Home / Financial Firm (Unknown - Insurer) / Determination 217910
Determination 217910
Denial of construction-related accidental damage claim
Summary
Landlord claimed for cracking and other damage to his rental building after neighbouring construction and builder-tenant repairs. The FSP accepted some damage and offered a cash settlement. AFCA found the remaining damage pre-existing or excluded and ordered nothing further.
The applicant bore the onus to prove the loss arose from an insured event, and the expert evidence showed pre-existing damage and tenant-caused repairs fell within policy exclusions.
Issues
- Claim denial primary · not upheld
“I am persuaded by the evidence of the experts that the damage denied by the FSP was pre-existing and not as a result of the construction work.”
- Poor claim handling secondary · not upheld
“I find no evidence that the Applicant was not treated respectfully and in a fair and reasonable manner throughout the claims process.”
- Inadequate claim investigation secondary · not upheld
“I do not agree with the Applicant's submission and consider that a prudent property owner... would appoint such an expert.”
- Repairs or contractors secondary · not upheld
“I find it clear and unambiguous that there is no cover for damage caused by tenants, this being the builders, attempting repairs to the property.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 217910 Determination Page 1 of 7
Case number: 217910
General Insurance - Landlord Insurance - Building - FSP Decision - Denial of
Claim – Accidental Damage – Movement of Building due to Construction Work
31 March 2011
Background
1. The Applicant held a landlord insurance policy with the Financial Services
Provider (FSP) from 30 September 2008 until 31 July 2009 to provide cover for
accidental damage to his rental property.
2. The Applicant contacted the FSP on 17 November 2009 to lodge a claim for
damage sustained to his property caused during construction work to a
neighbouring building.
3. The FSP accepts that the claim is one to which the policy responds and has
agreed that certain areas of the property has sustained cracking to the walls
and masonry due to the construction work. The FSP however, denies that the
majority of the damage claimed was as a result of the construction work but
contends that it was pre-existing or caused by the builders who were leasing
the property at the time.
4. The Applicant argues that the FSP has not been able to establish the cause of
the damage to all of his property and seeks the appointment of a structural
engineer at the FSP’s expense. He further seeks a review of the FSP’s decision
not to cover the damage caused by the builder’s poor repairs.
Summary of Applicant’s Position
5. The Applicant says that the FSP has failed to fully investigate the cause of the
damage to his property and believes that a structural engineer should be
appointed by the FSP before a decision is made to deny the ma jority of his
claim.
6. The Applicant further says that the FSP should take “responsibility for the
repairs to the property shonkily made by the builders”.
7. Furthermore, the Applicant asserts that the FSP should also accept to deal with
damage caused by the ingress of water and also a broken glass laundry roof.
Determination
Case No: 217910 Determination Page 2 of 7
8. The Applicant also contends that the FSP should establish the structural
integrity and safety of a boundary wall.
9. Finally, the Applicant requests that the FSP should be obliged to “treat future
insurance claims and their clients with the respect they deserve”.
Summary of FSP’s Position
10. The FSP says that the majority of the damage claimed by the Applicant is pre -
existing or caused by the builders, who were tenants of the property, attempting
to carry out repairs.
11. The FSP is satisfied based upon the expert evidence obtained that there is no
requirement to appoint a structural engineer.
12. In regard to the claims for water damage and broken glass, the FSP is
prepared to investigate this damage once separate claims have been lodged by
the Applicant as it is satisfied that the damage was not as a result of the
construction work.
13. The FSP submits that it is not required to appoint a structural engineer to
assess the boundary wall as it is in the same condition as it was prior to the
commencement of the building works.
14. The FSP further submits that it has dealt with the Applicant’s claim in a fair and
reasonable manner and that it has not been disrespectful to the Applicant
throughout the claims process.
15. The FSP relies on the following policy provisions contained within the Product
Disclosure Statement (PDS).
“ This policy does not cover any loss, damage or liability:
...
from pre-existing loss or damage
...
