Cash settlement amount for fire repairs - scope of works disputes

FirmFinancial Firm (Unknown - Insurer)
Decided2012-01-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$66,175
Non-financial loss—
Amount claimed$926,380
SourceAFCA PDF

Summary

A fire-damaged home insured disputed the insurer's cash settlement scope of works against his builder's quotes for rectification, plus 22 weeks of rent. AFCA ordered $66,175 in further settlement, left conditional items on proof of ownership of the alarm and light fittings, declined further rent, and treated the insurer's $25,000 delay offer as covering compensation.

A claim for building repair costs is assessed on what is reasonable and supported by evidence, and an insurer cannot be required to guarantee repairs it did not authorise.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 215731 Determination Page 1 of 17 Case number: 215731 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 21 December 2011 The Applicant is represented. For convenience and clarity in the Determination, the Applicant and his representative will hereafter be referred to as “the Applicant”. Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP). 2. In July 2008, the Applicant‟s home was severely damaged by fire. The FSP assessed the subsequent claim and accepted liability. 3. The contents claim was settled to the sum insured; however, disputes developed over several areas of the Scope of Works for the building damage. 4. The FSP initially intended to appoint a building company to repair the home; however, later offered to pay its quoted figure for repairs to the Applicant so he could arrange his own repairs. 5. Several issues relating to the costs of repairs and rental payments remain in dispute despite both parties making efforts to address and resolve them. Summary of Applicant’s Position 6. The FSP assessed the claim and originally offered to cash settle around $500,000. The quote from his building contractor „C‟ is $914,280. 7. With the assistance of a building consultant „C‟ he has disputed the FSP‟s offer. The FSP increased its offer to $547,833.44 but it is still well short of his quotation. 8. The FSP has failed to break down its Scope of Works and quotation to outline the work its quotation covers in a number of areas of the home. The Applicant submits he is unable to accept a quotation when he and his builder do not know what repair method the FSP‟s repairer intended to use. His builder‟s quotation for a number of items of the Scope of Works is significantly higher. 9. The FSP‟s repairer who prepared the quotation the FSP relies upon advised him it intended to quote low and add costs onto the claim later. A staff member Determination Case No: 215731 Determination Page 2 of 17 of the repairer also advised it would be better to demolish the home and start again rather than repair it. 10. The FSP‟s assessor was dismissive during assessments and was not interested in details such as how many power points were in each room of the home. 11. There are also questions as to the evidence provided by the FSP, as the screenshots from its claim system provide comments from the FSP‟s perspective and there are no actual assessment reports from the assessor, only computer logs which may or may not be written by him. 12. There was an onsite meeting on 24 February 2009 to discuss the issues with the claim and he did sign the FSP‟s fixtures and fittings list. However, he signed this only as confirmation he was at the meeting and was never told his signature was supposed to be confirmation of the complete list of items. The FSP‟s own claims system screenshots support his argument that the documents were just for consideration. The FSP‟s reliance on this documentation is a breach of its duty to act with utmost good faith under section 13 of the Insurance Contracts Act 1984 . 13. The FSP also failed to appropriately secure the property after the fire, resulting in further damage. 14. The FSP‟s service has been poor and it has sought to cash settle the claim in order to mitigate costs in the hope the he would just accept the money. 15. The engineer‟s report from „MP‟ completed in 2011 vindicates his position as it outlined the Scope of Works did not cover all aspects of the required rectification. 16. He provides a DVD showing the building and the various repair issues in dispute. 17. The FSP‟s policy offers a repair guarantee. Given the FSP is cash settling the claim without outlining the repair methods proposed in its quotation properly, the Applicant questions how the FSP is complying with its promise to guarantee repairs. 18. The FSP has stated his alarm system is 20 years old. The alarm is only two years old. The FSP has failed to explain where it got this completely incorrect information. 19. The claim has not been delayed by him or his builder. 20. The Applicant provides further comments specific to each item in dispute. Case No: 215731 Determination Page 3 of 17 Summary of FSP’s Position 21. It originally appointed its repairer to complete the repairs; however, the Applicant expressed concerns with the builder and enquired about providing his own quotation. 