit the fact the
damage was caused by the storm, by indicating the tiles may be prone to
damage. The FSP‟s own contractors agree the damage is storm related and
therefore the FSP‟s submission is unreasonable and irrelevant.
14. The FSP sent out several contractors in an attempt to find someone that would
state the roof could be repaired.
15. The FSP‟s handling of the claim has been poor , resulting in delays and it has
failed to keep her informed as to the progress of the claim. The FSP‟ s
submission also includes a number of typographical errors.
Summary of FSP’s Position
16. In 2008, it was advised the Applicant had a roof plumber attend to repairs on
the roof. Therefore, it was reasonable to expect the roof damage had been
attended to. It notes if there was extensive damage, it is surprising the roof
plumber did not make a note of it in 2008.
17. The Applicant contacted it 564 days following the storm in 2008 to report the
additional damage. It was not able to determine whether the damage was
caused by the storm and notes the tiles have broken as the result of contractors
standing on them, indicating they may be prone to damage.
18. However, having accepted the damage as storm related, it arranged
contractors to report and quote on the rectification of the damage . It has
received quotes indicating the damaged tiles can be replaced and the roof can
be repaired so that it is watertight and sound. In offering to either conduct those
repairs or cash settle the quoted cost to conduct those repairs; it has fulfilled its
obligations under the policy.
Case No: 219835 Determination Page 3 of 8
19. The Applicant has taken comments in expert reports out of context in arguing
her case.
20. The policy does not provide for the replacement of damaged materials to
achieve a match or for depreciation in value of the property. It notes the
Applicant ‟s neighbour reportedly had its roof tiles replaced as the result of the
storm and the Applicant is under the impression she is entitled to the same, yet
the decision of another insurer has no relevance to the subject claim and policy
terms.
21. It has agreed to pay to have tiles moved so the exposed roof areas have
matching materials and an inconspicuous area, the new tiles.
22. The Applicant ‟s contractor who inspected t he roof in 2005 and has now
provided a report has a vested interest in echoing the findings of its 2005
report.
23. It concedes there were some minor typographical errors in its submission and
apologises for any resulting confusion.
24. It submits the information on file proves it has made genuine efforts to try and
resolve the claim. It submits it did not fail to refer the Applicant to the IDR
department as alleged and sent a copy of the Notice of Response to the
Applicant in November 2010, and provides the postal reference.
25. The FSP relies on the following policy provisions:
“ HOW WE SETTLE CLAIMS
If we agree to pay a claim for loss, theft or damage to your home, contents or personal
effects, we will decide whether to:
repair the damaged property to the same standard, specification or quality as it
was when it was new, or
replace the damaged property with the nearest equivalent property available, or
pay you the amount it would cost us to repair or replace the property to “as new”
condition.
…
When it is not possible to repair or rebuild your property with original materials, we will
use the nearest available equivalent to the original materials.
…
When an item is part of a pair, set, system or collection we will only pay for repair or
replacement of the item that has been lost or damaged. The most we will pay is the
value that the item has as a proportion of the combined pair, set, system or collection.
We will not pay:
x to rebuild or repair undamaged property in order to achieve a match with
repaired or replaced property
x any additional costs to replace materials what are not damaged
x for any decrease in the value of any pair, set, system or collection. ”
Case No: 219835 Determination Page 4 of 8
Issue
26. Whether the FSP‟s offer to replace the damaged tiles only , fulfils its obligations
under the terms and conditions of the policy.
Reasons for Decision
27. There has been an exchange of the material upon which the disputing parties
rely. Accordingly, I am satisfied each party has had access to the material on
which the other party bases its case, and also an opportunity to reply to any
matters raised. In view of the aforesaid, it is unnecessary to analyse the
material in any detail unless required.
28. Given the nature of the dispute, FOS has considered it appropriate to expedite
the dispute directly to determination in accordance with the Operational
Guidelines to the FOS Terms of Reference.
29. Having reviewed the policy, I am satisfied it covers loss resulting from storm,
and the FSP has the option to either repair or replace damaged property. The
policy states the FSP will use the nearest equivalent materials in situations
where the original materials are no longer available and will not replace
undamaged materials to achieve a match.
30. The Applicant argues all the roof tiles require replacement as the result of the
event and the FSP‟s own contractors agreed. The FSP maintains the damaged
tiles can be replaced and it has offered to move tiles around so the more visible
roof areas still match.
31. The Applicant argues the FSP should have conducted a full inspection of the
roof in 2008. The FSP notes the Applicant arranged a roof plumber to conduct
repairs and accordingly, it was under the impression the roof had been rectified.
