Flood claim denied under flood exclusion - rainwater runoff versus flood water

FirmFinancial Firm (Unknown - Insurer)
Decided2011-01-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$290,000
SourceAFCA PDF

Summary

Storm water and creek flooding inundated the applicants' Roma home in March 2010 and the FSP denied the claim under the flood exclusion. AFCA found part of the inundation was rainwater runoff and ordered the FSP to pay 25% of restoration and contents costs, to be assessed.

The insurer bears the onus of establishing the flood exclusion; where source and timing of water could not be fully established AFCA applied a fair and reasonable apportionment.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

217485 Determination 1 of 7 DETERMINATION Case number: 217485 Home Building, Contents – flood – runoff rainwater – onus of proof SUMMARY OF FACTS 1. On 2 March 2010 the applicants‟ home was inundated with water during severe storms and flooding in the area. 2. The Financial Services Provider (FSP) denied liability for a claim under their home insurance policy on the ground that the damage was a direct cause of an inundation of flood water from Bungil Creek, and excluded from cover provided by the policy. 3. The applicants state the damage was caused by runoff rainwater and not flood water. ISSUES IN DISPUTE 4. Whether the inundation of the applicants‟ home was rain water, flood water or a combination of flood and rainwater runoff. RELEVANT POLICY PROVISIONS “Words with special meanings … “ flood’ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon, whether or not altered or modified from any reservoir, canal or dam. Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents. … When we will not pay a claim under your policy ... 2 Unless we state differently in your policy, we will not pay for: a flood as defined on page 5 .” REASONS FOR DECISION 5. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants Submission 6. There were two events on 2 March 2010. The first was 5” of rain and at approximately 1.00pm there was a flood. 7. The water that entered their home was clear and only came from local runoff and not from water overflowing from the creek as stated by the hydrologist. 217485 Determination 2 of 7 8. It was only later that day that the water backed up from the outer catchment areas, but by then the water was already through their home. 9. The report on which the FSP relied was found to be incorrect and inconclusive by an hydrologist commissioned by the regional council. 10. The applicants submitted a detailed description of the events from another resident “NG” in support of their claim. “NG” described his movements on the day of the flood and his observations of the variation in the height of the water from about 6.00am including at about 10.00am observing water was already at the base of the Bungil Creek bridge on the Warrego Highway and rising fast. 11. The captioned photographs submitted by NG show clear water at the time the water was at the front fence. There is little or no debris shown against the tide marks made by the water. The FSP’s Submission 12. It relies on hydrological reports commissioned by it. 13. The hydrologist determined that the damage was caused by the inundation of flood water from Bungil Creek. 14. The claim was denied based on the flood exclusion. Panel’s processes 15. In order to fully inform itself, representatives of the Panel attended the applicants property on Wednesday 8 December. Also present were two hydrologists engaged by the FSP, the applicants and the witness NG referred to above. The Panel representatives conducted an inspection of the ap plicants‟ property and spoke to the applicants as well as the hydrologist and NG. The Panel members and the hydrologists then went to the property owned by NG which was some distance away, but which gave Panel members an opportunity to examine other relevant topographical features. The information provided by the applicants during the inspection process included the following: • By 9am water was at the edge of the property and it entered the property between 9 and 9.30am and it was clear water. During a storm event which preceded the Panel‟s inspection by several days, the applicant s stated the water was muddy. • NG, who is employed as an environmentalist and does have some knowledge of the behaviour of water, although he stated he was not a qualified hydrologist, stated that the quality of water had changed from the initial inundation when it was clear to a later period after 10.30am when it was dirty. • NG spoke at some length about the role of the western catchment region, and the region near an area described a s “hospital hill”. He said that this water came across the Carnavon Highway, but that it would have drained into the long drain region. In other words, he stated that whilst it was a significant catchment area to the west of the property which would have facilitated the path of rain water runoff in the general direction of the applicants property, it could not have reached the area in which the applicant s‟ and other properties involved in these disputes were situated. 217485 Determination 3 of 7 This observation was consistent with the Panel representatives observations after an inspection of the relevant area in the company of the hydrologists had been carried out the previous evening. • The applicants indicated that the damage to the building was estimated at $200,000 and damage to contents at $90,000. The female applicant said it was not possible to obtain quotations because of the deteriorating state of the property. • As the Panel representatives‟ inspection of the applicants‟ property was interrupted to attend the property of NG, the Panel Chair spoke to the female applicant on Tuesday 14 December last in order to clarify some further matters. She indicated to the best of her recall that water came into the lounge room between 9am and 9.30am. It should be further noted that the front of the house is at a higher level above the ground than the rear of the property. She stated that the lounge room was towards the rear of the property, although it appeared to the Panel representatives that the lounge room was in an area higher than the area of the rear of the property. She said the water came in the property in “such a hurry” and that it initially “trickled” but then rose steadily so that by approximately 10am, she was “shin deep in water”. The water ceased to rise around about 11.30am to 1 2 noon, and that it “came up again” at approximately 1pm and subsided later in the day. She said the male applicant was called to attend to a next door neighbour who had become ill. She said these estimates of time were general. Consideration of each party’s submission 16. The FSP seeks to rely on a clause in the policy to deny liability for the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. 