22. The Applicant‟s first quotation was approximately $715,000 plus GST. The FSP noted the Applicant‟s builder‟s quotation was not based on the Scope of Works. 23. It decided to cash settle the claim and advised the Applicant that if his builder found additional damage during repairs, it could be assessed. It also agreed to cover 25 weeks of accommodation costs. 24. Further vandalism damage occurred at the property which it agreed to cover. 25. Various discussions and meetings took place in an effort to address the issues with the Scope of Works. 26. In particular a meeting took place at the property with the Applicant and his builder on 24 February 2009 where a detailed list of fixtures and fittings was drawn up. The list included details; such as that the light fittings were mid-range and there were three handsets for the alarm. The Applicant signed the list and was aware the purpose of the meeting was to address the areas of concern so the matter could be finalised. 27. The Applicant is claiming light fittings of over $32,000 and an alarm and communications system with 12 handsets and a laptop. Given the information provided earlier by the Applicant that the light fittings were mid-range and the alarm and communications system had only three handsets, while it has agreed to replace the lights fittings and alarm and communications system, it has sought evidence of ownership for the light fittings and made an allowance for an alarm and communications system similar to that which the Applicant had previously. It would appear the Applicant‟s quotation for the alarm and communications system is for an upgraded system and the Applicant has not provided proof he had the same system before, as is now included in his quotation. 28. It notes it is not normal practice for a repairer to provide an itemised quotation explaining how work will be done for the purpose of an insured to understand. 29. With relation to the guarantee under the policy, it was prepared to authorise its repairer to complete the work and had that occurred, it would have guaranteed the work as per the policy. 30. Its settlement offer based on its repairer‟s amended quotations and the fixtures list agreed upon by the Applicant and his builder, fulfils its obligations under the policy. 31. Since the matter was referred to the Financial Ombudsman Service, the FSP has offered $25,000 on a non-prejudice basis for delays while maintaining that apart from the appointment of an engineer in 2011, it has not delayed the claim. Case No: 215731 Determination Page 4 of 17 32. While it will always try and obtain matching materials, the policy does not cover the replacement of undamaged materials to achieve a uniform match. 33. The FSP relies on the following policy provisions: “ Repairing or rebuilding your building If your home building is damaged during the period of cover by an insured event, we will decide if the damage: can be properly repaired, or is so severely damaged that we reasonably believe your building will need to be rebuilt. Repairing your building When we establish that your home building can be properly repaired, we will decide to: repair it, or pay the cost of repairing it. When we repair your building, we will use new materials. We will make reasonable endeavours to match materials. Where this does not achieve an exact match, materials that in our opinion match the damaged or lost materials as near as reasonably practicable will be used. We will not pay to replace undamaged materials or any undamaged part of them to achieve a match. … The [FSP] Home Repair Guarantee The quality of workmanship and the materials used in any repair or rebuilding of your home and contents that we arrange and authorise will be guaranteed for the life of the property. … Helping us to pay your claim When you can provide us with information such as documents, booklets and photographs showing and/or valuing your building, you help us make speedy and accurate decisions regarding your claim and the repair or the rebuilding of your building. This information helps establish ownership of property and its value and condition. This information includes: receipts, bank and credit card statements, agreements and reports, valuations and photographs (photographs do not have to be specifically of your building; it may be easily identifiable in photos taken, for example, of personal events). We may require this type of information. If you are unable to provide information of this type, that establishes ownership and value of the property in question and the value of your claim, then we may reduce or refuse to pay your claim. ” Case No: 215731 Determination Page 5 of 17 Issue 34. Whether the FSP‟s settlement offer meet s its obligations to the Applicant under the terms and conditions of the policy. Reasons for Decision 35. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombud sman Service‟s Terms of Reference. 36. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 37. