Summary

The body corporate claimed for structural cracking to a strata building and sought exploratory costs and a report fee, and the FSP declined on the basis of exclusions. AFCA ordered the FSP to pay for the reasonable exploratory works and site clean-up to determine the cause, with any indemnity decision deferred until that investigation is reported.

The policy's exploratory-costs clause is ambiguous and must be construed contra proferentem in the policyholder's favour, so exploratory costs are covered regardless of whether a claim is ultimately payable.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

210969 Determination 1 of 5 DETERMINATION Case number: 210969 Body Corporate – structural damage to building and surrounds – exploratory costs and consideration of cause SUMMARY OF FACTS 1. The applicant is a body corporate for a double story dwelling of multiple units. It is represented by an agent. For the purposes of this Determination, the parties will be treated as one and the same. 2. The applicant held a broad form Residential Strata Insurance Plan policy with the Financial Services Provider (FSP) from 13 February 1994. 3. On or about 16 March 2009, the applicant received an expert report regarding existing damage to several units and the surrounding concrete. The report concluded that further work was necessary to evaluate the cause of this damage and to rectify possible underground storm pipe defects. It was submitted to the FSP as part of a claim for loss. 4. The FSP appointed its own expert who considered that the loss was due to gradual deterioration, wear and tear and other factors not covered by the policy. This led it to decline the claim. 5. The applicant rejects this finding and seeks indemnity for further exploration costs (estimated at $2,570) plus the report obtained for $880. The total rectification work to be undertaken has been broadly estimated by the FSP at $20,000. ISSUES IN DISPUTE 6. Whether the applicant has established that the loss has been incurred as a result of an insured event; and 7. If not, whether the applicant is entitled to receive extra benefit from the FSP to conduct further exploratory works to determine a cause of the damage. RELEVANT POLICY PROVISIONS Page 24 of the Residential Strata Insurance Plan document (policy) “We insure [y]ou... against ACCIDENTAL LOSS or DAMAGE to [y]our [i]nsured [p]roperty...” Page 28 of the policy “We will pay for the reasona ble exploratory costs [y]ou necessarily incur in locating the source of... leaking, discharging or overflowing... pipes... We will also pay for the reasonable costs incurred in: a. repairing... [i]nsured [p]roperty damaged by such exploratory work; b. repairing or replacing the defective part... to a limit of $1,000... We will not pay for any... costs if the... leaking... is caused by rust, oxidation, corrosion, [w]ear, [t]ear, gradual corrosion, gradual deterioration, [e]arth movement or by trees, plants or their roots.” 210969 Determination 2 of 5 Page 32 of the policy “Exclusions – what we do not insure ... We will not pay for loss or damage... c. caused by lack of maintenance... or failure to maintain [y]our... [p]roperty in a reasonably good state of repair. d. caused by non-rectification of (a)... defect... that you were aware of or should reasonably have been aware of... g. caused by vibration or from the... weakening of or interference with the support of the land or buildings... i. caused by the invasion of tree or plant roots... m due to no rmal settling, creeping... shrinkage, or expansion in buildings...” RELEVANT LAW Section 54 of the Insurance Contracts Act 1984 (insofar as it is relevant to this claim) provides that where but for this section an insurer may refuse to pay a claim, either in whole or in part by reason of some act of the insured or another person, being an act that occurred after the contract was entered into, the insurer may not refuse to pay that claim by reason only of that act, but its liability in respect of the claim is reduced by the amount that fairly represents the extent to which the insurer’s interests were prejudiced by that act, and where the act could reasonably be regarded as being capable of causing or contributing to a loss in respect of which cover is provided by the contract, the insurer may refuse to pay the claim. Contra proferentum - the obligation is on the FSP to ensure its policy wording is expressed clearly. A FSP who frames the document which constitutes the contract of insurance, is bound to make its meaning clear in order to prevent a policyholder being misled into the false belief he/she is to receive a benefit to which he/she is entitled. It is the FSP’s obligation to ensure its policy wording is precise and clear in its intent. Any ambiguity is resolved by adopting the construction most favourable to the policyholder in accordance with the rule of contra proferentum. In other words the contract of insurance is strictly construed against the FSP relying on it. Wayne Tank & Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57 (the “Wayne Tank principle”) - matter in which the court held that a policy which contains an express exclusion of cover in respect of a loss resulting from a specific cause, might enable an insurer/underwriter to escape liability for that cause, even if there is a concurrent cause of the loss which falls within the cover. Put simply, if there are two causes of a loss where one is subject to cover and the other is not, an insurer might cite the “Wayne Tank principle” to avoid payment of the claim. REASONS FOR DECISION 8. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 9. The applicant has evidence of obvious cracks within the structure of the building, affecting several units and the concrete surrounding the structure. 10. It relies on an expert report that submits that the damage is likely attributable to leaking storm water and sewerage pipes under the property. 11. The applicant cites Section 54 of the Insurance Contracts Act 1984 (the Act) in suggesting that the FSP has an obligation to fully investigate the cause of the loss, prior to declining the claim. 210969 Determination 3 of 5 12. It further relies upon the clause in the policy that allows for investigation of the cause of leaks to a limit of $1,000. The FSP’ s Submission 13. The FSP submits that there is no evidence to suggest that the damage was caused as a result of an insured event. 14. The onus is on the applicant to establish this in order to seek coverage under the policy. 15. The damage that has been located fits within exclusions under the policy and would not entitle the applicant to cover. 16. Even if further exploratory work were to be done, the aforementioned exclusions would entitle the FSP to avoid cover, subject to its reliance on the “Wayne Tank” principle. Consideration of each party’s submission 17. The applicant noticed severe cracking to both interior and exterior walls at the unit block and commissioned a report from a building engineer to review the damage. 