Seawall collapse after heavy rain: defect, maintenance, corrosion and sea-action exclusions
Text of the determination
216075 Determination 1 of 10
Case number: 216075
General Insurance - Domestic Insurance - Home Building – Storm/rainwater
damage – Policy exclusion – expectation of a defect or fault – failure to
maintain – wear tear and deterioration
01 April 2011
Background
1. The Applicants insured their home building under a Complete Replacement
Cover policy against loss or damage caused by insured events. The policy
commenced on 1 July 2008 and had been renewed annually to 1 July 2011.
The Applicants had owned the home since 1997.
2. On 19 May 2010, they lodged a claim for damage caused by rainwater. They
contend that heavy rainfall on or about 19 May 2010 caused a seawall to
collapse which also caused damage to swimming pool equipment and housing,
garden beds and landscaping. The seawall was situated on the bank of a
canal.
3. The Applicants have received a quotation for the amount of $542,367, including
GST, to complete repairs. However, they have reduced their claim to the limit of
the Financial Ombudsman Service jurisdiction, that is, $280,000.
4. The Financial Services Provider (FSP) denied indemnity to the Applicants on
the ground that the loss or damage was due to defect or fault in the design,
structure or construction of the insured building that is the sea wall, where the
Applicants could reasonably be expected to be aware of the defect or fault.
5. They further rely on further exclusions including loss resulting from an
unreasonable failure to properly maintain or repair the property, wear, tear,
deterioration or corrosion or actions of the sea.
6. The Applicants contend that the loss or damage to the seawall was caused by
the heavy rainfall on or about 19 May 2010 and they were not aware of the
deteriorated condition of the seawall.
Summary of Applicants ’ Position
7. On or about 19 May 2010, there was a storm that dropped significant rainfall at
their location destroying part of a seawall by pushing the wall out. About 24
hours later the capping which had been holding the wall in place collapsed.
Determination
216075 Determination 2 of 10
8. They consider that the damage occurred d ue to the storm and heavy rain.
9. They received a quote of $542,367, including GST, for repairs to the seawall
and they have already paid $42,565 for temporary repairs. In addition to this,
their pool equipment and landscaping has been destroyed.
10. Their policy of insurance covers loss or damage caused by:
(i) storm and rainwater including stormwater runoff; water escaping from any
water main, drain, pipe, street gutter, guttering or surface.
It does not cover loss or damage caused by:
(ii) water seeping into or otherwise entering the building due to a defect or
fault in the design structure, or construction of the building, where it could
reasonably be expected to be aware of the defect or fault; and
(iii) loss or damage caused or arising from or involving an unreasonable
failure to properly maintain your building, wear and tear, rust,
deterioration, or corrosion.
The FSP‟s appointed engineer reported that surface rainfall runoff together with
overflow from the roof gutters would have accumulated in the time of heavy
rainfall and flowed across the site towards the sea.
The engineer stated that the surface water runoff penetrated into and accumulated
within the soil beneath the concrete slab at the western end of the seawall. He
also stated that in his opinion it would have percolated through the filling and
mixed with sea water that would have routinely penetrated through joints
between the adjacent sea wall panels as the tide ebbs and flows.
In his summary, the engineer stated:
“...in our opinion, the outward rotation of t he precast concrete sea wall panels
has occurred because of an accumulation of surface water runoff in the filling soil
retained by the sea wall. The surface runoff was the result of unusual heavy
rainfall that occurred prior to the sea wall collapse.”
Previous wall failures in the [name] area have been due to damage to original
capping beams. They had replaced their capping beams about 23 years ago.
The capping beam on their property has been maintained and was in excellent
condition until the storm event. This failure would not have occurred had it not
been for the extreme storm damage that was reported in their area at that time.
The engineer‟s report also indicates that the failure of the sea wall would not
have occurred had it not been for the extensive storm damage at that time.
The FSP contends that there is no evidence to suggest that the damage would have
occurred to the sea wall if it had not been subject to long term corrosion. It
stated that the damage to the sea wall was a result of corrosion over a long
period of time rather than the direct result of an insured event.
216075 Determination 3 of 10
The engineer discusses the condition of sea walls in their locality stating that there
are a number of indications of significant corrosion influences on the exposed
face of the sea wall panel in areas other than their property. They believe this
indicates that the problem of corrosion of the sea wall panels is fairly
widespread within the waterfront sites at their locality.
The engineer‟s report states that the sea wall would normal ly have withstood the
load were it not for the storm. Storm is an insured event and the FSP should be
held accountable for the damage to the sea wall.
Other than an advisory letter more than a year old, and applying to sea walls greater
than 45 years old, there is no information suggesting that a sea wall with the
age and maintenance history of their wall should reasonably require significant
and repeated inspections.