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 38. Owing to the fact this has been an ongoing dispute since 2008, there is a large volume of material on file. The Panel notes that the ongoing nature of the dispute with a large Scope of Works, various quotations, assessment reports, expert reports, submissions and additional cash offers has made the task of assessing the appropriate weighting of some of this ma terial, challenging. 39. While the Panel has reviewed all the material, it does not intend to restate the entire history of the dispute in this Determination as the submissions provided outline the history of the claim and the parties have both had access to all the material before the Panel. Rather, the Panel will address each of the outstanding elements of the dispute under a separate heading for clarity, with reference to the evidence the Panel has relied upon in coming to its decision. 40. There is no dispute the insured event of fire caused the loss and that the FSP is liable for the damage. Rather, the dispute relates to the quoted cost of repairs to the insured property. Brick Work 41. The FSP‟s original settlement offer for the brick work was $11,300. The Applic ant‟s quotation was for $42,580. 42. Following the „MP‟ engineering assessment (MP) in 2011, the FSP agreed to cover the replacement of the walls on the first floor. The FSP agreed to pay an additional $31,280 (on top of the $11,300 already offered) to bring the cost up to the $42,580 in the Applicant‟s quotation. 43. While this matter is effectively settled on that basis, the Applicant notes the engineer‟s report by MP in 2011 vindicated the concerns he has had with the FSP‟s Scope of Wor ks since 2008. Case No: 215731 Determination Page 6 of 17 Tiling 44. The Applicant‟s quotation for the tiling is $41,750. The FSP‟s quotation is for $19,000. 45. The Applicant rejects the FSP‟s submission that tiled areas such as the kitchen, hallway, bathroom and laundry can be cleaned, with the Applicant‟s builder „C‟ finding additional areas of damage as the result of the fire, water and vandalism. 46. Following MP‟s report of 2011, the FSP agreed to cover an additional $2,200 for splashback tiles in the ground floor kitchen (an allowance of $3,000 less the $800 already offered for the re-grouting of the tiled area). 47. The Panel has reviewed MP‟s report on the tiling in several rooms. In summary, the report includes the following information and opinion on the tiles: Middle Floor Kitchen - Replace all wall and floor tiles. Included in FSP’s quotation . Middle Floor TV Room - Replace floor tiles. Included in FSP’s quotation . Ground Floor Laundry - Clean floor tiles and re-grout splashback wall tiles. Included in FSP’s quotation . Ground Floor Games Room - After floor tiles are cleaned there may be additional damage. FSP’s quotation includes the cleaning of tiles . Ground Floor Storage Area - After floor tiles are cleaned there may be additional damage. FSP’s quotation includes the cleaning of tiles . Lower Ground Floor Kitchen - After floor tiles are cleaned there may be additional damage or drummy tiles. If drummy tiles found may need to replace floor tiles. Replace splashback wall tiles. FSP’s quotation includes the cleaning of tiles only . Lower Ground Floor Passage - Clean floor tiles. FSP’s quotation includes the cleaning of tiles . 48. In reviewing this evidence, while the Panel is satisfied areas will likely clean satisfactorily, the Panel is concerned the ground floor games room, storage area and kitchen may require further tile replacement. 49. In the circumstances, bearing in mind the need for finalisation of this claim, the Panel determines the FSP should settle a further 50% of the difference between its offer and th e Applicant‟s claimed amount. Case No: 215731 Determination Page 7 of 17 50. Due to the effluxion of time there is some confusion as to the exact figures for the tiles. However, it would appear the difference between the parties‟ final figures is $20,550 ($41,750 less $19,000 and $2,200). 51. Accordingly, the Panel determines the FSP settle a further $10,275 towards the tiles. Kitchen and Laundry 52. The Applicant‟s quotation for the kitchen and laundry repairs is $83,400. The FSP‟s original offer was $41,000 plus $9,000 for appliances. After MP‟s report, the FSP‟s assessor made an additional allowance of $1,500 for rendering and plastering to the western wall and $500 for graffiti removal. 53. The FSP states its quotation allows for the replacement of all kitchen cupboards. 54. The FSP states the Applicant‟s quotation includes the replacement of cupboards extending past the kitchen. It allows for the replacement of all laundry cupboards and bench tops. The FSP states the required repairs for these areas are included under the Scope of Works for the relevant rooms. It also states the photographs reveal there was no bench top in the laundry. 55. The Panel has reviewed MP‟s report in this regard. It indicates the only items in the laundry not included in the FSP‟s quotation were the re -plastering and re- rendering of the western wall and removal of graffiti (the FSP subsequently made allowances for these). 