Home / Financial Firm (Unknown - Insurer) / Determination 216347
Determination 216347
Water damage claim denied under vermin exclusion
Summary
A burst pipe caused water damage to the applicant's holiday home after rats gnawed the pipe, and the FSP denied the claim under the vermin exclusion. AFCA found the exclusion applied and that the FSP was not liable for the damage or the carpet.
Once the FSP proves a loss falls within a policy exclusion, the insured's claim fails, and here the FSP proved vermin caused the water escape.
Issues
- Claim denial primary · not upheld“the FSP has met its onus of establishing that the policy exclusion applies and that it is entitled to deny liability”
- Poor claim handling secondary · not upheld“it would have been preferable if the applicant had been advised of the assessor's decision to dispose of the carpets, the applicant has not, in fact, suffered any loss”
- Failure to disclose secondary · not upheld“the FSP is entitled to rely on the terms and conditions of the policy in respect to the applicant's claim”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
216347 Determination 1 of 7
DETERMINATION
CASE NO: 216347
Home Building and Contents – escape of water
– damage by vermin
SUMMARY OF FACTS
1 The applicant insured his holiday home building and contents for $340,000 and
$51,000 respectively against loss or damage caused by insured events. The
policy was taken out on 26 February 2008, commencing on 5 March 2008 and
had been renewed annually to 5 March 2011. Building completion of the house
was in or about April 2008.
2 On or about 17 April 2010, the applicant contacted the Financial Services
Provider’s (FSP) emergency after -hours service to report a burst water pipe in
the ceiling of his house had caused water to flood the house.
3 The FSP appointed an external assessor to attend the insured premises and
report on the cause and extent of the water damage. The assessor inspected
the property on 26 April 2010 and in a report dated 30 April 2010 stated t hat
water damage had occurred to the following areas:
Paintwork and plaster in the en-suite, master bedroom and three other
bedrooms;
Plaster ceiling in the toilet and bathroom;
Rear door had swollen and could not open properly;
Extensive damage to the carpet. The entire carpeted area was showing
signs of delaminating; and
Four bedside tables and a bed end had swollen.
4 The assessor’s report stated that a 12mm polythene high pressure water pipe
had failed in two areas. The assessor first believed the pipes to have been
defective, and as the house was only two years old, he referred the applicant to
the original builder.
5 The assessor arranged for the carpet and underlay to be removed to allow the
premises to dry out and to eliminate the odour emanating from the carpet. The
FSP paid the account direct to the contractor who carried out the mitigation
work.
6 The assessor informed the FSP that the applicant’s builder had advised him
that its builder’s warranty insurance did not cover plumbing. The applicant then
appointed a plumber to inspect and repair the damaged pipe. The plumber
informed the applicant that he found that the pipes had been chewed by rats
and that this was the cause of the water escape.
7 The FSP advised the assessor that its policy excluded any loss or damage
caused by or resulting from insects, birds, wildlife or vermin. The assessor then
216347 Determination 2 of 7
issued a letter dated 13 May 2010 informing the applicant that his claim had
been denied.
8 On 31 May 2010, the FSP received a letter from the applicant advising that he
did not agree with the decision to deny his claim stating that he had not been
given sufficient notification prior to taking out the insurance that there was a
potential for a claim such as his to be declined. The FSP informed the applicant
that it provides customers with a Product Disclosure Statement (PDS) when a
new insurance is taken out.
9 The applicant arranged for the damaged pipes to be replaced which work was
completed on 28 May 2010. However, on 12 June 2010, the applicant returned
to his house to find that water was leaking through the wall in bedroom 3. A
further section of the polythene pipe was found to have been gnawed by rats
and was leaking. The applicant agreed that the damage to the pipes had been
caused by vermin and that he intended to replace the polythene pipes with
copper pipes as they were impervious to vermin.
10 The applicant referred his claim to a legal adviser who subsequently requested
the matter be considered by the FSP’s internal dispute review (IDR) process.
