Home / Financial Firm (Unknown - Insurer) / Determination 208628

Determination 208628

Substandard storm repairs, prolonged claim delay and mishandled contents

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$105,231
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was damaged in a June 2007 hail storm, and the claim dragged on for years with poor-quality repairs, delays, mishandled contents and removal of her name from the policies. AFCA found the repairs substandard and the delay gross, and ordered cash settlement of the contents balance, rectification of the building via an agreed scope, interest and $3,000 non-financial loss.

The insurer must restore the home to its prior condition, must not grossly delay the claim, and may pay non-financial loss under the Terms of Reference where an unusual degree of inconvenience has been caused.

Issues

Subjects and remedies

disabilityhealth or medicalhome or building damagenatural disastercorrect recordspay claimpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 208628 Determination Page 1 of 29 Case number: 208628 General Insurance - Domestic Insurance - Home Building - Service - Service quality 25 October 2011 Background 1. The insured property (building and contents) was covered under separate Home Building and Home Contents Insurance policies (the policies) by the Financial Services Provider (FSP). The policies were issued in the name of the Applicant‟s ex - husband “SK” on 1 1 January 2005. 2. The insured property sustained significant building and contents damage on or about 8 June 2007 as a result of a major hail storm experienced in the area. The Applicant lodged a claim under the policies seeking indemnity for the loss/ damage arising from the insured event. 3. The FSP accepted the claim and proceeded to authorise the repairs and replacement of the insured property. The initial estimate in respect to the time it would take to complete the repairs was four to five weeks and during which time the Applicant and her children would need to vacate the property. 4. Several issues developed between the concerned parties in relation to the quality of repairs, repairers appointed, FSP representatives and time taken to undertake the approved repairs and replacement of contents. 5. The FSP maintains it has done all possible to finalise the matter in line with its obligations under the policy, however any outstanding work is due to the Applicant‟s failure to co -operate with the FSP and its appointed representatives. 6. The Applicant remains dissatisfied with the outcome of the claim. She is seeking a determination requiring the FSP to accept liability for the poor workmanship, outstanding repair/replacement of damaged property, storage costs, rectification of the policy details and compensation for the experience she and her family had to endure. Summary of Applicant’s Position 7. The Applicant refutes the constant and blatantly untrue accusations made against her by the FSP. She maintains that no concerns in respect to her alleged difficult attitude were raised by the FSP or its representatives until such Determination Case No: 208628 Determination Page 2 of 29 stage as she lodged the formal complaint in relation to the FSP‟s attitude, unfair trading practices and management of the claim. 8. The Applicant has requested the FSP to make available evidence to support its contention that she had made additional claims for work not included within the allegedly approved scope of works. However, no such evidence has been forthcoming from the FSP. 9. The Applicant maintains she was not aware of a scope of works agreed upon by the parties nor has she been provided with a copy of the alleged scope of works. 10. The Applicant cannot understand why it would be considered unreasonable for her to expect hot water, heating, furniture or for the repairs to be undertaken to an acceptable standard. Insisting on the repairs to be carried out to an acceptable standard is, in the Applicant‟s opinion, not the same as being considered demanding. 11. The FSP ‟s inaction and turning of a blind eye enabled its appointed representatives to believe they were entitled to manipulate, deceive and use trickery to gain financial advantage through the claim. 12. The Applicant was never asked or agreed to pay/contribute towards the cost of repairs in the kitchen. The only costs she was responsible for were limited to the upgrade of the kitchen bench top and glass splashback. 13. The decision by the FSP to replace the kitchen arose from the fact that the house was left in a condition allowing water to leak in for over a year, due to the neglect of the FSP‟s appointed representatives. This resulted in significant mould infestation throughout their home. 14. The Applicant was originally referred to “VK” for the kitchen repairs, with whom the Applicant was quite impressed. However, after “MW” left the company, the newly appointed FSP representative “JP” advised the Applicant that she had to agree for the repairs to be carried out by “HK” (a company she later discovered was in receivership at the time). 