56. With respect to the kitchen, MP‟s report states “the quotation would not have made allowance for the additional work involved in replacing the kitchen cupboards on the eastern wall of the island covered within the middle of the room”. It also stated an allowance for mould and efflorescence treatment would be required. 57. The additional quotation by the FSP‟s repairer allows for the mould and efflorescence and replacement of the island cupboard. However, it does not appear an allowance was made for the cupboards on the eastern wall. 58. The Panel is aware there is a difference of approximately $31,200 between the quotations of the parties; however, the Panel is not satisfied the Applicant has established an entitlement to the full amount claimed. MP‟s report do es not appear to support the Applicant‟s claim for significant further works. 59. In considering the evidence as a whole, the Panel determines the FSP should settle a further allowance of $5,000 for the kitchen repairs. This should address the issue with the cupboards on the eastern wall and also allows for further costs. Case No: 215731 Determination Page 8 of 17 Plumbing and Drainage 60. The Applicant‟s quotation for plumbing is $37,885.40. The FSP‟s quotation for plumbing totals $14,300. 61. The Applicant states that the FSP has refused to provide a breakdown of the works included in its quotation. The Applicant states it appears the FSP‟s repairer intended to use all the same copper piping and no testing has been done on the pipes to see if they were affected by heat. The Applicant is concerned that it will be extremely expensive to access and replace damaged pipes if they are tested after the other repairs have been done and found to have an issue. The FSP‟s only suggestion seems to be that pipes are tested before the wall linings are fitted. 62. The FSP states its quotation allows to “replace, repair and test all plumbing to Australian standards” . The FSP notes that it is unlikely there was heat damage to the remaining copper pipes given the curtains in the same rooms were not affected by the fire. The FSP submits it is normal practice to fit plumbing and conduct testing before wall linings are fitted. If further damage not previously identified is found, then the FSP is willing to attend the property and assess the matter. 63. The Panel has reviewed the evidenc e. The FSP‟s Scope of Works allows to “replace, repair and test all plumbing to Australian standards” . This is included as item 481 on the quotation provided by the FSP‟s repairer. 64. There is a difference of $23,585.40 between the quotations. Possible issues with the plumbing will not become apparent until testing has been completed. It may be that existing pipes can be utilised. 65. However, the Panel is aware of the need to resolve this dispute and is therefore reluctant to make an open-ended decision that may lead to further contentiousness between the parties. It will therefore rely, wherever necessary, on its overarching mandate to do „what is fair in all the circumstances‟ . 66. Accordingly, the Panel determines the FSP should pay an additional $8,000 towards the plumbing. Alarm and Communications 67. The Applicant‟s quotation for the replacement of the alarm and communications system is $28,940. The Applicant states the system was approximately two years old at the time of the fire, not 20 years old as stated by the FSP. The Applicant questions where the FSP came up with the 20 year old age for the item. The Applicant also states he was never told the fixtures list that he signed off, at the 24 February 2009 meeting, was intended to be the final list and the FSP‟ s submission that it was the final list is a breach of its duty of utmost good faith. The Applicant notes the FSP‟s own claims systems indicates that list was not a final list. Case No: 215731 Determination Page 9 of 17 68. The FSP states the Applicant‟s quotation is not fair and reasonable because it is an upgrade on the system that existed prior to the fire. The FSP submits the features of the system were discussed with the Applicant at an onsite meeting on 24 February 2009. At that time the Applicant advised the system had only three handsets. The quotation for the new system includes twelve handsets, a laptop, a larger memory and four remote controls. The FSP argues the onsite meeting on 24 February 2009 took place so issues with the Scope of Works and the fixtures could be addressed and it submits there is no reason to doubt the accuracy of the information given. 69. Irrelevant of whether the fixtures list drawn up at the 24 February 2009 meeting was intended as the final list or not, the Panel notes it is unusual that the list would include details that were so different to the system the Applicant submits he actually had. It has not been explained as to how the FSP allegedly had details the system was 20 years old; however, the FSP acknowledges this was a mistake. 