Text of the determination
Case No: 215731 Determination Page 1 of 17
Case number: 215731
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
21 December 2011
The Applicant is represented. For convenience and clarity in the Determination, the
Applicant and his representative will hereafter be referred to as “the Applicant”.
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP).
2. In July 2008, the Applicant‟s home was severely damaged by fire. The FSP
assessed the subsequent claim and accepted liability.
3. The contents claim was settled to the sum insured; however, disputes
developed over several areas of the Scope of Works for the building damage.
4. The FSP initially intended to appoint a building company to repair the home;
however, later offered to pay its quoted figure for repairs to the Applicant so he
could arrange his own repairs.
5. Several issues relating to the costs of repairs and rental payments remain in
dispute despite both parties making efforts to address and resolve them.
Summary of Applicant’s Position
6. The FSP assessed the claim and originally offered to cash settle around
$500,000. The quote from his building contractor „C‟ is $914,280.
7. With the assistance of a building consultant „C‟ he has disputed the FSP‟s offer.
The FSP increased its offer to $547,833.44 but it is still well short of his
quotation.
8. The FSP has failed to break down its Scope of Works and quotation to outline
the work its quotation covers in a number of areas of the home. The Applicant
submits he is unable to accept a quotation when he and his builder do not know
what repair method the FSP‟s repairer intended to use. His builder‟s quotation
for a number of items of the Scope of Works is significantly higher.
9. The FSP‟s repairer who prepared the quotation the FSP relies upon advised
him it intended to quote low and add costs onto the claim later. A staff member
Determination
Case No: 215731 Determination Page 2 of 17
of the repairer also advised it would be better to demolish the home and start
again rather than repair it.
10. The FSP‟s assessor was dismissive during assessments and was not
interested in details such as how many power points were in each room of the
home.
11. There are also questions as to the evidence provided by the FSP, as the
screenshots from its claim system provide comments from the FSP‟s
perspective and there are no actual assessment reports from the assessor,
only computer logs which may or may not be written by him.
12. There was an onsite meeting on 24 February 2009 to discuss the issues with
the claim and he did sign the FSP‟s fixtures and fittings list. However, he signed
this only as confirmation he was at the meeting and was never told his
signature was supposed to be confirmation of the complete list of items. The
FSP‟s own claims system screenshots support his argument that the
documents were just for consideration. The FSP‟s reliance on this
documentation is a breach of its duty to act with utmost good faith under
section 13 of the Insurance Contracts Act 1984 .
13. The FSP also failed to appropriately secure the property after the fire, resulting
in further damage.
14. The FSP‟s service has been poor and it has sought to cash settle the claim in
order to mitigate costs in the hope the he would just accept the money.
15. The engineer‟s report from „MP‟ completed in 2011 vindicates his position as it
outlined the Scope of Works did not cover all aspects of the required
rectification.
16. He provides a DVD showing the building and the various repair issues in
dispute.
17. The FSP‟s policy offers a repair guarantee. Given the FSP is cash settling the
claim without outlining the repair methods proposed in its quotation properly,
the Applicant questions how the FSP is complying with its promise to guarantee
repairs.
18. The FSP has stated his alarm system is 20 years old. The alarm is only two
years old. The FSP has failed to explain where it got this completely incorrect
information.
19. The claim has not been delayed by him or his builder.
20. The Applicant provides further comments specific to each item in dispute.
Case No: 215731 Determination Page 3 of 17
Summary of FSP’s Position
21. It originally appointed its repairer to complete the repairs; however, the
Applicant expressed concerns with the builder and enquired about providing his
own quotation.
22. The Applicant‟s first quotation was approximately $715,000 plus GST. The FSP
noted the Applicant‟s builder‟s quotation was not based on the Scope of Works.
23. It decided to cash settle the claim and advised the Applicant that if his builder
found additional damage during repairs, it could be assessed. It also agreed to
cover 25 weeks of accommodation costs.
24. Further vandalism damage occurred at the property which it agreed to cover.
25. Various discussions and meetings took place in an effort to address the issues
with the Scope of Works.
26. In particular a meeting took place at the property with the Applicant and his
builder on 24 February 2009 where a detailed list of fixtures and fittings was
drawn up. The list included details; such as that the light fittings were mid-range
and there were three handsets for the alarm. The Applicant signed the list and
was aware the purpose of the meeting was to address the areas of concern so
the matter could be finalised.
