Home / Financial Firm (Unknown - Insurer) / Determination 217645
Determination 217645
Shed and contents damage refused as flood or run-off
Summary
After a March 2010 storm the applicant claimed for a damaged shed and contents on her farm. The FSP refused, finding the water was flood or run-off, and AFCA agreed the exclusion applied.
Flood water backing up along a drain was classified as run-off, which the policy expressly excludes.
Issues
- Claim denial primary · not upheld“The FSP is not liable to make payment under the policy terms and conditions for the damage to the shed and its contents”
- Product terms interpretation secondary · not upheld“the policy definition of run-off includes water that overflows from drains”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: «reference_id» Determination Page 1 of 6
Case number: 217645
General Insurance - Domestic Insurance - Home Contents - Service - Service
quality
31 January 2011
Background
1. The Applicant holds a Farm Cover policy of insurance with the Financial
Services Provider (FSP). The policy covers the building up to $452,600 and
contents up to $90,700.
2. On 1 March 2010 the Applicant ’s property was subject to water inundation after
a storm event which resulted in structural damage to a shed and the loss of
contents to two sheds. The Applicant subsequently lodged a claim under her
policy of insurance.
3. The FSP engaged an assessor and a hydrologist to investigate the damage
and provide a report on the cause of the water inundation.
4. As a result of the report, the FSP declined the claim on the basis that the
damage arose from flood which is excluded under the policy.
5. The Applicant disputes the FSP declinature on the basis that the hydrologist
has incorrectly identified topographical features at the property. Further, the
damage arises from storm which is a covered event under the policy.
Summary of Applicant’s Position
6. The Applicant has made a claim for structural damage to a shed and damage
to contents of the shed.
7. The Applicant considers the damage to the shed and shed contents arose from
storm damage. The Applicant notes that the temperature dropped, and there
were high winds which blew trees over.
8. The Applicant considers the hydrologist report was based on incorrect
information. The Applicant states that the Gully referred to by the hydrologist
enters into the Nebine Creek. The Gully the hydrologist refers to is actually a
bore drain, and the Applicant considers that what the hydrologist refers to as a
bore drain is potentially just erosion.
Determination
9. The Applicant was dissatisfied with time delays in this matter. The Applicant
states she made a claim mid-March and it was not until 30 July 2010 that a
builder was engaged to assess the shed. Further the FSP did not respond to
telephone calls.
Summary of FSP’s Position
10. The FSP relies on the following policy provisions:
“Some Farm Covers Terms Explained
...
Flood
Water that has escaped from or been released from the normal confines of any natural
or artificial water course, lagoon, lake, reservoir, canal or dam. The word includes
water discharged from sewerage or waste water systems due to pressure induced by
flood water.
...
Rainwater
Water falling from the sky onto an Insured Building or building containing the Insured
Property, until the time the Rainwater hits the ground.
...
Run-off
Stormwater or Rainwater that has gathered and flowed across normally dry land. It
includes overflow from public roadside gutters, channels and drains that are normally
dry, and overflow from swimming pools, spas, or saunas. Run-off does not include
water that has escaped or been released from any natural or artificial watercourse,
lake, lagoon, reservoir, canal or dam or water from the sea.
...
Storm
Violent atmospheric disturbance accompanied by high wind, rain, snow, sleet or hail. It
does not include persistent bad weather or heavy or persistent rain by itself.
...
Farm Property – Section 4
...
Cover for Defined Events
We will cover You for Loss of or damage in the Period of Insurance to Insured Property
at the Situation caused by any of the Defined Events explained below:
fire
lightning
explosion
earthquake
aircraft impact and sonic boom
Storm and/or Rainwater
...
Exclusions
We will not cover You under any part of Section 4
For Loss or damage caused directly or indirectly by, or in connection with:
...
Flood, inundation or Run-off .”
11. The Applicant has not demonstrated the claimed damage is in anyway related
to an insured event.
12. The FSP’s hydrologist has shown that the cause of the loss was due to the
Nebine Creek filling with water causing its banks to break. Once the banks
broke, the area was flooded.
13. The FSP notes that its policy terms and conditions specifically exclude damage
arising from flood.
14. The FSP has enclosed a copy of its assessors report from which I note the
following:
The property experienced heavy rainfall on Monday 1 March and Tuesday
2 March, after which a nearby creek broke its banks and the flood water
rose to a height of 700mm around the dwelling.
The Applicant’s son was advised to evacuate the property on 3 March and
returned on 7 March to start the clean up process. The Applicant returned
on 11 March.
The floodwater did not enter the dwelling and the damage is limited to the
contents of the shed.
The tool shed is a hardwood timber framed structure set on a concrete
slab with a corrugated metal roof. The shed is not internally lined and the
assessor considers that “Subjectively, we would have to say, the building
is an old structure and not well maintained” .