70. There is also a notation in the FSP‟s claims system that indicates the Applicant advised the system was approximately eight years old at the time of the fire. While this adds further confusion to the issue, given the FSP acknowledges there was a mistake with the notation the alarm was 20 years old, the Panel is not inclined to place any great weight on this contrary note, recorded by the FSP‟s claims system. 71. In reviewing the evidence, the Panel notes that the company that has provided the quotation for the Applicant is reportedly the same compa ny that supplied the original alarm system that was damaged in the fire (paragraph 10 of the Applicant‟s Statutory Declar ation dated 6 September 2011). 72. In the circumstances, the Panel is of the opinion that the company should be able to provide a receipt and proof of sale for the original alarm system given it was only purchased two years before the fire and was presumably valued upwards of $28,000 at that time. 73. Therefore the Panel determines that if the Applicant can provide the FSP proof of purchase or proof of sale (from the company) for the original system and it is the same specifications and features as the new system, then the FSP will be required to settle the $28,940 quoted, less any allowance already made. 74. If the Applicant is unable to provide proof of ownership or proof of sale of the original system, then the Panel determines the FSP is not required to pay anything further in regard to this item. Lighting 75. The Applicant has provided quotations of $32,786 (general fittings) and $3,200 (pool table light) for light fittings in the insured property. The FSP has sought proof of ownership for the light fittings, which the Applicant interprets as a belief by the FSP that he has been untruthful. Case No: 215731 Determination Page 10 of 17 76. The Applicant provides a Statutory Declaration from himself and Statutory Declarations from four people, who have been at the property, in support of his submission he had chandeliers and quality light fittings. 77. The Applicant questions how the FSP can say he cannot establish the light fittings in the quotations are the same as he had, when the FSP itself cannot establish its own quotation allows for the same light fittings. The Applicant maintains there has been no breach of the policy terms on his behalf. 78. The Applicant also raises the issue that section 54 of the Insurance Contracts Act 1984 applies to the FSP‟s reliance on its policy term that the Applicant has failed to provide sufficient proof of loss. The Applicant argues the FSP has not established it has suffered any prejudice and therefore cannot refuse to pay the claim. 79. As with the comments made in relation to the alarm and communications system, the Applicant states he was not advised of the fixtures and fittings list from the 24 February 2009 meeting, was intended as the final list. Likewise, the Applicant states the FSP‟s claims notations are self serving and should not be relied upon as an accurate reflection of events during the claim. 80. The FSP has requested the Applicant provide receipts or a bank statement in support of his purchase of the light fittings to show they were high end items. It accepts the lighting fixtures on the quotation may be similar to the ones in the property; however, the photograph of one fitting is not identical to the one the Applicant has provided a quotation for. 81. The FSP states that in the fixtures and fittings schedule from the meeting on 24 February 2009 that was signed by the Applicant, the light fittings were described as „mid price range‟. Nowhere in the schedule is there mention of a glass chandelier. The FSP is concerned the Applicant has provided quotations for high end items and has not provided photographs or proof of purchase for the disputed lighting items. 82. The FSP states the policy provides that if an insured is unable to establish ownership for an item, it may reduce or refuse to pay a claim. Its quotation has allowed for the replacement of mid range light fittings. 83. The Panel has reviewed the evidence. The Applicant has provided Statutory Declarations from witnesses. The statements all say there were large chandeliers in the entry foyer and high quality light fittings throughout the home. One of the witnesses is a cleaner who attests she refused to clean the large light fitting in the master bedroom because she was afraid she might damage it. 84. The Applicant has also provided a Statutory Declaration, dated 26 February 2010, which states: “1. I refer to Annexure “A” which is a list of light fittings which was in my house at [address] prior to the fire. 2. I refer to Annexure “B” which is a quote from [company] lis ting prices for all light fittings for specific light fittings except for the light fittings referred to in Case No: 215731 Determination Page 11 of 17 Annexure “C” and I say each one of the items listed are the same type of light fitting which were in my house prior to the fire. 3. I refer to An nexure “C” which is a quote from [company] listing a price for specific light fittings in relation to the pool table lighting and I say the items listed are for the same type of light fitting which were in my house prior to the fire. …” 85. In reviewing the post-fire photographs there is appears to be one photograph showing a light fitting with five bulbs under glass covers. 