Insurer required a second claim and excess for a recurring storm-related roof leak; delay in claim handling
Text of the determination
Case No: 210011 Determination Page 1 of 9
Case number: 210011
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
9 August 2011
Background
1. The Applicant holds a Home Building insurance policy with the Financial
Services Provider (FSP).The policy covered the home building for complete
replacement and the contents up to $200,000. The policy was subject to a
standard excess of $100 and a flexi-premium excess of $900, being a total
excess of $1,000.
2. On 6 March 2010, the Applicant lodged a claim for storm damage. The FSP
accepted the claim for the dining room, lounge room and foyer, but did not
cover damage to the roof which was not damaged by storm or the lower rooms
of the home as this damage resulted from rising damp.
3. On 23 December 2010, the Applicant informed the FSP of a leak in the same
area as the previous claim.
4. The FSP advised the Applicant that if he wanted repairs to the internal damage
to be covered that he should lodge a new claim.
5. The Applicant disputes that he should be required to lodge a new claim or pay
the excess as the recommended repairs to the roofing failed. Further, the FSP‟s
delay in dealing with this matter has caused inconvenience.
Summary of Applicant’s Position
6. The FSP insisted it would arrange repairs itself, but failed to do so despite
arranging an assessor and having quotations for repairs. Parts of the house
could not be used for over two months after the storm.
7. The Applicant contends that a further leak occurred in the dining room even
after the blocked gutters were professionally addressed. This indicates that
there was an additional reason for the damage in March 2010, which was not
picked up, as the roofing was not properly assessed. Further, had the additional
issues been discovered, the repairs would have been completed and the
additional damage would not have occurred.
8. The roofing issue was due to storm damage and not just the debris collection in
the gutters. The Appli cant has enclosed a plumber‟s (“JK”) report from which I
note the following:
Determination
Case No: 210011 Determination Page 2 of 9
“Upon our inspection of the proposed work due to the storm damage allowing
water penetration along the western wall at the south end.
...
DETAILS OF WORK
(1) Supply and install new lead soaker flashing along parapet wall at the south
west corner.... ”
9. The Applicant considers the FSP‟s expert opinion, that the leak occurred due to
a design defect, as incorrect given there has never been a similar leak
previously at the property.
10. The on going leak was suspected as a possible „slow drip‟ initially in the weeks
following repairs in August 2010. The dripping started to intensify and was
formally reported on 23 December 2010. The Applicant notes he attempted to
report the leak in November 2010, but after spending 45 minutes on hold, he
abandoned the call.
11. The Applicant is disappointed with the FSP‟s response to JK and considers the
FSP is hiding behind a technicality or is failing to clarify the issues to their own
satisfaction.
12. The FSP‟s expert “S”‟s report identifies issues which were not present during
the assessment by “C” or JK. Further S does not identify how the water entered
the property and was not as independent as JK.
13. After the first assessment report the Applicant proceeded to install gutter
guards to prevent debris entering the gutters. This demonstrates that the leaks
were caused by issues missed in the first assessment.
14. The Applicant maintains that there was substantive delay in relation to the
handling of his claim.
Summary of FS P’s Position
15. The FSP relies on the following policy terms and conditions:
“What we cover – insured events
...
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or service.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy
fall of rain, snow or hail.
...
No
...
Case No: 210011 Determination Page 3 of 9
Damage or loss caused by water seeping into or otherwise entering your building due
to:
A defect or fault in the design, structure or construction of your building where
you could reasonably be expected to be aware of the defect or fault;
...
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or liability
caused by or arising from or involving:
An unreasonable failure to properly maintain or repair your building
Wear and tear, rust, deterioration or corrosion”
16. The terms and conditions of the policy provide cover for water damage resulting
from a storm event. However, the policy excludes claims arising from an
unreasonable failure to properly maintain or repair the property, wear and tear,
rust and deterioration.
17. The FSP disputes that it failed to properly inspect the roof and it has provided a
number of expert reports in relation to same.
18. T he FSP has enclosed a report from a building services company “O”. The
report dated 14 March 2010 states the following:
“Contractor found roof leaked due to Inundation of hail. Also found gutters
blocked & full of leaves. Cleared away build of dirt & leaves & removed internal
gutter guard that was causing gutter to block. advised occupants to clean out
gutters more frequently. Job complete.”
