Determination 210823

Water leak damage: partial liability and loss of rent limited

FirmFinancial Firm (Unknown - Insurer)
Decided2010-10-26
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A leaking pipe caused damage to a strata unit over an extended period, and the FSP limited its liability to bedroom two, the hallway and one month's loss of rent. AFCA found the bathroom and bedroom one damage was also caused by the leak and ordered 75% of the repair costs for three rooms plus 75% of loss of rent from 23 November 2009.

The mould in the bathroom and bedroom one was caused by the leaking pipe rather than maintenance, since the FSP offered no detailed expert evidence of ventilation problems, but the FSP was not liable for damage before the claim was lodged.

Issues

Subjects and remedies

home or building damagepay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

210823 Determination 1 of 4 DETERMINATION CASE NO: 210823 Strata – building – extent of damage SUMMARY OF FACTS 1. The applicant owns a unit insured under a Strata Building and Common Contents policy with the Financial Services Provider (FSP). 2. In 2008, a leaking pipe was repaired at the property. The tenants reported issues with mould and the property manager advised them to better ventilate the property. In June 2009, another section of the pipe was repaired, following another leak. The tenants reported further issues with mould and damp at the property and the agent contacted the body corporate. 3. The body corporate eventually lodged a claim with the FSP on 23 November 2009. The FSP assessed the claim and accepted some damage to the property was the result of the leaking pipe. It initially agreed to settle repair costs for bedroom two, the hallway and exploratory repairs. 4. It subsequently agreed to pay for repairs to bedroom two, the hallway and exploratory costs and repairs. However, the FSP refused indemnity for the bathroom and bedroom one on the basis that the mould in those areas was the result of poor ventilation. The FSP also agreed to settle loss of rent for one month, noting the damage could have been assessed and repaired in a month. 5. The applicant disputed the settlement, noting the water leak was significant and the damage to all areas was the result of the leaking pipe. 6. The FSP’s internal disputes resolution department reviewed the matter at the request of the applicant. It maintained the decision to limit the claim to bedroom two, the hallway, exploratory costs and exploratory repairs and loss of rent for one month. 7. The applicant continues to dispute the FSP’s position, arguing the leak was significant and the delays have resulted in loss of rent. The applicant claims all damage is the result of the leaking pipe and seeks loss of rent payments from 10 July 2009. ISSUE IN DISPUTE 8. Whether the FSP is entitled to limit its liability to $2,615.30 under the terms and conditions of the policy. RELEVANT POLICY PROVISIONS “ 5. Care and Maintenance You must take all reasonable care and precautions to prevent or minimise loss, damage, injury, illness or liability including your compliance with any law, by-law, ordinance or regulation that concerns the safety of persons or property. Should any damage have occurred prior to commencement of the insurance and such damage has not been repaired or made good we shall not be liable for such damage or any consequential loss, destruction or damage. 210823 Determination 2 of 4 … 6. Claims Procedures On the happening of any occurrence or event , which may give rise to a claim, you must: (a) take all reasonable precautions to prevent further loss, damage or liability; … Building and Common Contents What you are insured against We agree to indemnity you against physical damage to your building and common contents occurring during the period of insurance . … building does not mean: … (c) window coverings, internal blinds, carpets or light fittings other than in common areas. … common contents does not mean: … (b) personal property owned by the unit owner. … Additional Benefits above the Sum Insured We will pay the following additional benefits over and above the sum insured . … 4. Loss of rent We will pay the relevant unit owner for loss of rent where: (a) an insured loss or damage renders a unit or units unfit to be occupied for their intended purpose; or … Exclusions We do not insure you against loss or damage caused directly or indirectly by or arising out of: … 10. birds, moths, termites or other insects, vermin or wildlife, rust or oxidation, mildew, mould, contamination or pollution, wet or dry rot, corrosion, change of colour, algae, dampness or atmosphere or other variations in temperature, ” REASONS FOR DECISION 9. There has been an exchange of the material upon which the disputing parties rely. Accordingly, I am satisfied each party has had full access to the material on which the other party bases its case, and also an opportunity to reply to any matters raised. In view of the aforesaid, it is unnecessary to analyse the material in any detail unless required. 10. In this case, the applicant submits all the damage was caused by a significant water leak in the pipe. He argues the mould in bedrooms one and two and in the bathroom was the result of the burst pipe and should therefore be covered under the policy. He disputes the submission the bathroom has a lack of ventilation, arguing a fan was installed which operates when the light is switched on. He argues in addition to the damage, he is entitled to loss of rent 210823 Determination 3 of 4 from 10 July 2009 as the property has not been rented out due to the body corporate and FSP delays in dealing with the claim and accepting liability. 