27. The Applicant is claiming light fittings of over $32,000 and an alarm and
communications system with 12 handsets and a laptop. Given the information
provided earlier by the Applicant that the light fittings were mid-range and the
alarm and communications system had only three handsets, while it has agreed
to replace the lights fittings and alarm and communications system, it has
sought evidence of ownership for the light fittings and made an allowance for
an alarm and communications system similar to that which the Applicant had
previously. It would appear the Applicant‟s quotation for the alarm and
communications system is for an upgraded system and the Applicant has not
provided proof he had the same system before, as is now included in his
quotation.
28. It notes it is not normal practice for a repairer to provide an itemised quotation
explaining how work will be done for the purpose of an insured to understand.
29. With relation to the guarantee under the policy, it was prepared to authorise its
repairer to complete the work and had that occurred, it would have guaranteed
the work as per the policy.
30. Its settlement offer based on its repairer‟s amended quotations and the fixtures
list agreed upon by the Applicant and his builder, fulfils its obligations under the
policy.
31. Since the matter was referred to the Financial Ombudsman Service, the FSP
has offered $25,000 on a non-prejudice basis for delays while maintaining that
apart from the appointment of an engineer in 2011, it has not delayed the claim.
Case No: 215731 Determination Page 4 of 17
32. While it will always try and obtain matching materials, the policy does not cover
the replacement of undamaged materials to achieve a uniform match.
33. The FSP relies on the following policy provisions:
“ Repairing or rebuilding your building
If your home building is damaged during the period of cover by an insured event, we
will decide if the damage:
can be properly repaired, or
is so severely damaged that we reasonably believe your building will need to
be rebuilt.
Repairing your building
When we establish that your home building can be properly repaired, we will
decide to:
repair it, or
pay the cost of repairing it.
When we repair your building, we will use new materials.
We will make reasonable endeavours to match materials. Where this does
not achieve an exact match, materials that in our opinion match the damaged
or lost materials as near as reasonably practicable will be used. We will not
pay to replace undamaged materials or any undamaged part of them to
achieve a match.
…
The [FSP] Home Repair Guarantee
The quality of workmanship and the materials used in any repair or rebuilding
of your home and contents that we arrange and authorise will be guaranteed
for the life of the property.
…
Helping us to pay your claim
When you can provide us with information such as documents, booklets and
photographs showing and/or valuing your building, you help us make speedy
and accurate decisions regarding your claim and the repair or the rebuilding
of your building. This information helps establish ownership of property and its
value and condition.
This information includes:
receipts, bank and credit card statements, agreements and reports,
valuations and photographs (photographs do not have to be specifically
of your building; it may be easily identifiable in photos taken, for
example, of personal events).
We may require this type of information. If you are unable to provide
information of this type, that establishes ownership and value of the property
in question and the value of your claim, then we may reduce or refuse to pay
your claim. ”
Case No: 215731 Determination Page 5 of 17
Issue
34. Whether the FSP‟s settlement offer meet s its obligations to the Applicant under
the terms and conditions of the policy.
Reasons for Decision
35. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombud sman Service‟s Terms of Reference.
36. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
37. There has been an exchange of information between the parties and the Panel
is satisfied that each party has had an opportunity to address the issues raised.
38. Owing to the fact this has been an ongoing dispute since 2008, there is a large
volume of material on file. The Panel notes that the ongoing nature of the
dispute with a large Scope of Works, various quotations, assessment reports,
expert reports, submissions and additional cash offers has made the task of
assessing the appropriate weighting of some of this ma terial, challenging.
39. While the Panel has reviewed all the material, it does not intend to restate the
entire history of the dispute in this Determination as the submissions provided
outline the history of the claim and the parties have both had access to all the
material before the Panel. Rather, the Panel will address each of the
outstanding elements of the dispute under a separate heading for clarity, with
reference to the evidence the Panel has relied upon in coming to its decision.
40. There is no dispute the insured event of fire caused the loss and that the FSP is
liable for the damage. Rather, the dispute relates to the quoted cost of repairs
to the insured property.