86. The FSP‟s claims systems notations in relation to a meeting that reportedly took place on 20 February 2009, contain the following comments in relation to the light fittings: “ -Assessor then questioned difference in light fittings -Assessor wanted to know what these were. Builder could not clarify as IO has organised quote. -IO has provided a quote for 2 chandeliers valued at $9648 each. -Assessor asked where these were as the ceiling height would be low for chandeliers. -Also assessor asked IO at time of assessment what type of lights IO had, which he confirmed down lights. Assessor also clarified with IO if he had any different lights in any other rooms such as chandeliers which IO replied no. -Assessor advised that there was no evidence of chandeliers on site and he looked for this specifically. -Also as IO advised the chandeliers were in one room where the curtains and furniture remained, there would‟ve been evidence of a chandelier.” (sic) 87. The Applicant has also raised the application of section 54 of the Insurance Contracts Act 1984 in relation to the FSP‟s reliance on the terms of its policy in requesting proof of ownership and value. The Applicant states the FSP has not established any prejudice and therefore cannot rely on the terms of the policy. 88. The Panel is satisfied the FSP‟s prejudice, in the absence of probative evidence such as photographs or receipts, would clearly be the difference in value between the Applicant‟s pre -fire light fittings and the items he has provided quotations for. 89. Given the conflicting nature of the evidence before the Panel in relation to the light fittings, it is left in a difficult position of having to make a determination with an eye to what is fair in all the circumstances to both parties. 90. The FSP‟s policy generally allows it to seek clarification on the value of items claimed. It has requested the Applicant provide proof of ownership and/or value of the original light fittings. 91. The Applicant has not provided any financial statements or receipts as proof of ownership or value for these items. The Panel also observes that the Applicant has not argued he cannot provide such evidence, due to the intervention of some external circumstance, such as their destruction in the fire, for example. Case No: 215731 Determination Page 12 of 17 92. However, the Applicant has provided evidence in the way of Statutory Declarations from witnesses that there were chandeliers and quality light fitti ngs at the property. That said, these statements do not reveal the actual value of the fittings. 93. In the circumstances, again noting the importance of resolution of this matter for all parties, the Panel determines, pursuant to FiC, the FSP settle an additional $8,000 over and above what it has already a llowed for the light fittings. 94. However, if the Applicant is able to provide receipts or proof of sale from the original supplier for the pre-fire light fittings, the Panel would direct the FSP to review the evidence and make further settlement, if the evidence showed the total allowance for lighting (including the additional $8,000 allowed by the Panel) was not sufficient. Air Conditioning Units 95. The Applicant has provided a quotation for $9,800 for air conditioning units servicing the ground floor kitchen and dining room, dialysis room and gym room and first floor kitchen. 96. The Applicant rejects the FSP‟s submission that its quotation includes an allowance for this, noting it fails to identify the item on the quotation. 97. The FSP states the original Scope of Works allowed for the cleaning and testing of the air conditioning units. However, following the subsequent vandalism event it agreed to cover the cost of replacing the air conditioning units and this cost is included in the amended $550,755.64 settlement. 98. The Panel has reviewed the evidence. The FSP refers to „Attachment 30‟ in its material with respect to the air conditioning units. There is no item marked „Attachment 30‟ in the file; however, between attachments 29 and 31 there is the fittings and fixtures list and a revised quotat ion from the FSP‟s repairer. 99. On page eight of the quotation, under the heading „KITCHEN 1 st FLOOR‟ item 299 is “Remove and replace wall air conditioner to match” . On page 11 of the quotation, under the heading „KITCHEN GND FLOOR‟, item 377 is “clean and test wall air conditioner” . 100. Given the FSP has failed to clearly identify the items in its evidence, the Panel presumes the items 299 and 377 relate to the same air conditioners the Applicant is claiming. 