Home / Financial Firm (Unknown - Insurer) / Determination 213252

Determination 213252

Flood damage to contents claim denied under 120-day away-from-home limit

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Contents damaged by water at a temporary residence were claimed, and the FSP refused the claim as flood damage and because the goods had been away from home over 120 days. AFCA found the FSP entitled to deny liability.

Contents away from home are covered for only 120 consecutive days, and the applicants' own admissions in the call indicated the goods had been there longer than that.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

213252 Determination 1 of 7 DETERMINATION Case number: 213252 Home Contents – flood – temporary removal of goods – onus of proof SUMMARY OF FACTS 1. On 2 March 2010 the applicants’ home was inundated with water following intense rainfall in the area. 2. The Financial Services Provider (FSP) denied liability for a claim under their home insurance policy on the grounds that the damage was caused by flood and that the home in which the contents were located was not the applicants ’ principal address and the contents had been stored at that location for more than the 120 days allowed by their policy. 3. The applicants claim the damage was caused by rainwater and not flood. They further state the contents for which they are claiming were moved into the home on 16 January 2010 being less than 120 days before the damage occurred and that the FSP was advised on 27 January 2010. ISSUES IN DISPUTE 4. Whether the policy includes cover for contents in the Roma home, and 5. Whether the damage to the goods was caused by flood or rainwater. RELEVANT POLICY PROVISIONS “We will cover … Your contents away from your home, anywhere in Australia and New Zealand, for up to 120 consecutive days if the damage or loss occurs as a result of an event we agree to cover. We won’t cover Your contents if they have been removed permanently from your home by you, unless we have agreed to cover them. We will cover Loss or damage as a result of storm (including named cyclone), rainwater or wind. We won’t cover … flood … Glossary … Flood : The covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of a reservoir, channel, canal or dam. The policy does not automatically cover floo d. You can apply for flood cover separately’ 213252 Determination 2 of 7 REASONS FOR DECISION 6. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants Submission 7. They did not receive the policy document until late March/April 2010. 8. The hydrologist report on which the FSP relies has been brought into question by a study commissioned by the regional council. The study found the event was caused by stormwater runoff initially and that overflowing from Bungil Creek was a separate event following the stormwater inundation. 9. The contents for which they are claiming were moved into the home on 16 January 2010. The FSP was advised on 27 January 2010 that some of their contents were situated at the Roma address. This was 45 days before the damage occurred. They again informed the FSP on 25 February 2010 that some of their contents were relocated in Roma being 25 days before the event. Their claim is only for the items moved into the home on those days. The FSP’s Submission 10. It relies on reports provided by a hydrologist which confirm the damage to the applicants’ contents was caused by flood. 11. During a telephone call on 5 February 2010 the applicants were informed there was no cover for damage caused by flood. 12. Its records confirm a policy document was issued to the applicants at their permanent address. Panel processes 13. On Wednesday 8 December last, representatives of the Panel and the FSP’s hydrologists attended the applicants’ property. The male applicant had indicated that he would not be able to attend. The Panel representatives observed that the applicants ’ property was very close to the westerly overflow path from which water inundated properties in Roma after escaping from the Bungil creek. 14. The Panel Chair also had a telephone attendance on the applicant on the day following the inspection whereupon the applicant again stated that the goods, the subject of the claim were in fact moved from the applicants ’ other residence to the subject property in the Christmas period 2009 as a result of the applicant ’s partner being required to work in Roma for a longer period than was expected. During the course of the telephone conversation, the applicants maintained the position that the goods had been in the property for less than the 120 day period for which cover under the policy was provided. 15. In terms of the information provided by the FSP referred to below, the applicants simply stated that the goods had been in the property for less than the 120 day period. 213252 Determination 3 of 7 Consideration of each party’s submission 16. The FSP seeks to rely on exclusions in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. Policy issue 17. The FSP’s Treasury Managed Fund manager by statutory declaration deposed that according to the FSP’s procedures an offer to insure document was issued and posted to the applicants’ Buderim address on 12 June 2009. 18. The Panel has examined the material referred to in the Treasury Managed Fund manager’s declaration and is satisfied the applicants’ policy was included in a print run and batches for despatch on 12 June 2009. A copy of the letter produced in this process informed the applicants of the change of insurer and indicated that the Product Disclosure Statement (PDS) should be reviewed to ens ure that the new product’s features and benefits suit their needs as they may differ from their previous insurance policy. 