Home / Financial Firm (Unknown - Insurer) / Determination 210969
Determination 210969
claim_denial
Summary
The body corporate claimed for structural cracking to a strata building and sought exploratory costs and a report fee, and the FSP declined on the basis of exclusions. AFCA ordered the FSP to pay for the reasonable exploratory works and site clean-up to determine the cause, with any indemnity decision deferred until that investigation is reported.
The policy's exploratory-costs clause is ambiguous and must be construed contra proferentem in the policyholder's favour, so exploratory costs are covered regardless of whether a claim is ultimately payable.
Issues
- Claim denial primary · upheld
“I do not consider that there are grounds to rely on the Wayne Tank principle as the exact nature of the loss is still to be determined”
- Inadequate claim investigation secondary · not upheld
“The contention that the onus is on the FSP to investigate and prove or disprove the claim is incorrect”
- Product terms interpretation secondary · upheld
“the FSP cannot have it both ways; I am inclined to invoke contra proferentum”
Subjects and remedies
home or building damagepay claim
Text of the determination
210969 Determination 1 of 5
DETERMINATION
Case number: 210969
Body Corporate – structural damage to building and surrounds
– exploratory costs and consideration of cause
SUMMARY OF FACTS
1. The applicant is a body corporate for a double story dwelling of multiple units. It
is represented by an agent. For the purposes of this Determination, the parties
will be treated as one and the same.
2. The applicant held a broad form Residential Strata Insurance Plan policy with
the Financial Services Provider (FSP) from 13 February 1994.
3. On or about 16 March 2009, the applicant received an expert report regarding
existing damage to several units and the surrounding concrete. The report
concluded that further work was necessary to evaluate the cause of this
damage and to rectify possible underground storm pipe defects. It was
submitted to the FSP as part of a claim for loss.
4. The FSP appointed its own expert who considered that the loss was due to
gradual deterioration, wear and tear and other factors not covered by the policy.
This led it to decline the claim.
5. The applicant rejects this finding and seeks indemnity for further exploration
costs (estimated at $2,570) plus the report obtained for $880. The total
rectification work to be undertaken has been broadly estimated by the FSP at
$20,000.
ISSUES IN DISPUTE
6. Whether the applicant has established that the loss has been incurred as a
result of an insured event; and
7. If not, whether the applicant is entitled to receive extra benefit from the FSP to
conduct further exploratory works to determine a cause of the damage.
RELEVANT POLICY PROVISIONS
Page 24 of the Residential Strata Insurance Plan document (policy)
“We insure [y]ou... against ACCIDENTAL LOSS or DAMAGE to [y]our [i]nsured [p]roperty...”
Page 28 of the policy
“We will pay for the reasona ble exploratory costs [y]ou necessarily incur in locating the
source of... leaking, discharging or overflowing... pipes...
We will also pay for the reasonable costs incurred in:
a. repairing... [i]nsured [p]roperty damaged by such exploratory work;
b. repairing or replacing the defective part... to a limit of $1,000...
We will not pay for any... costs if the... leaking... is caused by rust, oxidation, corrosion,
[w]ear, [t]ear, gradual corrosion, gradual deterioration, [e]arth movement or by trees, plants
or their roots.”
210969 Determination 2 of 5
Page 32 of the policy
“Exclusions – what we do not insure
... We will not pay for loss or damage...
c. caused by lack of maintenance... or failure to maintain [y]our... [p]roperty in a
reasonably good state of repair.
d. caused by non-rectification of (a)... defect... that you were aware of or should
reasonably have been aware of...
g. caused by vibration or from the... weakening of or interference with the support of the
land or buildings...
i. caused by the invasion of tree or plant roots...
m due to no rmal settling, creeping... shrinkage, or expansion in buildings...”
