Determination 212450

Storm damage claim partly denied and scope and cost of repairs disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2011-02-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$24,625
SourceAFCA PDF

Summary

The applicant claimed about $24,600 for storm damage to her home after the FSP paid $7,662.05 and denied five items. AFCA denied the gutters, downpipes and paved area but ordered the FSP to pay 50% of the costs of the roof tile, valley iron, repointing and re-colour items, with the amount to be set on proof of actual costs.

Once the insured proves prima facie storm damage the insurer must establish an exclusion for wear, rust or poor maintenance, and where expert evidence is evenly balanced it is fair to share the repair costs equally.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 212450 Determination Page 1 of 7 Case number: 212450 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Storm Damage – Quantum 04 February 2011 Background 1. The Applicant holds home building insurance with the Financial Services Provider (FSP). 2. On 29 January 2010, the Applicant lodged a claim with the FSP who recorded the following event description: “DURING THE STORMS THE CEILING HAS LEAKED IN MY LOUNGE ROOM. THE CEILING IS HOLDING WATER”. 3. The Applicant submitted several quotes to the FSP and claimed a total of $24,624.93 from the FSP. 4. The FSP partially accepted the claim and paid $7,662.05 to the Applicant. 5. In its letter dated 3 August 2010, the FSP denied five items claimed by the Applicant, thus: “[The FSP] reviewed your claim… and the decision was made as follows: 1. Replace 2 downpipes The [FSP’s] assessor confirmed these are not hail damage and therefore not covered by the claim. 2. Replace the bent gutter in the rear property. This only requires refitting as it [h]as just been dislodged. 3. Replace between 20-30 roof tiles, replace 2 valleys and re point ridge capping on the roof. The Assessment from [XYZ Builder] advises only 5 roof tiles were damaged and 12 metres of ridge capping. There was no damage noted to the valleys. As advised [the FSP is] happy to send an independent roofer out to inspect the entire roof to confirm if there is any additional damage and amend our scope of works if required. 4. Respray entire roof so replaced tiles match. [The FSP is] happy to look into covering the respraying of the roof tiles if there is a matching issue with the replaced tiles. To do this we would need to reinspect the roof. 5. Fixed paved area that has collapsed due to stormwater pipe damage. Determination Case No: 212450 Determination Page 2 of 7 The [FSP’s] Assessor advised that this is due to subsidence. The FSP would like to send an Engineer to inspect and confirm the cause of this damage. Decision After careful consideration of your claim, it is my decision that the above mentioned items are not covered and the settlement amount for the repairs is $7662.05. As advised [the FSP] can re inspect the roof to determine if there is any additional damage to the roof and send an Engineer to inspect the paved area. Whilst we are re inspecting the roof if matching issues are identified we will also cover the repainting of the remaining roof tiles to achieve a match. ” Summary of Applicant’s Position 6. The Applicant says she is entitled to a further $15,238.45 from the FSP. 7. In her letter to the FSP dated 30 August 2010, the Applicant said tha t “There is absolutely no use sending additional building inspectors or engineers to further inspect my roof and stormwater damage”. She asserts that the FSP had “multiple opportunities to execute further inspections” in the past six months but did not do so. 8. The Applicant also says that the FSP’s builder, XYZ Builder , informed her that it would be carrying out all work listed above. Summary of FSP’s Position 9. The FSP concedes that “the damage to the roof and the resultant damage to the ceilings as well as damage to the rest of the property is the result of the insured event”. However, it asserts that “some damage is due to wear and tear, structural breakdown and lack of maintenance” which are specifically excluded from cover. The onus is on the Applicant to prove that the damage claimed was due to an insured event. 