19. The Panel concludes that documentation was issued to the applicants on expiry of their policy on 13 July 2009 which included a PDS. 20. The policy document states that flood is not covered. 21. The Panel is therefore satisfied that the FSP complied with the obligations to clearly inform the applicants that damage caused by flood as defined is not covered by the policy issued to them. Temporary removal cover 22. The applicants state that their claim is for damage to contents which were moved into the home on 16 January 2010. They explained that in 2009 they temporarily resided in Roma and as they returned to their permanent residence most weekends they existed with only minimal possessions in Roma. On 16 January 2010 they moved additional contents into the Roma property and it is those items for which they are claiming. They state that they informed the FSP of this on 27 January 2010 and again on 5 February 2010. 23. The Panel has been provided with a transcript of the telephone call made by the male applicant to the FSP on 5 February 2010. The communication contains the following relevant information; - The male applicant advised he and his wife had moved temporarily to Roma and that some things had been taken with them - The FSP advised that contents away from the home were covered up to 120 days only and if the period extended beyond the120 days a new policy would need to be taken out. - The male applicant advised they had been in Roma longer than the 120 days, and they had been remiss in not contacting the FSP. - The FSP again advised the male applicant that his wife would need to take out cover for her location, otherwise there would be no cover in the event something arose. - In response to an enquiry by the male applicant, the FSP advised that the policy did not provide cover for flood damage and that the policy held with the previous insurer also did not provide flood cover. 213252 Determination 4 of 7 24. There is no mention during that communication that some contents were moved into the Roma premises in January 2010 or at any time other than when they were temporarily posted to Roma in 2009. On the other hand the evidence is that the male applicant acknowledged their contents had been in the Roma home more than 120 days and they had overlooked informing the FSP. 25. Significantly this communication took place about 20 days after the applicants ’ claim they moved additional items into the home. The claim 26. The FSP commissioned an hydrologist to report on the origin of the water which inundated the applicants’ premises on 2 March 2010. The hydrologist’s report dated 30 April 2010 included the following: - The applicants advised that at about 0700 on 2 March 2010 there was a large quantity of water on the other (northern) side of the road. - Water first came into the house around 0800-0845 and rose quickly - Water peaked around lunchtime about 1 metre above floor level. - The inundation of the applicants ’ property was caused by water overflowing from Bungil Creek to the north of the property along the overflow paths. - The timing of the inundation of the property above floor level was consistent with the timing of flood levels in Bungil Creek. - Local runoff would not have caused damage at the subject property as there is no significant local catchment. - The peak rainfall intensity in Roma occurred at about 0500 hours on 2 March. Any local stormwater associated with the heaviest rainfall burst would have drained from the property within 10 to 20 minutes after the intense rainfall occurred. - Bungil Creek peaked within 5-12 hours after the intense rainfall burst that caused the flood event. The report concluded: “Based on our site inspection and an assessment of available data for the subject site, it is concluded that the inundation of the subject property was caused by water overflowing from Bungil Creek. ” 27. The regional council commissioned an hydrologist to provide an inception study on the Roma flood event. The report dated 18 June 2010, which also included an overview of the report commissioned by various insurance companies, provided the following information: - The hydrologist report commissioned by various insurance companies was very limited in its scope and investigation to appropriately define the cause, severity and behaviour of the March 2010 flood event. - It was not possible to accurately determinate cause and mechanisms of flood without further and more detailed hydrological and hydraulic modelling. - The cause, severity and mechanism of the flood event could not be explained in terms of catchment and regional flooding behaviour and subsequently the damage to properties in Roma cannot be simply classified as the result of mainstream flooding. 213252 Determination 5 of 7 The report went on to state: “However it is very highly likely that backwater from moderate creek flooding in combination with overflow of the local system has resulted in such widespread flood damage.’ 28. A report on the causes, severity and behaviour of the Roma flood event on 2 March 2010 was commissioned by various insurance companies. The report dated 26 March 2010 considered issues raised by property owners who claimed their properties were inundated by local stormwater runoff and secondly by flood water from Bungil Creek. The following are relevant matters contained in the report: - Council flood maps indicate that Bungil Creek broke its banks north of the town and flowed along various defined drainage paths sometime before 0800 hours. - By 0800 hours Bungil Creek floodwater and local stormwater had joined to the east of the Carnarvon Highway. Very few properties were inundated by flood water before 0800 hours. Inundation of a significant number of properties by flood water commenced before 1030 hours. The report concluded: “ In conclusion the claims made disputing the findings of our earlier reports are not supported by available data and information. All the available data and information including recorded rainfall and water level data, local resident observations, flood mapping and detailed modelling of stormwater runoff, supported by [hydrologist] findings that inundation of properties in Roma during the March 2010 food event was predominantly caused by flood waters overflowing from Bungil Creek. Very few properties in Roma would have been inundated by stormwater runoff. Even fewer properties, if any would have been inundated above floor level by stormwater runoff because most properties have floo r levels elevated above surrounding ground level.” 