Home / Financial Firm (Unknown - Insurer) / Determination 210123

Determination 210123

Storm water damage claim refused under policy exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$21,000
SourceAFCA PDF

Summary

The applicant sought $21,000 for storm-related roof and ceiling damage, which the FSP refused as not caused by an insured event. AFCA found the FSP was entitled to deny the claim under the policy's storm and wear-and-tear exclusions.

Water entered through roof defects rather than through an opening made by the storm, which the policy excludes.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

210123 Determination 1 of 4 DETERMINATION Case Number: 210123 Home – storm damage – policy exclusion SUMMARY OF FACTS 1. The applicant arranged a home insurance policy with the Financial Services Provider (FSP) on 26 September 2002. The policy provides cover on a building sum insured of $255,138 and carries a $300 excess. 2. On 7 January 2010, the applicant lodged a claim for water damage to several rooms as a result of a storm on 28 December 2009. The applicant provided the following description when he lodged his claim: “ The rains seem to be getting through a tile through the roof and into the ceiling cavity and onto the lounge. We have moved the furniture so it wouldn’t get damaged . Most of the damage is in the bedroom and ceiling is coming away from the corners.” 3. The FSP appointed an external assessor to inspect the damage. The FSP refused indemnity on the basis that the damage was not caused by an insured event, but was caused by wear and tear and unrepaired damage from an earlier event. The applicant disputed the decision, arguing the damage was caused by faulty repairs which were paid for by the FSP following an earlier claimed event. 4. The FSP conducted an internal dispute resolution review of the matter at the request of the applicant. It maintained the decision to refuse indemnity. The applicant continues to dispute the FSP’s position, arguing the damage was storm related and due to poor roofing repairs as a result of an earlier claim. The applicant is seeking $21,000 for roofing and interior repairs. ISSUE IN DISPUTE 5. Whether the FSP is entitled to refuse indemnity under the terms and conditions of its policy. RELEVANT POLICY PROVISIONS “ Insured events we will pay .... 9. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. .... We will not pay for loss or damage: .... g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of:  structural defects,  faulty design of the buildings,  faulty workmanship in the construction of the buildings, or  your failure to adequately maintain the buildings; 210123 Determination 2 of 4 h. caused by wind, rainwater, hail or snow entering the buildings through an open window or door or any opening not made by the storm, unless the loss or damage is caused by run-off; .... When we will not pay a claim under your policy .... 1. This policy does not cover loss, liability, injury or damage: .... f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship;” REASONS FOR DECISION 6. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 7. This is the second claim that has been lodged with the FSP for storm related damage to his property. As a result of the first claim in July 2007, the FSP paid for repairs to his roof. The repairs were not completed satisfactorily, so the FSP should accept responsibility for rectifying the roof. 8. The FSP should pay for the roof to be repaired or replaced, the ceilings throughout the house to be repainted and for a new lounge suite and carpets. The FSP’s Submission 9. The applicant lodged a claim for storm damage to his roof and interior ceilings in July 2007 following a storm in February 2007. The claim was accepted and the applicant’s broken tiles were re paired by its builder OPC. Repairs to the applicant’s ceilings were also approved and a cheque was made out to a builder (ST) for an amount of $858 for repairs to the interior ceilings. The applicant was responsible for ensuring the ceiling repairs were co mpleted satisfactorily and in a timely manner. 10. The applicant has lodged this claim following a storm on 28 December 2009 when water came through the roof and damaged the ceilings. An external builder was appointed to investigate the damage and provide a report on his findings. He made the following report; “.... Based on the above report we were satisfied the Insured has not suffered any further insured event as well as the Building Consultant has verified that the repairs carried out by OPC were acceptable, but that the water now entering the building was due to some further damage to pointing and ridge capping tiles needing to be repaired and this has been caused by movement of the roof structure......Whereas the water has entered the roof cavity through some further cracked tiles, tiles not sufficiently lapped at the joints and mortar cracked at the joints as well as movement of the roof structure . ” 210123 Determination 3 of 4 11. It is the applicant’s responsibility to ensure that his roof is well maintained and his ceiling is properly repaired. The reason for the denial of this claim is that the applicant had failed to ensure his roof was well maintained and he had not effected repairs to the ceilings following the earlier claim settlement. Consideration of each party’s subm ission 12. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy. 13. The applicant lodged a claim for damage to his roofing tiles and ceiling on 19 September 2007 following a storm on 13 February 2007. The FSP accepted the claim and after an assessment from its builder, settled the claim by repairing the broken roof tiles and paying another builder to repair the interior ceilings. 14. The applicant lodged a claim on 7 January 2010 for damage from a storm on 28 December 2009. The rain from the storm entered through the roof and damaged the ceilings in the bedroom and lounge room. The FSP appointed an external assessor to inspect the damage and provide a report on her findings. 15. The assessor reviewed her report with the FSP on 8 February 2010 and the FSP’s operator made the following notation: “ Assessor has advised she has attended the site and that the insured has advised they had the roof repaired (previous maintenance issue insured was to rectify). [FSP] had previously cash settled the insured for the internal repairs. Insured has advised the assessor they had the roof repaired, but they cannot provide any proof of this and the roof does not look like it has been repaired .” 16. The FSP obtained a report from a building consultant who submitted his report dated 17 February 2010 following his inspection of the property on 9 February 2010. In summarising his findings, he reported: “ I am of the opinion that the insufficient tile cover at the valley gutter to the western roof plane does not prevent wind driven rain from entering the roof cavity of the residence. I am of the opinion the cause of the water ingress to the roof cavity of the residence is the result of the tiles to the valley gutter not being installed in accordance with the Building Code of Australia – Volume 2 Part 3.5.2.4 Gutters and Downpipes. I am also of the opinion that the cause of the water staining to the plasterboard ceiling linings to the bedroom and lounge is a result of the roof tiles to the v alley gutter not being installed in accordance with the Building Code of Australia – Volume 2 Part 3.5.2.4 Gutters and Downpipes. Therefore, I consider this to be a defective building work related issue.” 17. Whilst the applicant has claimed the repairs performed by the FSP’s roof repairer (OPC) were not properly completed, the building consultant has confirmed that this work was in fact completed satisfactorily. 18. The FSP’s assessor has advised in her Report No. 3 dated 18 February 2010, that the applicant has not as yet carried out repairs to the interior ceilings that were the subject of the applicant’s earlier claim. She has confirmed that no additional damage has occurred since the previous claim. 210123 Determination 4 of 4 19. The FSP’s policy is clear and unambiguous in that it doe s not cover storm damage: “.... caused by wind, rainwater, hail or snow entering the buildings through an open window or door or any opening not made by the storm ...” 20. In this matter, the applicant has not provided any evidence that the water entered the property through an opening made by the 28 December 2009 storm. All the evidence provided by the FSP’s external assessor and building consultant indicates that the water ingress was through defects in the roofing. 21. I am satisfied the tiling repairs approved by the FSP as a result of the applicant’s previous claim, were completed satisfactorily. I am unclear about the reasons why the approved repairs to the applicant’s ceilings from this previous claim are yet to be completed. CONCLUSION 22. Whilst there is no d oubt that water has entered the applicant’s property as a result of the December 2009 storm, I can find no evidence that the storm caused any damage to the applicant’s roof. I find that the rainwater did not enter the building through an opening made by the storm. 23. Accordingly, it is my determination that the FSP was entitled to deny the claim under the terms and conditions of its policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.