Home / Financial Firm (Unknown - Insurer) / Determination 215016
Determination 215016
Denial of malicious tenant damage claim to rental building and loss of rent claim
Summary
Applicant claimed for wall cracking to a rental property, attributed to a tenant's malicious acts, and for loss of rent from claim delay. The FSP denied the claim as earth movement, which is excluded. AFCA found the denial was open and the delay not unreasonable.
The applicant failed to prove malicious acts by the tenant, and the damage was attributable to excluded earth settlement and movement.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 215016 Determination Page 1 of 9
Case number: 215016
General Insurance - Domestic Insurance - Home Building – Landlords’
protection – Malicious damage – Structural defects
Date: 16 May 2011
Background
1. The Applicant insured her home rental building under a Landlords’ Protection
Policy of Insurance for $238,300 with a $500 policy excess. The policy
commenced on 16 October 2006 and was renewed annually to 16 October
2009.
2. On 5 August 2009, the Applicant lodged a claim for malicious damage to the
walls of the building which she contends was caused by the tenant of the
property. The estimated cost of repairs is between $20,000 and $30,000.
3. The Applicant has also submitted a claim for loss of rent which she contends
was caused by the delay of the Financial Services Provider (FSP) in
investigating her claim
4. The (FSP) has denied indemnity to the Applicant on the grounds that the
damage to the building was not the result of malicious acts by the tenant but
was due to movement and cracking in the building over a long period of time
due to drying soil.
Summary of Applicant ’s Position
5. The Applicant considers that her claim has not been dealt with in a fair manner.
6. The tenant of her property damaged the building with malicious intent during his
occupancy. She has a witness to verify that the tenant caused several acts of
malicious damage on separate occasions in his endeavour to reduce the rent of
the property and for a time ceased paying rent altogether.
7. The tenant suggested that he was capable of performing repairs to her property
in return for a reduction in the rent payments. Her real estate agent was present
at the time who agreed to draw up the required paper work.
8. She has never received a copy of the paperwork for the tenant to commence
repairs and furthermore, she has never seen the tenant’s qualifications to be
able to carry out the repairs.
Determination
Case No: 215016 Determination Page 2 of 9
9. Therefore, the tenant should not have been altering her property in any way or
causing further damage to it. She also believes that the attempt at repairs was
the tenant ’ s disguised attempt to cause further malicious damage to her
property.
10. She has read the FSP’s engineer’s report and she did not find the report
conclusive so as to rule out the damage to her property being caused by the
tenant and not just of a naturally occurring event.
11. She has submitted evidence that her property was well maintained before the
tenant moved in.
12. The Applicant has also submitted a claim for loss of rent which she contends
was caused by the delay of the FSP in investigating her claim. She contacted
the FSP to lodge a claim but did not receive advice of the final result until 14
June 2010 when she was informed her claim had been refused.
Summary of FSP’s Position
13. There is no dispute that there is cracking present in the Applicant ’s property.
However, the issue in dispute is whether malicious acts of the tenant are the
cause of the damage claimed.
14. To date, the Applicant has not produced any evidence to suggest the damage
present to her property has arisen as a result of malicious acts or that the
damage is insurable under the provisions of the policy.
15. The Applicant has not engaged any form of building specialist or engineer to
inspect the damage in question and has therefore solely formed her position
from her own personal opinions which are not qualified or expert in nature.
16. The FSP has relied upon a qualified professional engineer to base its
conclusions.
17. Its external loss assessor submitted a report dated 17 September 2009 in
which he stated:
The insured property was in a very poor condition with significant
building movement causing severe cracks to both internal and external
brick walls. The cracks caused further damage to plaster ceilings and
cornices along with paint work and fixtures.
There was significant water damage to the kitchen ceiling which
appeared to have resulted from cracks along the external wall allowing
water to enter the roof cavity.
Case No: 215016 Determination Page 3 of 9
The Applicant expressed her concerns regarding the current state of
the property, however, the assessor advised her that the damage had
resulted from building movement and was not considered malicious
damage caused by the tenant.
