Home / Financial Firm (Unknown - Insurer) / Determination 219706
Determination 219706
Scope of impact-damage repairs to front and dividing brick walls
Summary
The applicants claimed the FSP must rebuild the entire brick wall damaged by a vehicle impact and disputed the FSP's repair of the dividing wall. AFCA found the FSP never agreed to rebuild the entire wall, but that it poorly repaired the dividing wall and must rebuild it with matching tumbled bricks at the existing height.
The policy requires matching materials and repair to pre-loss condition but excludes undamaged parts, so only the poorly repaired dividing wall must be rebuilt.
Issues
- Claim denial primary · not upheld
“I determine that the FSP did not agree to re-build the entire wall and the FSP is entitled to deny the Applicants' claim to re-build the entire wall.”
- Repairs or contractors secondary · upheld
“the FSP had poorly repaired the dividing wall. The FSP must re-build or pay the cost of re-building the new dividing wall with matching or similar tumbled bricks.”
Subjects and remedies
repair or rectify
Text of the determination
Case No: 219706 Determination Page 1 of 8
Case number: 219706
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim – Impact Damage
02 March 2011
Background
1. The female Applicant held a home building insurance policy with the Financial
Services Provider (FSP) at the time of the loss which is the subject of this
dispute. She is assisted by her son, the male Applicant, in this case.
2. On 8 March 2010, a third party vehicle impacted the insured property which is
at No. 17 ABC Street. Subsequently, the Applicants lodged a claim with the
FSP.
3. The FSP partially accepted the claim.
4. In its Internal Dispute Resolution letter dated 22 June 2010 (IDR letter), the
FSP found that:
the dividing wall between Nos. 17 and 21 ABC Street was damaged by
impact;
there is no damage to the front wall of No. 17 ABC Street except where
the dividing wall and front wall meets and the three bricks where the gate
was mounted;
the front wall of No. 17 ABC was suffering from fretting due to age and / or
poor building practice. The bolts supporting the pergola were rusted and
expanded and had star shaped cracks around the bricks holding the
pergola, thus, loosening the bricks. The damage is due to lack of
maintenance and not due to impact.
The FSP then concluded that:
the FSP is entitled to repair only the dividing wall and section of the front
wall which was impacted by the vehicle;
the policy does not cover maintenance related repairs;
the policy does not cover undamaged parts of the home and if the FSP is
unable to replace the matching bricks, it is entitled to cash settle for the
nearest equivalent;
with regard to the Applicant s’ concern for decreased property value, the
policy does not cover financial and consequential losses.
5. The Applicants do not agree with the FSP, hence, this dispute.
Determination
Case No: 219706 Determination Page 2 of 8
Summary of Applicants ’ Position
6. The Applicants say that the front brick wall was damaged by impact of a
vehicle. The FSP had initially agreed that there is structural damage throughout
the wall. However, subsequently, it advised that it will only replace part of the
wall. The Applicants assert that if the FSP did not intend to replace the entire
wall, then why did it request for a quote to replace the entire wall?
7. They allege that they requested an on-site meeting with the FSP, but the FSP
refused.
8. They also allege that on 29 June 2010, part of the wall was repaired due to
ongoing safety and security issues.
9. The Applicant s contend that the “new section” of the dividing wall b uilt by the
FSP “is at a different height to existing” and the bricks used “do not even
vaguely resemble existing”.
10. The Applicant s have submitted a builder’s report commenting on the repairs
made by the FSP.
11. The Applicant s seek the replacement of the “enti re wal l” “as originally agreed
upon”.
Summary of FSP’s Position
12. The FSP relies on its reasoning in the IDR letter which is outlined in paragraph
4 above.
13. The FSP has submitted three reports from its builder.
14. It contends that its decision to request a quo te to rebuild the entire wall does
not constitute an offer to undertake the rebuilding of the entire wall. The quote
was arranged to assist the female Applicant to make a decision as to whether
to accept the FS P’s offer of cash settlement.
15. It also contends that the Applicant s’ expert report “for the most part refers to
cosmetic look of the repairs and not its structural integrity”.
16. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement:
“ SECTION 2
HOW WE SETTLE YOUR CLAIM
2.1. Repair, Rebuilding Or Replacement
When an insured event causes loss or damage to your home we will, if we accept
your claim, pay at our option for the reasonable cost of repairing, rebuilding or
replacing your home at the site :
to its condition when new; or
Case No: 219706 Determination Page 3 of 8
to its condition when last renovated, altered or restored.
We will not pay for the portion of these building costs which relate to the undamaged
parts of your home .
When we pay to repair or rebuild your home we will match the existing materials,
however where these materials are unavailable locally or it is not possible to match
them we reserve the right to pay for the nearest equivalent or similar materials.”
Issues
17. Whether the FSP agreed to re-build the entire wall.
18. Whether the repairs made by the FSP on the dividing wall between Nos. 17 and
21 of ABC Street complies with the policy terms and conditions.
19. Whether the front wall of No. 17 ABC Street was damaged by impact of a
vehicle. If yes, the extent of impact damage.
Reasons for Decision
20. Due to the nature of the dispute, the Financial Ombudsman Service (FOS) has
considered it appropriate to expedite the dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has
not been the subject of a FOS Recommendation and has proceeded directly to
Determination. The parties have been previously advised that a Determination
will be issued in this case.
Expert reports
FSP’s Evidence
21. The FSP’s builder issued three quotations/r eports dated 16 March 2010, 9 April
2010 and 26 May 2010.
22. The 16 March 2010 quotation is a “quotation to carry out works to repair impact
damage to the letterbox and dividing front brick wall of the property”. This
quotation lists works to be done at Nos. 17 and 21 ABC Street and shows
repair costs of $4,623.06. It relevantly reads:
“Damage has occurred to the letter boxes of number 17 and the dividing front
feature wall of numbers 17 and 21 [ABC] St where brickwork has been cracked
and letterboxes have been demolished. There is also minor damage to the gate
and post on the front of this wall and a water feature in the garden bed on the
inside of the wall.
This damage has occurred due to impact of a vehicle on the early hours of the
08/03/2010.
…
At the time of our inspection it was noted that the remaining section of the
dividing brick wall has been weakened due to mortar being washed out from
Case No: 219706 Determination Page 4 of 8
between the bricks and has allowed it to be susceptible to the damage. There is
cracking through sections of this wall which is a resultant to this impact damage.
We have also been informed that the bricks in the wall and the letterbox are no
longer available. We will make every attempt to match these bricks with a similar
brick as close as possible.”
23. The 9 April 201 0 quotation is a quotation “to carry out works to repair impact
damage dividing brick and wholly owned front brick wall of property”. This
quotation refers to No. 21 ABC Street and shows repair costs in the amount of
$12,125.96. It relevantly reads:
“Damag e has occurred to the dividing and front feature wall of this property
where brickwork has been cracked and collapsed. There is also minor damage
to the gate and post on the front of this wall and a water feature in the garden
bed on the inside of the wall.
This damage has occurred due to impact of a vehicle on the early hours of the
08/03/2010.
The neighbouring brick letterbox and the dividing section of this fence were
damaged in this incident, which have collapsed due to the force of the impact.
The letterbox has been rebuilt.
At the time of our inspection it was noted that the remaining section of the
dividing brick wall has been weakened. Mortar had been washed out from
between the bricks and has allowed it to be susceptible to the damage.
There is cracking through sections of the dividing wall which is a resultant to this
impact damage. There did not appear to be any damage [to] the front wall with
the exception of where the two walls meet.
We have been informed that the bricks in the wall are no longer available. We
are unable to source these bricks any longer and therefore have been requested
to quote to rebuild the entire wall as … similar brick as close as possible.
The remaining front section of wall matches the house and your Policyholder
stated that the new dividing section of brick wall will not match the house. It must
be said that if we rebuild the front wall we would use the same brick that we plan
to use in the dividing fence which wi ll also not match the house.”
