Home / Financial Firm (Unknown - Insurer) / Determination 214991

Determination 214991

Storm and flood damage claim partly declined

FirmFinancial Firm (Unknown - Insurer)
Decided2011-02-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,854
Non-financial loss—
Amount claimed$5,500
SourceAFCA PDF

Summary

The applicant claimed about $5,500 for storm and flood damage to his driveway, causeway and gate, and the FSP declined it under the flood exclusion. AFCA found the causeway damage was not flood damage and ordered payment for it and the gate, with interest, but upheld the exclusion for the unpaved earth and gravel driveway.

Flood under the policy requires water to overflow normally dry land from a watercourse, and unpaved earth or gravel driveways are not buildings and so are not covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

214991 Determination 1 of 9 DETERMINATION Case number: 214991 Home Building – flood – exclusions – notification of policy terms – Sections 35 and 77 Insurance Contracts Act 1984 SUMMARY OF FACTS 1. The applicant holds a home insurance policy with the Financial Services Provider (FSP). The policy covers the building for up to $450,000 and contents for up to $80,000. The policy is subject to an $800 excess. 2. On 5 June 2010 the applicant notified the FSP of damage to his driveway, including a causeway and electric gate caused by a storm cell that passed through the property on 2 June 2010. 3. The FSP engaged experts to assess the claim and determined the damage was caused by flood water overflowing from Beatties creek. 4. The FSP declined the claim as the damage resulting from flood water inundation which is an event excluded from cover under the policy. 5. The applicant disputes the FSP declinature of the claim on the basis he was not advised of the terms and conditions of the policy, and the damage occurred due to torrential rain and not flood water inundation. ISSUE IN DISPUTE 6. Whether the FSP has appropriately declined the claim. RELEVANT POLICY PROVISIONS ““means” the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. [Note: this policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents] ... What are not buildings The following items are not buildings ... e. unpaved paths or unpaved driveways constructed of earth or gravel; ... We will pay for loss or damage caused by the impact of any of the following objects: ... e. falling trees or parts of falling trees. We will not pay if the loss or damage is caused by the lopping or felling of trees at your risk address and you have given express or implied consent for the loping or felling; ... We will pay for loss or damage caused by storm, rainwater or run-off. “ storm ” means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. “ rainwater ” means rain falling naturally from the sky onto the buildings and/or ground 214991 Determination 2 of 9 “ run-off ” me ans rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a. Caused by:  Flood, or  Flood water combined with run-off and/or rainwater; “ flood ” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified, or of any reservoir, canal or dam. ... d. to gates, fences and retaining walls. ” RELEVANT LAW Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Section 77 of the Act provides that a notice or other document that is by the Act required or permitted to be given, may be given to a body corporate in any way in which documents may be served on that body corporate, and to a natural person, personally or by post to that person at his last known address. REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 8. I note there is substantial material provided by each party, and accordingly I will summarise these points and the material I believe is relevant to the matter. The Applicant’ s Submission 9. The applicant contacted the FSP to discuss motor vehicle insurance and was informed the FSP provided bundle insurance which would include his home and contents. During the inception of the policy for three motor vehicles and building and contents, the applicant asked whether there was „any catches to the policy‟ to which he received the response of „no‟. The applicant was also asked whether he lived in a flood zone and responded “no we actually live on a hill on a 23 acre property” . No further explanation regarding the issue of flood was provided to the applicant even though he informed the FSP that it was a rural property. 10. A large storm occurred in the locale of the insured building on 2 and 3 June 2010 affecting the property. The applicant notes the area was declared a „disaster zone‟ on 4 June 2010. 11. The applicant notes that his gate was damaged by a falling tree, a concrete causeway crossing the creek was damaged, and his driveway was damaged as a result of a storm. 214991 Determination 3 of 9 12. The applicant seeks the sum of approximately $5,500 for repairs to these items. 13. The applicant contends that he was misled in relation to the policy of insurance when incepting it over the telephone. The applicant believes he was not properly informed at the time of purchase , or provided with a „ Product Disclosure State ment‟ at the time the policy commenced. 14. The applicant submits his property was damaged by a storm. 15. The applicant contends that if the FSP is not paying for his claim then he should be entitled to seek a refund of his premium, and he will terminate the insurance policy with the FSP. 16. The applicant has enclosed a copy of his policy amendment schedule. I note that the schedule does not refer to flood damage. However the „Additional conditions and Endorsements Applyin g to the Policy‟ indicates that : “Subject to the terms, conditions and exclusions of your policy, except as they may be specifically varied by this endorsement, where your policy includes cover for buildings the policy has been extended to include cover for loss or damage to gates, fences or free-standing walls caused by storm, rainwater or run- off.” 17. The applicant has enclosed copy of correspondence between the parties. The FSP ’s Submission 18. The FSP has examined the evidence and audit trail for the production of the policy documents and Product Disclosure Statement (PDS). The FSP submits that the evidence indicates that the policy documents and PDS were forwarded to the applicant‟s last known address by postal mail in accordance with Section 77 of the Insurance Contracts Act (1984) . 