While this issue is not central to the issue in dispute, I consider the FSP was
reasonably under the impression the roof issues had been rectified in 2008. A
roof plumber arranged by the Applicant conducted minor repairs and with no
evidence to indicate there were any other issues, I do not consider the FSP
was under any obligation to conduct further investigations. However, I also
accept the Applicant ‟s submission that the roof plumber only attended to the
area above the leak. It would seem the matter was more of a
miscommunication issue rather than negligence or mismanagement on the part
of either party.
32. In June 2010, the FSP‟s loss adjustor conducted an assessment of the
property. The report, dated 18 June 2010, states:
“In recent weeks the Insured arranged to replace a wo rn out hot water system
with a solar panel system. The attending contractors for that work discovered a
number of cracked tiles on the roof, advising the Insured they appeared to be as
a result of storm damage.
Case No: 219835 Determination Page 5 of 8
The contractor tested a spare tile by drilling through it to establish if it was prone
to cracking (with age) and proved it was not. It is logical to assume, given the
ferocity of the subject storm, location of the premises and existence of other
damage; that the damage now discovered, occurred during the same event.
Considering the nature of the damage, we arranged „CBS‟ to accompany us on
inspection. At the time of inspection, we observed clear evidence of broken and
cracked roof tiles, attributed to hail and wind damage during the November 2008
storm. In all, approximately 110 tiles are cracked or broken requiring
replacement.”
33. The company “ CBS ” undertook temporary silicone repairs. It provided a report
and quote dated 09 July 2010, which states:
“ It is our opinion that hail and debris occurring during storms on the 19 October
2008, appears to have impacted roof cladding system, splitting and cracking
tiles, causing the resulting ….
We were unable to view any maintenance related issues during the time of our
inspection.
CONCLUSION
We have been unable to locate an exact or close matching profile tile within
Australia and believe this roof cladding system to be beyond remedial repairs to
a single elevation, using the existing terracotta tiles. ”
The quote totals $55,985.28 (inclusive GST).
34. The loss adjustor provided a further report dated 22 July 2010, which states:
“The fact remains that the original tiles are no longer available commercially.
They are not a common tile, and we attach a photograph we took at the time of
reinspection, for your information.
At best, the similar tile „JE‟ is chasing won‟t be exact match in either colour or
profile; and our view is to ascertain whether it is close enough to use to re-
arrange the damaged tiles into one elevation of the roof (there are several
elevations in this roof), and replace all tiles in that elevation with the closest
matching.
We previously mentioned this is an extremely complex and large roof, and we
already have a quote to replace the whole roof (on the basis tiles are not
available), for $55,985.28. It should be kept in perspective that the extent to
damage overall, amounts to only 100 or so tiles.”
35. The loss adjustor later provided two quotes for the replacement of the damaged
tiles only, with the preferred repair to “ replace each broken tile with matching
undamaged tiles from an obscure out-of-sight hip of the roof; and then
replacing all the tiles on that hip with a different profiled tile, so that they form
an effective and workable method of repair, which is invisible from street view.”
The preferred repairer , „TRS‟ reported 146 broken tiles were found “ but there
will be more as tiles are very fragile… broke more than 20 just walking on the
roof” . The quote allowed for at least 250 tiles to be replaced. The quote from
Case No: 219835 Determination Page 6 of 8
“TRS” was for $4,323. “ CBS ” also provided a repair quote on the same basis
for $8,613.42.
36. The Applicant provided a report from “ APS ” from 2005 (inspection report) and
September 2010. The 2005 report stated the roof was in good condition (noting
this is prior to the claimed event). The 2010 report states:
“Our current inspection revealed that broken, cracked and damaged tiles were
now observed to most sections of the roof and the damage is consistent with
storm damage and subsequent attempts to carry out temporary repair to broken
tiles.
The roof tiles have a coloured glazed surface which appears to be kiln baked
and are likely to have superior durability and life expectancy compared with
ordinary concrete roof tiles.
…
The roof is a prominent feature of the house and includes hips and shapes and is
generally exposed from all elevations and would be prominent in aerial
photography which is now commonly used for property searches. Any change to
the appearance of part of the roof would be obvious to an astute potential buyer
and would severely diminish the integrity of the finish of the house and the
associated value of the property.
…
It is suggested that the whole of the roof tiles and accessories are replaced with
materials similar to the owners preferred sample, Any proposal for part
replacement except with tiles exactly matching those existing would produce a
second rate and obviously repaired roof, which would diminish the attractiveness
and value of the propert y to any potential purchaser. ”
37. The Applicant also provided a report from another company, „K WR Roofing ‟,
dated 08 October 2010, which states:
“Upon inspection, the whole roof is in very poor condition. There are broken and
cracked tiles over approximately 90% of the roof area. This is causing the roof to
leak throughout the whole house. The cracks and breaks are mainly due to storm
damage and extreme weather conditions such as hail, debris and strong wind,
although a small portion is evidently trade damage caused by previous attempts
to repair.