15. “ JP ” made it very clear that it was his decision as to what would be or would not be included within the scope of works. Further, he did not seem to care about the obvious poor workmanship carried out under his supervision. 16. The Applicant believes that the poor repairs and ongoing issues with the scope of works were intentionally allowed by the loss adjuster “AR” in partnership with “ JP ” . The Applicant believes that this attitude was the result of the replacement of two previous loss adjuster s by “C” (FSP‟s appointed loss adjusting company), due to their negligence and poor service reported by the Applicant. 17. The Applicant contrary to the allegation of the FSP never signed off on a document agreeing that all the repairs had been completed to her satisfaction. The only document she signed was one agreeing the repairs be carried out in the kitchen by “ HK ” . Case No: 208628 Determination Page 3 of 29 18. The Applicant believes she was entitled to trust the FSP and its appointed representatives to repair the home adequately and to do the right thing by her, which unfortunately did not prove to be the case. 19. The Applicant was encouraged to choose upgrades and told she had to pay for any such upgrades upfront. She chose to upgrade the kitchen bench top and glass splashback, however, she then discovered the poor quality products and workmanship, provided by the FSP‟s representatives. 20. The Applicant never expected the FSP and its representatives to repeatedly lie and finds this quite shocking. The trades-people acted in accordance with their instructions from the FSP and “ AR ” . 21. The Applicant was kept away from meetings by “ AR ” , either by not informing her of times and places or informing other parties that she was too busy to attend. 22. The disagreement regarding the cracks in the bench top was between the electrician who installed the hotplates and the kitchen installers. As such, this is irrelevant from the Applicant‟s point of view, as the damage was caused by a service provider appointed by the FSP and therefore it‟s responsible to address the issue. 23. Appointing a trades-person with mental health issues to work at the insured property is nothing short of negligent. “MP” obviously had mental health issues and the Applicant believes he was the one responsible for placing a dead rat in her bag of clothes. 24. The Applicant was delivered many content items that did not belong to her and she promptly informed the removalists, including but not limited to a glass turn table that did not fit into her microwave, a matter which has yet to be rectified. 25. Work simply stopped, and there was no formal handing over of the property; nor were warranties supplied for the items installed, as promised and committed to by the FSP. 26. All complaints referred to the FSP were met with blanket and categorical denial with no commitment whatsoever towards an investigation, let alone establishing the truth. 27. To allow its representatives appointed to the claims to be left “unchecked” while managing these claims over such an extended period of time, such as has caused this degree of financial, emotional, physical and psychological harm to her family establishes there is something fundamentally wrong with systems in place at the FSP. 28. The Applicant in her submission to the Service has detailed her concerns with the management and service provided by the FSP and its representatives under the claims. These being: Case No: 208628 Determination Page 4 of 29 Removing the Applicant as co-insured from the policies 29. The Applicant alleges that the FSP at the request of her ex-husband (SK) and without her consent proceeded to remove her name from the policies. This has resulted in the FSP now being reluctant to openly deal with her and requesting authorisation from “ SK ” . 30. It is her position that the FSP has been provided with an authority from “ SK ” and therefore the FSP should reinstate her name on the policies. 31. The Applicant maintains the FSP in attempting to raise concerns in respect to authority under the policy regarding issuing of payments, a number of years after the matter had already been resolved, is unreasonable. Kitchen/Pantry repairs and fittings 32. The Applicant maintains that the builders in repairing the kitchen made use of the wrong plasterboard. It should have used blue board, which is standard for use in bathroom, laundry and kitchen wet areas. 33. There is no plasterboard installed behind the kitchen bench and sink. Only a piece of non wet area plasterboard has been slightly inserted behind the bench top to give an illusion that the wall behind the bench top has been replaced. 34. The Applicant has submitted pictures which show bench top, power switches and other fittings to be of poor quality and unacceptable. 