Brick Work
41. The FSP‟s original settlement offer for the brick work was $11,300. The
Applic ant‟s quotation was for $42,580.
42. Following the „MP‟ engineering assessment (MP) in 2011, the FSP agreed to
cover the replacement of the walls on the first floor. The FSP agreed to pay an
additional $31,280 (on top of the $11,300 already offered) to bring the cost up
to the $42,580 in the Applicant‟s quotation.
43. While this matter is effectively settled on that basis, the Applicant notes the
engineer‟s report by MP in 2011 vindicated the concerns he has had with the
FSP‟s Scope of Wor ks since 2008.
Case No: 215731 Determination Page 6 of 17
Tiling
44. The Applicant‟s quotation for the tiling is $41,750. The FSP‟s quotation is for
$19,000.
45. The Applicant rejects the FSP‟s submission that tiled areas such as the kitchen,
hallway, bathroom and laundry can be cleaned, with the Applicant‟s builder „C‟
finding additional areas of damage as the result of the fire, water and
vandalism.
46. Following MP‟s report of 2011, the FSP agreed to cover an additional $2,200
for splashback tiles in the ground floor kitchen (an allowance of $3,000 less the
$800 already offered for the re-grouting of the tiled area).
47. The Panel has reviewed MP‟s report on the tiling in several rooms. In summary,
the report includes the following information and opinion on the tiles:
Middle Floor Kitchen
- Replace all wall and floor tiles. Included in FSP’s quotation .
Middle Floor TV Room
- Replace floor tiles. Included in FSP’s quotation .
Ground Floor Laundry
- Clean floor tiles and re-grout splashback wall tiles. Included in FSP’s
quotation .
Ground Floor Games Room
- After floor tiles are cleaned there may be additional damage. FSP’s quotation
includes the cleaning of tiles .
Ground Floor Storage Area
- After floor tiles are cleaned there may be additional damage. FSP’s quotation
includes the cleaning of tiles .
Lower Ground Floor Kitchen
- After floor tiles are cleaned there may be additional damage or drummy tiles.
If drummy tiles found may need to replace floor tiles. Replace splashback wall
tiles. FSP’s quotation includes the cleaning of tiles only .
Lower Ground Floor Passage
- Clean floor tiles. FSP’s quotation includes the cleaning of tiles .
48. In reviewing this evidence, while the Panel is satisfied areas will likely clean
satisfactorily, the Panel is concerned the ground floor games room, storage
area and kitchen may require further tile replacement.
49. In the circumstances, bearing in mind the need for finalisation of this claim, the
Panel determines the FSP should settle a further 50% of the difference
between its offer and th e Applicant‟s claimed amount.
Case No: 215731 Determination Page 7 of 17
50. Due to the effluxion of time there is some confusion as to the exact figures for
the tiles. However, it would appear the difference between the parties‟ final
figures is $20,550 ($41,750 less $19,000 and $2,200).
51. Accordingly, the Panel determines the FSP settle a further $10,275 towards the
tiles.
Kitchen and Laundry
52. The Applicant‟s quotation for the kitchen and laundry repairs is $83,400. The
FSP‟s original offer was $41,000 plus $9,000 for appliances. After MP‟s report,
the FSP‟s assessor made an additional allowance of $1,500 for rendering and
plastering to the western wall and $500 for graffiti removal.
53. The FSP states its quotation allows for the replacement of all kitchen
cupboards.
54. The FSP states the Applicant‟s quotation includes the replacement of
cupboards extending past the kitchen. It allows for the replacement of all
laundry cupboards and bench tops. The FSP states the required repairs for
these areas are included under the Scope of Works for the relevant rooms. It
also states the photographs reveal there was no bench top in the laundry.
55. The Panel has reviewed MP‟s report in this regard. It indicates the only items in
the laundry not included in the FSP‟s quotation were the re -plastering and re-
rendering of the western wall and removal of graffiti (the FSP subsequently
made allowances for these).
56. With respect to the kitchen, MP‟s report states “the quotation would not have
made allowance for the additional work involved in replacing the kitchen
cupboards on the eastern wall of the island covered within the middle of the
room”. It also stated an allowance for mould and efflorescence treatment would
be required.