10. The FSP relies on the following policy provisions: “ What we do not cover general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: an unreasonable failure to properly maintain or repair your building, wear and tear, rust, deterioration or corros ion,” 11. The FSP says that a re-inspection of the insured property was conducted by its assessor on 28 June 2010 and accordingly, an updated scope of works was issued. Thereafter, the FSP offered a cash settlement in the amount of $7662.05. The Applicant then advised her concerns with the scope of works and sought the five items listed above. The FSP “requested an opportunity to re-inspect the roof to determine if there was any additional damage to the roof Case No: 212450 Determination Page 3 of 7 and would then send an Engi neer to inspect the paved area”. However, the Applicant declined this request. Issue 12. Whether the FSP must indemnify the Applicant an additional $15,238.45. TERMS OF REFERENCE “8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these).” Reasons for Decision 13. It is well-settled in insurance law that the onus is on the insured to establish that a loss or damage has occurred and that the loss or damage was caused by an insured event listed in the policy. Once this has been established, the onus shifts to the insurer to establish that it is entitled to deny the claim because of a policy exclusion or breach of policy condition. The Applicant’s Evidence 14. The Applicant submitted a quote from B Carpenters dated 30 April 2010. The quote refers to “storm damage” and reads in relevant part: “Pleased to submit our quote to repair storm damage at [address] Job: *Replace all-gutter and downpipes *Remove and replace broken roof tiles (up to 50 tiles) *Replace valley iron *Repoint entire roof tiles *Clear blocked drain *Repair damaged gyprock interior of the house *Replace 2.4 metre eaves over back window …. Total $15,669.50” Case No: 212450 Determination Page 4 of 7 15. The Applicant also submitted a quote by P Builder dated 7 May 2010. The quote refers to “storm damage” and relevantly reads: “I am please d to submit a quotation for the following due to storm damage on 28/01/2010:- *Remove & replace several insulation batts in the roof space *Repair and paint waterdamage soffit to FC sheet lining to front Porch area… *Repair and paint sagging F.C Eaves to front bed room area… *Paint 2.4 of Eave Soffit to rear of home *Paint two internal rooms Includes a 2 coat paint system *Roof restoration – Spray whole roof area only Includes pressure clean all dirt, moss, lichen & fungus from the roof Apply Mould rid to kill moss spores Prime tiles with primabond to stabilise surface Seal tiles and capping by applying a sealer coat Re-colour roof *Includes removal of all waste from the property Total $6,941.00” 16. The Applicant submitted another quote for the repair of the roof, including respray, by A Roofing dated 6 August 2010. The quote is in the amount of $4,730. I note, however, that this quote does not mention storm or hail damage. The FSP’s evidence 17. The FSP’s builder, XYZ Builder, assessed the insured property on 5 February 2010 and issued an assessment report dated 20 May 2010. The report relevantly reads: “ CAUSE/CIRCUMSTANCES (HOW DAMAGE OCCURRED AND CAUSES)  HAIL DAMAGE TO SEVERAL ROOF TILES ON THE MAIN ROOF AND AT VARIOUS LOCATIONS AROUND THE PROPERTY.  I REMOVED THE TARP DURING THE ASSESSMENT AND VIEWED THE ROOF SURFACE  THE WATER DAMAGE TO THE CEILINGS HAS BEEN CAUSED BY GUTTERS AND VALLEY GUTTERS UNABLE TO COPE WITH VOLUME OF THE WATER DURING THE STORM AND HAVE BACK FLOWED INTO THE ROOF SPACE  THE WATER DAMAGE IS CONSISTENT WITH ONE EVENT. THE CUSTOMER STATED THEY HAD NEVER HAD ANY ROOF PROBLEMS IN THE PAST ANY MAINTENANCE ISSUES/CUSTOMER AWARENESS OF DAMAGE THE CUSTOMER POINTED OUT GUTTERING DAMAGE CAUSED BY THE STORM HOWEVER WE ADVISED THAT THE GUTTERS HAD BEEN UNCLIPPED FROM BRACKETS AND DO NOT REQUIRE REPLACEMENT. Case No: 212450 Determination Page 5 of 7 THE GUTTERS WERE FOUND TO BE PARTIALLY BLOCKED WITH TREE DEBRI[S]. WE ADVISED THE CUSTOMER THAT SHE SHOULD PLAN TO HAVE PROPERLY FITTED GUTTER GUARD. THE CUSTOMER POINTED OUT THE REAR GUTTER LOCATED AT THE BACK DECK WAS BUCKLED BY THE STORM HOWEVER WE ADVISED THAT THE GUTTER WAS MISSING A BRACKET AND THIS HAD ALLOWED THE GUTTER TO TWIST. WE ADVISED THE CUSTOMER THAT SHE SHOULD HAVE GUTTERING AND DOWN PIPES CLEARED REGULARLY.” 18. The FSP submitted a scope of works dated 2 March 2010 which reads: “ SCOPE OF WORKS STORM DAMAGE STORM RELATED REPAIRS 1. REMOVE AND REPLACE FLYSCREENS X 2 (1370 X 870) 2. RE CLIP THE A LINE GUTTERING IN TO THE EXISTING BRACKETS AT LEFT SIDE OF PROPERTY 3. REMOVE AND REPLACE THE CHIPPED ROOF TILES X 5 4. RE POINTING OF 12 M OF RIDGE CAPPING 5. CARRY OUT REPAIRS AND PAINTING OF THE WATER DAMAGED SOFFIT FC SHEET LINING ON FRONT BALCONY AT FRONT DOOR – 5.8M X 2M 6. CARRY OUT REPAIRS TO THE SAGGING FC EAVES NEAR FRONT BEDROOM – 1/SM 7. PREPARE AND PAINT THE EAVES – 6 S/M 8. CARRY REFITTING OF THE REAR A LINE GUTTERING AT THE REAR OF THE DWELLING 9. REMOVE AND REPLACE 1.2M OF BROKEN EAVE AC SHEETING INTERNAL REPAIRS LOUNGE ROOM (6.3M X 4.9M) KITCHEN (4M X 3.1M) 10. BLEED SEAL AND PAINTING OF LOUNGE ROOM AND KITCHEN CEILING 11. PREPARATION AND PAINTING OF THE CEILING – 43 S/M 12. DISPOSE OF ALL DEBRIS” 19. The FSP also submitted a quotation for cost of repairs based on the original scope of works in the amount of $6,710. 