19. The FSP is aware of the applicant‟s contention that his property was damaged by storm and not flood. The FSP relies on its expert assessor and hydrologist who are of the opinion that the damage to the property was caused by flood. 20. The FSP submits that as the damage to the driveway and causeway were caused by flood that it is entitled to deny the claim in accordance with its policy terms and conditions. 21. The FSP has enclosed an incident report form for the claim from which I note the following statement regarding the damage – “Went to cousins before storm and has only just gone back home. Water damage to access road to property washed away in portions. Few trees fell one hit the electric gate. Only able to access home by 4x4.” 22. The FSP has enclosed a copy of its assessor report dated 18 June 2010 from which I note the following – (a) Gale force winds brought down a large tree at the insured‟s property which impacted with an electric gate, damaging the controller and gate frame. Additionally, 280mm of rain fell in a four hour period causing the small creek running through the property to overflow and damage a concrete causeway. Further, the rainwater run-off from the torrential downpour washed away a large quantity of soil and road base from the unpaved driveway. (b) The property is situated on the side of a steep hill and the driveway extends for the distance of 1.2 kilometres from the gate to the house. The 214991 Determination 4 of 9 upper 600 metres of the driveway is constructed of two concrete paths with soil and road base between the two paths. The remainder of the driveway is compacted earth and granite gravel and according to the applicant was improved and serviced 4 months ago. (c) The rainwater runoff has washed away the soil and the road base, depositing it at the base of the driveway. In the assessor‟s opinion the driveway was unpaved. (d) The concrete causeway spanning the creek has large rocks placed on either side of it to protect it from undermining in times of high flow. The force of the water during the event caused the large boulders on the upstream side of the bridge to wash over the causeway and washed away a number of large boulders. Further, a number of smaller rocks were jammed under the causeway blocking the pipe under the bridge. (e) An older unused causeway adjacent to the new causeway was washed downstream and the applicant sought the costs of its removal from the creek bed. 23. The FSP has enclosed a copy of its assessor ‟s report dated 24 June 2010 from which I note the following – The assessor notes the cost of gate repairs was $954 and the insured has an $800 excess. The assessor therefore recommends settlement to the applicant in the sum of $154. 24. The FSP has enclosed a copy of its assessor ‟s report dated 13 July 2010 which essentially summarised and enclosed the hydrologist report. 25. The FSP has enclosed a copy of the hydrologist report dated 12 July 2010 from which I note the following – (a) The gravel road base was eroded to various degrees along the entire length of the driveway (approximately 420m). The foundations of a concrete causeway crossing Beatties Creek were eroded and an old concrete causeway located next to it was washed downstream by approximately 100m. (b) The total rainfall depths of 150 and 189mm were recorded in the applicant‟s locale, the majority of which fell over a 4.5 -6 hour period. (c) The driveway traverses relatively steep topography on the southern side of Beatties Creek and captures stormwater runoff from surrounding hillsides. There was evidence of significant erosion along the driveway and it is likely that a lot of gravel/road base was washed into Beatties Creek during the event. (d) The hydrologist has included photographs with indicative water levels around the creek. The water levels indicated would mean the water levels rose several metres beyond the creek. (e) The hydrologist opined that the floodwater overflowed from Beatties Creek during the event and the water level may have reached a depth of up to two metres above the top of the causeway. (f) The causeway was damaged by water flowing down Beatties Creek. 214991 Determination 5 of 9 (g) The driveway was damaged by local stormwater runoff draining off the surrounding hillsides. Parts of the driveway in the vicinity of the causeway would have also been damaged by flood water overflowing from Beatties Creek. (h) The driveway was damaged by local stormwater runoff draining off the surrounding hillsides although parts of the driveway in the vicinity of the causeway would have also been damaged by floodwater overflowing from Beatties Creek. 26. The FSP has enclosed a copy of its assessor ‟s report dated 22 July 2010. 27. The FSP has enclosed a copy of the policy schedule and PDS 28. The FSP has enclosed a copy of internal claim file notes from which I note the following –  On 6 June 2010 the applicant advised the FSP that his driveway was gravel and concrete which he was advised would be excluded.  On 15 June 2010 the applicant called in relation to the driveway/access road and was advised that if it was considered to be a gravel road then it will not be covered. The applicant disagreed because he was not explicitly advised the gravel would not be a building when taking the policy out.  On 15 June 2010 the applicant has forwarded an email to the FSP confirming he removed and disposed of the fallen tree himself. The road repairs to the property are required due to it being unstable, boggy and in danger of collapse.  