On 29 June 2010, the IDR committee agreed that the claims department was
entitled to decline the applicant’s claim.
11 The applicant’s claim is estimated to be $30,000.
ISSUES IN DISPUTE
12 Whether the applicant received a copy of the PDS and policy of insurance; and
13 Whether the FSP is entitled to rely on the policy exclusion to deny liability.
RELEVANT POLICY PROVISIONS
“Insured event – You are covered for loss or damage to you home or contents caused
by
...
Bursting, leaking, discharge or overflow of water or liquids
from pipes, taps, dishwashers, washing machines, baths, spas, sinks, toilets basins, hot
water systems, refrigerators, air conditioners, roof gutters, rainwater down pipes, drainage
and sewerage systems or aquariums at your home.
...
Our exclusions (see also General Exclusions, pg 18) – You are not covered for
...
The cost to repair the item from which the water leaked or escaped,...
...
What you are not covered for
Like most insurance policies, there are general exclusions that apply to all covers.
You are not covered for any loss or damage caused by or resulting from:
...
insects, birds, wildlife or vermin;
....”
RELEVANT LAW
Insurance Contracts Act 1984
216347 Determination 3 of 7
Section 35 of the Act provides that, where a claim is made under a prescribed contract and
the event giving rise to the claim is a prescribed event in relation to the contract, an insurer
may not refuse to pay an amount equal to the minimum amount of cover set out in the
regulations made pursuant to the Act unless it can prove that before the contract was
entered into, the insurer clearly informed the insured in writing of the relevant provisions of
the contract, or that the insured knew or a reasonable person in the circumstances could be
expected to have known of such provision.
REASONS FOR DECISION
14 The onus of proof is on the applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against. Once
the applicant has established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
15 There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence, it is not necessary to go into all of this material in any great
detail.
The Applicant’s Submission
The Applicant is Legally Represented
16 He does not accept that the FSP can deny liability to cover damage caused by
flooding, even should it be conceded that no liability is sought for the cost of
plumbing to repair damage to the polythene piping if gnawed by rats.
17 The policy exclusions may well include the exclusion relied on by the FSP to
deny liability for his claim, however, in arranging online cover through the
facility offered by the FSP, insufficient prominence was given or notified to him
of the potential of the FSP to disclaim on the basis relied upon. If appropriate
warnings had been given, no reasonable person, himself included, would insure
his/her home with the FSP.
18 The assessor, acting as agent of the FSP, had arranged for contractors to
attend and remove all furniture and fittings from areas which had been affected
by flooding “and to remove carpets and underlay in o rder that the premises may
have the opportunity of drying out and the elimination of the odour which is
currently present”. He was subsequently advised of the disposal of the
damaged carpets and underlay pursuant to instructions from the assessor.
19 Prior to the removal of the carpets, he was advised by the loss assessor that
his insurance claim would be met by the FSP. If any reservation had been
expressed, he would have sought an assurance that the removal of the carpets
and other items from the premises, be effected conditionally only upon their
return after the treatment proposed by the loss assessor to allow the premises
to dry out and to eliminate the odour. He was never advised that the carpets
and underlay would be disposed of as revealed in a letter dated 10 May 2010.
20 Although his claim has been denied, the carpets have not been returned and he
seeks advice as to their disposal or current location for prospective inspection
purposes if in fact the disposal did not occur. If the Financial Ombudsman
Service (FOS) does not find in his favour, the relaying of the carpets and
216347 Determination 4 of 7
underlay, as he understands removed for drying o ut and the elimination of
odour may have been a cheaper option for him rather than purchasing
replacement carpets.
21 No explanation has been given by the FSP for denial of the claim that the
primary risk of damage (flooding), for which it accepted liability, can be negated
on the basis of one specified exclusion relating to vermin activity which it relies
upon. He has made all “reasonable efforts to maintain” his home and contents
“in a good state of repair and condition” as outlined in the terms and conditions
of the policy.
22 The rejection of his claim was not conveyed to him until more than one month
beyond the date upon which the FSP was made aware of the claim.