57. The additional quotation by the FSP‟s repairer allows for the mould and
efflorescence and replacement of the island cupboard. However, it does not
appear an allowance was made for the cupboards on the eastern wall.
58. The Panel is aware there is a difference of approximately $31,200 between the
quotations of the parties; however, the Panel is not satisfied the Applicant has
established an entitlement to the full amount claimed. MP‟s report do es not
appear to support the Applicant‟s claim for significant further works.
59. In considering the evidence as a whole, the Panel determines the FSP should
settle a further allowance of $5,000 for the kitchen repairs. This should address
the issue with the cupboards on the eastern wall and also allows for further
costs.
Case No: 215731 Determination Page 8 of 17
Plumbing and Drainage
60. The Applicant‟s quotation for plumbing is $37,885.40. The FSP‟s quotation for
plumbing totals $14,300.
61. The Applicant states that the FSP has refused to provide a breakdown of the
works included in its quotation. The Applicant states it appears the FSP‟s
repairer intended to use all the same copper piping and no testing has been
done on the pipes to see if they were affected by heat. The Applicant is
concerned that it will be extremely expensive to access and replace damaged
pipes if they are tested after the other repairs have been done and found to
have an issue. The FSP‟s only suggestion seems to be that pipes are tested
before the wall linings are fitted.
62. The FSP states its quotation allows to “replace, repair and test all plumbing to
Australian standards” . The FSP notes that it is unlikely there was heat damage
to the remaining copper pipes given the curtains in the same rooms were not
affected by the fire. The FSP submits it is normal practice to fit plumbing and
conduct testing before wall linings are fitted. If further damage not previously
identified is found, then the FSP is willing to attend the property and assess the
matter.
63. The Panel has reviewed the evidenc e. The FSP‟s Scope of Works allows to
“replace, repair and test all plumbing to Australian standards” . This is included
as item 481 on the quotation provided by the FSP‟s repairer.
64. There is a difference of $23,585.40 between the quotations. Possible issues
with the plumbing will not become apparent until testing has been completed. It
may be that existing pipes can be utilised.
65. However, the Panel is aware of the need to resolve this dispute and is therefore
reluctant to make an open-ended decision that may lead to further
contentiousness between the parties. It will therefore rely, wherever necessary,
on its overarching mandate to do „what is fair in all the circumstances‟ .
66. Accordingly, the Panel determines the FSP should pay an additional $8,000
towards the plumbing.
Alarm and Communications
67. The Applicant‟s quotation for the replacement of the alarm and communications
system is $28,940. The Applicant states the system was approximately two
years old at the time of the fire, not 20 years old as stated by the FSP. The
Applicant questions where the FSP came up with the 20 year old age for the
item. The Applicant also states he was never told the fixtures list that he signed
off, at the 24 February 2009 meeting, was intended to be the final list and the
FSP‟ s submission that it was the final list is a breach of its duty of utmost good
faith. The Applicant notes the FSP‟s own claims systems indicates that list was
not a final list.
Case No: 215731 Determination Page 9 of 17
68. The FSP states the Applicant‟s quotation is not fair and reasonable because it
is an upgrade on the system that existed prior to the fire. The FSP submits the
features of the system were discussed with the Applicant at an onsite meeting
on 24 February 2009. At that time the Applicant advised the system had only
three handsets. The quotation for the new system includes twelve handsets, a
laptop, a larger memory and four remote controls. The FSP argues the onsite
meeting on 24 February 2009 took place so issues with the Scope of Works
and the fixtures could be addressed and it submits there is no reason to doubt
the accuracy of the information given.
69. Irrelevant of whether the fixtures list drawn up at the 24 February 2009 meeting
was intended as the final list or not, the Panel notes it is unusual that the list
would include details that were so different to the system the Applicant submits
he actually had. It has not been explained as to how the FSP allegedly had
details the system was 20 years old; however, the FSP acknowledges this was
a mistake.
70. There is also a notation in the FSP‟s claims system that indicates the Applicant
advised the system was approximately eight years old at the time of the fire.
While this adds further confusion to the issue, given the FSP acknowledges
there was a mistake with the notation the alarm was 20 years old, the Panel is
not inclined to place any great weight on this contrary note, recorded by the
FSP‟s claims system.
