Home / Financial Firm (Unknown - Insurer) / Determination 210823
Determination 210823
Water leak damage: partial liability and loss of rent limited
Summary
A leaking pipe caused damage to a strata unit over an extended period, and the FSP limited its liability to bedroom two, the hallway and one month's loss of rent. AFCA found the bathroom and bedroom one damage was also caused by the leak and ordered 75% of the repair costs for three rooms plus 75% of loss of rent from 23 November 2009.
The mould in the bathroom and bedroom one was caused by the leaking pipe rather than maintenance, since the FSP offered no detailed expert evidence of ventilation problems, but the FSP was not liable for damage before the claim was lodged.
Issues
- Claim denial primary · upheld
“I determine the FSP is liable to indemnify the applicant for 75% of the damage resulting from the leak to all three rooms.”
- Inadequate claim investigation secondary · upheld
“The FSP has not provided a full inspection report discussing the areas of damage in detail.”
Subjects and remedies
home or building damagepay claimpay compensation
Text of the determination
210823 Determination 1 of 4
DETERMINATION
CASE NO: 210823
Strata – building – extent of damage
SUMMARY OF FACTS
1. The applicant owns a unit insured under a Strata Building and Common
Contents policy with the Financial Services Provider (FSP).
2. In 2008, a leaking pipe was repaired at the property. The tenants reported
issues with mould and the property manager advised them to better ventilate
the property. In June 2009, another section of the pipe was repaired, following
another leak. The tenants reported further issues with mould and damp at the
property and the agent contacted the body corporate.
3. The body corporate eventually lodged a claim with the FSP on 23 November
2009. The FSP assessed the claim and accepted some damage to the property
was the result of the leaking pipe. It initially agreed to settle repair costs for
bedroom two, the hallway and exploratory repairs.
4. It subsequently agreed to pay for repairs to bedroom two, the hallway and
exploratory costs and repairs. However, the FSP refused indemnity for the
bathroom and bedroom one on the basis that the mould in those areas was the
result of poor ventilation. The FSP also agreed to settle loss of rent for one
month, noting the damage could have been assessed and repaired in a month.
5. The applicant disputed the settlement, noting the water leak was significant and
the damage to all areas was the result of the leaking pipe.
6. The FSP’s internal disputes resolution department reviewed the matter at the
request of the applicant. It maintained the decision to limit the claim to bedroom
two, the hallway, exploratory costs and exploratory repairs and loss of rent for
one month.
7. The applicant continues to dispute the FSP’s position, arguing the leak was
significant and the delays have resulted in loss of rent. The applicant claims all
damage is the result of the leaking pipe and seeks loss of rent payments from
10 July 2009.
ISSUE IN DISPUTE
8. Whether the FSP is entitled to limit its liability to $2,615.30 under the terms and
conditions of the policy.
RELEVANT POLICY PROVISIONS
“ 5. Care and Maintenance
You must take all reasonable care and precautions to prevent or minimise loss, damage,
injury, illness or liability including your compliance with any law, by-law, ordinance or
regulation that concerns the safety of persons or property. Should any damage have
occurred prior to commencement of the insurance and such damage has not been repaired
or made good we shall not be liable for such damage or any consequential loss, destruction
or damage.
210823 Determination 2 of 4
…
6. Claims Procedures
On the happening of any occurrence or event , which may give rise to a claim, you must:
(a) take all reasonable precautions to prevent further loss, damage or liability;
…
Building and Common Contents
What you are insured against
We agree to indemnity you against physical damage to your building and common contents
occurring during the period of insurance .
…
building does not mean:
…
(c) window coverings, internal blinds, carpets or light fittings other than in common areas.
…
common contents does not mean:
…
(b) personal property owned by the unit owner.
…
Additional Benefits above the Sum Insured
We will pay the following additional benefits over and above the sum insured .
…
4. Loss of rent
We will pay the relevant unit owner for loss of rent where:
(a) an insured loss or damage renders a unit or units unfit to be occupied for their intended
purpose; or
…
Exclusions
We do not insure you against loss or damage caused directly or indirectly by or arising out
of:
…
10. birds, moths, termites or other insects, vermin or wildlife, rust or oxidation, mildew,
mould, contamination or pollution, wet or dry rot, corrosion, change of colour, algae,
dampness or atmosphere or other variations in temperature, ”
REASONS FOR DECISION
9. There has been an exchange of the material upon which the disputing parties
rely. Accordingly, I am satisfied each party has had full access to the material
on which the other party bases its case, and also an opportunity to reply to any
matters raised. In view of the aforesaid, it is unnecessary to analyse the
material in any detail unless required.
