Home / Financial Firm (Unknown - Insurer) / Determination 212954

Determination 212954

2010 interior water damage claim denied; roof repairs not shown to be faulty

FirmFinancial Firm (Unknown - Insurer)
Decided2010-09-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed in 2010 for interior water damage from a leaking roof, following storm claims over 1992 to 2001. AFCA found she had not shown the damage was caused by a covered storm or faulty repairs, so the FSP was not liable; her conduct complaint was referred for investigation.

The claimant bears the onus of showing the water ingress falls within cover, and the inspection reports found no storm damage or faulty workmanship.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

212954 Determination 1 of 5 DETERMINATION Case number: 212954 Home Building – storm – lifetime guarantee SUMMARY OF FACTS 1. The applicant held a Home Insurance policy with the Financial Services Provider (FSP) from 5 February 1991 to 5 February 2002. The policy insured a building of a dwelling. 2. The applicant had lodged ten claims under the policy for storm damage to the premises in 1992,1994,1995,1996, 2000 and three claims in 2001. 3. In November 2004, the applicant complained to the FSP that the repairs to the roof had failed and further damage had been caused to the property. 4. In March 2010, the applicant again complained to the FSP that due to faulty repairs to her roof, further damage had now occurred. The applicant claimed the FSP was responsible for repairing the problems with the roof and rectifying the internal damage arising from the leaking roof. 5. The FSP denied her claim on the grounds that the failure of the roof was not the result of either poor workmanship or faulty materials used in t he previous repairs to the home. The FSP further claims that the damage claimed did not occur during the period of cover. ISSUES IN DISPUTE 6. Whether the FSP was entitled to deny the claim for rectifying the damage claimed in 2010. RELEVANT POLICY PROVISIONS “ Home Insurance What IS covered Storm, hail or rainwater … General Exclusions applicable to your policy You are not covered under any section of his policy for damage, loss or liability caused by, arising from or involving any of the following: Water entering your home:  as a result of your failure to perform adequate maintenance on your home, or a structural defect, or faulty design or workmanship, …  Wear, tear, lack of maintenance or inherent defect,” REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 212954 Determination 2 of 5 The Applicant’s Submission 8. The FSP has been contacted many times by phone since the works were carried out. 9. At the time the claim was lodged, she informed the FSP that the repairer had been on her roof without her knowledge or approval. The repairer was a huge overweight man swinging a sledge hammer onto the roof tiles. 10. A few weeks later, significant flooding occurred and the ceiling collapsed. The FSP’s assessor agreed the damage was caused by storm. 11. The FSP refused the claim and referred her back to the original repairer. 12. It is clear the damage was not fixed properly. 13. She is also lodging a complaint about the dismissive manner with which the FSP handled her complaint The FSP ’s Submission 14. The applicant has lodged 10 claims during the period of insurance. Repairs to the roof had been completed. The assessor advised that there were general maintenance issues with the roof that needed to be rectified. 15. The assessor’s reports establish ed that there was no evidence of damage caused to the roof by a storm. 16. It relies on the opinions of its assessors that the damage for each claim had been correctly repaired and the present damage was not related to the previous claims. 17. It is not liable to rectify any damage which has arisen as a result of maintenance issues or general wear and tear. Consideration of each party’s submission 18. When making a claim under an insurance policy, the responsibility rests with the policyholder to establish on the balance of probabilities that the loss claimed falls within the cover provided by the policy. 19. The ap plicant’s claims history contained in the FSP’s records reveal a significant number of claims that were paid during the period from 1992 to 2001. 20. A claim was made for damage to the lining under the eaves on the front veranda and fairy lights which occurred on 17 January 2001. The sunroom ceiling was also damaged. The applicant considered the damage was due to faulty workmanship from a previous claim. The FSP accepted the claim and arranged repairs. 21. On 2 February 2001, a claim was made for a collapsed ceiling due to water penetrating via the roof. The assessor inspected the damage and in his report dated 9 April 2001 noted: - Damage was sustained to the ceiling to the front entry kitchen and sunroom and soffit outside sunroom and kitchen cupboards. Contents were also damaged. - The applicant was adamant that repairer “A” caused damage to the roof. 212954 Determination 3 of 5 - A contractor had checked the roof and could find no fault with the installation work carried out by “A” - The applicant was not happy with this inspection and a second contractor was appointed to inspect the roof. He found three broken tiles. - A roofing contractor was then appointed to inspect the roof. The roofing contractor advised that were three broken tiles, but felt that this damage may not have been caused by storm. - The applicant was given the benefit of the doubt and the contractor was authorised to replace the broken tiles. The damage to the kitchen was accepted and repairs were authorised. 22. The matter is complicated somewhat by the fact that the applicant attributes certain parts of the damage to the actions of “A” . The material does not establish why “A” was involved or who had called them. The applicant claims that an overweight “A” representative was “ swinging a sledge hammer over my tiled roof” . The applicant claims that a representative of the FSP elected to ignore any contribution to the damage to the roof which the employee may have caused, but to treat the damage discovered a few weeks later as being storm related. 