Flood damage to contents claim denied under 120-day away-from-home limit
Summary
Contents damaged by water at a temporary residence were claimed, and the FSP refused the claim as flood damage and because the goods had been away from home over 120 days. AFCA found the FSP entitled to deny liability.
Contents away from home are covered for only 120 consecutive days, and the applicants' own admissions in the call indicated the goods had been there longer than that.
Issues
- Claim denial primary · not upheld“the Panel determines that the FSP was entitled to deny liability in response to the claim.”
- Product terms interpretation secondary · not upheld“the goods, the subject of the claim had been stored at the property for more than 120 days.”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
213252 Determination 1 of 7
DETERMINATION
Case number: 213252
Home Contents – flood – temporary removal of goods
– onus of proof
SUMMARY OF FACTS
1. On 2 March 2010 the applicants’ home was inundated with water following
intense rainfall in the area.
2. The Financial Services Provider (FSP) denied liability for a claim under their
home insurance policy on the grounds that the damage was caused by flood
and that the home in which the contents were located was not the applicants ’
principal address and the contents had been stored at that location for more
than the 120 days allowed by their policy.
3. The applicants claim the damage was caused by rainwater and not flood. They
further state the contents for which they are claiming were moved into the home
on 16 January 2010 being less than 120 days before the damage occurred and
that the FSP was advised on 27 January 2010.
ISSUES IN DISPUTE
4. Whether the policy includes cover for contents in the Roma home, and
5. Whether the damage to the goods was caused by flood or rainwater.
RELEVANT POLICY PROVISIONS
“We will cover
… Your contents away from your home, anywhere in Australia and New Zealand, for up to
120 consecutive days if the damage or loss occurs as a result of an event we agree to cover.
We won’t cover
Your contents if they have been removed permanently from your home by you, unless we
have agreed to cover them.
We will cover
Loss or damage as a result of storm (including named cyclone), rainwater or wind.
We won’t cover
…
flood …
Glossary
…
Flood : The covering of normally dry land by water escaping or released from the normal
confines of a watercourse or lake, whether or not it is altered or modified. Flood also
includes water escaping from the confines of a reservoir, channel, canal or dam. The policy
does not automatically cover floo d. You can apply for flood cover separately’
213252 Determination 2 of 7
REASONS FOR DECISION
6. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
The Applicants Submission
7. They did not receive the policy document until late March/April 2010.
8. The hydrologist report on which the FSP relies has been brought into question
by a study commissioned by the regional council. The study found the event
was caused by stormwater runoff initially and that overflowing from Bungil
Creek was a separate event following the stormwater inundation.
9. The contents for which they are claiming were moved into the home on 16
January 2010. The FSP was advised on 27 January 2010 that some of their
contents were situated at the Roma address. This was 45 days before the
damage occurred. They again informed the FSP on 25 February 2010 that
some of their contents were relocated in Roma being 25 days before the event.
Their claim is only for the items moved into the home on those days.
The FSP’s Submission
10. It relies on reports provided by a hydrologist which confirm the damage to the
applicants’ contents was caused by flood.
11. During a telephone call on 5 February 2010 the applicants were informed there
was no cover for damage caused by flood.
12. Its records confirm a policy document was issued to the applicants at their
permanent address.
Panel processes
13. On Wednesday 8 December last, representatives of the Panel and the FSP’s
hydrologists attended the applicants’ property. The male applicant had
indicated that he would not be able to attend. The Panel representatives
observed that the applicants ’ property was very close to the westerly overflow
path from which water inundated properties in Roma after escaping from the
Bungil creek.
14. The Panel Chair also had a telephone attendance on the applicant on the day
following the inspection whereupon the applicant again stated that the goods,
the subject of the claim were in fact moved from the applicants ’ other residence
to the subject property in the Christmas period 2009 as a result of the
applicant ’s partner being required to work in Roma for a longer period than was
expected. During the course of the telephone conversation, the applicants
maintained the position that the goods had been in the property for less than
the 120 day period for which cover under the policy was provided.
15. In terms of the information provided by the FSP referred to below, the
applicants simply stated that the goods had been in the property for less than
the 120 day period.
213252 Determination 3 of 7
Consideration of each party’s submission
16. The FSP seeks to rely on exclusions in the policy to deny the claim and
therefore has the burden of establishing on the balance of probabilities that the
terms of the relevant clause applies to defeat the claim.
Policy issue
17. The FSP’s Treasury Managed Fund manager by statutory declaration deposed
that according to the FSP’s procedures an offer to insure document was issued
and posted to the applicants’ Buderim address on 12 June 2009.