Although corrosion has been exposed subsequent to the failure, it was not evident
prior to the failure, and there was no evidence to suggest that corrosion could,
or ever, has caused a similar sea wall at their locality to collapse.
Summary of FSP’s Position
11. The Applicants state that the damage to the seawall occurred as a result of the
insured event „storm and rainwater‟. Conversely, it submits that the damage
was not the result of storm and rainwater, but rather occurred due to an
unreasonable failure to maintain the structure, wear and tear, rust, deterioration
and corrosion, structural failure or breakdown and actions of the sea.
12. Its home loss assessor inspected the A pplicants‟ property and reported:
“The seawall showed signs of rust to the sea face...
The wall is original 39 years+ and is suffering with age were (sic) the sea has
affected the structural integrity of the wall.
Over the years the wall has experienced numerous storm events even greater
than the storm on the 19.05.2010, with no resultant damage.
The resultant damage to the sea wall has been in progress for a long period of
time. The storm on 19.05.2010, with the combined action of the sea and rain
water has caused the weakened wall to give way. The sea wall did not fail due to
one storm event.”
A structural engineer was appointed to inspect and report on the damage. In its
report dated 22 June 2010, it stated, in part:
“From our inspection of the failed panels, it is clear that some form of steel
reinforcing had been incorporated within the width of the panels although in the
area of the collapse it appears to have substantially degraded by corrosion – its
presence is only indicated by the intense dark brown ferruginous staining that
was evident on the top edge of the failed panels.”
216075 Determination 4 of 10
The engineer also confirmed that the rust and corrosion present within the failure
zone of the wall had been occurring for some time.
He also confirmed that the structural capacity of the seawall has been gradually
reducing over an extended period of time due to corrosion of the steel
reinforcements, ultimately resulting in it being unable to withstand the heavy
rainfall that occurred.
This is consistent with the opinion of its home assessor that over the years the wall
has experienced numerous storm events even greater than the storm on 19
May 2010, with no resultant damage.
The Applicants have referred to a newspaper article which reported 160mm of
rainfall over a 36-48 hour period in Cronulla. However, its engineer reported
that the rainfall reported as falling at Cronulla, 6kms from the A pplicants‟ site, is
not reflected in the records of the B ureau of Meteorology that are derived from
Sydney Airport, some 12kms northeast of the site where a total of only 82.6mm
of rainfall was recorded.
It does not dispute there was significant rainfall in the days surrounding the collapse
of the wall, however it is not satisfied it was as intensive as the Applicants
claim.
The FSP notes the A pplicants‟ engineer‟s states:
“...in our opinion, the outward rotation of the precast concrete seawall panels has
occurred because of an accumulation of surface water runoff in the filling soil
retained by the sea wall. The surface runoff was the result of unusual heavy
rainfall that occurred prior to the sea wall collapse.”
It submits however, that when considered in conjunction with the remaining
comments made by the engineer in their concluding statements, it is clear that
the reason the wall was unable to cope with the additional pressure was due to
its corroded and deteriorated state.
The engineer also confirmed that the actions of the tides further contributed to the
loss when it stated:
“In our opinion it is possible that the existence of a high tide at or near the time
that the heaviest downpour occurred could have been enough to prevent the
failure occurring at that time as the hydrostatic and soil loads on the sea-wall
panels would have been a minimum then.
However, as the tide fell, the height of the wet soil retained by the sea-wall
panels would have increased, increasing the loads on the sea-wall panels,
ultimately leading to their outward rotation and failur e.”
It submits the evidence provided by its assessor and engineer clearly demonstrates
that there was a significant amount of corrosion and deterioration to the
seawall. It acknowledges the collapse of the seawall may have occurred
following heavy rain, however it submits that the available evidence indicates
this was inevitable given its corroded and deteriorated condition.
216075 Determination 5 of 10
It submits there is no evidence to suggest the damage would have occurred had the
seawall not been subject to long-term corrosion.
For it to accept a valid claim under the A pplicants‟ policy, the damage must be
caused by an insured event detailed in the policy booklet. While Storm and
rainwater is an insured event, the policy also states:
“You are not covered under any section of the po licy for damage, loss, cost or liability
caused by or arising from or involving:
an unreasonable failure to properly maintain or repair your building, wear and tear,
rust, deterioration or corrosion.”
It submits that it is reasonable to expect the Applicants to have been aware of the
issues with the local seawalls and reasonable to expect the Applicants would
have taken steps to ensure that the structure was sound and complete of any
necessary repairs.
The Applicants state the collapse of their seawall cannot be compared to the
collapse of other seawalls in the area on the basis the original capping beam on
their wall has been replaced. It refutes this and notes that whilst the capping
beam may have been replaced, aside from this, the wall was still in its original
condition.