23. Notwithstanding the applicant’s concerns as above, in my opinion, w hether “A” caused or contributed to the damage is irrelevant. It is clear that shortly after the incident, there was a severe storm. The damage was discovered and a claim admitted by the FSP. The FSP did authorise the repairs and if the subsequent problems have arisen as the result of faulty repairs, the FSP would be responsible to rectify them. 24. In December 2001 a further claim was made for storm damage to a ceiling and two gazebos which occurred on 22 December 2001. A contractor appointed to report on the cause of the leak provided the following information: - Tiles on the southern elevation of the roof had dislodged and had been relocated to the waterproof roof. - No tiles were found dislodged above the bedroom. However a solar system had been fitted there and during heavy rainfall water can enter through joints of tiles around the fixing points of the solar system. There was no sarking fitted under the tiles. - Guttering was blocked with leaves and would cause overflowing causing damage to the sunroom and soffit outside the kitchen. 25. On 7 November 2004, after the policy has lapsed, the applicant complained to the FSP that previous effected repairs were falling apart. She had been advised that roof tiles had cracked. The applicant’s roof was inspected by the FSP and the contractor reported the that problem with the roof was related to a defect and not from the previous repairer’s work. 26. Following inspection of the roof, the assessor noted that areas around both a roof mounted solar hot water system and roof mounted satellite dish mounting points had been amateurishly sealed with very large quantities of silicone. Attempts had been made to seal the lap joints of the terracotta tiles with both silicone and cementatious grout. The lap joi nts should not be sealed. If there 212954 Determination 4 of 5 was water ingress at these points those tiles should be replaced. He could find no storm damage to the roof, and could not attribute the problem to previous work by repairers. 27. The assessor further noted that because of the manner of manufacturing terracotta roof tiles, they do not fit their neighbour and it was possible that this was the reason that at several locations, water was able to enter. 28. The assessor considered the problem was cracked, displaced or ill fitting tiles beneath the roof mounted solar hot water system panels. The panels were not damaged by storm and therefore had not been removed from the roof. If the tiles beneath the panels were cracked or defective then it was not a storm related issue, but related to previous repairs. 29. In March 2010, the applicant reported that the roof was sagging and this was due to faulty workmanship. 30. By letter to the applicant dated 22 April 2010, the FSP confirmed that it would not overturn the decision made in 2004 to decline the damage reported to it. This was because at that time, it was considered new damage. The applicant was invited to provide written evidence to support her claim for the 2010 damage to allow a further review of her claim to be made. 31. A quotation and building inspection report provided by the applicant noted that extensive work was required due to the amount of water contained in the ceiling areas when it was flooded. However this report has failed to link the problems to previous faulty repairs. 32. It is clear from the material that ongoing problems exist with the roof of the applicant’s premises which is allowing the ingress of rain water. 33. N otwithstanding the applicant’s assertion that the works carried out by the FSP’s authorised contractors were defective, there is no evidence that the roof demonstrated faulty workmanship or that repairs carried out were imperfect. 34. An inspection in January 2002 (following the December 2001 claim) found that tiles had been dislodged, but were relocated to waterproof the roof. While dislodged tiles may explain the ingress of water at about that time, it does not establish that they were in that condition because of faulty workmanship. Moreover, the inspection found water can enter through joints around the fixing points of a solar system fixed to the roof. 35. The report referred to in paragraph 26 further links the problem of water ingress to the possibility of cracked, displaced or ill fitting tiles located beneath the solar hot water system panels. The panels were not damaged in any storm event including a severe hail storm. This indicates that this potential source of leaks was unrelated to any storm damage rectification works. 36. The report obtained by the applicant confirms that water has damaged the ceilings of the applicant’s home and that this damage needs t o be repaired promptly. While the contractor says the damage occurred when the ceiling was flooded, his inspection of the damage was carried out in 2010. However the claims for storm related damage were made over a period of nine years from 1992 to 2001, with further damage reported in 2010. 212954 Determination 5 of 5 37. When considered in the context of the claims history, the findings in the reports obtained during this period of time and the period of time which that had elapsed before the applicant’s contractor inspected the premises, I have some difficulty accepting that the internal damage described by the contractor may be attributed to one single event, notably the failure of the repairs authorised by the FSP in 2001. CONCLUSION 38. I accept that the FSP has a responsibility to make good any faulty repairs to the roof arising from work carried out by contractors appointed by it. 39. However the roof of the applicant’s premises has been inspected on a number of occasions following her complaints. The contractors did not report any evidence of storm damage to the roof or evidence of faulty repairs. 40. For these reasons, it is my opinion that the evidence does not support a finding that the ongoing damage to the inter ior of the applicant’s building was caused by storm damage to the roof of her premises before the cancellation of the policy in 2002 or alternatively by the faulty workmanship of contractors employed to repair storm damage to the roof. 41. In these circumstances I conclude the applicant has not discharged the onus that rests with her to establish that the cause of the ingress of water to her home falls within the cover provided by the policy. 42. Accordingly I determine the FSP is not liable for damage claimed by the applicant. 43. The applicant’s complaint in relation the FSP’s conduct has been referred to the Code Compliance Manager for investigation

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.