The strata body's storm-damaged roof claim was partly refused by the FSP under exclusions for defects, faulty design and faulty workmanship. AFCA found the storm was the primary cause, that the FSP had not established the exclusion, and ordered payment of $2,500 for the roof repairs with statutory interest from the date of payment.

The insurer bears the onus of establishing an exclusion, and it did not show that defects or faulty workmanship rather than the storm caused the damage.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

214837 Determination 1 of 3 DETERMINATION Case number: 214837 Strata – storm – proximate cause – exclusion SUMMARY OF FACTS 1. The property is insured under a commercial strata policy with the Financial Services Provider (FSP). 2. On 6 March 2010, the property was damaged following a severe storm which caused widespread damage throughout Melbourne and its suburbs. 3. Following a notification of a claim by the applicant, the FSP assessed the claim. The original report of the FSP’s assessor recommended that the damage was plainly caused by the storm and that the claim should be allowed. Subsequently, a builder was engaged not, it appears, with a view to disputing the assessor’s opinion as to the cause of the damage, rather, for advice as to the quantum of the damage sustained. 4. The builder who was engaged for this purpose expressed a contrary view as to the water ingress, leading to the damage. In summary, the builder reached the conclusion that the weight of the four airconditioners on the roof was sufficient to cause a dipping of the roof level to the point that, in periods of very heavy rain, water would not reach the down pipes before the water formed a pool around the airconditioning units, and water could therefore enter. 5. Thereafter, the FSP refused indemnity for a portion of the roof repairs on the basis that the loss was the result of a defect, design failure or faulty workmanship, which are exclusions under the policy. 6. The applicant disputed the decision. The applicant noted that the two most recent airconditioning units had only been installed in February 2010, following a previous claim made to the FSP. 7. The FSP disputed that it had any liability for sequellae to the installation of the two airconditioning units, because, it claimed, the contractor who installed these units had been appointed for the task by the applicant or its broker. 8. The FSP’s Internal Disputes Resolution department reviewed the claim at the request of the applicant and maintained the decision to refuse indemnity. 9. This matter has been the subject of a Recommendation by this Service. The conclusion of the Case Manager who made the Recommendation was as follows: “Accordingly, it is my recommendation the FSP is to make a 50% contribution towards the cost of the roof repairs. It may request from the applicant, a receipt for the works recently conducted to clarify its liability. I acknowledge neither party will be entirely satisfied with my recommendation; however, it is made in light of various differences in opinion between experts while having regard for the fact the roof damage could be the result of the storm, an installation fault or a maintenance related issue.” 10. Whilst the applicant accepted the Recommendation, the FSP rejected it. 214837 Determination 2 of 3 11. Because, in the Recommendation, the relevant policy provisions and summaries of the submissions for both parties are fully set out, and the Case Manager who presented the Recommendation has set out at length his consideration of the various submissions, and because I adopt all of the material contained in these aspects of the Recommendation, I direct that a copy of the Recommendation shall be attached to this Determination. However, in the outcome, I disagree in part with the Recommendation as set out below. Overview of the FSP’s Submis sion 12. Following the Recommendation referred to above, the FSP made a further representation to this Service. In summary, the points advanced by the FSP were as follows: • That the repairer who eventually replaced the two contentious airconditioners was not sourced by the FSP or its agent; • As the previous repairs which were undertaken were not linked to the roof leaks, nor did any issues arise from the installation, there is no basis for the FSP to contribute any amount towards the costs incurred by the applicant. • That the plumber’s report which identified a dip in the roof structure of approximately 30mm at the mid-point between the two replaced airconditioning units and a similar dip in the roof between the two previously existing units indicates that these dips pre-date the replacement of the rear airconditioning units. This, it is said, bears out the building consultant ’ s finding that the weight of the airconditioners has dropped the roof level by 30mm – 40mm, thereby affecting the overall slope of the roof to the extent that the water could not dissipate off quickly enough in heavy rain. 13. I have read the voluminous material contained on this file including all of the materials supplied by the FSP in relation to the earlier claim which had led to the replacement of the two airconditioning units. Ironically, the claim which resulted in the replacement of the two units had barely been resolved when the severe storm referred to occurred on 6 March 2010. After consideration of all of the reports supplied by the FSP’s adjustor (MF), I am of the view that the FSP has been in error in its consideration of this matter. 14. It will be noted that the immediate conclusion of “MF”, upon its first inspection of the property, was that the damage was storm related. At this time , there were, literally, thousands of similar matters being considered by building owners and FSPs throughout Melbourne and its surrounding suburbs following one of the most severe storms in Victorian history. Huge volumes of hail and rain water led to damage to many roofs which had provided total protection against rainfall for many decades. 15. I note the opinion supplied by the FSP’s building consultant attributing the cause of the damage to the dipping in the roof, created by the four airconditioning units. But the report from the building consultant makes it plain that the dipping had long preceded the installation of the last two airconditioning units. If the dipping in the roof has been responsible for the damage sustained after 6 March 2010, then it seems remarkable that the dipping has not lead to earlier damage, noting that the building has been in its present state for some 25 years and is considered to be well maintained. 16. Thus, it cannot be accurately suggested in my view that the addition of the last two airconditioning units has lead to this damage. Those two units only 214837 Determination 3 of 3 replaced earlier units and there is no evidence to suggest that they were heavier than those which they replaced. These are points which do not appear to have been considered by the building consultant. 17. The FSP has very reasonably acknowledged a share of responsibility for the loss, but has concluded that some apportionment should be made between the damage caused by the failure of the roof flashing work (because of the problems allegedly caused by the airconditioning units) on the one hand, and losses caused by the inability of the water to escape quickly enough through the existing down pipes. 18. In my view the applicant has succeeded in establishing that the primary cause of the damage sustained on 6 March 2010 was the storm which dumped a great deal of hail and water onto the subject roof. This being the case, it is incumbent for the FSP to establish that it is entitled to the exclusion, and I consider that it has not done so. In order to do this, it has to establish that the damage was due to structural defects, faulty design and faulty workmanship or errors or omission in design, plan or specification or failure of design, or faulty materials or faulty workmanship. 19. I have read with interest the arguments advanced by the FSP as to why it has no responsibility for any damage which has followed the installation of the latter airconditioning units and why, in particular, it should have no liability in respect to that matter because it did not formally appoint the contractor who carried out the work. I do find this a very difficult argument for the FSP to maintain. The reason for the course which was followed, notably the nomination of a contractor by the broker, upon the basis that the FSP then approved that contractor was the course which the FSP decided to adopt “because we are interstate.” Whilst I accept that the FSP has not sought to “wash its hands of the matter”, had I been satisfied that the damage had been caused by the contractor who had installed the airconditioning units, I would, nevertheless, have concluded that the FSP was liable. However, as it turned out, I do not think that anything depends on that point. DETERMINATION 20. I determine that the FSP is liable to reimburse the applicant for the cost of roof repairs in the sum of $2,500. The applicant has established that a quotation was received for this sum, and the applicant was obliged to pay this sum in order that the necessary work could be carried out so that the premises could be used for the chosen purpose. 21. I determine that the applicant shall supply to the FSP the receipt for the account for this sum, and the FSP should pay to the applicant interest at the statutory rate from the date of payment of that sum, until payment by the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.