23 The delays in the claim review process and the failure to resolve the position,
and the conduct of the FSP and its agent in removal of carpets from the
premises without his informed consent, has deprived him of the use and
enjoyment of his property.
The Financial Services Provider’s Submission
24 The applicant’s claim was considered under the insured event “Bursting,
leaking, discharge or overflow of water or liquids”.
25 The applicant has stated that he was not made aware of the possibilit y of such
a claim being declined, prior to him accepting the policy. However, it is
unreasonable to expect its consultant to make the customer aware of all the
terms and conditions of cover during the telephone quote process.
26 The consultant at the time of inception of the policy advised the applicant that
documents including a PDS were being mailed to him and to contact the call
centre if he required any assistance.
27 The applicant has, at the commencement of his policy, a 14 day “cooling off”
period during which, having considered the terms and conditions of the policy,
he may return the policy for a full refund. The applicant was informed of the 14
day cooling off period during the policy inception telephone call.
28 Further, its records show that a “Welcome Pack” consisting of a Welcome
Letter, Certificate of Insurance and PDS was sent to the applicant on 27
February 2010. It does not have any record of the applicant advising that he
had not received any part of his “Welcome Pack” including the PDS until it w as
advised by the applicant’s solicitor.
29 It is satisfied from the evidence presented to it that damage to the water pipe
was caused by vermin. It therefore declined the applicant’s claim by relying on
the general exclusion:
“...loss or damage caused by or resulting from
...
insects, birds, wildlife or vermin.”
Consideration of each party’s submission .
30 The applicant contends that he did not receive a copy of the PDS and policy
terms and conditions when he took out the insurance policy. Therefore, he was
not aware of the policy exclusion on which the FSP has denied his claim.
216347 Determination 5 of 7
31 Further, he was misled by the loss assessor that his claim would be covered by
the FSP and on that basis he agreed to have the carpet and underlay lifted.
32 The FSP states that the applicant was provided with a copy of the Certificate of
Insurance and PDS and the applicant had a 14 day cooling off period in which
to reject the policy if it did not meet his requirements. It contends that it is
entitled to rely on the policy exclusion in respect to loss or damage caused by
vermin to deny liability.
33 It is not in dispute that the applicant’s house was damaged by an insured event
covered under the policy. Therefore, the onus shifts to the FSP to establish
that, on the balance of probabilities, the loss or damage was caused by an
event excluded by the policy, that is, damage caused by vermin.
34 The applicant contends that he did not receive a copy of the PDS and,
therefore, was not made aware of the policy exclusion relied upon by the FSP.
35 The FSP has submitted a copy of the CD recording and a transcript of the
telephone conversation between the applicant and the FSP’s consultant when
the policy was taken out. Part of the conversation was recorded as:
“FSP Excellent. Now I’m going to let you know so me information if you
wanted to grab a pen and a bit of paper there please?
Applicant Yep
FSP All right. Firstly, I’ll let you know your 14 day cooling off period starts as
of 5 th of March, and so does your [name] bonus, …Now
congratulations and welcome to the company of that date…
Applicant Yep.
FSP Now, I’m popping the Product Disclosure Statement and certificate of
insurance in today’s mail. That will arrive in three or four working days
I’d say.
Applicant Okay
FSP Any problems or questions, please don’t hesitate to give us a call back
on our service line which is [number], and we’re open 8 until 7
weekdays, 9 until 5 Saturdays, and that policy number again [number].
Applicant Now, can I ask a quick question?
FSP Certainly
Applicant You have noted the interest of [finance prov i der name ]?
FSP Absolutely
Applicant And so there’ll be a certificate that I can forward onto…?
FSP Yeah, the certificate of insurance will have their name listed as the
financial interest in the property
Applicant Good
FSP And that will be more than enough for them as the financier
Applicant And I should have it in a couple of days?
FSP Yeah, I’m popping it in this afternoon’s post. It will arrive in three or four
working days from today.”
