Home / Financial Firm (Unknown - Insurer) / Determination 208983

Determination 208983

Earthquake and leaking stormwater pipe damage denied as soil movement

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Following the March 2009 earthquakes, the applicants claimed for cracking and water damage to their rental home, and the FSP denied it as settling and soil movement. AFCA accepted that the earthquake and water leaking from tree-root-damaged pipes caused part of the damage, and held the FSP liable for 50% of the interior cracking repair cost.

Where a covered cause concurs with an excluded earth movement cause occurring consecutively, the insurer's liability is apportioned, and the 72-hour limit does not apply to water leaking from pipes damaged by tree roots.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

208983 Determination 1 of 6 DETERMINATION Case Number: 208983 Home Building – earthquake – leaking pipes – soil movement SUMMARY OF FACTS 1. On 18 March 2009, the applicants reported damage to their tenanted dwelling caused by the Korumburra earthquakes on 18 March 2009 that had their epicentre in Korumburra. 2. The FSP denied liability for the claim on the ground there was no evidence to show the damage resulted from the earth tremor and that the damage was due to settling, shrinkage and/or expansion of the foundations. In addition, the applicants had failed to establish that the direct or partial damage to the building was caused by a blocked or broken storm water drain. 3. The applicants contend they have a legitimate claim under the policy and seek rectification of the cracking damage. ISSUE IN DISPUTE 4. Whether the damage claimed was caused by settling, shrinkage and/or expansion of the property and its foundations. RELEVANT POLICY PROVISIONS “ Specified Events … (f) earthquake or tsunami … (p) water and/or liquids and/or substances discharged and/or overflowing and/or leaking from any apparatus and/or appliance and/pr pipes … This policy does not cover …  Erosion, subsidence, landslide, or earth movement other than as a direct result of: - storm - Earthquake - Explosion - Escaping liquid and occurring no more than 72 hours after the event. …  Wear, tear, rust, corrosion, depreciation or gradual deterioration  ..  Settling, shrinkage or expansion in buildings, foundations, walls pr pavements  …  Tree roots. However the exclusion applies only to damage caused directly by the tree roots. For example, if tree roots damage and block a pipe, we will pay for the resultant damage to the home cause by water overflowing in the pipe. We will not pay for damage to the pipe.” 208983 Determination 2 of 6 TERMS OF REFERENCE “ 8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry coded or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these) ” REASONS FOR DECISION 5. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 6. When the home was purchased in May 2006, there was no evidence of movement inside or outside the building. About a year later, they noticed a few cracks appearing in the meals area. There was no evidence in the brickwork to indicate footing problems. 7. When the earthquakes occurred on 6 and 18 March 2009, the tenants informed them there was new damage to the home. 8. The FSP experts reported damage to stormwater pipes along the front of the property where the damage occurred. Tree roots had broken the storm water pipes and allowed water to leak around the footings. This is covered by the policy. 9. They agree that there had been drought conditions for some time, but the amount of rainfall was not enough to cause the ground to heave. 10. The earthquake was reported to the FSP within 24 hours of the second earthquake which is when the damage occurred. The 72 hours limitation period does not apply to leaking from storm water pipes caused by tree roots. As the damage was caused by storm water leaking from broken pipes, then the 72 hour time frame does not apply. 11. They consider they are covered under Section 2(p) and damage by tree roots. The FSP ’s Submission 12. The movement of the foundations was not caused by the earthquake, but by fluctuations in the moisture content of the clay soils. This is not covered by the policy. 13. Investigations were carried out on the drainage pipes to establish the possibility that other causes may be responsible for the damage. According to the reports, there was insufficient evidence to establish any water discharged, overflowed or leaked from any apparatus, appliance or pipe that directly caused the damage. 208983 Determination 3 of 6 14. In any event, the leaking of water from a pipe had been occurring over an extended period of time and was therefore outside the required 72 hours set out in the policy. 15. In the alternative, the FSP relies on the expert evidence to maintain denial on the ground the policy excludes loss or damage resulting from earth movement occurring no more than 72 hours after the event. It is clear the earth movement has been occurring over a period of years 16. While tree roots may have contributed to drying out of the soil during the drought, this drying out falls within the policy exclusion. Drying of moisture from the ground is not an insured event. 17. Damage to the stormwater drains and ensuing leakage has been gradual and as such falls within the exclusion „wear and tear gradual deterioration‟. Consideration of each party’s submission 18. When making a claim under an insurance policy, the responsibility rests with the policyholder to establish on the balance of probabilities that the cause for the loss claimed falls within the cover provided by the policy. An insurer relying on a clause in the policy to deny the claim has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. 19. The FSP relies substantially on engineer “AB‟s” reports commissioned by it to determine the cause of the building movement. As the material has been exchanged, a summary of the main points only, will be cited in this determination. 20. Report dated 15 April 2009. - The tenant advised there was pre-existing damage to the front eastern section of the property. The pre-existing damage worsened and some new damage occurred as a consequence of the earthquake event on 6 March 2009. - The earthquake registered ML4.6 on the Richter Local Magnitude Scale. - The „felt radius‟ of the earthquake was approximately 113 km and the „damage radius‟ was appro ximately 9km. According to Geosciences Australia Building, damage starts occurring when earthquakes measure above 4.6 on the Richter Scale. - The type of building movement and distress is consistent with differential footing movement associated with excessive variations in moisture content of the foundation clays across the affected section of the building envelope. - The primary external influences contributing to the excessive differential settlement are ongoing dry/drought conditions and tree root drying. - The earthquake was considered to have had a negligible affect with the respect to the footings and to the damage/distress to the building. 