This policy does not cover loss, damage, destruction, consequential loss or liability
directly or indirectly caused by, contributed to by, resulting from, or arising out of or in
connection with:
...
erosion, subsidence, landslide, settling, shrinkage, expansion, undermining, washing
away or any other earth movement except when loss or damage is caused by:
- earthquake
- storm or rainwater
- explosion, or
- escape of liquid
and occurring within 72 hours after the event
Case No: 217910 Determination Page 3 of 7
...
settling, seepage, shrinkage or expansion in buildings, walls, roofs, floors, ceilings,
foundations, pavements, roads and the like
...
We do not cover loss or damage arising from:
...
- maintenance or repair operations carried out by tenants or anyone acting on their
behalf. ”
Issues
16. Whether the FSP is required to appoint a structural engineer to attend the
Applicant’s property and provide a report on any damage sustained to it.
17. Whether the FSP is required to indemnify the Applicant for damage caused by
water ingress and broken glass to the laundry roof without additional claims
being lodged by the Applicant.
18. Whether the FSP is required to indemnify the Applicant for the poor repairs
undertaken by the builders to the interior of the property.
19. Whether the FSP has dealt with the claim in a fair and reasonable manner,
being respectful to the Applicant at all times throughout the claims process.
Reasons for Decision
20. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity of addressing any issues
raised therein.
21. Due to the nature of this dispute, FOS has considered it appropriate to expedite
the dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
22. Due to the number of issues raised by the Applicant, I will address each issue
individually.
Appointment of a structural engineer to assess current damage
23. When submitting a claim for consideration, the burden of proof lies with the
Applicant to demonstrate on the ba lance of probabilities that all of the loss
claimed is as a result of an insured event, in this case accidental damage
caused by neighbouring construction work.
Case No: 217910 Determination Page 4 of 7
24. Once an insured event has been established, the onus transfers to the FSP to
show on the balance of probabilities that some or all of the loss claimed falls
within one or more exclusion of the policy.
25. Upon lodgement of the claim, the FSP appointed a loss adjuster to attend the
Applicant’s property and report on the extent and cause of the damage. Th e
loss adjuster considered it prudent to obtain the opinion of a building
practitioner as to the cause of the cracking noticeable within the property.
26. The loss adjuster also requested sight of the dilapidation report commissioned
by the builders prior to the commencement of the construction work. This was
duly supplied by the Applicant.
27. Without the benefit of the dilapidation report, the building practitioner detailed:
Inspection of the property show the terrace home has masonary [sic] cracking to
the boundary walls. The cracking indicates subsidence of approx 5-10mm in the
wall, resulting in spalling of the internal plaster surfaces. These cracks are
present to 2 rooms downstairs and 2 rooms upstairs.
Exterior inspection shows the boundary wall has now been exposed following
demolition of the adjoining dwelling. This exposed brick wall was previously
hidden by the adjoining attached property.
In our opinion, the masonary [sic] cracking the the [sic] result of disruption due to
excavation/construction in the adjoining property, including changes to the
exposure conditions of the wall and its footings during construction..
We believe the movement will now have stabilized and not contiunue [sic] to
deteriorate.
We also noted damage to parapet walls, including missing flashings and
distrubed [sic] corbals. These should be repaired/replaced. It is unclear if this
damage is due to the construction process or is pre-existing damage prior to
construction.”
28. The Applicant provided a copy of the dilapidation report to the loss adjuster and
a further inspection of the property was undertaken by the loss adjuster and
another building consultant.
29. The building consultant was able to cross reference the damage reported in the
dilapidation report, supported by photographic evidence, and the 32 areas of
damage being claimed by the Applicant.
30. The building consultant was able to identify five new signs of cracking to
internal plasterwork which he considered could have been as a result of the
vibrations caused during the construction work.
31. All other damage claimed was present prior to commencement of the
construction work and reported in the dilapidation report. It was noted that the
damage did not appear to have worsened and therefore this damage was
considered pre-existing, which I accept is excluded under the terms of the
policy.
Case No: 217910 Determination Page 5 of 7
32. The building consultant further reported that “the hairline cracking, is not
considered to be associated with excessive foundation movement, but rather
possible vibration to the wall, and does not require the input from a
geotechnical engineer.’
33. As previously detailed, the burden of proof lies with the Applicant to show on
the balance of probabilities that the loss claimed falls to be dealt with under the
terms and conditions of the policy. The Applicant has not provided any expert
evidence to contradict that of the FSP. As such, I am persuaded by the
evidence of the experts that the damage denied by the FSP was pre -existing
and not as a result of the construction work.