71. In reviewing the evidence, the Panel notes that the company that has provided
the quotation for the Applicant is reportedly the same compa ny that supplied
the original alarm system that was damaged in the fire (paragraph 10 of the
Applicant‟s Statutory Declar ation dated 6 September 2011).
72. In the circumstances, the Panel is of the opinion that the company should be
able to provide a receipt and proof of sale for the original alarm system given it
was only purchased two years before the fire and was presumably valued
upwards of $28,000 at that time.
73. Therefore the Panel determines that if the Applicant can provide the FSP proof
of purchase or proof of sale (from the company) for the original system and it is
the same specifications and features as the new system, then the FSP will be
required to settle the $28,940 quoted, less any allowance already made.
74. If the Applicant is unable to provide proof of ownership or proof of sale of the
original system, then the Panel determines the FSP is not required to pay
anything further in regard to this item.
Lighting
75. The Applicant has provided quotations of $32,786 (general fittings) and $3,200
(pool table light) for light fittings in the insured property. The FSP has sought
proof of ownership for the light fittings, which the Applicant interprets as a belief
by the FSP that he has been untruthful.
Case No: 215731 Determination Page 10 of 17
76. The Applicant provides a Statutory Declaration from himself and Statutory
Declarations from four people, who have been at the property, in support of his
submission he had chandeliers and quality light fittings.
77. The Applicant questions how the FSP can say he cannot establish the light
fittings in the quotations are the same as he had, when the FSP itself cannot
establish its own quotation allows for the same light fittings. The Applicant
maintains there has been no breach of the policy terms on his behalf.
78. The Applicant also raises the issue that section 54 of the Insurance Contracts
Act 1984 applies to the FSP‟s reliance on its policy term that the Applicant has
failed to provide sufficient proof of loss. The Applicant argues the FSP has not
established it has suffered any prejudice and therefore cannot refuse to pay the
claim.
79. As with the comments made in relation to the alarm and communications
system, the Applicant states he was not advised of the fixtures and fittings list
from the 24 February 2009 meeting, was intended as the final list. Likewise, the
Applicant states the FSP‟s claims notations are self serving and should not be
relied upon as an accurate reflection of events during the claim.
80. The FSP has requested the Applicant provide receipts or a bank statement in
support of his purchase of the light fittings to show they were high end items. It
accepts the lighting fixtures on the quotation may be similar to the ones in the
property; however, the photograph of one fitting is not identical to the one the
Applicant has provided a quotation for.
81. The FSP states that in the fixtures and fittings schedule from the meeting on 24
February 2009 that was signed by the Applicant, the light fittings were
described as „mid price range‟. Nowhere in the schedule is there mention of a
glass chandelier. The FSP is concerned the Applicant has provided quotations
for high end items and has not provided photographs or proof of purchase for
the disputed lighting items.
82. The FSP states the policy provides that if an insured is unable to establish
ownership for an item, it may reduce or refuse to pay a claim. Its quotation has
allowed for the replacement of mid range light fittings.
83. The Panel has reviewed the evidence. The Applicant has provided Statutory
Declarations from witnesses. The statements all say there were large
chandeliers in the entry foyer and high quality light fittings throughout the home.
One of the witnesses is a cleaner who attests she refused to clean the large
light fitting in the master bedroom because she was afraid she might damage it.
84. The Applicant has also provided a Statutory Declaration, dated 26 February
2010, which states:
“1. I refer to Annexure “A” which is a list of light fittings which was in my house
at [address] prior to the fire.
2. I refer to Annexure “B” which is a quote from [company] lis ting prices for all
light fittings for specific light fittings except for the light fittings referred to in
Case No: 215731 Determination Page 11 of 17
Annexure “C” and I say each one of the items listed are the same type of
light fitting which were in my house prior to the fire.
3. I refer to An nexure “C” which is a quote from [company] listing a price for
specific light fittings in relation to the pool table lighting and I say the items
listed are for the same type of light fitting which were in my house prior to
the fire.
…”
85. In reviewing the post-fire photographs there is appears to be one photograph
showing a light fitting with five bulbs under glass covers.
86. The FSP‟s claims systems notations in relation to a meeting that reportedly
took place on 20 February 2009, contain the following comments in relation to
the light fittings:
“ -Assessor then questioned difference in light fittings
-Assessor wanted to know what these were.