RELEVANT LAW
Section 54 of the Insurance Contracts Act 1984 (insofar as it is relevant to this claim)
provides that where but for this section an insurer may refuse to pay a claim, either in whole
or in part by reason of some act of the insured or another person, being an act that occurred
after the contract was entered into, the insurer may not refuse to pay that claim by reason
only of that act, but its liability in respect of the claim is reduced by the amount that fairly
represents the extent to which the insurer’s interests were prejudiced by that act, and where
the act could reasonably be regarded as being capable of causing or contributing to a loss in
respect of which cover is provided by the contract, the insurer may refuse to pay the claim.
Contra proferentum - the obligation is on the FSP to ensure its policy wording is expressed
clearly. A FSP who frames the document which constitutes the contract of insurance, is
bound to make its meaning clear in order to prevent a policyholder being misled into the
false belief he/she is to receive a benefit to which he/she is entitled. It is the FSP’s obligation
to ensure its policy wording is precise and clear in its intent. Any ambiguity is resolved by
adopting the construction most favourable to the policyholder in accordance with the rule of
contra proferentum. In other words the contract of insurance is strictly construed against the
FSP relying on it.
Wayne Tank & Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57 (the
“Wayne Tank principle”) - matter in which the court held that a policy which contains an
express exclusion of cover in respect of a loss resulting from a specific cause, might enable
an insurer/underwriter to escape liability for that cause, even if there is a concurrent cause of
the loss which falls within the cover. Put simply, if there are two causes of a loss where one
is subject to cover and the other is not, an insurer might cite the “Wayne Tank principle” to
avoid payment of the claim.
REASONS FOR DECISION
8. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
The Applicant’s Submission
9. The applicant has evidence of obvious cracks within the structure of the
building, affecting several units and the concrete surrounding the structure.
10. It relies on an expert report that submits that the damage is likely attributable to
leaking storm water and sewerage pipes under the property.
11. The applicant cites Section 54 of the Insurance Contracts Act 1984 (the Act) in
suggesting that the FSP has an obligation to fully investigate the cause of the
loss, prior to declining the claim.
210969 Determination 3 of 5
12. It further relies upon the clause in the policy that allows for investigation of the
cause of leaks to a limit of $1,000.
The FSP’ s Submission
13. The FSP submits that there is no evidence to suggest that the damage was
caused as a result of an insured event.
14. The onus is on the applicant to establish this in order to seek coverage under
the policy.
15. The damage that has been located fits within exclusions under the policy and
would not entitle the applicant to cover.
16. Even if further exploratory work were to be done, the aforementioned
exclusions would entitle the FSP to avoid cover, subject to its reliance on the
“Wayne Tank” principle.
Consideration of each party’s submission
17. The applicant noticed severe cracking to both interior and exterior walls at the
unit block and commissioned a report from a building engineer to review the
damage.
18. The report identified that the likely cause of the loss was defective storm, sewer
or water systems under the property, combining to “create unnatural moisture
patterns surrounding the building”.
19. The engineer suggested that further study be undertaken, including installing
CCTV cameras to view the performance of the drains and pipes, as well as
fitting out the downpipes with inspection ports for easy access. The engineer
suggested 12 months of monitoring to identify the actual problem, before a
correct diagnosis and remedial action is undertaken.
20. Upon receipt of this report, the FSP appointed its own agent to review the
property and provide a report.
21. The FSP’s expert concluded that the engineer’s report was “equivocal,
contradictory... (and) speculative”. The FSP’s expert concluded that the
engineer failed to determine a cause of the loss.
22. The FSP’s expert was critical that the engineer failed to test the soil or conduct
leak detection tests in reaching his opinion and submitted that the most likely
cause of the loss was structural movement from subsidence, the influence of
nearby tree roots and foliage, the age of the underground pipes, and other
factors that would be excluded from cover under the policy.
23. The engineer had not dismissed these possibilities from his analysis, but
reached a different conclusion. In fairness, he submitted that the analysis would
be subject to further work to investigate the state of affairs underground at the
property.
24. The FSP denied the claim and has expressed reliance on the Wayne Tank
principle to avoid further work to assess the damage.
25. The Wayne Tank principle is based on a case that determined where two
identified causes of an incident (one covered by the policy and one excluded)
210969 Determination 4 of 5
are present; the FSP is entitled to rely upon the exclusion to avoid cover for the
claim.