34. The Applicant submits that the FSP should be responsible for appointing a
structural engineer to inspect the property. I do not agree with the Applicant’s
submission and consider that a prudent property owner, believing his property
is suffering from subsidence, would appoint such an expert at the earliest
opportunity to avoid further damage to the building.
35. Should the Applicant now appoint such an expert and a differing opinion as to
the cause of the damage be proffered the n this should be submitted to the FSP
for its further consideration.
Water ingress
36. The Applicant asserts that water has entered the property causing damage to
the ceiling of a bedroom. The building consultant detailed in his report:
“There is no evidence to suggest that this water leakage is related to or was
caused by works being carried out on the adjoining property.”
37. The loss adjuster also reported on the damage caused by the ingress of water:
“There is evidence of water damage to the ceiling of several rooms which are
new events and we have recommended to the insured they lodge a claim
because we observed it following the storms of 11 February and we think there
has been more since 6 March. We think it would be valuable for these claims to
be lodged as it would enable us to arrange a roof report which would cover any
storm damage and consideration of building damage...or maintenance.
38. Again, without expert evidence to the contrary, I am persuaded by the evidence
of the FSP’s loss adjuster and building con sultant that the damage caused by
the ingress of water was not as a result of the construction work.
39. The FSP remains open to the Applicant lodging a separate claim for the water
damage should he so wish which I consider appropriate in the circumstances.
Broken glass
40. Neither the building consultant nor the loss adjuster considered that the actual
construction work had led to the breaking of glass in the laundry roof. No
evidence has been submitted by the Applicant that it was the construction work
which caused the damage.
Case No: 217910 Determination Page 6 of 7
41. As indicated previously, without contradictory evidence from the Applicant, I am
persuaded by the evidence of the building consultant and the loss adjuster that
the broken glass has not arisen as a direct result of the construction work being
undertaken to the adjoining building.
42. The builders have confirmed to the loss adjuster that they are prepared to
replace the broken glass at their expense. Alternatively, the FSP has advised
that it is prepared to consider the cost of replacing the glass should the
Applicant wish to lodge a separate claim which I consider is a fair and
reasonable stance for the FSP to adopt.
Poor repairs by the builders
43. The builders who were completing the construction work to the adjoining
property had leased the Applica nt’s property to use as office facilities until the
work was complete.
44. During this time, the builders, accepting that additional hairline cracks had been
caused to the property, attempted repairs albeit not to a high standard.
Furthermore, the builders confirmed to the loss adjuster that upon vacating the
property, it would repair the broken glass, totally redecorate the interior, repair
the cracks and replace carpets and vinyl flooring.
45. The Applicant contends that the FSP should attend to the interior repairs as the
work carried out by the builder so far is of poor quality.
46. I have carefully considered the policy wording and find it clear and
unambiguous that there is no cover for damage caused by tenants, this being
the builders, attempting repairs to the property.
47. It is to be noted that the repairs completed at the time of the submission of this
dispute were initial repairs only and it is unknown what the quality of the final
repair finish will be. If they remain unsatisfactory to the Applicant, then he will
be able to seek recourse directly from the builders.
48. The FSP has however obtained a quote for the repairs to the damage accepted
under the policy and has offered to cash settle the Applicant based upon this
quote. Considering that the damage may be adequately repaired by the
builders upon vacating the property, I consider this cash settlement offer by the
FSP to be reasonable.
Conduct of the FSP throughout the claims process
49. I have read through the FSP’s screen notes and the correspondence which has
passed between the Applicant and the FSP and find no evidence that the
Applicant was not treated respectfully and in a fair and reasonable manner
throughout the claims process.
Case No: 217910 Determination Page 7 of 7
Determination
50. On the basis of the available information, I determine the following:
a) The FSP is not required to appoint a structural engineer.
b) The FSP is not required to indemnify the Applicant for the poor repairs
undertaken by the builders.
c) The FSP is not required to consider the cost of the water damage without a
separate claim being lodged by the Applicant.
d) The FSP is not required to consider the cost of replacing the broken glass
without a separate claim being lodged by the Applicant.