Summary
The applicant claimed for cracked brick veranda pillars after an earthquake, and the FSP refused the claim on the basis that the damage was not caused by earthquake. AFCA found the FSP entitled to refuse the claim.
The applicant bears the onus of proving a loss caused by a covered event, and she provided no evidence to refute the engineer's findings that soil movement and inadequate footings caused the damage.
Subjects and remedies
natural disasterno remedy
Text of the determination
212270 Determination 1 of 4
DETERMINATION
Case Number: 212270
Home Building – earthquake – onus of proof
SUMMARY OF FACTS
1. The applicant held a home building policy issued by a Financial Services
Provider (FSP) that provided cover on an insured events basis.
2. On 18 May 2009, the applicant lodged a claim for earthquake damage to brick
pillars at the front of the house.
3. Following assessment of the damage and an inspection by an engineer, the
FSP rejected the claim on the basis it was not caused by earthquake.
4. The applicant does not accept the FSP is entitled to refuse the claim.
ISSUE IN DISPUTE
5. Whether the claimed loss is covered by the policy.
RELEVANT POLICY PROVISIONS
Insured Events
Please include type of loss and reference to earthquake and others from the policy.
“When we will not pay a claim under your policy
1. …
3. Unless we state differently in your policy, we will not pay for:
a) …
b) any loss or damage which is not caused directly by one of the insured events;”
REASONS FOR DECISION
6. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
The Applicant’s Submission
7. The cracks in the veranda pillars were noticed after the earthquake occurred.
8. The FSP’s engineer inspected the house inside and out with her and then took
photos of the damage after she (the applicant) had left.
9. The engineer did not carry out any testing and the inspection was not thorough,
taking around 15 to 20 minutes. His opinions about the house and the soil in
the area were formed without any testing.
10. The house has been maintained in excellent condition and any work necessary
due to wear and tear was always attended to.
11. The engineer has compared her house with two other nearby properties. One
of these has a five foot high fence; the other is covered in trees. She does not
accept the engineer was able to make a judgment that the properties showed
no evidence of cracking.
212270 Determination 2 of 4
The FSP ’s Submission
12. The cover has been issued on an insured events basis and while earthquake is
one of the events listed as covered, it is not established the damage claimed is
due to earthquake.
13. The engineer that inspected the home has reported that the cracking to the
brick pillars is caused by rotation of the pillar footings. This rotation is due to a
combination of inadequate footings and movement in the foundation soils due
to changes in moisture content.
14. The engineer also reported that an earthquake with a magnitude of 4.6 on the
Richter scale and an epicentre of 100kms from the applicant's home would not
cause structural damage to the home or any building structure.
15. The applicant has provided no material to refute the findings of the engineer
and there is no evidence to establish the damage claimed was caused by the
insured event of earthquake or any other event covered by the policy.
Consideration of each party’s submission
16. The applicant's home is described to be a California style timber bungalow with
two verandas that are supported by brick pillars; the images provided
confirming this description.
17. The assessor appointed by the FSP commissioned a report from an engineer.
Summarised extracts/ quotes from the engineer’s report follow below:
The damage inspected was to pillars supporting verandas and the worst
damage is seen on one of the pillars at the front of the house. The
brickwork is cracked and the pillar is on a slight lean; a similar crack is
seen in the left pillar on the left side of the house.
The reason for this type of failure is rotation of the footings. This has
caused a crack in the parapet wall beside it and because the top of the
pillar is held laterally by the veranda beams, a crack in the brick stem.
Across the road there are two other houses of the same style and age
and there are no signs of cracking or movement to the pillars of those
houses. Two doors down there is a brick church with expansive brick
walls that show no cracking.
This suburb, Yarraville, is in an area of basaltic clays covering the vast
majority of the western suburbs of Melbourne.
Basaltic clays are very plastic and highly reactive. This soil type
undergoes large volume changes with changes in moisture content.
The drought conditions experienced in Melbourne have played havoc
with structures built on foundations not designed to cater for these
conditions.
The damage observed at the property inspected is consistent with
inadequate footings founded in the reactive clays common in this region.
The earthquake of 6 March 2009 was of a magnitude of 4.6 on the
Richter scale with 3 aftershocks in the following 24 hours. The epicentre
212270 Determination 3 of 4
was 96 kms south east of Melbourne and 15 kms deep. This quake was
felt up to 100kms away, including parts of Melbourne.
The second earthquake was in the same area on 18 March 2009 and it
also had a magnitude of 4.6 on the Richter scale with 3 aftershocks in
the following 24 hours. Like the first earthquake, no serious damage was
reported.
According to the Seismology Research centre at Richmond Victoria,
Yarraville had a classification of III or possibly IV on the Modified Mercalli
intensity for this earthquake event. At this intensity, no structural damage
occurs.
The applicant's home is a single storey timber house on low stumps that
is very resistant to earthquake damage. The brick pillars, although more
susceptible, are very unlikely to suffer damage in an earthquake of the
magnitude involved.
If the damage was due to earthquake then the damage would be present
in nearby structures that are less resistant to earthquake, namely the
nearby church and the adjacent 2 storey block of units, no damage being
visible.
It is my considered opinion, that the damage inspected at the insured’s
building was caused by a combination of reactive soil and inadequate
foundations. Under these circumstances, I believe the earthquake did
not contribute to the damage sustained.
18. The engineer’s report also included a table of damage expected for va rious
Richter scale intensities;
Level of damage Richter Scale
No damage 4.4 – 4.8
Rather strong. Damage negligible. Small
unstable objects displaced or upset, some
dishes and glassware broken 4.9 – 5.4
Strong. Damage slight, windows, dishes, glassware
broken. Furniture moved or overturned. Weak
plaster and masonry cracked 4.9 – 5.4
19. Following a discussion with the FSP in January 2010 concerning rejection of
the claim, the applicant sent an email to the FSP, the extracts from that email
being as quoted below;
o “ The claim is for a very solid large pillar that is coming away from an attached
small wall being the front veranda of my property.
o I was advised that it wasn’t the earthquake that caused this but no other
explanation has been provided for me.
o …it did seem to look worse after this event so I assumed this was the
cause.
o … since being home over Christmas and spending time in my home more
than usual, I have noticed we have a dip/ditch (has been there for quite
212270 Determination 4 of 4
some time and I have called the council) in the road outside my home
and when the big trucks go by my whole house seems to move when
they fall into it, ”
20. The applicant has not provided any reports or other evidence to refute the
FSP’s submission the damage was not due to earthquake.
21. The images of the cracking present in the front pillar demonstrating significant
damage is indicative of the pillar rotating outwards, away from the line of the
abutting low vertical brick wall. An upper level crack running from the outer
edge of the upper stem of the pillar is strongly supportive of rotation in this
direction. The upper cracking is described by the engineer as associated with
lateral pressures from the top of the pillar resisting the outward rotation and
causing the upper stem crack.
22. The applicant's email referred to above includes reference to the damage
seeming to look worse after the earthquake indicating damage was present
before the event described.
23. While the applicant has expressed doubts as to the engineer’s ability to have
knowledge of the lack of damage in nearby buildings, there is no evidence
provided to establish the engineer was wrong in this regard. The material
presented also includes an image of the nearby large brick church that is
described to be free of any signs of earthquake damage, that building being
more susceptible to such damage, according to the engi neer’s report.
24. Overall, I am not satisfied that the applicant has established a loss caused by
earthquake or any other event listed as covered under the policy. On that basis,
the claim cannot succeed.
CONCLUSION
25. I determine the FSP is entitled to refuse the claim.