The applicant's home insurer denied a water damage claim relying on a shower recess exclusion. AFCA found the leak came from covered tap spindle seals and ordered the FSP to indemnify the claim under the policy.

The loss was prima facie caused by an insured leak event and the exclusion did not apply because the shower recess was not the cause of the leak.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

210587 Determination 1 of 4 DETERMINATION Case number: 210587 Home & Contents – water damage – leaking pipe SUMMARY OF FACTS 1. The applicant held a defined events home and contents insurance policy with the Financial Services Provider (FSP), which commenced on 23 January 2008. 2. On 24 March 2010, the applicant lodged a claim with the FSP for damage to his bathroom caused by a leaking pipe. The FSP’s claims lodgement system recorded the following notations: “Insd advsd water pipe burst in shower wall, damaging wall in bathroom” 3. The applicant engaged his own plumber to investigate the cause of the leak and provided a report to the FSP. The FSP also engaged a builder to provide a report. 4. The FSP denied liability on the basis that the reports provided by both the plumber and builder, identified the cause of damage to be a leaking shower recess wall and floor, which is excluded by the policy. 5. The applicant submitted an additional report from the plumber which identified the cause of damage to be leaking copper pipe work and leaking tap spindle seals, which are covered by the policy. 6. A dispute arose when the FSP maintained its denial of the claim, which the applicant believes should be covered by the policy. ISSUES IN DISPUTE 7. Whether the FSP is entitled rely on a policy exclusion to deny the applicant’s claim. RELEVANT POLICY PROVISONS “What we cover We cover loss or damage caused by insured events 1 to 12 When we insure them, your home and contents are covered for loss or damage by the insured events 1 to 12 at the insured address. What you are covered for Insured events 1 to 12 ... 2. Burst pipes, leaks and overflows ... We do not cover  ...  ...  the repair of a leaking shower floor or base, shower cubicle walls, shower glass screening or shower doors, or any damaged caused by the leak  ... What you are not covered for We do not cover 210587 Determination 2 of 4 Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot...” REASONS FOR DECISION 8. I am satisfied that there has been an exchange of material on which the parties rely. Each party has full access to the material on which the other party relies. Consequently it is not necessary to go into all the material in detail. The Applicant’s Submission 9. The applicant submits that the leaking shower should be fixed by the FSP. He lodged the claim and obtained two reports. He was also told if the damage was caused by the plumbing, it would be repaired. The FSP’s Submission 10. The FSP has relied on expert reports provided by its preferred builder , and the applicant’s plumber , as both of these reports identified the cause of damage to be a leaking recess shower floor and wall, which are excluded by the policy. It therefore claims it is entitled to decline the applicant’s claim. 11. The applicant submitted a further report from the plumber which identified that leaking copper pipe work also contributed to the damage. The FSP submits that little weight should be placed on this report as it has been clearly amended. It is unusual that the plumber would have failed to note this in his original report. 12. Notwithstanding this, the FSP submits that even if it accepts that the leaking tap spindle contributed to the loss, it is an accepted principle of insurance law, that where there are two or more concurrent proximate causes of damage, one of which is covered by the policy and one of which is excluded, the FSP is entitled to rely on the policy exclusion in declining the claim in its entirety. 13. The FSP submits that in this instance there are four proximate causes of damage as follows:  Leaking tap combination (covered by the policy)  Leaking tap spindle (covered by the policy)  Leaking shower recess floor (excluded by the policy)  Leaking shower recess wall (excluded by the policy) Consideration of each party’s submission 14. The onus of proof is on the applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the applicant has established that the loss was prima facie caused by a risk insured against, the onus of proof shifts to the FSP to show that, on the balance of probabilities, the claim falls within an exclusion clause in the contract of insurance. 15. On review of the plumber’s reports, I not e that both reports identify that there were no seals around the shower tap spindles, thereby allowing water to gain access to the inside of the shower recess. As the seals around the shower tap 210587 Determination 3 of 4 spindles would have most likely been concealed by a cover, I am satisfied that the applicant would not, on the balance of probabilities have been aware that there was a leak. Even the first report from the a pplicant’s plumber refers to water leaking from the shower tap spindles, not a leaking shower floor base, as cubicle wall. 16. Furthermore, both reports confirm that the build up of water behind the shower recess caused the tile grout to deteriorate at a rapid pace, causing one tile to fall. The fallen tile has created a hole in the fibreglass base of the shower and water has then leaked through this hole into the shower recess and caused damage to the underlying timber. 17. After the initial inspection and report by the plumber to the water supply to the shower was switched off, nevertheless water continued to flow. After a second examination, the plumber identified a leak was coming from a faulty spindle body seal. 18. As the policy covers burst pipes, leaks and overflows, I am satisfied that the applicant established that the loss was prima facie caused by an insured event under the policy. 19. The FSP has denied the claim on the basis of the policy exclusion relating to leaking shower recess floor and walls. However, in my opinion, there is no evidence to suggest that the shower recess or walls were the cause of the leak. Both of the plumber’s reports state the cause of the leak was due to a lack of seals around the shower tap spindles, which resulted in water gaining access to the inside of the shower recess floor and walls, causing damage to those areas. 20. Furthermore, the report from the FSP’s builder does not indicate the damage was caused by a leaking shower recess floor or walls. 21. On the basis of the material provided, I am persuaded that on the balance of probabilities that the main cause of the damage was caused by water leaking from the shower tap spindles. 22. The FSP has argued that the applicant is not entitled to indemnity due to legal authority as a result of the Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd (1974) case. 23. I am not persuaded that this principle applies to this dispute as the leaking shower recess floor and walls were not a result of a concurrent proximate cause, but from the lack of seals around the shower tap spindles, thereby allowing water to gain access inside the shower recess. 24. Therefore, I am of the opinion that there is only one proximate cause and not four concurrent proximate causes of damage as submitted by the FSP. 210587 Determination 4 of 4 CONCLUSION 25. Accordingly, I determine that the FSP is liable to indemnify the applicant for the claim in accordance with the terms and conditions of the policy.