On 1 July 2010 the FSP advised the applicant it would pay for damage caused by the fallen tree but its policy excluded damage to unpaved paths/driveways. 29. The FSP has enclosed photographs of the damaged driveway. I note that the driveway appears to have a number of different portions to it. I note the following from the photographs –  There is a portion which appears to be constituted of concrete/gravel type mixture. There are two „tracks‟ of concrete which are approximately the width of a vehicle‟s tyres with gravel type material and vegetation in between the tracks.  There are currently patches of dirt and patches of what appears to be a gravel type material on sections of driveway.  There are currently patches of road base and mud on sections of the driveway.  There is a concrete bridge or passage which spans a creek which runs through or close to the applicant‟s property. The appli cant has noted on this photograph (forwarded to the FSP) that the support walls for the concrete passage are collapsing.  There is a portion of mud and gravel where it appears to meet two concrete „tyre tracks‟. 30. The FSP has enclosed copies of documents as evidence that the applicant received the policy documents and PDS in the postal mail. The document includes the payment method for the applicant‟s policy, printing date at the mailing house, and status check for the mail out of the applicant‟s policy, stoc k usage, printing and mailing reports and output files and lodgement reports. 214991 Determination 6 of 9 31. The FSP has enclosed copy of a quotation for road repair at the applicant‟s property in the sum of $4,325 inclusive of GST. 32. The FSP has enclosed copies of correspondence. Consideration of each party’s submission 33. In making this Determination, I consider it relevant to review the evidence in relation to whether the terms and conditions of the PDS were communicated to the applicant, whether a flood occurred at the property, and whether the resulting damage is excluded under the policy. 34. I propose to deal with each matter separately in turn. Whether the terms and conditions of the PDS were communicated to the applicant 35. The applicant has stated that the FSP misled him and failed to provide the PDS terms to him at policy inception. 36. In contrast the FSP denies that the terms and conditions were not communicated to the applicant, and has provided evidence that the policy docu ments and PDS were posted to the applicant‟s last known address. 37. I have considered the evidence provided by the applicant in relation to the allegation that the FSP misled him. 38. The first basis of the allegation appears to be that he asked if there was „an y catch?‟ to which he received a response of „no‟. I do not consider this as misleading as there is no specific question or explanation of what is being asked by the applicant. The reasonable person would also be aware that any insurance provided is subject to terms and conditions. 39. The second basis alleged is that the FSP did not provide an explanation of why it asked him at policy inception whether he lived in a flood zone. The FSP has not specifically responded to this issue. However in my opinion, it is highly probable that the FSP asked the question to determine the risks in covering the applicant‟s property. I also note that the applicant responded he did not live in a flood zone and he did not ask any questions of the FSP in relation to flood cover. Accordingly, as the FSP was not asked for information on the extent of any flood cover, it has not made any representations regarding this issue which could be considered misleading. Further, there is no evidence that the applicant indicated he sought a policy with flood cover and the FSP failed to notify him of the exclusion. 40. A more serious allegation by the applicant has been made that the PDS terms were not provided to him at inception and/or received in the postal mail. 41. I note that the FSP is not required to list each and every item in the PDS during policy inception. As the PDS is a substantial document, it would be unduly onerous and ineffective for the FSP to cite all the terms and conditions during a telephone initiated policy inception by way of notification of the PDS terms. However, the FSP is required to give notice to the applicant of its terms and conditions in writing under Sections 35 and 77 of the Insurance Contracts Act 1984 (“the Act”), particularly if it seeks to rely on an exclusion of cov er. 214991 Determination 7 of 9 42. The material before me regarding the posting of the policy documents together with the PDS is substantial. I have reviewed these documents to determine whether the relevant documents were printed, mailed or returned (which should be indicated by an error report). I can find no evidence to suggest the policy and PDS documents were not correctly printed and mailed to the applicant. 43. I accept on the balance of probabilities that the policy documents and PDS were mailed to the applicant‟s last known postal address. 44. Under the Act, the applicant is deemed to have been provided with written notice of the policy terms and conditions. 45. I accept that the FSP appropriately communicated the terms and conditions of the policy (the policy document and PDS) to the applicant. Whether a flood occurred at the property 46. The applicant has stated the damage occurred as a result of a large amount of rainfall in the locale of his property. 47. The FSP relies on its expert who was of the opinion that flood had occurred at the property causing damage. 48. The expert evidence before me from the hydrologist confirms that a high amount of rainfall occurred predominantly within a 4.5-6 hour period. 49. The hydrologist was persuaded that the floodwater overflowed from Beatties Creek during the event and the water level may have reached a depth of up to two metres above the top of the causeway. 