Builder could not clarify as IO has organised quote.
-IO has provided a quote for 2 chandeliers valued at $9648 each.
-Assessor asked where these were as the ceiling height would be low for
chandeliers.
-Also assessor asked IO at time of assessment what type of lights IO had, which
he confirmed down lights.
Assessor also clarified with IO if he had any different lights in any other rooms
such as chandeliers which IO replied no.
-Assessor advised that there was no evidence of chandeliers on site and he
looked for this specifically.
-Also as IO advised the chandeliers were in one room where the curtains and
furniture remained, there would‟ve been evidence of a chandelier.” (sic)
87. The Applicant has also raised the application of section 54 of the Insurance
Contracts Act 1984 in relation to the FSP‟s reliance on the terms of its policy in
requesting proof of ownership and value. The Applicant states the FSP has not
established any prejudice and therefore cannot rely on the terms of the policy.
88. The Panel is satisfied the FSP‟s prejudice, in the absence of probative
evidence such as photographs or receipts, would clearly be the difference in
value between the Applicant‟s pre -fire light fittings and the items he has
provided quotations for.
89. Given the conflicting nature of the evidence before the Panel in relation to the
light fittings, it is left in a difficult position of having to make a determination with
an eye to what is fair in all the circumstances to both parties.
90. The FSP‟s policy generally allows it to seek clarification on the value of items
claimed. It has requested the Applicant provide proof of ownership and/or value
of the original light fittings.
91. The Applicant has not provided any financial statements or receipts as proof of
ownership or value for these items. The Panel also observes that the Applicant
has not argued he cannot provide such evidence, due to the intervention of
some external circumstance, such as their destruction in the fire, for example.
Case No: 215731 Determination Page 12 of 17
92. However, the Applicant has provided evidence in the way of Statutory
Declarations from witnesses that there were chandeliers and quality light fitti ngs
at the property. That said, these statements do not reveal the actual value of
the fittings.
93. In the circumstances, again noting the importance of resolution of this matter
for all parties, the Panel determines, pursuant to FiC, the FSP settle an
additional $8,000 over and above what it has already a llowed for the light
fittings.
94. However, if the Applicant is able to provide receipts or proof of sale from the
original supplier for the pre-fire light fittings, the Panel would direct the FSP to
review the evidence and make further settlement, if the evidence showed the
total allowance for lighting (including the additional $8,000 allowed by the
Panel) was not sufficient.
Air Conditioning Units
95. The Applicant has provided a quotation for $9,800 for air conditioning units
servicing the ground floor kitchen and dining room, dialysis room and gym room
and first floor kitchen.
96. The Applicant rejects the FSP‟s submission that its quotation includes an
allowance for this, noting it fails to identify the item on the quotation.
97. The FSP states the original Scope of Works allowed for the cleaning and
testing of the air conditioning units. However, following the subsequent
vandalism event it agreed to cover the cost of replacing the air conditioning
units and this cost is included in the amended $550,755.64 settlement.
98. The Panel has reviewed the evidence. The FSP refers to „Attachment 30‟ in its
material with respect to the air conditioning units. There is no item marked
„Attachment 30‟ in the file; however, between attachments 29 and 31 there is
the fittings and fixtures list and a revised quotat ion from the FSP‟s repairer.
99. On page eight of the quotation, under the heading „KITCHEN 1 st FLOOR‟ item
299 is “Remove and replace wall air conditioner to match” . On page 11 of the
quotation, under the heading „KITCHEN GND FLOOR‟, item 377 is “clean and
test wall air conditioner” .
100. Given the FSP has failed to clearly identify the items in its evidence, the Panel
presumes the items 299 and 377 relate to the same air conditioners the
Applicant is claiming.
101. As item 377 does not allow for the replacement of the air conditioner in the
ground floor kitchen, the Panel determines the FSP should settle a further
$4,900 (being half of the Applicant‟s quotation for two units).
Case No: 215731 Determination Page 13 of 17
PC Items
102. The Applicant has provided an itemised „PC items‟ list from his repairer that
totals $29,300. The Applicant notes the FSP‟s quotation does not provide a
broken down list of PC items and therefore he cannot tell what if any PC items
the FSP‟s repairer intended to replace. The Applica nt submits the $29,300
should be added to the FSP‟s settlement as the FSP cannot show it s quotation
includes PC items.