Further, it submits that even if it were to be accepted that the seawall was partially
damaged by the storm, legal precedent provides that an insurer is not liable
when one of the causes of the loss falls within an exclusion clause in the policy.
Because the causes of wear and tear, rust, deterioration or corrosion, structural
failure or breakdown, an unreasonable failure to maintain or repair the insured
property and actions of the sea are excluded under all sections of the policy, it
is not liable to accept the claim even if it is accepted that a storm contributed to
the damage to the Applicants‟ seawall.
13. The FSP relies on the following policy/contract provisions:
“What we cover – insured events
This section describes under the heading:
Yes - the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured events.
Yes
You are covered for damage or loss to your home building occurring during the period
of cover and caused by the following events:
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of snow or hail.
No
...
216075 Determination 6 of 10
Damage or loss caused by water seeping into or otherwise entering your building due
to:
a defect or fault in the design, structure or construction of your building where you
could reasonably be expected to be aware of the defect or fault,
...
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or liability
caused by or arising from or involving:
an unreasonable failure to properly maintain or repair your building,
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical or other failure or breakdown, other than as provided
for under „Damage to electric motors‟
...
tidal wave, tsunami, high tide or other actions of the sea,
....”
Issues
The onus of proof is on the Applicants to establish, on the balance of probabilities,
that they have suffered a loss caused by a risk insured against. Once the
Applicants have established that the loss was prima facie caused by a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
There has been an exchange of material which the parties rely on. Each party has
had access to the material on which the other party bases its case. As a
consequence, it is not necessary to go into all of this material in any great
detail.
The damage to the A pplicants‟ seawall occurred after very heavy rainfall in their
location. The FSP contends that the rai nfall was not heavy enough in the days
leading up to the collapse of the seawall to have caused its collapse.
Although in its Notice of Response the FSP has relied upon incorrect days and
dates, the Panel acknowledges that the total rainfall recorded by the Bureau of
Meteorology at the Sydney Airport, which is about 12kms from the A pplicants‟
locality, is correct for the period 9.00am on 17 May to 9.00am on 19 May 2010,
that is, 91.6mm.
It also dismisses the A pplicants‟ reliance on a newspaper report of ab out 160mm of
rainfall in the Cronulla area. However, the Bureau of Meteorology also has a
recording station at Cronulla which is closer to the A pplicants‟ locality by 6kms.
The Bureau of Meteorology records for Cronulla, which is about 6kms from the
Applic ants‟ locality, confirmed the following rainfall at 9.00am on each of the
following days:
216075 Determination 7 of 10
17 May 2010 18 May 2010 19 May 2010
6.6mm 77.0mm 83.0mm
A total of 160.6mm over the three days
Therefore, the Panel accepts that the extremely heavy rainfall prior to the collapse of
the seawall could have contributed to its collapse and it finds that prima facie,
the Applicants have a claim that falls within the cover provided by their policy of
insurance.
However, the FSP has relied on various exclusions to the cover provided by the
policy to deny indemnity to the Applicants, therefore, the onus shifts to it to
establish that, on the balance of probabilities, the damage was caused by an
event excluded under the policy of insurance.
Reasons for Decision
The exclusions the FSP has relied upon to deny indemnity to the Applicants are:
Damage or loss caused by a defect or fault in the design, structure or
construction where the Applicants could reasonably be expected to be
aware of the defect or fault;
Loss or damage arising from or involving an unreasonable failure to
properly maintain or repair their building;
Tidal wave, tsunami, high tide or other actions of the sea.
Wear and tear, rust, deterioration or corrosion;
Mechanical, structural, electrical, electronic or other failure or
breakdown....
Consideration of Exclusions
In reviewing the evidence submitted by the FSP in respect to the exclusions, there is
a very significant evidentiary burden upon the FSP.
Damage or loss caused by a defect or fault in the design, structure or
construction where the Applicants could reasonably be expected to be
aware of the defect or fault.
An unreasonable failure to properly maintain or repair the building.
In seeking to deny the claim upon these grounds, the FSP must firstly establish
that the Applicants should reasonably have been aware of the danger posed by
their failure to take steps to ensure the seawall was sound and to complete any
necessary repairs.
The Applicants conceded that the problem of corrosion of the seawall panels is
widespread and as older seawalls on the waterways did not collapse, the heavy
rains must have been the primary cause of the collapse of their seawall.
216075 Determination 8 of 10
The FSP has stated that the Applicants were warned by the Waterways Authority
(Authority) that:
“It should be further explained that the efficiency of the seawall is very much
dependent upon the capping beam at the top of the seawall and the supporting
tie rods that are connected to concrete anchor blocks buried in your backyard.
The original capping beams have now exceeded their design life as the tie
rods have been subjected to corrosion over the years. The majority of residents
have had their tie rods checked or replaced and new capping beams installed.”