18. The Panel has examined the material referred to in the Treasury Managed
Fund manager’s declaration and is satisfied the applicants’ policy was included
in a print run and batches for despatch on 12 June 2009. A copy of the letter
produced in this process informed the applicants of the change of insurer and
indicated that the Product Disclosure Statement (PDS) should be reviewed to
ens ure that the new product’s features and benefits suit their needs as they
may differ from their previous insurance policy.
19. The Panel concludes that documentation was issued to the applicants on expiry
of their policy on 13 July 2009 which included a PDS.
20. The policy document states that flood is not covered.
21. The Panel is therefore satisfied that the FSP complied with the obligations to
clearly inform the applicants that damage caused by flood as defined is not
covered by the policy issued to them.
Temporary removal cover
22. The applicants state that their claim is for damage to contents which were
moved into the home on 16 January 2010. They explained that in 2009 they
temporarily resided in Roma and as they returned to their permanent residence
most weekends they existed with only minimal possessions in Roma. On 16
January 2010 they moved additional contents into the Roma property and it is
those items for which they are claiming. They state that they informed the FSP
of this on 27 January 2010 and again on 5 February 2010.
23. The Panel has been provided with a transcript of the telephone call made by
the male applicant to the FSP on 5 February 2010. The communication
contains the following relevant information;
- The male applicant advised he and his wife had moved temporarily to
Roma and that some things had been taken with them
- The FSP advised that contents away from the home were covered up to
120 days only and if the period extended beyond the120 days a new
policy would need to be taken out.
- The male applicant advised they had been in Roma longer than the 120
days, and they had been remiss in not contacting the FSP.
- The FSP again advised the male applicant that his wife would need to
take out cover for her location, otherwise there would be no cover in the
event something arose.
- In response to an enquiry by the male applicant, the FSP advised that the
policy did not provide cover for flood damage and that the policy held with
the previous insurer also did not provide flood cover.
213252 Determination 4 of 7
24. There is no mention during that communication that some contents were
moved into the Roma premises in January 2010 or at any time other than when
they were temporarily posted to Roma in 2009. On the other hand the evidence
is that the male applicant acknowledged their contents had been in the Roma
home more than 120 days and they had overlooked informing the FSP.
25. Significantly this communication took place about 20 days after the applicants ’
claim they moved additional items into the home.
The claim
26. The FSP commissioned an hydrologist to report on the origin of the water which
inundated the applicants’ premises on 2 March 2010. The hydrologist’s report
dated 30 April 2010 included the following:
- The applicants advised that at about 0700 on 2 March 2010 there was a
large quantity of water on the other (northern) side of the road.
- Water first came into the house around 0800-0845 and rose quickly
- Water peaked around lunchtime about 1 metre above floor level.
- The inundation of the applicants ’ property was caused by water
overflowing from Bungil Creek to the north of the property along the
overflow paths.
- The timing of the inundation of the property above floor level was
consistent with the timing of flood levels in Bungil Creek.
- Local runoff would not have caused damage at the subject property as
there is no significant local catchment.
- The peak rainfall intensity in Roma occurred at about 0500 hours on 2
March. Any local stormwater associated with the heaviest rainfall burst
would have drained from the property within 10 to 20 minutes after the
intense rainfall occurred.
- Bungil Creek peaked within 5-12 hours after the intense rainfall burst that
caused the flood event.
The report concluded:
“Based on our site inspection and an assessment of available data for the
subject site, it is concluded that the inundation of the subject property was
caused by water overflowing from Bungil Creek. ”
27. The regional council commissioned an hydrologist to provide an inception study
on the Roma flood event. The report dated 18 June 2010, which also included
an overview of the report commissioned by various insurance companies,
provided the following information:
- The hydrologist report commissioned by various insurance companies
was very limited in its scope and investigation to appropriately define the
cause, severity and behaviour of the March 2010 flood event.
- It was not possible to accurately determinate cause and mechanisms of
flood without further and more detailed hydrological and hydraulic
modelling.
- The cause, severity and mechanism of the flood event could not be
explained in terms of catchment and regional flooding behaviour and
subsequently the damage to properties in Roma cannot be simply
classified as the result of mainstream flooding.
213252 Determination 5 of 7
The report went on to state:
“However it is very highly likely that backwater from moderate creek flooding in
combination with overflow of the local system has resulted in such widespread
flood damage.’
28. A report on the causes, severity and behaviour of the Roma flood event on 2
March 2010 was commissioned by various insurance companies. The report
dated 26 March 2010 considered issues raised by property owners who
claimed their properties were inundated by local stormwater runoff and
secondly by flood water from Bungil Creek. The following are relevant matters
contained in the report:
- Council flood maps indicate that Bungil Creek broke its banks north of the
town and flowed along various defined drainage paths sometime before
0800 hours.