18. The report clearly establishes that the damage to the insured property has not
arisen as a result of malicious acts by the former tenant.
19. The FSP also appointed an engineer to inspect and report on the damage to
the insured property. In his report dated 29 April 2010 he stated:
The Applicant purchased the property in late 2006. The second tenant
occupied the property from about July 2007 to about May 2009.
It was after the second tenant’s occupation that the Applicant reported
many areas of the dwelling had been damaged including the walls and
ceilings.
There is a noticeable fall in the lounge room floor and in the second
bedroom.
There are a number of locations where the internal and external walls
have been chased b ack, ‘breakouts’, to the base of the brickwork. The
width and extent of the chasing is extensive. The brick mortar joints are
in a deteriorated condition with many joints devoid of any mortar. The
engineer did not believe that the mortar has been manually raked out.
There is evidence of previous repair and long term movement having
occurred throughout the dwelling.
In his opinion, the foundation soils in the vicinity of the site are likely to
include reactive clay horizons, which will expand if their moisture content
increases and shrink if their moisture content decreases. These
volumetric heaving and shrinkage movements will lead to vertically
upward heaving and downward settlement movements at the soil
surface.
Building movement as a result of the soil shrinkage has cracked the
dwelling, both now and in the past. The patterns of ‘breakouts’ is
consistent with the location of where one would expect the cracking to
have originated.
The ‘breakouts’ are in locations where it would be expected the masonry
to have cracked from settlement due to soil drying influences. The
northern elevation’s external render coat has been neatly cut out and
removed to expose the cracking to the masonry wall’s brickwork mortar
matrix.
The so called ‘commenced repair work’ does not appear to be random,
however, the repair work has been left unfinished.
Case No: 215016 Determination Page 4 of 9
Based on the available information, the movement and cracking damage
throughout the dwelling is consistent with a reduction in moisture content
of reactive clay foundation soil and a resultant soil settlement.
The ‘breakout’ locations of the so called ‘commencement of repairs’ to
the walls are consistent with cracks due to soil drying influences and
settlement.
It is not possible to be definitive about what was malicious damage to the
dwelling. The ‘breakout’ locations and preparation are consistent with a
rationalised approach to the commencement of crack repair, although,
understanding why the dwelling cracked goes a long way toward a
successful repair.
The engineer’s report establis hes that the damage present to the internal and
external walls is attributable to long term movement, which has occurred
throughout the property and is consistent with the drying and shrinkage of
highly reactive clay foundations.
The engineer’s investigati ons demonstrate that the former tenant had attempted to
perform repairs to the internal and external masonry brick walls to rectify the
cracking which arose due to earth movement and subsidence.
20. The FSP’s loss assessor submitted an additional report dated 12 May 2010, in
which he stated:
The initial cracking to the brick walls and masonry ceilings are as a result
of long standing building movement issues. There was no evidence of
water leaks or plumbing issues which led the engineer to the opinion that
the movement has resulted from the soil underneath the property slowly
drying over an extended period of time.
The original cracking along the external and internal brick walls is the
result of long standing building movement and not related to a single
defined event.
With the initial cracking, the hard plaster is in need of removal to prepare
the area for repairs. The ‘breakouts’ are consistent with a rationalised
approach to the commencement of crack repair.
There was an oral agreement between the former tena nt and the
Applicant to undertake repairs to the property. During part of these
repairs the tenant removed or ‘chased’ the hard plaster from the affected
areas in preparation of re-plastering the wall.
As there was no written agreement between the tenant a nd the Applicant
it is difficult to determine if any of the work completed falls outside of the
oral agreement.
Case No: 215016 Determination Page 5 of 9
The action by the tenant generally would not be considered ‘malicious’
but rather consistent with expected repairs needed to rectify the damage
to the walls.