35. The sink fitted is not the sink the Applicant had been shown and selected to be installed. The sink shown to the Applicant was of better quality, slightly larger and designed to fit underneath the bench top. 36. The sink was only adhered with silicone and has since dropped out of the bench top. The Applicant believes it was never installed to remain in place. The sink tap has not been installed correctly and therefore leaks from the connection under the cupboard. Despite cleaning it every day the Applicant cannot prevent the appearance of mould. 37. Holes in the bench top, kitchen cupboards and floor under the cupboard have not been sealed. The left hand side of the sink does not sit flush with the bench and allows water to get in under the sink and into the cupboard below. 38. There are cracks present around and behind the hotplates in the bench top due to actions of the people responsible for installing the hotplates. When “ JP ” came to install the filters in the range hood, he dropped the metal filters onto the newly installed induction hot plates causing two chips. 39. There are gaps between the range hood and kitchen cupboards. The insides of the cupboards are easily visible through these gaps. The cupboards have not been installed evenly and do not sit flush with each other or other fittings. They cannot be adjusted as they do not fit into their designated areas. Case No: 208628 Determination Page 5 of 29 40. Large gaps have been left in the installation of the ovens. The structures underneath the ovens are visible. These are self cleaning ovens; however cleaners in an attempt to clean them after the mould infestation have used strong chemicals, damaging the ovens. 41. The workmanship in the kitchen is nowhere near what one would expect from a skilled tradesman. The corners of the cupboard doors are rough and have an unprofessional finish. There are large gaps between the cupboard doors. 42. Cupboard doors have been left with scratches by tools used by the tradesman and the cupboard under the sink has been drilled twice around the handle fittings allowing movement of the handles, and are therefore not properly fitted. The cupboard handle fittings have already begun to discolour and they cannot be cleaned. 43. The shelving installed in the kitchen pantry has jagged edges, slices and chips. There are gouges in the pantry cupboard doors and shelves due to poor workmanship. 44. The pantry door is falling away from the rest of the cupboard as the screws holding the door are coming away. 45. She believes that evidence made available by her establishes that the people employed by the FSP to carry out the repairs in the kitchen did not have the necessary skills or were unwilling to exercise that skill, when completing the repairs. 46. There are excessive and unnecessary holes in the cupboards and shelving which do not line up with the holes on the opposite side in order to allow shelves to sit properly. 47. The pantry shelves although designed to be adjustable, cannot be adjusted as they are poorly cut and jammed into place. Also, the holes cut are not in line as stated above, except for the ones the shelves are currently sitting on. Further, the shelves are not strong enough to hold food products and as a result they bend. 48. The push lock door openers (stops) fall off all the time as they have been adjusted to capacity in an effort to compensate for the poorly fitted cupboard doors. She has submitted evidence showing that there are a number of electrical fittings and other repairs left hanging and/or unattended. 49. She was advised that she was not allowed to install a splashback to the same height as was originally installed and would have to accept installation of a lower height splashback. The Applicant was of the understanding she was entitled to have replaced, all that was present prior to the loss. 50. The Applicant maintains that this was the FSP‟s attitude in respect to all fixtures in the home that were previously of high quality and she was advised they had to be replaced with “standard stock” items. Case No: 208628 Determination Page 6 of 29 51. The electrician forgot to install the power points in the kitchen before the plasterboards were fitted. To address this they had to punch holes in the plasterboard along the wall in an attempt to locate the spots where the power points were originally fitted. The holes were then repaired/filled in very poorly. 52. Floorboards in the kitchen were never replaced as stated in the FSP‟s fourth report submitted by “ MH ” , after the damage was assessed. In reality, what happened was that the damaged floor boards were simply tiled over, which has left the kitchen floor with a dip in it. Laundry 53. Incorrect measurements of the laundry cupboards resulted in one of two entry doors into the laundry (initially removed by the repairers) not being able to be re-installed. The incorrect measurements meant there was not enough space between the end of the cupboards and the door leading into the house. Due to the lack of space the electrical light fittings and exhaust fan originally installed in the laundry could not be reinstated. 