19. The FSP‟s assessor “CS” attended the Applicant‟s property on 19 April 2 010.
CS determined there was long term damage to the walls, jambs and architraves
in the lower rooms which was the result of rising damp. Accordingly, the lower
rooms would not be covered, but the upper rooms would be covered.
20. The FSP engaged C to carry out a roof inspection. C determined that the
proximate cause for the initial damage to the Applicant‟s property was due to
water overflowing into the ceiling due to poor design, insufficient fall or volume
in the flashing and restrictions due to debris in the gutters. The FSP has
enclosed C‟s report dated 6 May 2010.
21. As the issues with the roof were not caused by an insured event, the FSP only
repaired the internal portion of the building.
22. The FSP notes the Applicant‟s argument that water damage has appeared in
the same area six months after the original event as a result of the FSP‟s failure
to identify the roof issues. The FSP disputes this and notes that the report
relied upon by the Applicant, from JK, does not state how the water has entered
the property.
23. The FSP has engaged a further expert “S” to inspect the roof. S‟s report dated
9 March 2011 determines that the water entry into the dining room was caused
by blocked soaker flashing which allowed rain water to divert and overflow into
Case No: 210011 Determination Page 4 of 9
the roof cavity below. Further, the sealant on the flashing and capping junction
had cracked in an area nearby to the leak and this had contributed to the
damage in the dining room. The FSP has enclosed S‟s report which also notes
that sealant was applied to the roofing.
24. The FSP accepts that the recently reported damage has occurred in a similar
way as the previous claim. However, the FSP submits that this damage arose
from a separate event that occurred in December 2010 and therefore is not
related to the original claim.
25. The FSP considers it clear that the policy terms and conditions require an
excess to be contributed to each claim. If the claim is for more than one
occurrence, the excess applicable to each occurrence will be payable.
Accordingly, the FSP is entitled to request that the Applicant lodge a separate
claim and pay an additional excess for the new internal damage to the dining
room to be considered.
26. The FSP maintains that it processed the Applicant‟s claim in a fair and
reasonable time frame. Further, there is no provision in the policy to provide
compensation, increased settlement, refund of excess or other benefits due to
inconvenience in the claims process.
27. The FSP has enclosed its claim file notes from which I note the following:
On 9 March 2010, the Applicant agreed in a telephone conversation to
obtain quotes for damage, but there was a limit for $3,500.
On 21 March 2010, the Applicant had difficulties obtaining a builder to
quote and requested the FSP arrange same. The Applicant had obtained
a quote for the carpet and wished to prioritise the carpet and the electrical
works.
A review of the carpet quote on 3 April 2010 indicated the carpet quotation
was not suitable as it did not contain measurements and appeared to only
relate to the foyer. The original assessor report is noted as only indicating
a build up of leaves and debris in the gutters.
On 20 April 2010, a roof and electrical report were requested.
On 27 April 2010, the FSP received the assessment.
On 12 May 2010, a review of the claim was conducted with the issues
raised pertaining to service and actioning claim. The claim had all reports
for the electrical and roofing issues. The cause of water ingress is
“SMALL CONCEALED GUITTERS (sic) BUT MAIN ISSUE IS DEBRI (sic)
IN GUTTERS” . A discussion was had with the Applicant who queried
findings but was informed if he wished to dispute, to contact his own
expert to review.
Case No: 210011 Determination Page 5 of 9
Works were undertaken to the agreed areas by 31 May 2010, but the
Applicant continued to dispute the downstairs damage arose from rising
damp. However, the Applicant did not provide any expert evidence
regarding this.
On 6 June 2010, the Applicant lodged a complaint for delay and was
informed there would be no compensation given as he could not indicate
his loss. Further, that as the cost of repairs was over $3,500 an assessor
would be required.
The FSP closed its file on 1 July 2010 as the Applicant had not provided
any further submissions/evidence regarding his dispute to allow a review.
The Applicant contacted the FSP on 23 December 2010 to advise the leak
had re-appeared in the same spot as last time. The FSP investigated and
maintained the roof was not covered as the leak arose from maintenance
and faulty design issues. The Applicant was informed he should lodge a
new claim.