21. The assessor’s report establishes that the damage to the Applicant ’s property
has not arisen as a result of malicious acts by the tenant, but rather due to
attempts by the tenant to perform repairs to the damage caused by settling,
expansion, shrinkage and earth movement.
The FSP is satisfied that the damage the subject of the claim is not the result of
malicious acts in nature, but rather is the result of settling, expansion, shrinkage
and earth movement, causes which are excluded under the policy.
The FSP contends that the Applicant has failed to establish, upon the balance of
probabilities that the damage was caused by malicious acts. Therefore, the
Applicant has failed to establish that her claim falls within the terms and
conditions of the policy.
The Applicant has also submitted a claim for loss of rent due to alleged delays in the
FSP’s assessment of her claim.
The FSP rejects the Applicant ’s claim and ba sed on the numerous items of evidence
it has been clearly established that the full entitlement to loss of rent has been
paid.
The Applicant has failed to establish that any of the timeframes experienced were
anything but reasonable. Therefore, it rejects the Applicant ’s position in this
matter as all of the evidence presented to date identifies that any of the delays
experienced are not attributable to the FSP’s management of the claim.
The FSP relies on the following policy/contract provisions:
“Genera l exclusions
We do not insure you for any loss or damage that is caused by or arises from:
■ ...
■ settling, expansion, shrinkage or any earth movement other than earthquake.
...
Landlords’ Protection Insurance
...
When you insure your buildings for Landlo rds’ Protection your choice will be shown in
the schedule and the following insurance will apply.
Case No: 215016 Determination Page 6 of 9
Malicious Acts
Malicious Acts means acts of malice. Malice includes an intention to cause harm to
another person’s property through an unlawful or wrongful a ct without justification or
excuse.
We will insure you against loss or damage occurring during the period of insurance
that is caused by malicious acts by your tenants.
...
When we will not pay a claim
We will not pay a claim for an event when:
■ ...
■ the claim is excluded by specific policy exclusions or by any of the General
exclusions on page 13.”
Issues
22. The Applicant submitted a claim for damage to her rental property that she
contends was caused by the malicious acts of a tenant. On receiving its loss
assessor’s report dated 17 September 2009, th e FSP accepted that the some
of the damage was due to acts malicious in nature.
23. The Applicant contends that the damage to her building was caused by the
insured event, being malicious acts caused by a tenant. The FSP disputes that
the damage was caused by malicious acts but rather was the result of settling,
expansion, shrinkage or any earth movement which are excluded from the
cover provided by the policy of insurance.
24. The Applicant also contends that the FSP should pay her for loss of rent which
she states was caused by the FSP’s l ong delay in processing her claim.
The onus of proof is on the Applicant to establish, on the balance of probabilities,
that she has suffered a loss caused by a risk insured against. Once the
Applicant has established that the loss was prima facie caused b y a risk
insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
There has been an exchange of material which the parties rely on. Each party has
had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material in any great detail.
Case No: 215016 Determination Page 7 of 9
Reasons for Decision
Damage to the Insured Buildings
25. The Applicant contends that her property was well maintained before the
second tenant occupied the property. She relies on a Property Inspection Sheet
which was partially completed on 25 June 2007 which graded the property as
average/clean/good under the ‘cleanliness/condition code’.
26. However, the inspection report was not signed by the tenant and is of little
evidentiary value.
27. The Applicant has also submitted a copy of a letter dated 13 August 2009 from
the Department for Families and Communities with a ‘Declaration of Property to
be Sub- standard’. The lette r included a list of sub-standard defects and a list of
maintenance defects.
28. The list of defects included external damage:
Brickwork and joints require repair;
Wall surfaces require repair, and
Walls were fractured and cracking.
A structural engineer’s ce rtificate is required after repairs have been
completed.
29. The list of defects also detailed substantial internal damage that required to be
repaired.
30. The Applicant states that the tenant offered to repair her property in return for a
reduction in rent. However, the agreement was oral and no firm guidelines were
put in place as to what and how, repairs were to be carried out.