18. The report identified that the likely cause of the loss was defective storm, sewer or water systems under the property, combining to “create unnatural moisture patterns surrounding the building”. 19. The engineer suggested that further study be undertaken, including installing CCTV cameras to view the performance of the drains and pipes, as well as fitting out the downpipes with inspection ports for easy access. The engineer suggested 12 months of monitoring to identify the actual problem, before a correct diagnosis and remedial action is undertaken. 20. Upon receipt of this report, the FSP appointed its own agent to review the property and provide a report. 21. The FSP’s expert concluded that the engineer’s report was “equivocal, contradictory... (and) speculative”. The FSP’s expert concluded that the engineer failed to determine a cause of the loss. 22. The FSP’s expert was critical that the engineer failed to test the soil or conduct leak detection tests in reaching his opinion and submitted that the most likely cause of the loss was structural movement from subsidence, the influence of nearby tree roots and foliage, the age of the underground pipes, and other factors that would be excluded from cover under the policy. 23. The engineer had not dismissed these possibilities from his analysis, but reached a different conclusion. In fairness, he submitted that the analysis would be subject to further work to investigate the state of affairs underground at the property. 24. The FSP denied the claim and has expressed reliance on the Wayne Tank principle to avoid further work to assess the damage. 25. The Wayne Tank principle is based on a case that determined where two identified causes of an incident (one covered by the policy and one excluded) 210969 Determination 4 of 5 are present; the FSP is entitled to rely upon the exclusion to avoid cover for the claim. 26. This principle is based on the identification of a dominant or proximate cause of the loss. If the dominant cause is excluded from cover, it can be relied upon to avoid the claim. In the event that the causes are concurrent in their contribution to the loss, the exclusion may be also relied upon. 27. The reliance on the Wayne tank principle is still dependent on identifying specific causes of the loss and where exclusions may exist. 28. The exclusions relied upon by the FSP in this instance are unable to be considered as the exact influence of the possible leakage underground (and the other possible contributing factors) has not been identified. I do not consider that there are grounds to rely on the Wayne Tank principle as the exact nature of the loss is still to be determined. 29. The final analysis of the actual cause of the loss is inconclusive. Both experts have suggested probable causes of the damage, but neither could convincingly reach a conclusion that is definitive as to the cause. 30. In that context, I agree with the engineer that further analysis is appropriate to ascertain a cause of the damage to the applicant’s property. 31. The applicant has cited Section 54 of the Act to submit that an onus is on the FSP to fully investigate the cause of the loss. This section determines that the FSP can only limit payment on a claim to the extent to which it has been prejudiced by the actions of the applicant. 32. The contention that the onus is on the FSP to investigate and prove or disprove the claim is incorrect and the reliance of the applicant on Section 54 in this instance is misplaced. 33. There is an onus on the applicant to establish on the balance of probabilities that a claim fits the definition of an insured event. Should this onus be discharged, it is then the responsibility of the FSP to establish the application of any exclusion on which it relies to deny the claim. 34. The applicant has not (as yet) established that the claim was caused by an insured event. It remains possible that this was the case, however this remains to be proven. 35. The policy provides that the FSP will permit investigation of a potential leak to determine if a matter is suitable for a claim. Cover will then be provided for the relevant damage to the extent of $1,000 in the event that the loss is caused by an event that is not excluded under the policy. 36. Whilst the policy does provide that the FSP “will not pay” for matters excluded from cover, this cannot be determined until the relevant exploratory work is done. 37. The relevant section (section 7 on page 28) of the policy is confusing as the FSP undertakes to “pay the reasonable exploratory costs” incurred, but later revokes this right to recover these costs in a final paragraph that focuses on whether the identified damage is relevant to the claim. 210969 Determination 5 of 5 38. This first paragraph clearly allows for the incurring of reasonable costs for exploring the source of the leaking pipes, which would be relevant for the applicant in this instance. 39. The second paragraph references items to be considered in addition to the exploratory works. This leaves the reader (in this case the applicant) with the impression that the relevant costs for exploratory work to determine a cause of the loss should be covered. 40. The third paragraph places a condition on the cover for costs, being that the costs incurred must be relevant to a loss claimable under the policy. It is not specified if this paragraph should be relevant to all of section 7 or simply to the second paragraph, which identifies specific additional costs that might reasonably be considered claim relevant. 41. It appears wrong that the FSP should permit exploratory work to ascertain if damage is claimable, but then revoke this entitlement with the condition that it must be claim related. 42. The FSP cannot have it both ways. In considering section 7 of the policy and the relevant three paragraphs, I am inclined to invoke contra proferentum in order to consider that the payment of exploratory costs will be covered, regardless of whether it determines if a claim exists or not. 43. This means that the applicant is entitled to rely upon the policy for investigation of the potenti al loss. The costs of attending to the “exploratory” investigation are to be borne by the FSP. 44. Once this investigation is conducted, a further determination can be made as to whether the applicant is entitled to cover for the relevant damage. CONCLUSION 45. I determine that the FSP must attend to, or cover the cost of, the reasonable exploratory works and clean up of the site. This action is to determine if the loss can be attributed to an insured event. 46. Once this investigation is done, and the relevant report provided, a decision on indemnity for the existing damage to the property can be made.