103. The FSP states that the PC items were discussed and agreed upon at the
meeting on 24 February 2009. It notes its repairer used this as the basis for its
quotation and the quotations includes a “PC Item Allowance”. It submits its
repairer has the necessary industry expertise to determine the relevant costs in
this quotation.
104. The Panel has reviewed the evidence. In what is presumed to be „At tachment
30‟ the Panel acknowledges there is a fixtures and fittings list; however, the
Panel is not able to identify a reference to “PC Item Allowance” on the quotation
from the FSP‟s repairer, dated 3 June 2009.
105. In the circumstances, the Panel accepts t hat the FSP‟s quotation does allow for
the replacement of general PC items; however, in the circumstances, as it does
not appear on the quotation and there is no breakdown of the items the Panel
determines the FSP should settle an additional $10,000 towards PC items.
Parquetry Flooring
106. The Applicant has provided a quotation of $39,539 to replace the parquetry
flooring in the property; however the flooring company has advised it may be
able to do the work for $29,000 plus GS T.
107. The Applicant states the FSP has not provided evidence as to the method of
replacement of the floor or a quotation from a flooring expert to indicate its
quotation would replace what existed before the event. He notes the floor had
specific design features with a designer star in the lounge room, four stars in
the hallway and a designer border around the floor.
108. The FSP states the parquetry floor was discussed as part of the meeting on 24
February 2009 and the design features are included in the fixtures and fittings
list that was signed by the Applicant.
109. The FSP states the quotation was made in full knowledge of the design
features and the repairer was aware of the materials to be used.
110. The Panel has reviewed the evidence. Notations from the FSP‟s claims system
from 20 February 2009 in dicate the FSP‟s cost for the parquetry flooring is
approximately $18,000. There is also reference to the FSP‟s quotation being
$18,700 in a facsimile sent to the FSP from the Applicant‟s builder on 2 June
2009.
Case No: 215731 Determination Page 14 of 17
111. The fixtures and fittings list prepared from the 24 February 2009 meeting
indicates stars and borders were included on the Scope of Works. The FSP‟s
quotation allows for replacement of the parquetry floor to match.
112. There is also an notation from the FSP‟s assessor from 5 June 2009 which
states:
“Par quetry flooring has been described in fixtures and finishes schedule and
replacement allowed for in scope. Total price is shown in trade summary
schedule. I called [timber company] to enquire about the price of Blackbutt and
Blue Gum parquetry flooring they quoted supply only $76/M2” (sic)
113. The Panel is persuaded that while the FSP‟s repairer would be experienced in
providing a quotation for items such as parquetry flooring, it was not
unreasonable for the Applicant to request a detailed quotation for the parquetry
flooring given there were specific design features.
114. In the circumstances, pursuant to FiC, the Panel determines the FSP settle an
additional $10,000 towards the parquetry flooring at the property.
Cement Render
115. The Applicant provides quotations totalling between $88,600 and $93,616.50
for cement rendering of walls. He notes there would still be no guarantee
provided with the work. The Applicant states the FSP‟s further settlement of
$2,600 after MP‟s report does not cover the cost of the required r epairs.
116. The Applicant states there are heavy deposits of soot on the walls, cracking
and areas of the walls are „drummy‟. The Applicant‟s builder has suggested the
walls be demolished and new bricks put in place.
117. The FSP states it originally only allowed for the cleaning and rendering of walls
on the first floor. It later allowed a contingency of $8,400 for this rendering of
the first floor. However, following MP‟s report from 2011, which recommends
the first floor walls be demolished, the assessor allowed $11,000 for the
rendering of walls. The FSP states the Applicant‟s quotations for these walls
was $10,800 and as it has already settled $8,400, it was only required to pay a
further $2,600 which it has done.
118. The Panel has reviewed the evidence presented. It appears the last quotation
from the FSP‟s repairer allowed $21,500 for the rendering of walls and an
additional $850 for the rendering of the western wall.
119. MP‟s report mentions that additional rendering would be required.
120. The Applicant‟s list indicates there is a difference of between $63,650 and
$69,066.50. The Panel notes this is a significant difference and while the
Applicant has provided quotations, the Panel is not persuaded the Applicant
has established his costing should be preferred for this aspect of the claim.