24. The 26 May 2010 quotation is a quotation “to carry out works to repair impact
damage dividing brick wall of property”. This quotation lists refers to No. 21
ABC Street and shows repair costs of $3,668.79. It essentially repeats the first
four paragraphs of the 9 April 2010 quotation which are quoted above. It then
states:
“There is cracking through sections of the remaining dividing wall, which is a
resultant to this impact damage. There does not appear to be any damage [to]
the front wall with the exception of where the two walls meet and three bricks
where the gate was mounted. These two walls are wire and cement joined, not
toothed together.
The front wall cement is suffering from fretting due to age and of poor building
practice.
The remaining front wall curves into the driveway on the other side of this
property. The pergola stretches across from one side to the other and is attached
to both side walls. The bolts supporting the pergola are rusted and expanded,
Case No: 219706 Determination Page 5 of 8
and have “star” cracked the bricks holding the pergola, loosening the bricks. This
is not a resultant from this incident but of lack of maintenance.
We are unable to source any of these bricks as they are no longer available and
had located a simmilar (sic) brick to the existing.”
25. The FSP has also submitted photographs of the subject walls.
Applicant s’ Evidence
26. Subsequent to the lodging of the dispute with FOS, the Applicants submitted
their own expert report.
27. According to the report, the Applicant s’ builder was “commissioned to report on
repairs made to the front perimeter fence” at No. 21 ABC Street.
28. With regard to the dividing wall, the report reads:
“(1) Section of wall dividing No 21 and the adjoining western property
Neither skill nor conscience were (sic) used in choosing a brick to match the
exiting. On choosing a replacement brick to match, no consideration has been
given to the fact that the existing brick work is tumbled. The net result being that
a square brick had been used and as such does not match the front perimeter
fence of No 21.
Upon rebuilding this section of wall, no consideration has been given to the
gauge of the existing wall. (21 courses) Had the bricklayer followed existing
gauge then the top of both walls would have been constant. In its present form
the new wall sits higher than the existing.
…
… I recommend that:
(a) The section of wall dividing No 21 and the adjoining property be demolished
and rebuilt with a tumbled brick to the gauge of the existing perimeter fence
and finishing equal in height.
I do acknowledge that given the age of the existing brickwork a perfect brick
match is not possible and as such I would recommend liaising with the owner
of No [17]… with regard to the matter of choosing the bricks.”
29. With regard to the front wall where the pergola is, the report reads:
“(2) Section of wall to east side, dividing driveway and No 21
I have been instructed that damage to this portion of wall occurred with the same
incident relevant to item No 1.
Damage to this wall is a result of the pergola structure within the front courtyard
of no 21 moving this wall at the time of impact.
The resultant damage has left this wall unstable.
Rather than remove the damaged portion of wall and replace the same it
appears that this section of wall has merely been pushed back into position and
in doing so no consideration has been given to the structural integrity of this
portion of wall.
Areas of the existing wall at No 21 not disturbed by this incident still hold their
structural integrity.
Case No: 219706 Determination Page 6 of 8
…
… I recommend that
(b) Section of wall to the east side, dividing driveway and No 21. – The section
in question should be taken apart brick by brick, as in its present form these
bricks are loose, and then re-laid with the same bricks. Any damaged bricks
to this section would have to be replaced with the same chosen for item (a )”.
Whether the FSP agreed to re-build the entire wall
30. The Applicants assert that the FSP agreed to re-build the entire wall. They say
that this is evidenced by the FSP’s quotation f or re-building the entire wall. I am
not persuaded.
31. I have carefully reviewed the three quotations by the FSP’s builder.
32. I note that on 9 April 2010, the FSP’s builder made a quotation in the amount of
$12,125.96 “to carry out works to repair impact dama ge dividing brick and
wholly owned front brick wall of property”.
33. The reason for preparing this quotation is stated in the quotation, thus:
“We have been informed that the bricks in the wall are no longer available. We
are unable to source these bricks any longer and therefore have been requested
to quote to rebuild the entire wall as … similar brick as close as possible.”
34. It is clear from the above that the quotation for the entire wall was requested
because the bricks in the wall are no longer available and the builder was
unable to source matching bricks.
35. There is no evidence before me which shows that the FSP agreed to re-build
the entire wall.
36. I accept that the FSP requested this quotation in order to assist the female
Applicant to make a decision as t o whether to accept the FSP’s offer of cash
settlement.