31. The Applicant contends that the tenant is responsible for much of the damage
due to his malicious intent when he was altering and repairing the property. She
believes that the tenant’s attempt at re pairs was his disguised attempt to cause
further malicious damage to her property.
32. The FSP engaged an engineer to inspect and report on the damage to the
insured property. The engineer is of the opinion that the movement and
cracking damage throughout the building is consistent with a reduction in
moisture content of reactive clay foundation soil and a resultant soil settlement.
33. However, the engineer also noted that some repair work had been commenced
but was then left unfinished. He gave an example where full cornice lengths
had been removed but there had not been any reinstatement of the removed
cornices.
Case No: 215016 Determination Page 8 of 9
34. Further, the engineer could not explain why hard plaster finish to the kitchen
chimney had been removed although the masonry substrate did not appear to
be extensively cracked. He offered the explanation that the plaster finish may
have been in a state of fretting damage which required its total removal in order
to facilitate a uniform repair finish.
35. The engineer also stated that it was not possible to be definitive about what
was malicious damage to the building. He considered that the ‘breakout’
locations and preparation are consistent with a rationalised approach to the
commencement of crack repair.
36. The onus is on the Applicant to establish that, on the balance of probabilities,
the damage to her building was caused by malicious acts of the tenant.
Although the engineer considers that it is not possible to be definitive as what
was malicious damage, on the evidence submitted, I am of the opinion that the
tenant has commenced various haphazard repairs to the building which, for
whatever reason, he failed to complete.
37. In Jeffrey v Associated National Insurance Co Ltd [1982] 1 Qd R238, the court
defined ‘malicious’ as being ‘...the intentional doing of a wrongful act without
just excuse.” Unfortunately, there was no written agreement between the
Applicant and the tenant as to what repairs were to be carried out on the
building. Therefore, there is no evidence that any of the work undertaken by the
tenant was ‘wrongful’.
38. The repair work may have been haphazard and unprofessional but that does
not make it a malicious act.
39. Accordingly, I find that the Applicant has failed to establish that the damage to
the insured building was caused by the malicious acts of the tenant. Further, on
the balance of probabilities, the damage was the result of earth settlement and
movement which are excluded from the cover provided by the policy.
Loss of Rent Claim
40. The Applicant has submitted a claim for loss of rent due to the delay in the
processing of her claim.
41. The FSP has rejected the claim on the grounds that it considers it did not
exceed any timeframes with respect to the management of the claim. Further, it
states that it had previously settled a loss of rent claim for the Applicant and it is
not prepared to offer a further settlement.
42. The Applicant submitted her claim on or about 5 August 2009 for malicious
damage to her rental property. The FSP appointed an external loss assessor to
investigate the claim and its report dated 17 September 2009, recommended
payment of malicious damage to the property and loss of rent on receipt of
proof of loss.
Case No: 215016 Determination Page 9 of 9
43. The loss assessor also noted that there was significant damage to the building
caused by building movement which he considered not to be consistent with
malicious acts.
44. However, the Applicant maintained her claim that the cracking to the building
was caused by the malicious acts of the tenant. In response, in early April
2010, the FSP appointed an engineer to inspect and report on the building
movement and cracking to the building.
45. Following receipt of the engineer’s report, the loss adjuster wrote to the FSP on
the 12 May 2010 with his final report. On the 14 June 2010, the FSP wrote to
the Applicant informing her that her claim had been rejected but inviting her to
refer her claim to its Internal Dispute Resolution (IDR) process if she was not
satisfied with the rejection of her claim.
46. On 10 August 2010, the Applicant wrote to the IDR officer requesting a review
of her claim. An IDR letter dated 22 September 2010 rejecting the claim was
posted to the Applicant.
47. In view of the nature of the entire claim I find that the FSP did not unduly delay
the handling of the Applicant ’s claim.
Determination
48. Accordingly, I determine that the FSP is entitled to:
1. deny indemnity to the Applicant for the damage to her rental building, and
2. is not liable for any additional loss of rent payment.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.