The flood waters have significantly damaged the original building. The
bottom plates were dislodged off the ‘strip footings’.
Repairs may not be economically viable.
15. The FSP has enclosed a copy of the hydrologist report from which I note the
following:
Water levels reached a depth of about 400mm above ground level in the
vicinity of the house on the subject property.
The house, which has a minimum floor level of approximately 500mm
above ground level, was not inundated above floor level. A machinery
shed with a floor at ground level and a tool shed with a floor level above
100mm was inundated to a depth of 500mm and 400mm respectively.
The hydrologist notes the nearest rainfall gauge indicates that between 28
February and 6 March 2010 a total of 300mm fell.
The property is located on the western floodplain of Nebine Creek which
has a catchment area of approximately 2,000km² to the subject property.
The Nebine Creek flows in a south easterly direction in the vicinity of the
house and other buildings on the subject property.
There is a gully located about 170 metres south west of the house on the
subject property. The gully appears to drain a significant catchment area.
It discharges into Nebine Creek approximately 1.2km south east
downstream of the house on the property.
The local stormwater catchment draining to the house and other buildings
on the subject property is insignificant.
The hydrologist was advised by the Applicant that she recorded 60mm of
rain on 28 February and 1 March. At this point water was flowing in the
creek and the gully, but was contained within the creek’s banks. On 1
March a storm occurred and 120mm of rain was recorded. When the
Applicant woke up on Tuesday morning she noted water everywhere. The
creek was still within its banks however water that would normally drain
from upstream to the creek via the gully had backed up and inundated the
machinery and tool sheds.
The hydrologist considers the Applicant’s version of events consistent with
the available rainfall data.
The inundation of the machinery sheds at the subject property was
caused by floodwater from Nebine Creek backing up along the gully
located to the south west of the buildings at the subject property. The
hydrologist considers it is possible that water coming down the gully to the
south-west contributed to the initial stages of inundation of the sheds at
the property due to high tailwater levels in the Nebine Creek.
Local stormwater could not have inundated the machinery and tool sheds
at the subject property as the local stormwater catchment draining to the
sheds is insignificant.
16. The FSP has enclosed a building consultant report for the structural damage to
a shed from which I note the following:
The building consultant disagrees with the assessor that the shed has
dislodged from the strip footings.
The flood event eroded soil under the bottom plate of the North East wall,
giving the appearance of movement to the footing, however there is no
corresponding sign of movement on the opposite side wall.
There is further damage to the adjacent South East wall where the bottom
plate is either missing or rotted away.
The damage arose from long term maintenance issues rather than a
specific event.
Issues
17. Whether the FSP is liable to make payment under the policy terms and
conditions for the damage to the shed and the contents of the two sheds.
Reasons for Decision
18. I have read each party’s submissions and materials , but will only refer to the
relevant submissions and materials.
19. It is clear to me that the policy terms and conditions do not cover flood or run-
off. Accordingly, if the damage to the shed and the shed contents arises from
flood water or run-off water as defined in the policy (and outlined above), then it
will not be covered.
20. There is contradictory evidence before me in relation to the topography of the
property and the placement of the bore drain and the gully in relation to the
Nebine Creek. Due to the Applicant’s familiarity with her own property , I prefer
her evidence as to the location of these land features.
21. I note that the Applicant has produced no evidence or submissions addressing
the aspects of flood water or run-off water inundation. Although the Applicant
has stated the damage was the result of a storm event and she has also noted
the creek did not appear to break its banks.
22. I accept the Applicant’s evidence that the creek did not break its banks. I note
the hydrologist does not appear to allege the creek broke its banks. The
assessor alleges the creek broke its banks, but it is unclear on what basis he
made this statement and accordingly, I do not accept same.
23. Whilst I accept that a storm brought heavy rainfall in the property locale, the
policy definition of storm does not include heavy or persistent rain by itself.
Furthe r, the policy definition of ‘run - off’ (which is not covered) includes
stormwater or rainwater that has gathered and flowed across normally dry land
and overflowed from channels and drains.
24. The hydrologist report’s brief was to determine the cause of the wa ter
inundation to the property. The hydrologist considered local stormwater did not
inundate the sheds at the property. Further, that the inundation was caused by
floodwater from the Nebine Creek backing up along the gully.
25. I note that the water may have backed up in the bore drain (as the Applicant
has indicated the gully referred to in the report is in fact the bore drain).
However, a consideration of the policy definition of run-off includes water that
overflows from drains.
26. The evidence before me indicates that it was the flood water from Nebine
Creek which backed up along the bore drain causing inundation. This
circumstance would be classified under the policy terms and conditions as run-
off water inundating the property.
27. As the policy expressly excludes loss or damage caused directly or indirectly
by, or in connection with run-off water, I consider the damage to the shed and
its contents would not be covered.
Determination
28. The FSP is not liable to make payment under the policy terms and conditions
for the damage to the shed and its contents.