Home / Financial Firm (Unknown - Insurer) / Determination 212954
Determination 212954
2010 interior water damage claim denied; roof repairs not shown to be faulty
Summary
The applicant claimed in 2010 for interior water damage from a leaking roof, following storm claims over 1992 to 2001. AFCA found she had not shown the damage was caused by a covered storm or faulty repairs, so the FSP was not liable; her conduct complaint was referred for investigation.
The claimant bears the onus of showing the water ingress falls within cover, and the inspection reports found no storm damage or faulty workmanship.
Issues
- Claim denial primary · not upheld
“Accordingly I determine the FSP is not liable for damage claimed by the applicant.”
- Complaint handling failure secondary · unclear
“The applicant's complaint in relation the FSP's conduct has been referred to the Code Compliance Manager for investigation.”
- Third-party or outsourcing failure secondary · not upheld
“there is no evidence that the roof demonstrated faulty workmanship or that repairs carried out were imperfect.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
212954 Determination 1 of 5
DETERMINATION
Case number: 212954
Home Building – storm – lifetime guarantee
SUMMARY OF FACTS
1. The applicant held a Home Insurance policy with the Financial Services
Provider (FSP) from 5 February 1991 to 5 February 2002. The policy insured a
building of a dwelling.
2. The applicant had lodged ten claims under the policy for storm damage to the
premises in 1992,1994,1995,1996, 2000 and three claims in 2001.
3. In November 2004, the applicant complained to the FSP that the repairs to the
roof had failed and further damage had been caused to the property.
4. In March 2010, the applicant again complained to the FSP that due to faulty
repairs to her roof, further damage had now occurred. The applicant claimed
the FSP was responsible for repairing the problems with the roof and rectifying
the internal damage arising from the leaking roof.
5. The FSP denied her claim on the grounds that the failure of the roof was not
the result of either poor workmanship or faulty materials used in t he previous
repairs to the home. The FSP further claims that the damage claimed did not
occur during the period of cover.
ISSUES IN DISPUTE
6. Whether the FSP was entitled to deny the claim for rectifying the damage
claimed in 2010.
RELEVANT POLICY PROVISIONS
“ Home Insurance What IS covered
Storm, hail or rainwater
…
General Exclusions applicable to your policy
You are not covered under any section of his policy for damage, loss or liability caused by,
arising from or involving any of the following:
Water entering your home:
as a result of your failure to perform adequate maintenance on your home, or a structural
defect, or faulty design or workmanship,
…
Wear, tear, lack of maintenance or inherent defect,”
REASONS FOR DECISION
7. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
212954 Determination 2 of 5
The Applicant’s Submission
8. The FSP has been contacted many times by phone since the works were
carried out.
9. At the time the claim was lodged, she informed the FSP that the repairer had
been on her roof without her knowledge or approval. The repairer was a huge
overweight man swinging a sledge hammer onto the roof tiles.
10. A few weeks later, significant flooding occurred and the ceiling collapsed. The
FSP’s assessor agreed the damage was caused by storm.
11. The FSP refused the claim and referred her back to the original repairer.
12. It is clear the damage was not fixed properly.
13. She is also lodging a complaint about the dismissive manner with which the
FSP handled her complaint
The FSP ’s Submission
14. The applicant has lodged 10 claims during the period of insurance. Repairs to
the roof had been completed. The assessor advised that there were general
maintenance issues with the roof that needed to be rectified.
15. The assessor’s reports establish ed that there was no evidence of damage
caused to the roof by a storm.
16. It relies on the opinions of its assessors that the damage for each claim had
been correctly repaired and the present damage was not related to the previous
claims.
17. It is not liable to rectify any damage which has arisen as a result of
maintenance issues or general wear and tear.
Consideration of each party’s submission
18. When making a claim under an insurance policy, the responsibility rests with
the policyholder to establish on the balance of probabilities that the loss
claimed falls within the cover provided by the policy.
19. The ap plicant’s claims history contained in the FSP’s records reveal a
significant number of claims that were paid during the period from 1992 to
2001.
20. A claim was made for damage to the lining under the eaves on the front
veranda and fairy lights which occurred on 17 January 2001. The sunroom
ceiling was also damaged. The applicant considered the damage was due to
faulty workmanship from a previous claim. The FSP accepted the claim and
arranged repairs.
21. On 2 February 2001, a claim was made for a collapsed ceiling due to water
penetrating via the roof. The assessor inspected the damage and in his report
dated 9 April 2001 noted:
- Damage was sustained to the ceiling to the front entry kitchen and
sunroom and soffit outside sunroom and kitchen cupboards. Contents
were also damaged.
- The applicant was adamant that repairer “A” caused damage to the roof.
212954 Determination 3 of 5
- A contractor had checked the roof and could find no fault with the installation
work carried out by “A”
- The applicant was not happy with this inspection and a second contractor
was appointed to inspect the roof. He found three broken tiles.
- A roofing contractor was then appointed to inspect the roof. The roofing
contractor advised that were three broken tiles, but felt that this damage may
not have been caused by storm.
- The applicant was given the benefit of the doubt and the contractor was
authorised to replace the broken tiles. The damage to the kitchen was
accepted and repairs were authorised.
22. The matter is complicated somewhat by the fact that the applicant attributes
certain parts of the damage to the actions of “A” . The material does not
establish why “A” was involved or who had called them. The applicant claims
that an overweight “A” representative was “ swinging a sledge hammer over my
tiled roof” . The applicant claims that a representative of the FSP elected to
ignore any contribution to the damage to the roof which the employee may
have caused, but to treat the damage discovered a few weeks later as being
storm related.
