Home / Financial Firm (Unknown - Insurer) / Determination 216075

Determination 216075

Seawall collapse after heavy rain: defect, maintenance, corrosion and sea-action exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2011-04-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$135,592
Non-financial loss—
Amount claimed$280,000
SourceAFCA PDF

Summary

A seawall collapsed after heavy rain and the insurer denied the home building claim, relying on defect, maintenance, corrosion and sea-action exclusions. The ombudsman found the defect and maintenance exclusions not established, but applied the excluded deterioration as a concurrent cause and ordered the insurer to contribute 25% of replacement cost, $135,591.75.

Where a storm contributed to a collapse but deterioration preceded it and made the wall vulnerable, the excluded cause limits the insurer to a fair contribution, set at 25% of replacement cost.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

216075 Determination 1 of 10 Case number: 216075 General Insurance - Domestic Insurance - Home Building – Storm/rainwater damage – Policy exclusion – expectation of a defect or fault – failure to maintain – wear tear and deterioration 01 April 2011 Background 1. The Applicants insured their home building under a Complete Replacement Cover policy against loss or damage caused by insured events. The policy commenced on 1 July 2008 and had been renewed annually to 1 July 2011. The Applicants had owned the home since 1997. 2. On 19 May 2010, they lodged a claim for damage caused by rainwater. They contend that heavy rainfall on or about 19 May 2010 caused a seawall to collapse which also caused damage to swimming pool equipment and housing, garden beds and landscaping. The seawall was situated on the bank of a canal. 3. The Applicants have received a quotation for the amount of $542,367, including GST, to complete repairs. However, they have reduced their claim to the limit of the Financial Ombudsman Service jurisdiction, that is, $280,000. 4. The Financial Services Provider (FSP) denied indemnity to the Applicants on the ground that the loss or damage was due to defect or fault in the design, structure or construction of the insured building that is the sea wall, where the Applicants could reasonably be expected to be aware of the defect or fault. 5. They further rely on further exclusions including loss resulting from an unreasonable failure to properly maintain or repair the property, wear, tear, deterioration or corrosion or actions of the sea. 6. The Applicants contend that the loss or damage to the seawall was caused by the heavy rainfall on or about 19 May 2010 and they were not aware of the deteriorated condition of the seawall. Summary of Applicants ’ Position 7. On or about 19 May 2010, there was a storm that dropped significant rainfall at their location destroying part of a seawall by pushing the wall out. About 24 hours later the capping which had been holding the wall in place collapsed. Determination 216075 Determination 2 of 10 8. They consider that the damage occurred d ue to the storm and heavy rain. 9. They received a quote of $542,367, including GST, for repairs to the seawall and they have already paid $42,565 for temporary repairs. In addition to this, their pool equipment and landscaping has been destroyed. 10. Their policy of insurance covers loss or damage caused by: (i) storm and rainwater including stormwater runoff; water escaping from any water main, drain, pipe, street gutter, guttering or surface. It does not cover loss or damage caused by: (ii) water seeping into or otherwise entering the building due to a defect or fault in the design structure, or construction of the building, where it could reasonably be expected to be aware of the defect or fault; and (iii) loss or damage caused or arising from or involving an unreasonable failure to properly maintain your building, wear and tear, rust, deterioration, or corrosion. The FSP‟s appointed engineer reported that surface rainfall runoff together with overflow from the roof gutters would have accumulated in the time of heavy rainfall and flowed across the site towards the sea. The engineer stated that the surface water runoff penetrated into and accumulated within the soil beneath the concrete slab at the western end of the seawall. He also stated that in his opinion it would have percolated through the filling and mixed with sea water that would have routinely penetrated through joints between the adjacent sea wall panels as the tide ebbs and flows. In his summary, the engineer stated: “...in our opinion, the outward rotation of t he precast concrete sea wall panels has occurred because of an accumulation of surface water runoff in the filling soil retained by the sea wall. The surface runoff was the result of unusual heavy rainfall that occurred prior to the sea wall collapse.” Previous wall failures in the [name] area have been due to damage to original capping beams. They had replaced their capping beams about 23 years ago. The capping beam on their property has been maintained and was in excellent condition until the storm event. This failure would not have occurred had it not been for the extreme storm damage that was reported in their area at that time. The engineer‟s report also indicates that the failure of the sea wall would not have occurred had it not been for the extensive storm damage at that time. The FSP contends that there is no evidence to suggest that the damage would have occurred to the sea wall if it had not been subject to long term corrosion. It stated that the damage to the sea wall was a result of corrosion over a long period of time rather than the direct result of an insured event. 