11. The FSP argues it has offered to cover the damage from the leaking pipe and the other claimed damage is maintenance related and therefore not covered under the policy. The FSP argues the claim was not lodged until November 2009 and therefore, it has no liability for loss of rent other than the one month it has agreed to pay, noting the claim could have been assessed and settled within a month. The FSP argues carpet is excluded under the policy. Consideration of each part y’s submission 12. I have considered the submissions of the parties in relation to the terms and conditions of the policy. 13. Having reviewed the video of the water leak provided by the applicant, I am satisfied the leak was a significant event. Noting the leak may have been occurring for months prior to the leak exploration and repair, I accept on the balance of probabilities, that a significant amount of water from the leak would have entered the applicant’s property. 14. The FSP submits its loss adjustor and the building contractor (organised by the body corporate) agreed the damage was limited to bedroom two and the hall. The building quotation, dated 13 January 2010, includes the repairs required as the result of the leak. The loss adjustor’s second report, dated 14 January 2010 states: “We recently discussed this matter with [builder] and it was indicated that not all structural repairs relate to insurance… It was agreed that damage which has occurred in bedroom two is the only area which relates to insurance from the leaking pipe. … There is extensive mould in the bathroom on both walls and ceiling. At the time of our recent inspection it was agreed that this unit has ventilation problem which is causing this damage in the bathroom.” 15. The FSP has not provided a full inspection report discussing the areas of damage in detail, outlining why some areas are covered and some are not. The FSP’s loss adjustor refers to the property having ventilation issues; however, provides no specific details to clarify where and what the issues are. In short, the FSP’s submission lacks detail. 16. The applicant submits he has a fan in the bathroom which operates when the light is switched on. He provides a photograph of the fan. The FSP makes no submission on the existence of the ventilation fan. I am therefore left in the position of having to accept the bathroom did in fact have ventilation. 17. The video of the leaking pipe indicates, on the balance of probabilities; that a significant amount of water would have entering the property in the period before the leak was rectified. The applicant has established the bathroom has ventilation, while the FSP’s expert evidence on the alleged ventilation issues is minimal to say the least. 18. The applicant also provides an undated condition report from a gas appliance company which states the damage to the property is the result of the leaking pipe going back to 2008. 210823 Determination 4 of 4 19. Based on the evidence before me, I can only conclude the damage to the property was the result of the leaking pipe. The FSP has not provided any detailed or persuasive expert evidence to indicate the damage is the result of maintenance issues. 20. The policy with the FSP commenced 06 March 2009. Noting the damage would appear to have been occurring since 2008, it would appear the FSP cannot reasonably be held liable for all the damage. However, noting the amount of water coming from the pipe in the video, I am satisfied the FSP’s liability would still be significant. Assessing the issues on a fair and reasonable basis, I determine the FSP is to settle 75% of the repairs costs for the three affected rooms. 21. With relation to the loss or rent issue, I accept the FSP had no liability before the claim was lodged, being some months after damage had been discovered. I am therefore satisfied the FSP is only liable for loss of rent payments from 23 November 2009. In the circumstances, I determine the FSP is to settle 75% of the loss of rent from 23 November 2009. 22. The case manager spoke to the applicant about the carpet issue and the applicant advised the other insurer has agreed to cover all the carpet in the unit. Therefore, I am not required to consider the matter of carpet cover. CONCLUSION 23. Accordingly, I determine the FSP is liable to indemnify the applicant for 75% of the damage resulting from the leak to all three rooms. Additionally, I determine the FSP is liable to compensate the applicant 75% of the loss of rent from 23 November 2009 until such time as the repairs are completed. 24. The FSP may decide to reassess the claim or accept the quotes provided by the applicant. I note the FSP is not required to pay for any upgrade at the property. If the FSP decides to cash settle the claim, it should make a reasonable allowance for loss of rent payments for the period of time it would reasonably take to complete the repairs. Likewise, the applicant has an onus to ensure any works are completed in a timely manner. 25. I trust the parties will co-operate in good faith in resolving the matter. If the parties cannot resolve the compensation issue amicably, the matter can be referred back to the Service for determination.