Home / Financial Firm (Unknown - Insurer) / Determination 212028
Determination 212028
Storm damage to farm shed roof - indemnity declined on design, workmanship and maintenance exclusions
Summary
Strong winds damaged the roof of a farm chicken shed and the applicants claimed $21,406.91 for re-roofing. The FSP declined on structural defect, faulty workmanship and maintenance grounds, and AFCA found it had not proved those exclusions and ordered reimbursement with statutory interest at 8.25%.
The insurer bears the onus of proving an exclusion or general-condition breach and failed to adduce detailed evidence, particularly where the roof had been in place for 23 years without incident.
Issues
- Claim denial primary · upheld
“I find that the FSP has failed to meet the onus on it in relying on policy exclusions and general conditions to deny indemnity.”
- Inadequate claim investigation secondary · upheld
“It requires the FSP to submit detailed supporting evidence of alleged breaches of any legislation and building codes.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
212028 Determination 1 of 5
DETERMINATION
Case Number: 212028
Farm Buildings – storm damage – policy exclusion
– wear and tear, faulty design, faulty workmanship
SUMMARY OF FACTS
1. The applicants insured their farm property under a Rural Plan Farm Property
Damage Policy of Insurance against loss or damage caused by insured events.
2. On or about 23 September 2009, the applicants reported that the roof of
chicken shed number three at their property had been damaged by strong
winds. They stated in the claim form:
“Wind storm lifted part of roof on southern side of shed three & loosened screws
on balance of shed.”
3. They submitted a claim for the amount of $21,406.91 for the re-roofing of part
of the shed and screwing down the remainder.
4. The Financial Services Provider (FSP) appointed a building consultant to
inspect and report on the damage to the shed. After the building consultant had
submitted two reports to the FSP on the damage to the shed, the FSP declined
to indemnify the applicants for the cost of repairs to the roof on the grounds that
the damage arose from structural defects, faulty design or faulty workmanship
in the installation of the roof and the fixing methods of the roof sheets being
inadequate.
5. It also contends that the poor design and installation of the roof sheeting was
also a breach by the applicants of the general condition requiring compliance
with legislation and Australian Standards.
6. The applicants contend that the roof on shed three was replaced by a
registered builder in 1986 and, as far as the y were knew, it complied with the
building codes at that time.
ISSUE IN DISPUTE
7. Whether the FSP is entitled to deny indemnity to the applicant on the grounds
that the damage to the insured building was the result of faulty design, faulty
workmanship and/or the building had been built in breach of the building codes
that were in force in 1986.
RELEVANT POLICY PROVISIONS
“General conditions applying to all policies
What You must do when You have a policy
You must:
keep all insured property in good condition
comply with legislation and the requirements of government and statutory authorities
comply with all relevant Australian Standards
....
...
The events You are insured against
212028 Determination 2 of 5
...
6 wind, rain, hail, snow or escape of liquid
but not for loss or damage:
...
directly or indirectly caused by or arising out of:
- ...
- a structural fault, faulty design or faulty workmanship
- lack of maintenance (e.g. failure to clean out gutters) ”
REASONS FOR DECISION
8. The onus of proof is on the applicants to establish, on the balance of
probabilities, that they have suffered a loss caused by a risk insured against.
Once the applicants have established that the loss was prima facie caused by a
risk insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
The Applicants’ Submission
9. The builder who re-roofed shed three in 1986 did not have any problems with
the methods used.
10. The builder who repaired the roof after the storm damage in September 2009,
used the same methods as used on shed three and he did not suggest that
they did not comply with Australian Standards. If qualified tradespeople are not
aware of the Building Standards for poultry sheds, it should not be expected
that farmers should have that knowledge.
11. If the FSP requires such standards, a building inspection should take place
prior to taking out the policy, not after a claim has been lodged.
12. Shed number three was built in 1964 and completely re-roofed in 1986. All work
was carried out by qualified tradespeople. Sheds one and two are satisfactory
as stated by the FSP‟s building consultant, and these two sheds were re -roofed
by licensed builders in 2003 using the same materials as in sheds three and
four.
13. Sheds three and four were built in early 1960 and have been constantly
upgraded over the past 45 years. They believe the sheds have withstood the
test of time and the recent lifting of sheeting on only part of the southern side of
shed three was due to an unusually severe wind gust.
14. Over the past ten years, sheds three and four have had new footings and
concrete bin walls constructed. All sheds are 100% waterproof.
T he FSP’s Submission
15. The only expert opinion in relation to the claim was provided by its building
consultant in his reports dated 20 October 2009 and 5 February 2010.
16. The building consultant confirmed that at the time of the damage, the shed
roof did not comply with relevant Australian Standards or the Building Code of
Australia in terms of the method of installation of the roof sheets. Further,
council approval had not been obtained for the installation of the roofing
sheets which is in breach of the Local Government Act 1919.
212028 Determination 3 of 5
17. The building consultant contends that the conditions of the shed roof caused
and/or contributed to the damage. He further confirms that the shed roof was
not kept in good condition or properly maintained with regard to extensive
corrosion.