36 The FSP has also submitted a Statutory Declaration from its Facilities and
Procurement Manager which states in part:
“I can confirm, having viewed the batching information, that a Certificate of
Insurance and Welcome Letter were printed on 27 February 2008 for this
customer. The correspondence procedure was, and to this day is followed daily
and all Welcome Packs are sent with the inclusion of a copy of the relevant
Product Disclosure Statement.
216347 Determination 6 of 7
Having reviewed the Incidents Register, I can confidently confirm that there has
been no incident recorded on or after 27 February 2008 for the customer with
policy number [number and name]. Therefore I confirm that a Product Disclosure
Statement was supplied to the customer on aforementioned date.”
37 From the recording of the applicant ’s conversation with the FSP’s consultant,
the applicant expressed his obligation to forward a copy of the Certificate of
Insurance to his financier. If he did not receive a copy of the Certificate of
Insurance, it would be expected that he would have contacted the FSP.
Further, he had been made aware that a copy of the PDS would also be
included in the Welcome Pack. If a copy of the PDS was not provided, it would
be expected that the applicant would contact the FSP.
38 However, if it is assumed that a copy of the PDS was not included, the
applicant had two renewal periods in which to request a copy of the PDS be
provided. Therefore I find that the FSP is entitled to rely on the terms and
conditions of the policy in respect to the applicant’s claim.
39 The applicant contends that the FSP did not deny liability for his claim until after
its loss assessor had informed him the loss would be covered. He also
contends that the loss assessor informed him that he could purchase
replacement furniture for those items that had been water damaged. The loss
assessor then arranged removal of the carpets on the basis that the damage
was covered under the policy. The applicant states that his consent was not
sought nor given.
40 However, the water damage was discovered by the applicant on 16 April 2010,
on which date he turned off the water. It was inspected by the loss assessor on
26 April 2010. At that time the assessor was of the opinion that a building fault
might have been the cause of the water damage as the house was only two
years old.
41 The applicant contends that the loss assessor informed him that the damage
was covered under his policy. However, in the loss assessor’s report dated 30
April 2010 he stated that he was of the opinion that the costs associated with
reinstating the dwelling and replacing contents items should fall on the building
contractor under his warranty policy, failing that, it might have been possible
that action could be taken against the pipe manufacturer.
42 The loss assessor also confirmed that he engaged a contractor to attend the
applicant’s property and remove all furniture and fittings from the areas affected
and to remove all saturated carpet and underlay which was exhibiting signs of
odour and de-lamination. The FSP has informed FOS that the damaged carpet
has been disposed of.
43 I have given careful consideration to the applicant’s claim that before the
assessor disposed of sodden carpet, the applicant should have been informed.
The applicant has stated that he believes that once dried out, the carpet would
have had some value.
44 However, the information recently supplied by the FSP (and which has been
forwarded to the applicant’s solicitor), convinces me that the carpet was so
damaged as to be worthless and that, in fact, the applicant has been saved the
cost of removing and disposing of it.
216347 Determination 7 of 7
45 Therefore, whilst it would have been preferable if the applicant had been
advised of the assessor’s decision to dispose of the carpets, the applicant has
not, in fact, suffered any loss.
46 The applicant was last at his house on 7 April 2010 and next returned on 16
April 2010. It appears that it was at least on or after 26 April 2010 before the
carpet and underlay was lifted. It is not known for how long the carpet had been
water logged, but it could have been in excess of two weeks. It would be
expected that carpet water logged for this period of time would not be
salvageable.
CONCLUSION
47 There is no dispute that the damage to the water pipe in the ceiling of the
applicant’s house was caused by vermin, in particular, rats. The applicant’s
policy of insurance contains a general exclusion that excludes:
“...loss or damage caused by or resulting from: (ombudsman’s emphasis)
...
Insects, birds, wildlife or vermin;”
48 Therefore, I determine that the FSP has met its onus of establishing that the
policy exclusion applies and that it is entitled to deny liability for the water
damage to the applicant’s house. I further determine that the FSP is not liable
to pay any sum in respect to the carpet.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.