Home / Financial Firm (Unknown - Insurer) / Determination 219265

Determination 219265

Lounge ceiling collapse refused; cause not shown to be an insured event

FirmFinancial Firm (Unknown - Insurer)
Decided2011-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home insurer refused a claim for a collapsed lounge ceiling, attributing it to gradual deterioration and climatic conditions. AFCA found the applicant, who was represented by his son, did not establish an insured event caused the collapse.

The applicant bears the onus of proving a loss caused by an insured event, and the plasterer's undated report did not establish cause.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 219265 Determination Page 1 of 5 Case number: 219265 General Insurance - Domestic Insurance - Home Building – Collapse of ceiling Onus of proof - Policy exclusion – gradual deterioration 31 January 2011 Background 1. The Applicant insured his home building against loss or damage caused by insured events for $310,000 with a $1,000 policy excess. The policy commenced on 28 August 2007 and had been renewed annually to 28 August 2010. 2. On 4 July 2009, the Applicant contacted the Financial Services Provider (FSP) to report that the entire ceiling of the lounge room had collapsed. The Applicant reported that there was no known cause for the collapse. 3. The FSP appointed a building consultant to inspect and report on the damage. The consultant reported that an insured event did not cause the collapse but was the result of gradual deterioration. He estimated the cost of repairs would be approximately $8,700. 4. The FSP denied indemnity to the Applicant on the grounds that an insured event did not cause the collapse but was the result of a combination of climatic conditions and insufficient fixings. Summary of Applicant’s Position 5. The FSP has stated that climatic conditions and insufficient fixings caused the ceiling to fail. However, he obtained a letter from a plasterer stating that he found nothing to indicate that things were no t done to a professional standard and that proper board, nails and glue seemed to have been used on the ceiling. 6. The FSP contends that the plasterer’s report was made 12 months after the collapse occurred. However, the inspection was made not long after the event and only the report was written approximately 12 months later due to him finding out approximately 12 months after the event that the FSP had declined the claim. Determination 7. The FSP also stated that the report was made after the ceiling had fallen and had been disposed of. This is correct. However, its own report had been prepared after the damaged ceiling had been disposed of. The FSP arranged for the damaged ceiling to be cleared as it was deemed to be dangerous. The disposal was carried out before any inspections were carried out. 8. The FSP also contends that there were no signs of water entry. However, leaking water was discovered and approximately six roof tiles had to be replaced. 9. Further, the FSP inspection was carried out at about 7.00am and at that time of the day in July, it is very dark. With no lights being available, it would have been difficult to make a proper inspection. 10. The FSP’s consultant stated that no contents were damaged. However , some contents were damaged including a billiard table. Summary of FSP’s Position 11. It contends that the Applicant has failed to demonstrate that the ceiling collapse was the result of any insured event of the policy of insurance. 12. It obtained a repair report from a building specialist who, in his expert opinion, had confirmed that the cause of the ceiling collapse as a combination of climatic conditions and inadequate glue fixings which over time had gradually deteriorated resulting in the damage sustained . 13. While the Applicant has submitted a written report which he contends proves that the ceiling was professionally installed, it notes that the report does not provide any indication as to how this conclusion was arrived at. 14. Further, the report does not provide any evidence to indicate how the damage is related to a single event as covered by the policy of insurance. 15. The FSP relies on the following policy provisions: “What we cover We cover loss or damage caused by insured events 1 to 12 When we insure them, your home and contents are covered for loss or damage by the insured events 1 to 12 at the insured address. ... What we do not cover There are things we do not cover within each insured event, feature and option. You should also refer to page 121 for information on what we do not cover under any part of this policy. ... We do not cover ... Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot unless this is covered under: - insured event 1 (storm and flood) - insured event 2 (burst pipes, leaks and overflows). ... How to establish your loss Establish an incident took place When making a claim you must be able to prove that an incident insured by your policy actually took place. If you do not do this, we will not be able to pay your claim. ... Terms explained ... incident or event A single occurrence which is not intended or expected to happen by you.” Issues 16. The Applicant contends that the lounge room ceiling was professionally installed and fixed. He also contends that water had entered the ceiling space through damaged roofing tiles. 17. The FSP contends that the Applicant has not established that the collapse of the ceiling was caused by an insured event of the policy. Further, it contends that the ceiling failed through gradual deterioration of the plaster fixings. Reasons for Decision 18. The onus of proof is on the Applicant to establish on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 19. On 15 July 2009, the FSP wrote to the Applicant denying indemnity for the collapse of the lounge room ceiling. It also invited the Applicant to request that its decision be referred to its Customer Dispute Resolution Process if he was dissatisfied with its decision. 20. The Applicant contacted the FSP on the 29 July 2009 requesting that the disputed claim be referred to the FSP’s Internal Dispute Resolution process for review. The FSP has stated that it attempted to contact the Applicant on several occasions by telephone to discuss details of the dispute, without success. 21. In a letter dated 13 August 2009, the FSP informed the Applicant that it could not review his claim before firstly discussing his concerns with him. The Applicant failed to contact the FSP and it closed its file on 21 August 2009. 22. On 17 June 2010, the Applicant contacted the FSP to enquire why his claim had been denied. He also informed the FSP that his son was acting on his behalf in the matter. 23. On 21 June 2010, the FSP contacted the Applicant ’s son who confirmed that he considered the FSP’s decision to reject the claim as being incorrect and he would obtain his own report. 24. An undated report was received by the Applicant which stated: “ To whom it may concern As a plasterer & business owner who has been in the trade for a number of years, from what I gathered after looking at the ceiling at [Applicant ’s address] was that I found nothing indicating that things were not done to a professional standard and that proper board, nails and glue seemed to be used on the ceiling.” 25. Following receipt and consideration of the report from the plasterer, the FSP maintained its position to deny indemnity to the Applicant on the grounds that the report did not provide any reasons for the failure of the ceiling and, as such, failed to establish an insured event of the policy caused the failure . 26. In his Referral Notice to the Financial Ombudsman Service, the Applicant ’s son stated that leaking water had been discovered and approximately six roof tiles had to be replaced. 27. No evidence has been submitted in support of this statement and, on the assumption there was leaking water, there is no evidence that it was cause of the failure of the ceiling. 28. However, following the FSP’s building specialist’s inspection on 7 July 2009, he stated in his report: “CAUSE OF DAMAGE I believe that as there was no sarking or insulation in the roof, climatic conditions such as cold air have weakened the plaster board ceiling. The cornice surrounding the ceiling was not glued to the brick walls. As the plaster sheeting is not supported at the edges and carries the weight of the cornice, this combined with the weakened plaster has caused it to fall. There were no signs of water entry.” Determination 29. As mentioned above, the onus is on the Applicant to establish that on the balance of probabilities, an insured event covered under the policy of insurance was the cause of the failure of the ceiling. 30. On the evidence submitted to me, I determine that the Applicant has failed to establish the failure of the ceiling was caused by an insured event of the policy and the FSP is entitled to deny indemnity to the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.