18. The damage to the shed roof is excluded as damage caused by or arising
from structural defects, faulty design or faulty workmanship in the installation
of the roof in the 1980‟s, in terms of the new sheets being installed over
existing roof sheets, and the fixing methods of the roof sheets being
inadequate.
19. The poor design and installation of the roof sheets also represents a breach
by the applicants of the general condition requiring compliance with legislation
and Australian Standards.
20. It is also of the view that the extensive corrosion of the roof sheeting
represents a breach of the General condition to keep all property in good
condition and is excluded as damage caused by or arising from a lack of
maintenance.
21. It contends that the corrosion and lack of maintenance would have been
evident to the applicants noting their advice that the roof sheets had been in
place for more than 20 years prior to the damage.
22. Further, the failure to remove old roof sheets prior to installing new roof
sheets would or should have been evident as poor workmanship and
inappropriate in the circumstances including the location being an area prone
to high winds.
23. The building consultant confirmed that the damage has arisen as a result of
the faulty and inadequate fixing of the roof sheets to the shed and accordingly
the damage complained of is excluded from cover under the policy.
24. The shed roof sheets should have been installed in compliance with relevant
Australian Standards and the Building Code of Australia and manufacturer‟s
recommendations. In particular, that the old roof sheeting should have been
removed prior to installation of the new sheets and, further, the roof sheets
should have been adequately fixed to the shed structure in order to avoid the
type of damage complained of and the failure to remove the old sheeting prior
to installation of the new roof sheets is faulty workmanship.
25. The applicants have not provided any independent expert opinion in support
of their position with the only expert opinion available confirming that the
roofing installed on the shed prior to the damage was poorly designed and
installed.
26. Further, the work was non- compliant with both the manufacturer‟s
specifications and the relevant Australian Standards and that these aspects
resulted in the damage complained of. Therefore, all loss and damage is
excluded under its policy of insurance.
Consideration of each party’s submission
27. The FSP contends that storm damaged shed roof:
did not comply with:
212028 Determination 4 of 5
o Australian Standards, or
o the Building Code of Australia;
Council approval had not been obtained which was in breach of the
Local Government Act 1919.
Had not been kept in good condition or properly maintained with regard
to corrosion.
28. The FSP denied indemnity for the storm damage on the grounds:
The damage to the shed roof was caused by or arising from structural
defects, faulty design or faulty workmanship which are excluded under
the policy of insurance;
The faulty workmanship was the result of the new roof sheets being
installed over the original roof sheets and the method of fixing was
inadequate; and
There was extensive corrosion of the roof which was in breach of the
general condition to keep all insured property in good condition.
29. The applicants contend that shed three was built in early 1960 and was re-
roofed in 1986 by a qualified builder. As far as they knew, the building met all
statutory requirements and had met the Building Code of the day.
30. They also contend that the shed was constantly upgraded and had withstood
the „test of time‟.
31. The FSP‟s building consultant stated that the damaged roof did not comply with
the relevant Australian Standards or the Building Code of Australia. However,
he has not submitted any evidence in support of his contentio n nor has he
stated in what respect the roof did not comply with the standards mentioned.
32. The building consultant has stated, “The damaged roof sheets displayed signs
of extensive corrosion in numerous locations.” However, he did not submit any
evidence of this other than some photographs of minor corrosion to three
sheets of roofing iron.
33. The building consultant did submit some images of shed number four which
showed some damage. However, shed four is not the subject of this dispute.
34. The FSP contends that the damage to the roof was caused by or arose from
structural defects, faulty design or faulty workmanship due to the replacement
roof being constructed over the original roof and the fixing methods being
inadequate.
35. In view of this, the FSP states that poor design and installation of the roof
sheeting represents a breach by the applicants of the general condition
requiring compliance with legislation and Australian Standards. However, the
FSP has not submitted any evidence in support of its contention.
36. The Financial Ombudsman Service has been informed by the applicants that
they supplied chickens to a processor who required them to insulate the roofs
of their chicken sheds. Instead of remo ving the original roof of shed three, they
decided to place the insulation on top of the original roof and place a new roof
on top of the insulation. I note that the building consultant did not mention these
alterations to the roof.
212028 Determination 5 of 5
CONCLUSION
37. As stated above, the onus is on the FSP to establish that, on the balance of
probabilities, the claim falls within an exclusion of the policy or was the result of
a breach of a General condition.
38. This onus is a heavy burden requiring more than statements about the
condition of something such as the roof in question. It requires the FSP to
submit detailed supporting evidence of alleged breaches of any legislation and
building codes. This is particularly the case when the roof has been in situ for
23 years, without incident.
39. Therefore, I find that the FSP has failed to meet the onus on it in relying on
policy exclusions and general conditions to deny indemnity to the applicants.
Accordingly, I determine that the FSP reimburse the applicants the amount of
$21,406.91 less any applicable policy excess.
40. The applicants paid the amount of $21,406.91 in April 2010. Therefore, I
determine that the FSP is to pay statutory interest on the $21,406.91, less any
applicable policy excess at the rate of 8.25% from the 4 May 2010, the date of
the final IDR decision, to the date on which payment is made.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.