The Applicants state that they replaced their capping beam twenty three (23) years
ago. However, the concrete panels of the seawall collapsed before the capping
failed some hours later.
The Financial Ombudsman Service (FOS) contacted a Director of the Authority who
confirmed that the danger of failure of a seawall arises from the age of the
waterways seawalls. However, while acknowledging the problem, the Director
also stated that it is very difficult for the property owners on the waterways to
know of the condition of the tie rods holding the seawall in place because the
only way to check on the condition of the tie rods was to excavate the earth
surrounding the tie rods so that they could be inspected.
The FSP contends that the Applicants should have been aware of the condition of
the seawall and the loss or damage to the seawall was caused by their
unreasonable failure to properly maintain or repair the seawall.
However, the Panel does not agree with the FSP‟s opinion. If the t ie rods that held
the seawall in place could have been easily inspected, the Panel may have
agreed with the FSP. However, to expect a property owner to excavate their
property to inspect the condition of the tie rods is unreasonable.
Therefore, the Panel finds that the FSP has failed to establish that the Applicants
should have been aware of the fault with the seawall and unreasonably failed to
properly maintain the seawall.
Exclusion
Tidal wave, tsunami, high tide or other actions of the sea
The FSP contends that a high tide or other actions of the sea contributed to the
failure of the seawall.
In his report dated 22 June 2010, the FSP‟s engineer stated:
“In our opinion it is possible that the existence of a high tide at or near the time
that the heaviest downpour occurred could have been enough to prevent the
failure occurring at that time as the hydrostatic and soil loads on the sea-wall
panels would have been a minimum then.
However, as the tide fell, the height of the wet soil retained by the sea-wall
panels would have increased, increasing the loads on the sea-wall panels,
ultimately leading to their outward rotation and failure.
...
216075 Determination 9 of 10
In our opinion, the most likely time of the sea-wall panel failure would have been
after the reported heavy rainfall had occurred, and at a time when the tide was
approaching low tide, or rising after the low tide.”
The engineer‟s report persuades the Panel to the opinion that the proximate cause of
the failure of the seawall was not a high tide or the actions of the sea but was
due to the heavy rainfall that fell on or about 19 May 2010.
Therefore, the Panel finds that the FSP has not established that it can rely on the
policy exclusion to deny indemnity to the Applicants.
Exclusion:
Loss or damage caused by wear and tear, rust, deterioration or corrosion,
Loss or damage caused by mechanical, structural, electronic or other
failure.
The Panel is persuaded by the evidence that the seawall had deteriorated over a
period of time and its condition at the time of the heavy rainfall in May 2010 was
a factor in causing the damage claimed.
However, the Panel notes that the FSP‟s engineer has stated that the heavy rainfall
contributed to the failure of the seawall. The FSP has also stated that there is
no dispute the seawall partially collapsed following a period of heavy rainfall.
In the circumstances, where more than one concurrent cause has been established
as responsible for the damage and one concurrent cause is covered by the
policy and the other cause excluded, it is established law that the clause
excluding the cover is dominant and the claim fails.
However, in the circumstances of this case, the deterioration of the seawall occurred
prior to the heavy rainfall, which means that one proximate cause was followed
by another, so that they were consecutive.
While the policy provides cover for damage caused by rainfall, the policy also
contains a clause which excludes cover when the loss or damage is caused by
wear and tear, rust or gradual deterioration.
Because one proximate cause of the damage was the deteriorated condition of the
seawall which made it vulnerable to storm damage, the Panel is satisfied the
FSP has established that it should not be fully responsible for the claim.
However, the Panel finds that the insured event storm and rainwater contributed to
the failure of the seawall and therefore it is fair and reasonable that the FSP
makes a contribution to the cost of repairs to the seawall.
Given that the seawall was significantly deteriorated having been in place for 39+
years, it is likely that much of its effective life has been expended. One can only
speculate as to the possible further life-span available, but given that there is
evidence of other failure across the locality it is reasonable to conclude that it is
well into the latter half of its effective lifespan.
216075 Determination 10 of 10
On this basis the Panel determines that a fair and reasonable contribution for the
FSP would be 25% of the replacement cost.
The Terms of Reference of FOS limits the maximum amount that it may award to
$280,000. However, as 25% of the estimated cost of repairs to their seawall of
$542,367 equates to $135, 591.75, this is within the FOS Terms.
Determination
In summary, the Panel determines that the FSP has established that, on the balance
of probabilities, the seawall failed partly because of the action of wear and tear,
gradual deterioration and/or rust over a period of time which is excluded from
the cover provided under the policy of insurance.
However, the Panel also determines that the action of the consecutive event of
heavy rainfall also contributed to the failure of the seawall and determines that
the FSP contributes $135,591.75 to the cost of repairing the seawall.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.