20. The FSP submitted another quotation dated 29 June 2010 following advice from the Applicant that further damage to the property has occurred and a reinspection of the insured property conducted on 28 June 2010. This quotation shows a repair cost of $7,662.05 and includes internal repairs of the sitting room. Case No: 212450 Determination Page 6 of 7 Consideration of the parties’ evidence 21. Based on the quotes from B Carpenters and P Builder, I am satisfied that the Applicant has established prima facie that the following were damaged by the storm and require repair or replacement:  replace all-gutter and downpipes;  remove and replace broken roof tiles, up to 50 tiles;  replace valley iron;  repoint entire roof tiles; and  roof restoration by respraying whole roof area. 22. The onus has then shifted to the FSP to establish that a policy exclusion applies or a breach of policy condition has occurred in order to be entitled to deny the Applicant’s claim . 23. With regard to the gutter and downpipes, I note XYZ Builder’s assessment report dated 20 May 2010, quoted in paragraph 18 above, which states the maintenance issues on the gutter and down pipes. 24. I further note XYZ Builder’s email to the FSP dated 21 July 2010 which states: “In regards to the replacement of two down pipes, I did not state that in my assessment as they were not damaged by hail and did not require replacement, there is evidence of long term rust at all offset joints. I did not advise the client they would be replaced. In regards to the two valley gutters, they had gutter guard installed when we carried out inspection and I could not see any pitting of the valley irons. I did not advise the owner that they would be replaced. In regards to the rear gutter we did not advise the [Applicant] that we considered that it needed replacement.” 25. I am satisfied that the FSP has rebutted the Applicant’s evidence and has discharged its onus of establishing that the damage to the downpipes and gutter was due to wear and tear, rust and poor maintenance. Therefore, I am of the opinion that the FSP is entitle d to deny the Applicant’s claim for the gutter and downpipes. 26. With regard to roof tiles, valley iron, ridge capping and respraying of roof tiles, I note XYZ Builder’s response in his email dated 21 July 2010, thus : “During the assessment of [the Applicant’s] home I carried out removal of the tarp and inspected the roof tiles and found that only approx five tiles were chipped by hail and approx only 12m of ridge capping had been disturbed by hail. At no time did I state to [the Applicant] that we deemed it necessary to repoint the whole roof or that 30 tiles were damaged. Whilst the roof tiles were scuffed in several sections of the roof which was pointed out by the [Applicant] we definitely did not advise the client that a respray of the roof tiles was required. The tiles on the roof are cement and are approx 35 years old. ” 27. Thus, there is conflicting evidence before me with regard to the extent of damage to the roof. However, I note that although each party has presented Case No: 212450 Determination Page 7 of 7 supporting expert evidence, the evidence is very brief. In my view, neither evidence is more compelling than the other. 28. I note that the FSP volunteered to do a third inspection of the insured property to determine the extent of damage and/or whether the items claimed should be covered under the policy. I further note that this was declined by the Applicant who was by then frustrated with the delay and the manner in which the FSP has handled her claim. The claim was lodged on 29 January 2010 yet still by 3 August 2010, the FSP was suggesting another inspection. 29. Under these circumstances, I am of the opinion that it is fair in all the circumstances, for both parties to contribute equally to the repair/replacement costs of the following:  removal and replacement of broken roof tiles, up to 50 tiles;  replacement of valley iron;  repointing of entire roof tiles; and  re-colour roof. 30. Assuming that the Applicant has already undertaken the repairs/replacement of the above, the Applicant must submit evidence to the FSP showing the actual costs incurred in the repair and replacement. Thereafter, the FSP must reimburse the Applicant within 30 days from receipt of the evidence. 31. With regard to the Applicant’s claim that a paved area had collapsed due to stormwater pipe damage, I note that the quotes submitted by the Applicant do not refer to a collapsed paved area. Hence, I am of the opinion that the FSP is entitled to deny the Applicant’s claim. Determination 32. I determine that the FSP is entitled to deny the Applicant’s claim for gutter , downpipes and paved area. 33. Subject to paragraph 30 above, I further determine that the FSP indemnify the Applicant for 50% of the repair/replacement costs of the following:  removal and replacement of broken roof tiles, up to 50 tiles;  replacement of valley iron;  repointing of entire roof tiles; and  re-colour roof.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.