37. Furthermore, the policy clearly and unambiguously provides that the FSP will
not pay for undamaged parts of the home. It is clear from all the expert reports
submitted by the parties that the vehicle impact did not damage the entire wall.
Thus, the FSP is entitled to deny the Applicant s’ claim to repair t he undamaged
parts of the wall.
Dividing Wall
38. The Applicant s’ builder states that the new wall now sits higher than the
existing wall because the FSP ’s builder has not given consideration to the
gauge of the existing wall.
39. The FSP concedes that “at the time of completion of the repair to the wall a
height differential was noted”. The FSP has not explained why the height
differential could not have been avoided.
Case No: 219706 Determination Page 7 of 8
40. On the other hand, the Applicant s’ builder says that “(h)ad the bricklayer
followed existing gauge then the top of both walls would have been constant”.
41. It is settled law that the FSP is obliged to repair or rebuild the wall to its pre-
accident condition.
42. Thus, I am satisfied the FSP should have repaired the wall in such a manner
that the height of the new wall is the same as the height of the existing wall.
43. The Applicant s’ builder also states that the FSP used square bricks instead of
tumbled bricks. He says that prior to the loss, the wall had tumbled bricks. He
“acknowledge[s] that given the age of the existing brickwork a perfect brick
match is not possible”. However, he suggests that tumbled bricks are still
locally available.
44. The policy c learly and unambiguously states that the FSP “will match the
existing materials” but if “these materials are unavailable locally or it is not
possible to match”, the FSP has the “right to pay for the nearest eq uivalent or
similar materials.”
45. The FSP does not deny that the original bricks on the dividing wall are tumbled
bricks and that its builder used square bricks. It does not dispute that tumbled
bricks are still locally available. It has not explained why square bricks were
used by its builder instead of tumbled bricks.
46. In my view, the onus is on the FSP to establish that tumbled bricks are not
locally available and that the square bricks used are the nearest equivalent or
similar material. The FSP has failed to do this.
47. Therefore, I determine that the FSP had poorly repaired the dividing wall and
thus, failed to comply with its obligations under the policy with respect to the
dividing wall.
Front wall
48. With regard to the front wall, the FSP’s builder reported that:
there was no impact damage to the front wall except where the two walls
meet and on the three bricks where the gate was mounted;
the front wall cement is suffering from fretting due to age and of poor
building practice;
the pergola stretches across from one side to the other and is attached to
both side walls. The bolts supporting the pergola are rusted and
expanded, and have “star” cracked the bricks holding the pergola,
loosening the bricks. This is lack of maintenance and not impact damage.
49. I have examined the photographs and note the rusted bolts and star cracks on
the wall around the bolts.
50. I have carefully considered the Applicant s’ expert report and I am not satisfied
that the Applicant s’ expert had rebutted the FSP’s expert evidence.
Case No: 219706 Determination Page 8 of 8
51. The Applicant s’ expert briefly states “Damage to this wall is a result of the
pergola structure within the front courtyard of no 21 moving this wall at the time
of impact.” He does not explain how the vehicle possibly impacted the pergola
and in turn, how the pergola moved the wall and caused the cracks. He also
does not address the rusted bolts and star cracks found on the wall.
52. It appears that the Applicant s’ expert merely relied on the information provided
by the Applicant s as he wrote “I have been instructed that damage to this
portion of the wall occurred with the same incident relevant to item No 1
[dividing wall]”.
53. Therefore, I am satisfied that the impact damage on the front wall is limited to
where the dividing wall and front wall meets and to the three bricks where the
gate was mounted on.
Determination
54. Based on the foregoing reasons, I determine that:
the FSP did not agree to re-build the entire wall and the FSP is entitled to
deny the Applicant s’ claim to re -build the entire wall;
the FSP had poorly repaired the dividing wall. The FSP must re-build or
pay the cost of re-building the new dividing wall with matching or similar
tumbled bricks and to the gauge of the existing wall ensuring that the new
wall will be of the same height as the existing wall; and
the FSP is entitled to deny the Applicant s’ claim to repair the front wall
except where the dividing wall and front wall meets and to the three bricks
where the gate was mounted.