On 14 February 2011, the FSP received a copy of JK‟s report but
considered “THIS IS NOT AN EXPERT REPORT” , as it did not provide
relevant detail. In further conversations, the Applicant indicated he acted
in accordance with the recommended works but the roof still leaked.
Further, JK‟s report stated the water penetrated due to storm damage.
The FSP requested a more detailed report from JK, but the Applicant was
unable to provide same.
The FSP arranged for a further report from S. The FSP called the
Applicant on 30 March 2011, once in receipt of S‟s report. The FSP noted
the cause of the leaks and that these issues had been resolved by S.
However, the FSP required a new claim to be lodged for resulting damage
to the dining room as the roof was not repaired in the initial claim, there is
no storm damage to the roof and there was a separate storm incident.
Issues
28. Whether the FSP was entitled to require the Applicant to lodge a second claim.
29. Whether the FSP delayed in dealing with the claim.
Reasons for Decision
30. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
31. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
Case No: 210011 Determination Page 6 of 9
32. I note the issue of the lower rooms does not appear to be a current issue. The
only expert evidence before me from CS indicates that the damage has been
ongoing for some time and is the result of rising damp. In the absence of
contrary expert evidence I find that the damage to the lower rooms is unrelated
to the storm damage events which affected the upper level rooms.
33. I am satisfied that there are two main issues for consideration (stated above)
which should be dealt with separately.
Whether the Applicant should be required to lodge a second claim
34. The following policy terms and conditions are relevant to this claim:
“Excesses
An excess on your policy is the amount that you must first contribute towards each
claim. If your claim is for more than one occurrence, the excess applicable to each
occurrence will be payable.”
35. There is no definition contained within the policy for the term “claim”. However,
there is a definition of “ insured event ” which includes the events listed from
pages 8- 13 on the policy. This definition includes the event of „storm‟.
36. In order to determine whether the Applicant should lodge a second claim, it is
first necessary to determine if the claims are separate events or if there is a
causal connection between them which indicates it resulted from one claimed
event. If there are two separate events, then the FSP is entitled to require a
second claim be lodged and request payment of another excess.
37. The Applicant has submitted that the roof was not properly assessed in the first
instance and he acted to prevent further damage from blockage by installing a
gutter guard. The Applicant had had no prior leaks to the roof and considers
that if it had been a defect, such an issue would have occurred previously.
Further, he relies on JK‟s report to demonstrate that the cause of water ingress
was storm damage to the roof.
38. The report by JK does not detail the cause of water entry or the reasons he
considers a new soaker flashing should be installed. The Applicant was
requested to obtain further detail from JK, but was unable to do so. It was still
open to the Applicant to obtain a further report from a qualified expert which
supported his position. If the Applicant wished to dispute the FSP‟s three ex pert
roofing reports, then the onus was on him to provide evidence on which to base
the dispute.
39. The report from JK is unsatisfactory as it provides no rationale or observations
on which JK based his opinion that the damage was caused by the storm.
40. In contrast, the FSP has three reports regarding the roof which are as follows:
O‟s report dated 14 March 2010 which essentially blames debris for the
leak which O then cleared out . O‟s contractor then advised the Applicants
to clean the gutters more frequently.
Case No: 210011 Determination Page 7 of 9
C‟s report which found the cause of water overflowing into the ceiling was
due to poor design, insufficient fall or volume in the flashing and
restrictions due to debris in the gutters.
S‟s report which determined the water entry into the dining room was
caused by blocked soaker flashing which allowed rain water to divert and
overflow into the roof cavity below. Further, S observed the sealant on the
flashing and capping junction had cracked in an area nearby to the leak
and this had contributed to the damage in the dining room.
41. I note that only expert C is of the opinion that there is a design defect in the
roofing. Both O and S state that blockages have caused the leak. Neither S nor
O provided evidence that the soaker flashing or the roof generally had a
defective design.
42. I note that O and S‟s reports are more consistent with the Applicant‟s evidence
that there was no previous leak. Accordingly, I prefer the evidence provided by
the experts O and S as the cause of the roof leak is consistent with the
Appli cant‟s own evidence.
43. I note that only S states that the sealant on the flashing and capping junction
had cracked in an area nearby to the leak and this has contributed to the dining
room damage. It is unclear from this report whether S was able to determine
that the cracking was old or new. Further, S does not comment as to whether
the cracking to the sealant and joins was the result of hail or age, wear and
tear. S does state that the general condition of the roof is good.