216075 Determination 3 of 10 The engineer discusses the condition of sea walls in their locality stating that there are a number of indications of significant corrosion influences on the exposed face of the sea wall panel in areas other than their property. They believe this indicates that the problem of corrosion of the sea wall panels is fairly widespread within the waterfront sites at their locality. The engineer‟s report states that the sea wall would normal ly have withstood the load were it not for the storm. Storm is an insured event and the FSP should be held accountable for the damage to the sea wall. Other than an advisory letter more than a year old, and applying to sea walls greater than 45 years old, there is no information suggesting that a sea wall with the age and maintenance history of their wall should reasonably require significant and repeated inspections. Although corrosion has been exposed subsequent to the failure, it was not evident prior to the failure, and there was no evidence to suggest that corrosion could, or ever, has caused a similar sea wall at their locality to collapse. Summary of FSP’s Position 11. The Applicants state that the damage to the seawall occurred as a result of the insured event „storm and rainwater‟. Conversely, it submits that the damage was not the result of storm and rainwater, but rather occurred due to an unreasonable failure to maintain the structure, wear and tear, rust, deterioration and corrosion, structural failure or breakdown and actions of the sea. 12. Its home loss assessor inspected the A pplicants‟ property and reported:  “The seawall showed signs of rust to the sea face...  The wall is original 39 years+ and is suffering with age were (sic) the sea has affected the structural integrity of the wall.  Over the years the wall has experienced numerous storm events even greater than the storm on the 19.05.2010, with no resultant damage.  The resultant damage to the sea wall has been in progress for a long period of time. The storm on 19.05.2010, with the combined action of the sea and rain water has caused the weakened wall to give way. The sea wall did not fail due to one storm event.” A structural engineer was appointed to inspect and report on the damage. In its report dated 22 June 2010, it stated, in part: “From our inspection of the failed panels, it is clear that some form of steel reinforcing had been incorporated within the width of the panels although in the area of the collapse it appears to have substantially degraded by corrosion – its presence is only indicated by the intense dark brown ferruginous staining that was evident on the top edge of the failed panels.” 216075 Determination 4 of 10 The engineer also confirmed that the rust and corrosion present within the failure zone of the wall had been occurring for some time. He also confirmed that the structural capacity of the seawall has been gradually reducing over an extended period of time due to corrosion of the steel reinforcements, ultimately resulting in it being unable to withstand the heavy rainfall that occurred. This is consistent with the opinion of its home assessor that over the years the wall has experienced numerous storm events even greater than the storm on 19 May 2010, with no resultant damage. The Applicants have referred to a newspaper article which reported 160mm of rainfall over a 36-48 hour period in Cronulla. However, its engineer reported that the rainfall reported as falling at Cronulla, 6kms from the A pplicants‟ site, is not reflected in the records of the B ureau of Meteorology that are derived from Sydney Airport, some 12kms northeast of the site where a total of only 82.6mm of rainfall was recorded. It does not dispute there was significant rainfall in the days surrounding the collapse of the wall, however it is not satisfied it was as intensive as the Applicants claim. The FSP notes the A pplicants‟ engineer‟s states: “...in our opinion, the outward rotation of the precast concrete seawall panels has occurred because of an accumulation of surface water runoff in the filling soil retained by the sea wall. The surface runoff was the result of unusual heavy rainfall that occurred prior to the sea wall collapse.” It submits however, that when considered in conjunction with the remaining comments made by the engineer in their concluding statements, it is clear that the reason the wall was unable to cope with the additional pressure was due to its corroded and deteriorated state. The engineer also confirmed that the actions of the tides further contributed to the loss when it stated: “In our opinion it is possible that the existence of a high tide at or near the time that the heaviest downpour occurred could have been enough to prevent the failure occurring at that time as the hydrostatic and soil loads on the sea-wall panels would have been a minimum then. However, as the tide fell, the height of the wet soil retained by the sea-wall panels would have increased, increasing the loads on the sea-wall panels, ultimately leading to their outward rotation and failur e.” It submits the evidence provided by its assessor and engineer clearly demonstrates that there was a significant amount of corrosion and deterioration to the seawall. It acknowledges the collapse of the seawall may have occurred following heavy rain, however it submits that the available evidence indicates this was inevitable given its corroded and deteriorated condition. 