26. This principle is based on the identification of a dominant or proximate cause of
the loss. If the dominant cause is excluded from cover, it can be relied upon to
avoid the claim. In the event that the causes are concurrent in their contribution
to the loss, the exclusion may be also relied upon.
27. The reliance on the Wayne tank principle is still dependent on identifying
specific causes of the loss and where exclusions may exist.
28. The exclusions relied upon by the FSP in this instance are unable to be
considered as the exact influence of the possible leakage underground (and the
other possible contributing factors) has not been identified. I do not consider
that there are grounds to rely on the Wayne Tank principle as the exact nature
of the loss is still to be determined.
29. The final analysis of the actual cause of the loss is inconclusive. Both experts
have suggested probable causes of the damage, but neither could convincingly
reach a conclusion that is definitive as to the cause.
30. In that context, I agree with the engineer that further analysis is appropriate to
ascertain a cause of the damage to the applicant’s property.
31. The applicant has cited Section 54 of the Act to submit that an onus is on the
FSP to fully investigate the cause of the loss. This section determines that the
FSP can only limit payment on a claim to the extent to which it has been
prejudiced by the actions of the applicant.
32. The contention that the onus is on the FSP to investigate and prove or disprove
the claim is incorrect and the reliance of the applicant on Section 54 in this
instance is misplaced.
33. There is an onus on the applicant to establish on the balance of probabilities
that a claim fits the definition of an insured event. Should this onus be
discharged, it is then the responsibility of the FSP to establish the application of
any exclusion on which it relies to deny the claim.
34. The applicant has not (as yet) established that the claim was caused by an
insured event. It remains possible that this was the case, however this remains
to be proven.
35. The policy provides that the FSP will permit investigation of a potential leak to
determine if a matter is suitable for a claim. Cover will then be provided for the
relevant damage to the extent of $1,000 in the event that the loss is caused by
an event that is not excluded under the policy.
36. Whilst the policy does provide that the FSP “will not pay” for matters excluded
from cover, this cannot be determined until the relevant exploratory work is
done.
37. The relevant section (section 7 on page 28) of the policy is confusing as the
FSP undertakes to “pay the reasonable exploratory costs” incurred, but later
revokes this right to recover these costs in a final paragraph that focuses on
whether the identified damage is relevant to the claim.
210969 Determination 5 of 5
38. This first paragraph clearly allows for the incurring of reasonable costs for
exploring the source of the leaking pipes, which would be relevant for the
applicant in this instance.
39. The second paragraph references items to be considered in addition to the
exploratory works. This leaves the reader (in this case the applicant) with the
impression that the relevant costs for exploratory work to determine a cause of
the loss should be covered.
40. The third paragraph places a condition on the cover for costs, being that the
costs incurred must be relevant to a loss claimable under the policy. It is not
specified if this paragraph should be relevant to all of section 7 or simply to the
second paragraph, which identifies specific additional costs that might
reasonably be considered claim relevant.
41. It appears wrong that the FSP should permit exploratory work to ascertain if
damage is claimable, but then revoke this entitlement with the condition that it
must be claim related.
42. The FSP cannot have it both ways. In considering section 7 of the policy and
the relevant three paragraphs, I am inclined to invoke contra proferentum in
order to consider that the payment of exploratory costs will be covered,
regardless of whether it determines if a claim exists or not.
43. This means that the applicant is entitled to rely upon the policy for investigation
of the potenti al loss. The costs of attending to the “exploratory” investigation are
to be borne by the FSP.
44. Once this investigation is conducted, a further determination can be made as to
whether the applicant is entitled to cover for the relevant damage.
CONCLUSION
45. I determine that the FSP must attend to, or cover the cost of, the reasonable
exploratory works and clean up of the site. This action is to determine if the loss
can be attributed to an insured event.
46. Once this investigation is done, and the relevant report provided, a decision on
indemnity for the existing damage to the property can be made.