Home / Financial Firm (Unknown - Insurer) / Determination 213072

Determination 213072

Drainage system rectification claim declined after storm water ingress

FirmFinancial Firm (Unknown - Insurer)
Decided2010-07-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$16,071
SourceAFCA PDF

Summary

Applicants claimed the cost of a new drainage system after a February 2010 storm caused water ingress, and the FSP accepted interior damage but denied the drainage works. AFCA found the FSP was entitled to deny the drainage component, ordering no payment.

Under the policy the building excludes soil, and washing away of soil is excluded, so the drainage works were not within cover.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

213072 Determination 1 of 4 DETERMINATION Case number: 213072 Home Building – storm – extent of cover SUMMARY OF FACTS 1. On 6 February 2010 the downstairs area of the applicants‟ home was inundated with water during heavy storms. The applicant reported the force of the rainwater had knocked a hole in the wall of the downstairs room and caused internal damage to the property. 2. The Financial Services Provider (FSP) accepted liability for a claim under the applicants‟ home insurance policy and authorised repairs to the internal damage and contents. The FSP denied that part of the claim for rectifying the cavity/drainage system which failed during the storm on the ground the damage was due to inadequate drainage causing soil to wash away. 3. The applicants state they have provided evidence to show that the ingress/cavity of water was a direct result of severe storm and to rectify that damage required redoing the drainage system. 4. The applicants submitted quotations in the sums of $16,071 and $6,850 plus GST to rectify the damage. ISSUES IN DISPUTE 5. Whether the FSP was entitled to deny payment for rectifying the applicants‟ drainage system. RELEVANT POLICY PROVISIONS “What do we cover as the building? … The building includes: outbuildings and permanent structural improvements; fixtures and fittings that: … that part of the building used for performing office work services, whether above or below ground that are on your property, or for which you are liable any jetty at your site owned by you and used only for domestic purposes … You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: … erosion or washing away of soil, earth or gravel .” 213072 Determination 2 of 4 REASONS FOR DECISION 6. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants’ Submission 7. In the opinion of two independent experts , the ingress/cavity of water was a direct result from the severe storm on 13 February 2010. 8. The expert reports state redoing the damaged drainage is required to repair the cavity. 9. The drainage to their home was more than adequate as no water had entered the home before the February storm. 10. They consider the severe storm caused enough pressure to penetrate through the existing drainage and created the cavity allowing excessive water to enter the home. 11. The FSP‟s assessor failed to include in his report the information discussed at the time of his inspection of the damage which in their opinion was relevant to the claim. 12. The assessor did not inspect the damage until 22 February and water had been in the home for 20 days before anything was done, hence the presence of mildew. Mildew had never been present prior to the flooding. 13. The existing drainage was compromised by the storm which created the opening, and to rectify the damage, required installation of geotech fabric and agricultural piping. The damaged drainage system needed to be removed and a new one installed. 14. The independent reports obtained by them did not comment on soil movement as this did not occur, but that the opening was created by the severe force of the storms which punched a hole into the home. The FSP ’s Submission 15. The water inundation to the sub-floor did not occur as a result of an insured event, but from a design defect and washing away of soil. 16. The sub-floor flooding was a result of water flooding across the front of the dwelling due to the absence of drainage and waterproofing to the brick foundation wall. 17. The applicants‟ contractors submitted quotes for the upgrading the drainage system. Had the drainage system and waterproofing in place at the time of the storm been sufficient, it would have been able to withstand the effect of the storm. 18. The evidence suggests that design defect in respect of the drainage was the primary cause for the washing away of the soil resulting in water inundating the sub-floor of the dwelling. Consideration of each party’s submission 19. When making a claim under an insurance policy, the policyholder must establish on the balance of probabilities that the loss claimed falls within the 213072 Determination 3 of 4 terms of cover provided by the policy. An insurer relying on a clause in the policy to deny the claim has the burden of establishing on the balance of probabilities that the relevant clause applies to defeat the claim. 20. The applicants‟ premises were inspected by a consultant build ing service on 22 February 2010. His report contains the following relevant information: - Water had entered the lower floor area via the brick foundation wall on top of sandstone rock base. - A grate drain was across the driveway, but there was nothing across the front of the dwelling. - There was no storm created opening. 21. In the consultant‟s opinion water had entered the building as a result of a deluge of water flooding the area due to minimal drainage and lack of water proofing. He considered the flooding was highly likely to reoccur in similar conditions. 22. Captioned photographs of the sub-floor area show earth abutting brick walls. 23. The applicant commissioned a drain and pipeline specialist to inspect and report on the damage. The contractor provided the following opinion: “It is my professional opinion that the recent storm has created an entry point (cavity) through the sub-soil, which has allowed the ingress of water, which was the primary cause of water damage. This cavity needs to be repaired before any further damage occurs. ” 24. The contractor provided a quotation/estimate in the sum of $16,071 to rectify the problem. The quotation/estimate involved installation of a pit and pump system and was subject to further investigation of the existing stormwater system. 25. The applicant also sought the opinion of a plumbing service. That contractor stated the cause for ingress of water to the building was sub -soil rainwater tracking along the rock shelf from higher ground in front of the house. 26. The contractor further stated: “ It is my professional opinion that the recent storms has created a cavity between the sub-floor wall and footing in two areas and any subsequent storm will create more water damage to th e ground floor of the dwelling.” 27. The plumbing services contractor stated that remedial works included excavating a trench the width of the house just below flooring level then installation of geotech fabric with aggregate over two AG lines. The PVC pipes will continue to the right hand side of the house with a core hole through the brickwork out onto the concrete driveway. 28. In my opinion the evidence has established that the ingress of water to the dwelling was not through an opening in the building made by the storm. On the other hand, I am satisfied the ingress of rainwater into the building was the result of rainwater entering the sub-floor area and causing a cavity in the earth/soil between the sub-floor wall and footing. It is reasonable to conclude that in order to create a cavity, there must be some movement of the earth/soils in situ prior to the ingress of the rainwater. 29. The remedial works recommended and quoted by both the drain and pipeline specialist and the plumbing service contractor to rectify the problem while 213072 Determination 4 of 4 differing in the proposed methods, nevertheless involve construction and installation of an entirely new drainage facility. The works quoted do not include any external works to the existing dwelling structure or services. 30. According to the evidence, all building damage was to the interior compone nts of the premises. There is no evidence of external structural damage to the building arising from the ingress of rainwater. 31. The policy defines what is meant by „building‟ , This includes outbuildings and permanent structural improvements, fixtures and fittings, services and any jetty at the site. 32. I am satisfied the term „Building‟ does not include the earth/soil at the site on which the structural improvements are founded. 33. In these circumstances I am persuaded on balance that the cost of installation of the drainage works required to prevent further water damage to the premises do not fall within the terms of cover provided by the policy. CONCLUSION 34. For these reasons, I conclude the applicants have not discharged the onus that rests with them to show the claim for installation of the drainage system succeeds. 35. Accordingly I determine the FSP was entitled to deny that part of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.