Case No: 215731 Determination Page 15 of 17
121. In the circumstances, in the interest of resolving the claim and pursuant to FiC,
the Panel determines the FSP should settle an additional $10,000 towards
rendering at the property.
Rent
122. The Applicant states the FSP has only paid for 33 weeks of rent. He states the
home is still not habitable even though the fire occurred in 2008. The Applicant
n otes the policy covers 12 month‟ s rent in the event of a large loss and he
seeks a further 22 week‟ s rent at $550 per week.
123. The FSP states the Applicant delayed the claim; however, concedes additional
damage was found in 2011. It has offered to pay an additional $25,000 to the
Applicant for these delays and it considers no further rental costs are
warranted.
124. The Panel notes the Applicant would only be entitled to another 19 weeks of
rent (given 33 have already reportedly been paid). However, the Panel is
persuaded the additional $25,000 settlement offered by the FSP for delays is a
generous one and reasonably takes into account any further outstanding rental
payment that might have been available to the Applicant.
125. Accordingly, the Panel determines the FSP is not required to make any further
settlement for rental payments.
Guarantee
126. The Applicant has raised concerns that the policy offers a lifetime guarantee on
repairs and with the cash settlement of the claim; the FSP is no longer offering
a guarantee.
127. The FSP notes that had it proceeded with repairs as it originally intended to do,
it would have guaranteed the repairs as per the terms of the policy.
128. In the circumstances, the Panel accepts an insurer can only guarantee work it
authorises. The evidence before the Panel indicates the FSP originally
authorised its repairer to complete the work, but after it became apparent the
Applicant was not satisfied with the repairer, the FSP made the decision to
cash settle the claim.
129. In the circumstances, the Panel is satisfied the FSP has complied with the
terms of the policy in offering a cash settlement.
Other
130. The evidence before the Panel indicates the Applicant has accepted the
settlement offers from the FSP in respect of the „Efflorescence‟ and „Corrosion
and Manganese Testing‟.
131. The evidence before the Panel also indicates the FSP has settled $75,870.85
for the additional items identified from the MP engineering report of 2011, which
was an increase from its original allowance of $45,600.
Case No: 215731 Determination Page 16 of 17
Service
132. This has been an ongoing claim since 2008. Having reviewed all the material
on file, the Panel is of the opinion that both parties have made genuine efforts
to address the issues with the claim.
133. The Panel notes the FSP did originally intend to undertake repairs and if this
had proceeded, the claim may have been resolved far sooner than it has.
However, the Panel als o acknowledges the Applicant‟s desire to ensure he was
being indemnified correctly.
134. The Panel is satisfied the FSP‟s $25,000 settlement offer towards delays
sufficiently covers any compensation the Panel may have been inclined to
award in this case. The Panel is aware that at the time of writing this
determination, the $25,000 settlement was still outstanding. The Panel trusts
the FSP will attend to the settlement of the $25,000 as a matter of urgency if it
has not done so already.
Determination
135. On the basis of the available information the Panel determines the FSP should
make the following settlement over and above the settlements it has already
made:
$10,275 for tiles
$5,000 for kitchen repairs
$8,000 for plumbing
$8,000 for light fittings
$4,900 for an air conditioner
$10,000 towards PC items
$10,000 towards parquetry flooring
$10,000 towards cement render
Total = $66,175
136. In relation to the alarm and communications systems, the Panel determines
that if the Applicant provides the FSP proof of purchase or proof of sale (from
the company) for the original system and it is the same specifications and
features as the new system, then the FSP should settle the $28,940 quoted
less any allowance already made for the system.
137. In relation to the light fittings, the Panel determines that if the Applicant is able
to provide receipts or proof of sale from the original supplier for the pre-fire light
fittings, the FSP is to review the evidence and make further settlement if the
evidence shows the total allowance for lighting (including the additional $8,000
awarded by the Panel) was not sufficient.
Case No: 215731 Determination Page 17 of 17
138. The Panel determines the FSP is not required to make any further settlement
towards rental payments.
139. If the Applicant accepts this Determination, the Panel directs the FSP to settle
the $66,175 within 30 days of the notification of the acceptance.