21. Supplementary Report dated 20 May 2009. Stormwater drainage 208983 Determination 4 of 6 - The sub-soil stormwater drainage was partially obstructed by debris at various locations around the perimeter of the dwelling which would inhibit the flow of stormwater. - Major damage was discovered to the sub-soil stormwater drainage beneath the footpath and to the nature strip area just before the con nection into the authority‟s drain. - Damage to the sub-soil drainage indicates that stormwater collected from the property has not been able to reach the legal point of discharge for some time. Initially, it was likely that stormwater was able to leak at this location causing significant erosion of soil locally. Eventually, the drain completely blocked from obstruction by debris/silt/roots and the like. This allowed stormwater to fill and possibly back- flow via the insured‟s stormwater drainage most likely via the surface drainage pit located to the driveway. - The tenant advised the hole in the nature strip had been there since they moved into the property three years ago. - Considering the tenants account and the CCTV inspection, it is assumed that the stormwater drainage has been adversely affected over a period of say three to five years. - The building movement is consistent with excessive differential footing movement associated with excessive moisture variations in clay soils in particular the north eastern corner of the building - The primary external factors contributing to the excessive/fluctuations in the moisture content of the clay soils are:  Localised tree-root drying to the north eastern corned of the building.  Ongoing dry/drought conditions.  To a lesser degree accumulation of stormwater around the perimeter footings of the building subsequent to heavy downpours over a period of 3-5 years. 22. The applicant obtained a report from a house blocking and underpinning contractor. The contractor‟s report of 2 0 January 2010 noted: - Trees along the north east corner of the building would be causing a drying effect to the entire wall. - The north east corner where the subsidence is severe has been exposed to excess moisture. Introduction of excess moisture is consistent with having a blocked or broken stormwater pipe around this area. - Severe subsidence is generally caused by excess wetting and drying of the foundation clay. 23. After analysis of the various reports, I accept that damage to the applicants dwelling was caused by a number of factors including to varying degrees: 208983 Determination 5 of 6 a differential settlement of the foundation soils caused by variation in the moisture content of the foundation soils. b tree roots drying the soil. c dry/drought conditions over a period of about ten years. d accumulation of stormwater around the perimeter footings . e exacerbation of existing damage and some new damage due to the March 2009 earthquake. 24. Application of the terms of the policy in these circumstances is complex. 25. The policy provides cover for damage caused by earthquake. The tenants were reported to have observed worsening of pre-existing damage to the front eastern section of the dwelling after the earthquakes and some new damage was found. 26. The engineer reported the earthquake had negligible effect on the footings but observed it was possible the aftershocks were capable of slightly worsening the pre-existing cracks or causing an isolated section of cornice to partially detach. 27. In my opinion, the tenant‟s observations cannot be ign ored and when considered in the context of the engineer‟s report I accept that some damage to the structure was caused by the earthquakes. 28. The applicant contends that tree roots had broken the storm water pipes allowing leaking around the footings. The engineer noted that a CCTV inspection of the drainage system revealed a blockage caused by debris/silt/ roots and the like. 29. The engineer observed that the stormwater drain blockage caused back flow via the drainage pit located to the driveway. In his opinion the accumulation of stormwater around the perimeter footings was a contributing factor but to a lesser degree. He also noted that based on information provided by the tenants the blockage and overflow had been occurring over a period of three to five years. 30. The policy provides cover for damage caused by water overflowing from pipes. However the FSP contends the damage must occur within 72 hours of the event giving rise to the escaping liquid. As the back-up rainwater is reported to have been occurring for between three to five years, the FSP contend that any contribution to the damage caused by the escaping water does not fall within the cover provided by the policy. I am not satisfied that this argument correctly applies the terms of the policy. The 72 hour time restriction is contained exclusively in the dot point relating to earthquake and other events. There is no reference to a time restriction with regard to tree roots damaging pipes. In those circumstances, I am satisfied that part of the damage arises from the water overflowing from damaged pipes and that this is not excluded from coverage under the terms of the policy. 31. The evidence has also established that the damage to the property was due to ground movement caused by variation in the moisture content of the foundation clay. Variation to the moisture content of the soil was due to dry/drought conditions experienced over the past 10 years. 208983 Determination 6 of 6 32. The policy excludes damage arising from settling, shrinkage or expansion in foundations. Thus damage arising from the ground movement due to dry/drought conditions is excluded from cover provided by the policy. CONCLUSION 33. The FSP has established that ground movement has caused or contributed to the damage. I am also satisfied that the applicant has established that some damage was caused by or contributed to by the earthquakes in March 2009, and that damage was caused by storm water leaking from pipes damaged by tree roots. 34. In circumstances, where more than one concurrent cause has been established as responsible for the damage and one concurrent cause is covered by the policy, and the other cause is excluded, it is established law that the clause excluding the cover is dominant and the claim fails. However, in the circumstances of this case, the damage arising from earth movement has been ongoing and occurred prior to the earthquake, which means that one proximate cause was followed by another, so that they were consecutive. 35. In the circumstances, it is only fair and reasonable that liability be adjusted to take into account the damage due to earth movement. 36. Having regard to the circumstances giving rise to the damage claimed, I consider it fair and reasonable that the FSP contribute 50% to the cost of repairing the internal cracking damage. The FSP is entitled to settle the claim by cash payment should it chose to do so. 37. For these reasons, I determine the FSP is liable for damage to the interior of the building and that the F SP‟s liability is limited to 50% of the cost to rectify this damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.