- By 0800 hours Bungil Creek floodwater and local stormwater had joined to
the east of the Carnarvon Highway. Very few properties were inundated
by flood water before 0800 hours. Inundation of a significant number of
properties by flood water commenced before 1030 hours.
The report concluded:
“ In conclusion the claims made disputing the findings of our earlier reports are
not supported by available data and information. All the available data and
information including recorded rainfall and water level data, local resident
observations, flood mapping and detailed modelling of stormwater runoff,
supported by [hydrologist] findings that inundation of properties in Roma during
the March 2010 food event was predominantly caused by flood waters
overflowing from Bungil Creek. Very few properties in Roma would have been
inundated by stormwater runoff. Even fewer properties, if any would have been
inundated above floor level by stormwater runoff because most properties have
floo r levels elevated above surrounding ground level.”
29. The Panel has viewed the report commissioned by the regional council. The
report is critical of the report issued by the hydrologist for various insurers,
stating that the report was very limited in scope and investigation and in
particular that no analysis of the actual discharge or severity of the flood or its
relationship to catchment flooding behaviour and the flooding at Roma was
included. Having made this criticism, the Panel notes the council consultant
considered the floodwater was “ very highly likely ´ that a combination of
moderate creek flooding and overflow of the local system resulted in the
widespread damage.
30. The council consultant, while of the opinion it was not possible to accurately
determine the cause and mechanisms of the flood based on the available data,
nevertheless postulated, with considerable emphasis, that a combination of
water from creek flooding and local system overflow was responsible for the
widespread damage.
31. The hydrologist appointed by the FSP responded to the regional council report.
FSP’s consultant’s report is detailed with comprehensive explanations for the
findings and critique of the council report. The ma jor points in the consultant’s
report are:
- They had inspected more than 100 properties throughout Roma and
prepared more than 70 site-specific reports.
213252 Determination 6 of 7
- Additional information now available does not change the original findings
on the primary source of the inundation in Roma.
- The report considered the issue of stormwater verses floodwater
inundation noting due to the extended travel distance from the upper
Bungil Creek catchment to Roma, the peak level at Roma would normally
occur several hours later than the peak rainfall.
The report stated:
“Figure 19 of the (regional council report) clearly shows the difference in timing
between the peak rainfall intensity in Roma which occurred at about 5.00am on 2
March and the peak of the flood in Bungil Creek which occurred at about 1.00pm
the same day, some 8 hours after the peak rainfall. The peak rate of stormwater
runoff in Roma would have occurred during the heaviest rainfall, and would have
reached Bungil Creek within an hour or two. Hence any property that was not
inundated above floor level prior to about 8.00am on 2 March would not have
been inundated by stormwater runoff.”
32. The FSP’s hydrologist has therefore responded to assertions by a number of
residents in Roma that the first inundation of their properties was by runoff
rainwater and to criticisms of her report by the council hydrologist.
Notwithstanding the critique by the council hydrologist , the FSP’s consultant
noted the council report did not identify any errors in her report and went on to
provide comprehensive explanations based on known information and available
data to support her findings. Of further significance, the hydrologist was
commissioned to consider the source of the inundation in the context of water
which overflowed Bungil Creek, runoff rainwater or a combination of both.
These are matters of relevance to insurers.
33. In the course of a report provided of a general nature with regard to inundation
of properties in the Roma area in October 2010, the hydrologist stated as
follows:
“ Bungil Creek broke its banks to the North of the town (and east of the Roma
airport) and flowed south along various defined drainage paths sometime before
0800 and that very few properties in Roma were inundated by flood water before
0800 and that inundation of a significant number of properties by flood water
commenced before 10.30. ”
34. In any event after the inspection occurred, the hydrologists were still of the
opinion that the water that inundated the property which was stated to be 8.45
at the latest, was likely to be flood water.
35. In the Panel’s opinion, the major difficulty faced by the applicant s is in terms of
the admissions attributed to the male applicant during the course of the
telephone conversation extracted above on 5 February 2010. The only
conclusion that the Panel can draw from the contents of this conversation was
that on the balance of probabilities, the goods, the subject of the claim had
been stored at the property for more than 120 days. Whilst the Panel
acknowledges based on the information provided by the male applicant to the
Panel Chair on 9 December 2010 that there may be some confusion in this
regard, the male applicant has not, in the Panel’s opinion satisfactorily
established on the balance of probabilities that the goods, the subject of the
claim had been in the property for less than 120 days.
36. In the Panel’s opinion, the evidence as to whether the water that inundated the
property is equivocal as to whether it was flood water or storm water,
213252 Determination 7 of 7
particularly in view of the timing. In any event, it is not necessary for the Panel
to determine this aspect of the dispute in the light of the above findings.
CONCLUSION
37. On the basis of the above analysis, the Panel determines that the FSP was
entitled to deny liability in response to the claim.