216075 Determination 5 of 10 It submits there is no evidence to suggest the damage would have occurred had the seawall not been subject to long-term corrosion. For it to accept a valid claim under the A pplicants‟ policy, the damage must be caused by an insured event detailed in the policy booklet. While Storm and rainwater is an insured event, the policy also states: “You are not covered under any section of the po licy for damage, loss, cost or liability caused by or arising from or involving: an unreasonable failure to properly maintain or repair your building, wear and tear, rust, deterioration or corrosion.” It submits that it is reasonable to expect the Applicants to have been aware of the issues with the local seawalls and reasonable to expect the Applicants would have taken steps to ensure that the structure was sound and complete of any necessary repairs. The Applicants state the collapse of their seawall cannot be compared to the collapse of other seawalls in the area on the basis the original capping beam on their wall has been replaced. It refutes this and notes that whilst the capping beam may have been replaced, aside from this, the wall was still in its original condition. Further, it submits that even if it were to be accepted that the seawall was partially damaged by the storm, legal precedent provides that an insurer is not liable when one of the causes of the loss falls within an exclusion clause in the policy. Because the causes of wear and tear, rust, deterioration or corrosion, structural failure or breakdown, an unreasonable failure to maintain or repair the insured property and actions of the sea are excluded under all sections of the policy, it is not liable to accept the claim even if it is accepted that a storm contributed to the damage to the Applicants‟ seawall. 13. The FSP relies on the following policy/contract provisions: “What we cover – insured events This section describes under the heading: Yes - the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. Yes You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of snow or hail. No ... 216075 Determination 6 of 10 Damage or loss caused by water seeping into or otherwise entering your building due to: a defect or fault in the design, structure or construction of your building where you could reasonably be expected to be aware of the defect or fault, ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: an unreasonable failure to properly maintain or repair your building, wear and tear, rust, deterioration or corrosion, mechanical, structural, electrical or other failure or breakdown, other than as provided for under „Damage to electric motors‟ ... tidal wave, tsunami, high tide or other actions of the sea, ....” Issues The onus of proof is on the Applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against. Once the Applicants have established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence, it is not necessary to go into all of this material in any great detail. The damage to the A pplicants‟ seawall occurred after very heavy rainfall in their location. The FSP contends that the rai nfall was not heavy enough in the days leading up to the collapse of the seawall to have caused its collapse. Although in its Notice of Response the FSP has relied upon incorrect days and dates, the Panel acknowledges that the total rainfall recorded by the Bureau of Meteorology at the Sydney Airport, which is about 12kms from the A pplicants‟ locality, is correct for the period 9.00am on 17 May to 9.00am on 19 May 2010, that is, 91.6mm. It also dismisses the A pplicants‟ reliance on a newspaper report of ab out 160mm of rainfall in the Cronulla area. However, the Bureau of Meteorology also has a recording station at Cronulla which is closer to the A pplicants‟ locality by 6kms. The Bureau of Meteorology records for Cronulla, which is about 6kms from the Applic ants‟ locality, confirmed the following rainfall at 9.00am on each of the following days: 216075 Determination 7 of 10 17 May 2010 18 May 2010 19 May 2010 6.6mm 77.0mm 83.0mm A total of 160.6mm over the three days Therefore, the Panel accepts that the extremely heavy rainfall prior to the collapse of the seawall could have contributed to its collapse and it finds that prima facie, the Applicants have a claim that falls within the cover provided by their policy of insurance. However, the FSP has relied on various exclusions to the cover provided by the policy to deny indemnity to the Applicants, therefore, the onus shifts to it to establish that, on the balance of probabilities, the damage was caused by an event excluded under the policy of insurance. Reasons for Decision The exclusions the FSP has relied upon to deny indemnity to the Applicants are:  Damage or loss caused by a defect or fault in the design, structure or construction where the Applicants could reasonably be expected to be aware of the defect or fault;  Loss or damage arising from or involving an unreasonable failure to properly maintain or repair their building;  Tidal wave, tsunami, high tide or other actions of the sea.  Wear and tear, rust, deterioration or corrosion;  Mechanical, structural, electrical, electronic or other failure or breakdown.... Consideration of Exclusions In reviewing the evidence submitted by the FSP in respect to the exclusions, there is a very significant evidentiary burden upon the FSP.  Damage or loss caused by a defect or fault in the design, structure or construction where the Applicants could reasonably be expected to be aware of the defect or fault.  An unreasonable failure to properly maintain or repair the building. In seeking to deny the claim upon these grounds, the FSP must firstly establish that the Applicants should reasonably have been aware of the danger posed by their failure to take steps to ensure the seawall was sound and to complete any necessary repairs. The Applicants conceded that the problem of corrosion of the seawall panels is widespread and as older seawalls on the waterways did not collapse, the heavy rains must have been the primary cause of the collapse of their seawall. 