29. The Panel has viewed the report commissioned by the regional council. The report is critical of the report issued by the hydrologist for various insurers, stating that the report was very limited in scope and investigation and in particular that no analysis of the actual discharge or severity of the flood or its relationship to catchment flooding behaviour and the flooding at Roma was included. Having made this criticism, the Panel notes the council consultant considered the floodwater was “ very highly likely ´ that a combination of moderate creek flooding and overflow of the local system resulted in the widespread damage. 30. The council consultant, while of the opinion it was not possible to accurately determine the cause and mechanisms of the flood based on the available data, nevertheless postulated, with considerable emphasis, that a combination of water from creek flooding and local system overflow was responsible for the widespread damage. 31. The hydrologist appointed by the FSP responded to the regional council report. FSP’s consultant’s report is detailed with comprehensive explanations for the findings and critique of the council report. The ma jor points in the consultant’s report are: - They had inspected more than 100 properties throughout Roma and prepared more than 70 site-specific reports. 213252 Determination 6 of 7 - Additional information now available does not change the original findings on the primary source of the inundation in Roma. - The report considered the issue of stormwater verses floodwater inundation noting due to the extended travel distance from the upper Bungil Creek catchment to Roma, the peak level at Roma would normally occur several hours later than the peak rainfall. The report stated: “Figure 19 of the (regional council report) clearly shows the difference in timing between the peak rainfall intensity in Roma which occurred at about 5.00am on 2 March and the peak of the flood in Bungil Creek which occurred at about 1.00pm the same day, some 8 hours after the peak rainfall. The peak rate of stormwater runoff in Roma would have occurred during the heaviest rainfall, and would have reached Bungil Creek within an hour or two. Hence any property that was not inundated above floor level prior to about 8.00am on 2 March would not have been inundated by stormwater runoff.” 32. The FSP’s hydrologist has therefore responded to assertions by a number of residents in Roma that the first inundation of their properties was by runoff rainwater and to criticisms of her report by the council hydrologist. Notwithstanding the critique by the council hydrologist , the FSP’s consultant noted the council report did not identify any errors in her report and went on to provide comprehensive explanations based on known information and available data to support her findings. Of further significance, the hydrologist was commissioned to consider the source of the inundation in the context of water which overflowed Bungil Creek, runoff rainwater or a combination of both. These are matters of relevance to insurers. 33. In the course of a report provided of a general nature with regard to inundation of properties in the Roma area in October 2010, the hydrologist stated as follows: “ Bungil Creek broke its banks to the North of the town (and east of the Roma airport) and flowed south along various defined drainage paths sometime before 0800 and that very few properties in Roma were inundated by flood water before 0800 and that inundation of a significant number of properties by flood water commenced before 10.30. ” 34. In any event after the inspection occurred, the hydrologists were still of the opinion that the water that inundated the property which was stated to be 8.45 at the latest, was likely to be flood water. 35. In the Panel’s opinion, the major difficulty faced by the applicant s is in terms of the admissions attributed to the male applicant during the course of the telephone conversation extracted above on 5 February 2010. The only conclusion that the Panel can draw from the contents of this conversation was that on the balance of probabilities, the goods, the subject of the claim had been stored at the property for more than 120 days. Whilst the Panel acknowledges based on the information provided by the male applicant to the Panel Chair on 9 December 2010 that there may be some confusion in this regard, the male applicant has not, in the Panel’s opinion satisfactorily established on the balance of probabilities that the goods, the subject of the claim had been in the property for less than 120 days. 36. In the Panel’s opinion, the evidence as to whether the water that inundated the property is equivocal as to whether it was flood water or storm water, 213252 Determination 7 of 7 particularly in view of the timing. In any event, it is not necessary for the Panel to determine this aspect of the dispute in the light of the above findings. CONCLUSION 37. On the basis of the above analysis, the Panel determines that the FSP was entitled to deny liability in response to the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.