10. In this case, the applicant submits all the damage was caused by a significant
water leak in the pipe. He argues the mould in bedrooms one and two and in
the bathroom was the result of the burst pipe and should therefore be covered
under the policy. He disputes the submission the bathroom has a lack of
ventilation, arguing a fan was installed which operates when the light is
switched on. He argues in addition to the damage, he is entitled to loss of rent
210823 Determination 3 of 4
from 10 July 2009 as the property has not been rented out due to the body
corporate and FSP delays in dealing with the claim and accepting liability.
11. The FSP argues it has offered to cover the damage from the leaking pipe and
the other claimed damage is maintenance related and therefore not covered
under the policy. The FSP argues the claim was not lodged until November
2009 and therefore, it has no liability for loss of rent other than the one month it
has agreed to pay, noting the claim could have been assessed and settled
within a month. The FSP argues carpet is excluded under the policy.
Consideration of each part y’s submission
12. I have considered the submissions of the parties in relation to the terms and
conditions of the policy.
13. Having reviewed the video of the water leak provided by the applicant, I am
satisfied the leak was a significant event. Noting the leak may have been
occurring for months prior to the leak exploration and repair, I accept on the
balance of probabilities, that a significant amount of water from the leak would
have entered the applicant’s property.
14. The FSP submits its loss adjustor and the building contractor (organised by the
body corporate) agreed the damage was limited to bedroom two and the hall.
The building quotation, dated 13 January 2010, includes the repairs required as
the result of the leak. The loss adjustor’s second report, dated 14 January 2010
states:
“We recently discussed this matter with [builder] and it was indicated that not all
structural repairs relate to insurance… It was agreed that damage which has
occurred in bedroom two is the only area which relates to insurance from the
leaking pipe.
…
There is extensive mould in the bathroom on both walls and ceiling. At the time
of our recent inspection it was agreed that this unit has ventilation problem which
is causing this damage in the bathroom.”
15. The FSP has not provided a full inspection report discussing the areas of
damage in detail, outlining why some areas are covered and some are not. The
FSP’s loss adjustor refers to the property having ventilation issues; however,
provides no specific details to clarify where and what the issues are. In short,
the FSP’s submission lacks detail.
16. The applicant submits he has a fan in the bathroom which operates when the
light is switched on. He provides a photograph of the fan. The FSP makes no
submission on the existence of the ventilation fan. I am therefore left in the
position of having to accept the bathroom did in fact have ventilation.
17. The video of the leaking pipe indicates, on the balance of probabilities; that a
significant amount of water would have entering the property in the period
before the leak was rectified. The applicant has established the bathroom has
ventilation, while the FSP’s expert evidence on the alleged ventilation issues is
minimal to say the least.
18. The applicant also provides an undated condition report from a gas appliance
company which states the damage to the property is the result of the leaking
pipe going back to 2008.
210823 Determination 4 of 4
19. Based on the evidence before me, I can only conclude the damage to the
property was the result of the leaking pipe. The FSP has not provided any
detailed or persuasive expert evidence to indicate the damage is the result of
maintenance issues.
20. The policy with the FSP commenced 06 March 2009. Noting the damage would
appear to have been occurring since 2008, it would appear the FSP cannot
reasonably be held liable for all the damage. However, noting the amount of
water coming from the pipe in the video, I am satisfied the FSP’s liability would
still be significant. Assessing the issues on a fair and reasonable basis, I
determine the FSP is to settle 75% of the repairs costs for the three affected
rooms.
21. With relation to the loss or rent issue, I accept the FSP had no liability before
the claim was lodged, being some months after damage had been discovered. I
am therefore satisfied the FSP is only liable for loss of rent payments from 23
November 2009. In the circumstances, I determine the FSP is to settle 75% of
the loss of rent from 23 November 2009.
22. The case manager spoke to the applicant about the carpet issue and the
applicant advised the other insurer has agreed to cover all the carpet in the
unit. Therefore, I am not required to consider the matter of carpet cover.
CONCLUSION
23. Accordingly, I determine the FSP is liable to indemnify the applicant for 75% of
the damage resulting from the leak to all three rooms. Additionally, I determine
the FSP is liable to compensate the applicant 75% of the loss of rent from 23
November 2009 until such time as the repairs are completed.
24. The FSP may decide to reassess the claim or accept the quotes provided by
the applicant. I note the FSP is not required to pay for any upgrade at the
property. If the FSP decides to cash settle the claim, it should make a
reasonable allowance for loss of rent payments for the period of time it would
reasonably take to complete the repairs. Likewise, the applicant has an onus to
ensure any works are completed in a timely manner.
25. I trust the parties will co-operate in good faith in resolving the matter. If the
parties cannot resolve the compensation issue amicably, the matter can be
referred back to the Service for determination.