17. The Panel has been provided with a number of hydrological reports. As the materiel has been exchanged between the parties, only relevant matters contained in the reports will be noted in the determination. 18. The hydrologist commissioned by the FSP to report on the origin of the water that inundated the applicants‟ property on 2 March 2010, in her report of 7 April 2010 stated : “ 6 FINDINGS Our findings on water damage to the subject property are as follows:  The inundation of the subject property was caused by water overflowing from Bungil Creek to the north of the subject property along the overflow path identified in Figure 1. At the peak of the event, floodwater from overflow paths would have joined together with Bungil Creek to the east.  Local runoff would not have caused damage at the subject property as there is no significant local catchment.  Bungil Creek peaked within about 5-12 hours after the intense rainfall burst that caused the flood event.  The 2 nd March 2010 flood was the largest on record for Bungil Creek at Roma. This flood inundated most of the eastern side of Roma town area. 19. The report concluded: 217485 Determination 4 of 7 “ Based on our site inspection and an assessment of available data for the subject site, it is concluded that the inundation of the subject property was caused by water overflowing from Bungil Creek” 20. The regional council commissioned an engineer to provide an inception study regarding the Bungil Creek flooding. The report dated 18 June 2010 provided a detailed analysis of the flood event and causes for the event. The report noted: “ “The cause, severity and mechanism of this flood could not be explained in terms of catchment and regional flooding behaviour and subsequently, the damages to property in Roma cannot be simply classified as the result of mainstream flooding. However, it is very highly likely that backwater from moderate creek flooding in combination with overflow of the local system had resulted in such widespread flood damage.” 21. The council report also overviewed a report commissioned by various insurers noting: “The investigation did not include any analysis of the actual discharge or severity of the March 2010 flood at Roma or its relation to catchment flooding. The report suggested that the inundation in Roma was primarily by main stream flooding without any quantitative assessment of the proportional contribution from local storm and catchment wide flooding.” 22. The council report concluded: – It was not possible to accurately determine the cause and mechanisms of the flood event without further and more detailed research. – The following factors could have contributed to the large flood:  High intensity rainfall on the fully saturated area around Roma in combination with backwater from relatively moderate catchment flooding in Bungil Creek  Potential of break-out from the catchment to the west of Roma flowing through the township to Bungil  Potential obstructions associated with any new infrastructures downstream of the gauging station in Roma since the 2002 flood study.  The reading of the flood level height at Roma gauge may not represent the actual flood level associated with Bungil Creek. 23. The applicants referred to the council hydrologist report noting the hydrologist found the report produced by the FSP‟s hydrologist was incorrect and inconclusive. However the report to which the council hydrologist referred was commissioned by a number of insurers to provide a general overview of the Bungil Creek flooding behaviour in Roma during the March 2010 flood event, and provide general advice on whether particular areas were inundated by floodwaters, local rainwater runoff, or a combination of both. The report relied on by the FSP was commissioned to report specifically on the source of the inundation of the applicants‟ property. While some of the data is common between the reports, the comments made in the council report therefore do not expressly apply to the report relied on by the FSP. 24. The FSP‟s hydrologist responded to the applicants‟ submission to FOS, in particular that the inundation to their property above floor level was caused by stormwater. The hydrologist also responded to the information and photographs provided by the Roma resident “NG” . The report of 20 October 2010 contained the following relevant information: 217485 Determination 5 of 7 - Floodwater is not always muddy and does not always leave large amounts of debris and mud. Water quality can vary substantially and is not a reliable indicator of the source of water. A number of residents reported that floodwater did not leave debris and mud in their homes and left only a thin layer of silt. This suggests the floodwater that inundated properties in Roma in March 2010 may have been relatively clear. - The recorded water level for Bungil Creek indicates there was no second peak in the water level hydrograph as claimed by the applicants. - The catchments areas referred to by the applicants were Roma local catchments to the west of Carnovan Highway and the Bungil Creek catchment and runoff response from these areas were considered in their original report. - Bungil Creek peaked around 1.00pm. Available data shows Bungil Creek broke its banks prior to 8.00am before the Bungil Creek Gauge reached 7.0mGH. This is supported by “NG‟s” statement that around 8.00am „all creeks and drainage lines were beginning to breach bankfull discharge‟ - “NG‟s” interpret ation that town flooding was a combination of localised stormwater runoff … „is not supported by the available data which shows that flood water started to inundate the town by 8.00am. - Parts of the town were inundated by stormwater prior to the arrival of Bungil Creek floodwaters. However the extent of stormwater inundation was not sufficient to inundate the applicants‟ property 25. The Panel was also provided with a report from the hydrologists dated October 2010. That report included the following statement: “Bungil creek broke its banks to the north of the town (and east of the Roma airport) and flowed south along various defined drainage paths sometime before 0800 and that very few properties in Roma were inundated by flood water before 0800 and that inundation of a significant number of properties by flood water commenced before 1030.” 