44. In the FSP‟s claim file notes of 12 May 2010 (after receipt of O and C‟s reports ),
the FSP indicated to the Applicant that the main cause was blocked gutters.
45. The Applicant clearly states in his correspondence to the FSP that he has taken
steps to install gutter guards to prevent further blockage. It does not appear that
he was aware of the alleged design fault as detailed by C.
46. I note that neither O nor C have mentioned the existence of cracking to the roof
sealant or capping. However, the Applicant has given evidence of ongoing
leaking despite the installation of gutter guards and the clearing of debris by O.
47. Given the ongoing roof leak, it is difficult to accept that the 2011 claim is not in
any way connected to the original claim or that the cracked sealant was only a
recent occurrence. This being the case, the damage has been caused by or is
interrelated to the original event.
48. Whilst I acknowledge that the secondary storm event would ordinarily be a
separate insured event, the circumstances and evidence as provided indicate
the ongoing leak is related to the original storm damage claim. Accordingly, it
would not be fair and reasonable in the circumstances to require the lodgement
of a second claim.
Case No: 210011 Determination Page 8 of 9
Delay in Claims Handling
49. The Applicant has claimed the FSP delayed substantially in arranging
settlement of his claim despite the receipt of quotations and that he has been
forced to expend additional monies due to the delay. The FSP disputes that it
caused any delays and further that its policy terms and conditions do not allow
for compensation for loss of time.
50. I have been unable to locate an express exclusion for compensation for
consequential loss which means that it is open to the Service to award same.
51. I consider the following FOS Terms of Reference relevant to this dispute:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial
Services Provider compensate the Applicant for consequential financial loss or
damage up to a maximum amount of $3,000 per claim made in the Dispute
...
b) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the Financial
Services Provider Compensate the Applicant for non-financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred; or
(ii) in the case of a Di spute pertaining to an individual‟s privacy rights – injury has
occurred to the Applicant‟s feelings or humiliation has been suffered by the
Applicant.
The maximum amount of compensation for non-financial loss will be $3,000 per claim
made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that expressly
excludes such liability ”
52. The Applicant has not provided any documentary proof of the amounts claimed
to have been lost as a result of the delays or provided submissions confirming
the loss was definitively the result of these delays. Accordingly, there is
insufficient evidence to demonstrate the FSP is liable for consequential loss.
53. I have also considered whether non-financial loss has occurred by virtue of the
alleged delays.
54. Under 9.3(b) of the Terms of Reference (TOR), there must be an unusual
degree or extent of physical inconvenience, time taken to resolve the situation
or interference with the Applicant‟s expectation of enjoyment or peace of mind
has occurred before compensation for non-financial loss may be determined.
Accordingly, I consider it important to view the reasons for the time taken to
Case No: 210011 Determination Page 9 of 9
provide a mutually agreeable scope of works and whether an unusual amount
of time was taken to resolve the dispute over the scope of works.
55. The reasons for the time taken to resolve the relevant repairs appears to be as
follows:
(a) The hail storms in Victoria created an unusual number of claims at the FSP
which had to be processed.
(b) The Applicant stated he would obtain certain quotations but then was
unable to obtain same. This caused a short delay.
(c) The works to the Applicant‟s property were u nderway by 31 May 2010.
(d) The FSP undertook repairs to the Applicant‟s property in under three
months despite the high volume of claims, a dispute as to the items to be
covered, the need to assess the property, the need to assess the quotes for
repairs and arrange appropriate repairs.
56. I do not consider the influx of claims due to the hail storms can be appropriately
deemed the fault of the FSP. I am of the opinion that the FSP should not be
held liable for additional time taken as a result of natural weather events.
57. Having considered all the material before me together with the relevant policy
terms and TOR, I am not satisfied that as a result of the FSP‟s conduct the
building repairs were delayed. Accordingly, the Applicant is not entitled to non-
financial loss.
Determination
58. On the basis of the available information, I determine that the Applicant is not
required to lodge a second claim in order for the FSP to deal with the additional
secondary damage.
59. On the basis of the available information, I determine that the Applicant is not
entitled to either consequential or non-financial compensation.