The condition that the tiles are in makes it nearly impossible to walk on them
without breaking and the lack of availability of the Kirang Pilang tile or similar
tiles will result on any repair being of low standard and without warranty. Due to
this, „K WR Roofing ‟ will not quote to repair this roof and would suggest the roof
n eeds to be totally replaced.”
38. He provides two quotes - $50,302.33 to replace with terracotta tiles or
$34,692.41 to replace with concrete tiles. Having reviewed this evidence, I do
not agree with the FSP‟s submission that there is doubt as the cause of the
loss. All the experts, including the FSP‟s own loss adjustor , clearly report the
damage is storm related. There is also evidence a tile was drilled and it
Case No: 219835 Determination Page 7 of 8
confirmed there was no inherent issue with the tiles. In short, there is no
evidence to conclude there is doubt as to the cause of the loss.
39. I am also concerned “ CBS ” initially indicates the roof should be replaced and
provided a scope of works and quote for the replacement. The quote notes no
allowance had been made for repair, although this would appear to relate to the
unavailability of the tiles. In looking at the evidence as a whole, there are three
reports stating the roof requires replacement (including the initial report from
CBS). The FSP argues the Applicant ‟s expert “ APS ” had a vested interest in
echoing the findings of its 2005 report. While this does not specifically relate to
its opinion all the roof tiles should be replaced, a similar argument could be
made that the FSP‟s contractors have a vested interest in providing reports that
support the FSP‟s desired outcome, particularly given the opportunity for
ongoing work. I do not propose that is the case at all. However, I make the
point to illustrate the partisan nature of such statements. They do nothing to
progress the dispute or create goodwill among the parties.
40. “ TRS ” stated “ broke more than 20 (tiles) just walking on the roof ” and it is of the
opinion at least 250 tiles will be required to repair the roof. This comment
concerns me as it indicates the roof is in a poor state following the storm and
the damage may be more severe than just the tiles identified, given the relative
ease with which 20 tiles reportedly broke. I am also concerned the FSP is
unable to source tiles that are the same colour and profile as the original. In
most cases where matching issues arise, the colour of the new materials (often
due to the wear and tear or age of the original materials) is the issue. But in this
dispute, it appears the colour and profile of the tiles cannot be matched.
41. In considering the evidence as a whole, I am persuaded the Applicant ‟s roof is
a constructive total loss. A solid weight of opinion attributes the loss to the 2008
storm, and three contractors have reported the most appropriate method of
rectification is replacing all the tiles. “ CBS ” reported “ We have been unable to
locate an exact or close matching profile tile within Australia and believe this
roof cladding system to be beyond remedial repairs to a single elevation, using
the existing terracotta tiles” . “ KWR ” Roofing reported there is damage to over
90% of the roof and would not quote on repairs, stating “ The condition that the
tiles are in makes it nearly impossible to walk on them without breaking and the
lack of availability of the Kirang Pilang tile or similar tiles will result on any repair
being of low standard and without warranty ” . These reports in conjunction with
the comments by “ TRS ” (indicating the existing tiles are very fragile and prone
to breaking), lead me to conclude that it is quite probable a large number of the
tiles have been damaged and weakened by the storm event. I also have
concerns there are no tiles available that are even a close match, with both
colour and profile being issues.
42. The FSP‟s policy provide s it will not match materials, but in a situation where it
would seem likely other tiles are damaged anyway, and the new tiles will not
even be a close match neither in profile or colour to the original, I am of the
opinion the most appropriate method of rectification would be to replace all the
tiles.
Case No: 219835 Determination Page 8 of 8
43. The policy also states the FSP will repair the damaged property to the same
standard, specification or quality as when new, or replace the damaged
property with the nearest „equivalent‟ property available or pay what it would
cost to repair or replace the property “as new”. In this case, it would seem there
are no genuinely equivalent tiles available as none match in colour or profile. I
believe the FSP and its contractors have made genuine efforts to try and
source the tiles. However, it would seem they are not available. So despite the
fact there is evidence to conclude, on the balance of probabilities, that all the
roof tiles should be replaced due to the nature and apparent extent of the
damage, I am also concerned, in this specific situation, that the FSP‟s proposed
rectification would not leave the proper ty “as new” and would not realistically be
done using “equivalent” property as it would seem no genuine equivalent is
available.
Determination
44. Based on the evidence before me, I determine the FSP has an obligation to
replace all the tiles on the roof as it would seem the roof has been damaged to
an extent where the replacement of a small portion of the roof will not address
the damage that reportedly is spread over 90% of the roof area.
45. I am aware the quotes provided may now be out of date. I determine the FSP
and Applicant may seek further quotes if they wish to do so and that the FSP
may choose to either conduct the works with one of its own contractors or cash
settle the claim, as per its rights under the policy.
46. I trust the parties will cooperate in good faith in resolving the claim.