101. As item 377 does not allow for the replacement of the air conditioner in the ground floor kitchen, the Panel determines the FSP should settle a further $4,900 (being half of the Applicant‟s quotation for two units). Case No: 215731 Determination Page 13 of 17 PC Items 102. The Applicant has provided an itemised „PC items‟ list from his repairer that totals $29,300. The Applicant notes the FSP‟s quotation does not provide a broken down list of PC items and therefore he cannot tell what if any PC items the FSP‟s repairer intended to replace. The Applica nt submits the $29,300 should be added to the FSP‟s settlement as the FSP cannot show it s quotation includes PC items. 103. The FSP states that the PC items were discussed and agreed upon at the meeting on 24 February 2009. It notes its repairer used this as the basis for its quotation and the quotations includes a “PC Item Allowance”. It submits its repairer has the necessary industry expertise to determine the relevant costs in this quotation. 104. The Panel has reviewed the evidence. In what is presumed to be „At tachment 30‟ the Panel acknowledges there is a fixtures and fittings list; however, the Panel is not able to identify a reference to “PC Item Allowance” on the quotation from the FSP‟s repairer, dated 3 June 2009. 105. In the circumstances, the Panel accepts t hat the FSP‟s quotation does allow for the replacement of general PC items; however, in the circumstances, as it does not appear on the quotation and there is no breakdown of the items the Panel determines the FSP should settle an additional $10,000 towards PC items. Parquetry Flooring 106. The Applicant has provided a quotation of $39,539 to replace the parquetry flooring in the property; however the flooring company has advised it may be able to do the work for $29,000 plus GS T. 107. The Applicant states the FSP has not provided evidence as to the method of replacement of the floor or a quotation from a flooring expert to indicate its quotation would replace what existed before the event. He notes the floor had specific design features with a designer star in the lounge room, four stars in the hallway and a designer border around the floor. 108. The FSP states the parquetry floor was discussed as part of the meeting on 24 February 2009 and the design features are included in the fixtures and fittings list that was signed by the Applicant. 109. The FSP states the quotation was made in full knowledge of the design features and the repairer was aware of the materials to be used. 110. The Panel has reviewed the evidence. Notations from the FSP‟s claims system from 20 February 2009 in dicate the FSP‟s cost for the parquetry flooring is approximately $18,000. There is also reference to the FSP‟s quotation being $18,700 in a facsimile sent to the FSP from the Applicant‟s builder on 2 June 2009. Case No: 215731 Determination Page 14 of 17 111. The fixtures and fittings list prepared from the 24 February 2009 meeting indicates stars and borders were included on the Scope of Works. The FSP‟s quotation allows for replacement of the parquetry floor to match. 112. There is also an notation from the FSP‟s assessor from 5 June 2009 which states: “Par quetry flooring has been described in fixtures and finishes schedule and replacement allowed for in scope. Total price is shown in trade summary schedule. I called [timber company] to enquire about the price of Blackbutt and Blue Gum parquetry flooring they quoted supply only $76/M2” (sic) 113. The Panel is persuaded that while the FSP‟s repairer would be experienced in providing a quotation for items such as parquetry flooring, it was not unreasonable for the Applicant to request a detailed quotation for the parquetry flooring given there were specific design features. 114. In the circumstances, pursuant to FiC, the Panel determines the FSP settle an additional $10,000 towards the parquetry flooring at the property. Cement Render 115. The Applicant provides quotations totalling between $88,600 and $93,616.50 for cement rendering of walls. He notes there would still be no guarantee provided with the work. The Applicant states the FSP‟s further settlement of $2,600 after MP‟s report does not cover the cost of the required r epairs. 116. The Applicant states there are heavy deposits of soot on the walls, cracking and areas of the walls are „drummy‟. The Applicant‟s builder has suggested the walls be demolished and new bricks put in place. 117. The FSP states it originally only allowed for the cleaning and rendering of walls on the first floor. It later allowed a contingency of $8,400 for this rendering of the first floor. However, following MP‟s report from 2011, which recommends the first floor walls be demolished, the assessor allowed $11,000 for the rendering of walls. The FSP states the Applicant‟s quotations for these walls was $10,800 and as it has already settled $8,400, it was only required to pay a further $2,600 which it has done. 118. The Panel has reviewed the evidence presented. It appears the last quotation from the FSP‟s repairer allowed $21,500 for the rendering of walls and an additional $850 for the rendering of the western wall. 119. MP‟s report mentions that additional rendering would be required. 