26. In addition, the FSP‟s hydrologist in a supplementary report dated 5 November 2010 responded to a number of claims made by policyholders that they were inundated by two separate inundations during the event, the first by local stormwater runoff and the second by flood waters from Bungil Creek. 27. The hydrologist‟s supplementary report dated 5 November 2010 addressed the timing and behaviour of floodwater overflowing from Bungil Creek into Roma. The report contained the following information which is similar to that contained above: - Bungil Creek broke its banks to the north of Roma at sometime before 8.00am and flowed south - Bungil Creek floodwater also flowed north from the south side of the town - The floodwaters merged before 8.00am. - Very few properties were inundated by floodwater before 8.00am - Inundation of a significant number of properties by floodwater commenced before 10.30am. - Bungil Creek broke its banks to the north of the town sometime before 8.00am - The flood extent maps are generally consistent with the information provided by local residents except in the vicinity of Edna and Borland 217485 Determination 6 of 7 streets as the topography to the immediate north of Edna street has changed. - Flood maps for the March 2010 flood event were consistent with the available historical flood extent maps and available aerial photographs for the February and March 2010 flood events except for a small area in the vicinity of Edna and Borland streets. 28. In discussion with the Panel representatives, the hydrologists indicated that it might take approximately an hour for the water that overflowed from the Bungil Creek to travel from the point of overflow down the overflow paths to the applicants property and other properties in the area. The Panel was able to attend with the hydrologists on the evening of 7 December to trace the likely path of the water travelling down the overflow path from the point near where it broke its banks to the locations of the various properties involved in these disputes including the applicants‟ property. 29. The issue central to this matter is whether the water which caused the inundation of the applicants‟ property was surface run -off rainwater or water which had overflowed from Bungil Creek. 30. The difficulty which the Panel has found in dealing with this dispute (and other disputes in the Roma region) is that there have been criticisms directed by a number of the policyholders towards the hydrologists to the effect that they have changed their mind or offered different views as to when the water from the creek would have first been in a position to inundate the various properties, including for the purpose of this determination, the applicants ‟ property. The hydrologists further stated to the Panel representatives that as a result of a flood event which occurred several days prior to the Panel‟s inspection, they had formed a different view to that expressed above, and that it may well have been that the creek broke its banks at an earlier time. The Panel has difficulty with accepting an expert opinion formed 9 months after the event which in effect expresses in a critical way a different view to that expressed in earlier reports. It is for this reason that the Panel has taken the trouble to indicate at length the contents of the various reports issued by the hydrologists. 31. The Panel further notes the contents of the council report noted the cause, severity and mechanism of the flood could not be explained in terms of catchment and regional flooding behaviour, and subsequently damage to properties in Roma could not be simply classified as a result of mainstream flooding. 32. After considering the material provided, and on the analysis described above, the Panel has reached the conclusion, bearing in mind that the FSP has the burden to establish the policy exclusion on which it relies that some part of the applicants‟ property would have been inundated by storm water prior to the inundation by flood water. After taking into account the various topographical features analysed above , the Panel accepts the applicants‟ evidence that water that entered the property from the rear sometime between 9am and 9.30am was likely on the balance of probabilities to be rain water. The Panel has reached this conclusion based on its inspections and on the information obtained from the hydrologists. The Panel believes that any inundation which occurred certainly by 9am, and possibly by 9.30am would have been rain water runoff. 217485 Determination 7 of 7 33. However, as the applicants property at the front is somewhat higher than the rear of the property, and because the Panel believes that the flood water would have arrived at the applicants‟ property at some specified period not long after the inundation of rain water, that the inundation coming from the front of the property was likely to have been flood water. 34. The further difficulty arises in assessing what damage is payable pursuant of the policy and what damage is excluded. The matter is further complicated by the fact that the applicants have not taken any steps to rectify the damage which has meant that the property has deteriorated. If the applicants had, at their own cost, caused repairs to be affected to the property, as far as the Panel understands the position, the quantum of the applicants‟ loss would be significantly less. 35. This particular dispute highlights the complexities and difficulties in dealing with disputes which centre critically upon the timing of entry of water to a property and the classification thereof. In these circumstances, the Panel believes it must apply a fair and reasonable resolution to the dispute. CONCLUSION 36. The Panel therefore determines that the FSP is responsible to pay 25% of the costs of restoring the applicants‟ pr operty and the cost of the damaged contents. This loss will need to be assessed, in the event that the applicants accept this determination. If this occurs, the Panel recommends that the parties will be flexible, in reaching a resolution of this dispute. 37. If there is any dispute as to the sum payable pursuant to this determination, the applicants may seek a further determination from the Panel.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.