216075 Determination 8 of 10 The FSP has stated that the Applicants were warned by the Waterways Authority (Authority) that: “It should be further explained that the efficiency of the seawall is very much dependent upon the capping beam at the top of the seawall and the supporting tie rods that are connected to concrete anchor blocks buried in your backyard. The original capping beams have now exceeded their design life as the tie rods have been subjected to corrosion over the years. The majority of residents have had their tie rods checked or replaced and new capping beams installed.” The Applicants state that they replaced their capping beam twenty three (23) years ago. However, the concrete panels of the seawall collapsed before the capping failed some hours later. The Financial Ombudsman Service (FOS) contacted a Director of the Authority who confirmed that the danger of failure of a seawall arises from the age of the waterways seawalls. However, while acknowledging the problem, the Director also stated that it is very difficult for the property owners on the waterways to know of the condition of the tie rods holding the seawall in place because the only way to check on the condition of the tie rods was to excavate the earth surrounding the tie rods so that they could be inspected. The FSP contends that the Applicants should have been aware of the condition of the seawall and the loss or damage to the seawall was caused by their unreasonable failure to properly maintain or repair the seawall. However, the Panel does not agree with the FSP‟s opinion. If the t ie rods that held the seawall in place could have been easily inspected, the Panel may have agreed with the FSP. However, to expect a property owner to excavate their property to inspect the condition of the tie rods is unreasonable. Therefore, the Panel finds that the FSP has failed to establish that the Applicants should have been aware of the fault with the seawall and unreasonably failed to properly maintain the seawall. Exclusion  Tidal wave, tsunami, high tide or other actions of the sea The FSP contends that a high tide or other actions of the sea contributed to the failure of the seawall. In his report dated 22 June 2010, the FSP‟s engineer stated: “In our opinion it is possible that the existence of a high tide at or near the time that the heaviest downpour occurred could have been enough to prevent the failure occurring at that time as the hydrostatic and soil loads on the sea-wall panels would have been a minimum then. However, as the tide fell, the height of the wet soil retained by the sea-wall panels would have increased, increasing the loads on the sea-wall panels, ultimately leading to their outward rotation and failure. ... 216075 Determination 9 of 10 In our opinion, the most likely time of the sea-wall panel failure would have been after the reported heavy rainfall had occurred, and at a time when the tide was approaching low tide, or rising after the low tide.” The engineer‟s report persuades the Panel to the opinion that the proximate cause of the failure of the seawall was not a high tide or the actions of the sea but was due to the heavy rainfall that fell on or about 19 May 2010. Therefore, the Panel finds that the FSP has not established that it can rely on the policy exclusion to deny indemnity to the Applicants. Exclusion:  Loss or damage caused by wear and tear, rust, deterioration or corrosion,  Loss or damage caused by mechanical, structural, electronic or other failure. The Panel is persuaded by the evidence that the seawall had deteriorated over a period of time and its condition at the time of the heavy rainfall in May 2010 was a factor in causing the damage claimed. However, the Panel notes that the FSP‟s engineer has stated that the heavy rainfall contributed to the failure of the seawall. The FSP has also stated that there is no dispute the seawall partially collapsed following a period of heavy rainfall. In the circumstances, where more than one concurrent cause has been established as responsible for the damage and one concurrent cause is covered by the policy and the other cause excluded, it is established law that the clause excluding the cover is dominant and the claim fails. However, in the circumstances of this case, the deterioration of the seawall occurred prior to the heavy rainfall, which means that one proximate cause was followed by another, so that they were consecutive. While the policy provides cover for damage caused by rainfall, the policy also contains a clause which excludes cover when the loss or damage is caused by wear and tear, rust or gradual deterioration. Because one proximate cause of the damage was the deteriorated condition of the seawall which made it vulnerable to storm damage, the Panel is satisfied the FSP has established that it should not be fully responsible for the claim. However, the Panel finds that the insured event storm and rainwater contributed to the failure of the seawall and therefore it is fair and reasonable that the FSP makes a contribution to the cost of repairs to the seawall. Given that the seawall was significantly deteriorated having been in place for 39+ years, it is likely that much of its effective life has been expended. One can only speculate as to the possible further life-span available, but given that there is evidence of other failure across the locality it is reasonable to conclude that it is well into the latter half of its effective lifespan. 216075 Determination 10 of 10 On this basis the Panel determines that a fair and reasonable contribution for the FSP would be 25% of the replacement cost. The Terms of Reference of FOS limits the maximum amount that it may award to $280,000. However, as 25% of the estimated cost of repairs to their seawall of $542,367 equates to $135, 591.75, this is within the FOS Terms. Determination In summary, the Panel determines that the FSP has established that, on the balance of probabilities, the seawall failed partly because of the action of wear and tear, gradual deterioration and/or rust over a period of time which is excluded from the cover provided under the policy of insurance. However, the Panel also determines that the action of the consecutive event of heavy rainfall also contributed to the failure of the seawall and determines that the FSP contributes $135,591.75 to the cost of repairing the seawall.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.