120. The Applicant‟s list indicates there is a difference of between $63,650 and $69,066.50. The Panel notes this is a significant difference and while the Applicant has provided quotations, the Panel is not persuaded the Applicant has established his costing should be preferred for this aspect of the claim. Case No: 215731 Determination Page 15 of 17 121. In the circumstances, in the interest of resolving the claim and pursuant to FiC, the Panel determines the FSP should settle an additional $10,000 towards rendering at the property. Rent 122. The Applicant states the FSP has only paid for 33 weeks of rent. He states the home is still not habitable even though the fire occurred in 2008. The Applicant n otes the policy covers 12 month‟ s rent in the event of a large loss and he seeks a further 22 week‟ s rent at $550 per week. 123. The FSP states the Applicant delayed the claim; however, concedes additional damage was found in 2011. It has offered to pay an additional $25,000 to the Applicant for these delays and it considers no further rental costs are warranted. 124. The Panel notes the Applicant would only be entitled to another 19 weeks of rent (given 33 have already reportedly been paid). However, the Panel is persuaded the additional $25,000 settlement offered by the FSP for delays is a generous one and reasonably takes into account any further outstanding rental payment that might have been available to the Applicant. 125. Accordingly, the Panel determines the FSP is not required to make any further settlement for rental payments. Guarantee 126. The Applicant has raised concerns that the policy offers a lifetime guarantee on repairs and with the cash settlement of the claim; the FSP is no longer offering a guarantee. 127. The FSP notes that had it proceeded with repairs as it originally intended to do, it would have guaranteed the repairs as per the terms of the policy. 128. In the circumstances, the Panel accepts an insurer can only guarantee work it authorises. The evidence before the Panel indicates the FSP originally authorised its repairer to complete the work, but after it became apparent the Applicant was not satisfied with the repairer, the FSP made the decision to cash settle the claim. 129. In the circumstances, the Panel is satisfied the FSP has complied with the terms of the policy in offering a cash settlement. Other 130. The evidence before the Panel indicates the Applicant has accepted the settlement offers from the FSP in respect of the „Efflorescence‟ and „Corrosion and Manganese Testing‟. 131. The evidence before the Panel also indicates the FSP has settled $75,870.85 for the additional items identified from the MP engineering report of 2011, which was an increase from its original allowance of $45,600. Case No: 215731 Determination Page 16 of 17 Service 132. This has been an ongoing claim since 2008. Having reviewed all the material on file, the Panel is of the opinion that both parties have made genuine efforts to address the issues with the claim. 133. The Panel notes the FSP did originally intend to undertake repairs and if this had proceeded, the claim may have been resolved far sooner than it has. However, the Panel als o acknowledges the Applicant‟s desire to ensure he was being indemnified correctly. 134. The Panel is satisfied the FSP‟s $25,000 settlement offer towards delays sufficiently covers any compensation the Panel may have been inclined to award in this case. The Panel is aware that at the time of writing this determination, the $25,000 settlement was still outstanding. The Panel trusts the FSP will attend to the settlement of the $25,000 as a matter of urgency if it has not done so already. Determination 135. On the basis of the available information the Panel determines the FSP should make the following settlement over and above the settlements it has already made:  $10,275 for tiles  $5,000 for kitchen repairs  $8,000 for plumbing  $8,000 for light fittings  $4,900 for an air conditioner  $10,000 towards PC items  $10,000 towards parquetry flooring  $10,000 towards cement render Total = $66,175 136. In relation to the alarm and communications systems, the Panel determines that if the Applicant provides the FSP proof of purchase or proof of sale (from the company) for the original system and it is the same specifications and features as the new system, then the FSP should settle the $28,940 quoted less any allowance already made for the system. 137. In relation to the light fittings, the Panel determines that if the Applicant is able to provide receipts or proof of sale from the original supplier for the pre-fire light fittings, the FSP is to review the evidence and make further settlement if the evidence shows the total allowance for lighting (including the additional $8,000 awarded by the Panel) was not sufficient. Case No: 215731 Determination Page 17 of 17 138. The Panel determines the FSP is not required to make any further settlement towards rental payments. 139. If the Applicant accepts this Determination, the Panel directs the FSP to settle the $66,175 within 30 days of the notification of the acceptance.