23. Notwithstanding the applicant’s concerns as above, in my opinion, w hether “A”
caused or contributed to the damage is irrelevant. It is clear that shortly after
the incident, there was a severe storm. The damage was discovered and a
claim admitted by the FSP. The FSP did authorise the repairs and if the
subsequent problems have arisen as the result of faulty repairs, the FSP would
be responsible to rectify them.
24. In December 2001 a further claim was made for storm damage to a ceiling and
two gazebos which occurred on 22 December 2001. A contractor appointed to
report on the cause of the leak provided the following information:
- Tiles on the southern elevation of the roof had dislodged and had been
relocated to the waterproof roof.
- No tiles were found dislodged above the bedroom. However a solar system
had been fitted there and during heavy rainfall water can enter through joints
of tiles around the fixing points of the solar system. There was no sarking
fitted under the tiles.
- Guttering was blocked with leaves and would cause overflowing causing
damage to the sunroom and soffit outside the kitchen.
25. On 7 November 2004, after the policy has lapsed, the applicant complained to
the FSP that previous effected repairs were falling apart. She had been advised
that roof tiles had cracked. The applicant’s roof was inspected by the FSP and
the contractor reported the that problem with the roof was related to a defect
and not from the previous repairer’s work.
26. Following inspection of the roof, the assessor noted that areas around both a
roof mounted solar hot water system and roof mounted satellite dish mounting
points had been amateurishly sealed with very large quantities of silicone.
Attempts had been made to seal the lap joints of the terracotta tiles with both
silicone and cementatious grout. The lap joi nts should not be sealed. If there
212954 Determination 4 of 5
was water ingress at these points those tiles should be replaced. He could find
no storm damage to the roof, and could not attribute the problem to previous
work by repairers.
27. The assessor further noted that because of the manner of manufacturing
terracotta roof tiles, they do not fit their neighbour and it was possible that this
was the reason that at several locations, water was able to enter.
28. The assessor considered the problem was cracked, displaced or ill fitting tiles
beneath the roof mounted solar hot water system panels. The panels were not
damaged by storm and therefore had not been removed from the roof. If the
tiles beneath the panels were cracked or defective then it was not a storm
related issue, but related to previous repairs.
29. In March 2010, the applicant reported that the roof was sagging and this was
due to faulty workmanship.
30. By letter to the applicant dated 22 April 2010, the FSP confirmed that it would
not overturn the decision made in 2004 to decline the damage reported to it.
This was because at that time, it was considered new damage. The applicant
was invited to provide written evidence to support her claim for the 2010
damage to allow a further review of her claim to be made.
31. A quotation and building inspection report provided by the applicant noted that
extensive work was required due to the amount of water contained in the ceiling
areas when it was flooded. However this report has failed to link the problems
to previous faulty repairs.
32. It is clear from the material that ongoing problems exist with the roof of the
applicant’s premises which is allowing the ingress of rain water.
33. N otwithstanding the applicant’s assertion that the works carried out by the
FSP’s authorised contractors were defective, there is no evidence that the roof
demonstrated faulty workmanship or that repairs carried out were imperfect.
34. An inspection in January 2002 (following the December 2001 claim) found that
tiles had been dislodged, but were relocated to waterproof the roof. While
dislodged tiles may explain the ingress of water at about that time, it does not
establish that they were in that condition because of faulty workmanship.
Moreover, the inspection found water can enter through joints around the fixing
points of a solar system fixed to the roof.
35. The report referred to in paragraph 26 further links the problem of water ingress
to the possibility of cracked, displaced or ill fitting tiles located beneath the solar
hot water system panels. The panels were not damaged in any storm event
including a severe hail storm. This indicates that this potential source of leaks
was unrelated to any storm damage rectification works.
36. The report obtained by the applicant confirms that water has damaged the
ceilings of the applicant’s home and that this damage needs t o be repaired
promptly. While the contractor says the damage occurred when the ceiling was
flooded, his inspection of the damage was carried out in 2010. However the
claims for storm related damage were made over a period of nine years from
1992 to 2001, with further damage reported in 2010.
212954 Determination 5 of 5
37. When considered in the context of the claims history, the findings in the reports
obtained during this period of time and the period of time which that had
elapsed before the applicant’s contractor inspected the premises, I have some
difficulty accepting that the internal damage described by the contractor may be
attributed to one single event, notably the failure of the repairs authorised by
the FSP in 2001.
CONCLUSION
38. I accept that the FSP has a responsibility to make good any faulty repairs to the
roof arising from work carried out by contractors appointed by it.
39. However the roof of the applicant’s premises has been inspected on a number
of occasions following her complaints. The contractors did not report any
evidence of storm damage to the roof or evidence of faulty repairs.
40. For these reasons, it is my opinion that the evidence does not support a finding
that the ongoing damage to the inter ior of the applicant’s building was caused
by storm damage to the roof of her premises before the cancellation of the
policy in 2002 or alternatively by the faulty workmanship of contractors
employed to repair storm damage to the roof.
41. In these circumstances I conclude the applicant has not discharged the onus
that rests with her to establish that the cause of the ingress of water to her
home falls within the cover provided by the policy.
42. Accordingly I determine the FSP is not liable for damage claimed by the
applicant.
43. The applicant’s complaint in relation the FSP’s conduct has been referred to the
Code Compliance Manager for investigation