50. I note the policy defines „flood‟ to mean the inundation of normally dry land by water that has escaped or has been released from the normal confines of a natural watercourse. 51. Pursuant to the policy, the stormwater has created a higher water volume within Beatties Creek resulting in the floodwater travelling down the creek to the extent that it reached a depth of approximately two metres above the causeway. 52. However in order to establish that a flood as defined by the policy has occurred, the FSP has to demonstrate that water overflowed the banks of the creek. In this case, the hydrologist clearly states “the causeway was damaged by water flowing down Beatties Creek ” 53. In my opinion, this does not constitute “flood” as defined by the policy, and the damage to the causeway which crosses the creek is covered. 54. However, reference is made to a second causeway which I do not fully understand. If damage is done to any p art of the applicant‟s property as a result of water which overflowed the banks of the creek, then it is excluded by the flood definition. 55. At page 3 of the assessor‟s report, described as “report number 1” an assessment is made at the cost of rectifying the damage to the causeway which crosses the creek at $1,700 including GST. I am not told as to whether this estimate of damage is still accurate. As stated above, there is reference also to a second causeway. In any event, if this refers to the causeway which 214991 Determination 8 of 9 crosses the creek, I determine that the FSP is to meet the cost of repairing the damage to this causeway. Damage to the driveway caused by storm water run -off 56. I have considered the issue of whether the stormwater run-off which caused damage to sections of the driveway above the floodwaters is covered by the policy. 57. The policy pays for loss or damage to a building caused by storm, rainwater or run-off. 58. Accordingly, in order to be covered the driveway would ha ve to be constructed in a method which constitutes a „building‟. 59. The policy defines buildings as excluding unpaved driveways constructed of earth or gravel. 60. The applicant has not specifically described his driveway to the Service in his submissions, and accordingly I am required to rely upon the description provided in the expert assessor reports together with telephone notes between the parties in which the applicant describes the driveway to the FSP. 61. The expert assessor has described the driveway as being in sections. The upper 600 metres of the driveway is constructed of two concrete paths with soil and road base between the two paths. The remainder of the driveway is compacted earth and granite gravel. The expert assessor also opined that the driveway was unpaved. 62. The telephone file notes record the applicant advising that his driveway was gravel and concrete and alternatively as gravel. 63. I consider that the policy would not cover any section of driveway which was unpaved and constructed of earth and grave l. This is because this portion of the property does not constitute a building for the purpose of the policy and accordingly cover does not extend to same. 64. It does not appear that the concreted paths on the driveway have sustained damage from the water run-off. However, if the concreted paths on the driveway had sustained water run-off damage, then this portion of the driveway would be covered. Damage to the Gate 65. I note that the FSP has accepted payment of the electric gate due to the damage being caused by a falling tree. I consider that this item has been correctly accepted as impact damage from trees is covered in these circumstances. 66. I have considered the FSP‟s offer of payment for the quote repair amount of $954 less the excess of $800. 67. Under the policy, the FSP is entitled to charge this higher excess and indeed it appears the applicant was aware of the application of a higher excess in return for a lower premium. 214991 Determination 9 of 9 68. It is unclear whether the applicant has received payment of $154 in relation to this item of damage. 69. If the applicant has not received payment then it would be appropriate for the FSP to discharge its payment obligation without further delay. Miscellaneous 70. The applicant has stated that he will seek cancellation of the policy together with a complete refund of the policy premium from the FSP. 71. The FSP has been on risk for the insured events covered under its policy in relation to the applicant‟s vehicles , and building and contents from the date of inception. Accordingly the FSP is entitled to the portion of premium paid which applies to the length of time it has been on risk. 72. The applicant should be aware that he is entitled to a pro rata reimbursement of the premium for the remainder of the unused portion of the policy period as of the date of cancellation. CONCLUSION 73. I determine that the FSP is liable to make payment for the damage done to the causeway which crosses the creek. In the event that reference is made to another causeway, which was damaged by flood water, that is water which escapes from the normal confines of the creek, then the FSP is not liable for that damage. 74. I determine that the FSP is not liable to make payment for any section of driveway constructed of earth and gravel. 75. I determine that the FSP is liable for any damage to the concreted portion of the driveway caused by stormwater run-off. 76. I determine that the FSP is liable for the electric gate and should make payment of $154 (being the quote less the excess) within 14 days from the receipt of this Determination if it has not already done so. 77. I further determine that the FSP is to pay interest at the statutory rate from 19 July 2010 to the date when it settles this determination, on any sum payable pursuant to the determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.