54. The Applicant was advised by the FSP‟s representative that he would allow for reinstallation of the cupboards and cater for the necessary adjustments by adjusting the rest of the laundry design, which did not occur. He installed a different style door opening into the home and also left out the second door to the garage. 55. The cupboard originally located next to the washing machine was not replaced. On raising this with the FSP‟s representative she was advised the replacement cost would be deducted from the overall expense of the kitchen and laundry to help offset the upgrades to the bench top and glass splashback for which the Applicant was responsible, again this did not occur. 56. The FSP‟s representative suggested that the light switch be fi tted inside the laundry cupboard due to the mismeasurements, which the Applicant found unacceptable. She was then treated as if she was being exceedingly uncooperative, and was offered to have the light switches placed on the door frame. Ultimately, the light switches were installed on the wall outside the laundry, which is again inconvenient. 57. The workmanship in respect to the cupboards is on par with the quality of repairs completed in the kitchen. There are rough edges, doors do not fit and cannot be adjusted or aligned properly due to incorrect size. 58. The laundry sink originally had a diverter designed to switch between the installed shower and standard tap. However, now the diverter will not move and consequently the tap cannot be used and only the shower head is available for use. The shower head had a bracket which should have been installed which makes the shower hands-free, but this had been left lying next to the sink and has now gone. Case No: 208628 Determination Page 7 of 29 59. The lower edges of the cupboards are bubbled and distorted; also the back of the inside of the cupboard had been damaged while installing a power point and this has been repaired using a cheap already scratched piece of laminate. 60. The washing drawers which originally had metal sides in order to allow the drawers to hold the weight of clothes stored in them were not replaced with metal sides and therefore are not strong enough to fulfil their intended purpose. 61. The front of the drawers and cupboard doors are damaged and poorly installed while the clothes drying racks originally present have not been replaced at all. 62. Incorrect tiles have been installed in the laundry even though, at the request of and accepted by the FSP‟s representat ives, she had made it clear what type of tiles were to be installed. 63. On trying to have her concerns in relation to the laundry addressed by the FSP, she was continuously advised to “deal with one area at a time”, and always referred back to the kitchen. As a result, all concerns in respect to the laundry were completely overlooked by the FSP due to the concerns relating to the kitchen. 64. The washing machine was damaged as a result of it being left in the home for such an extended period of time with water leaking into it, and the clothes dryer also no longer works. 65. The ceiling light socket fitted in the laundry was broken and as a result, the Applicant is unable to screw in a new light globe. The FSP had promised to replace this however this did not occur. Ceilings/ Ceiling fixtures and Floors 66. The ceilings have spots left unpainted, ditches where electrical work was done and due to the changes in moisture over the extended period of time, the ceilings have also cracked. The ceilings now require significant rectification work. Swimming Pool and Surrounds 67. The swimming pool surrounds were supposed to be replaced by the FSP after they were damaged by the storm/flood water only to be exacerbated by the length of time they were neglected by the FSP after the event. The repairs to the pool surrounds were also originally quoted to be repaired by the FSP however this was later discarded. 68. The FSP was advised very early on in the management of the claims that if the pool surrounds were not repaired in a timely manner, the damage would only further increase to extend to the swimming pool itself. The Applicant maintains that the main cause for the damage was the storm. 69. Due to the length of time it has taken the FSP to manage the claims and its complete neglect, the swimming pool has now split down the (internal) side. Case No: 208628 Determination Page 8 of 29 Swimming is an important activity for the Applicant‟s mobility (back problems) and the FSP was made aware of this early on in the claims process. Sub-floor area 70. Due to water being allowed to sit in the sub-floor area of the property over an extended period of time whilst repairs were underway, the entrance door has rotted away. 71. There is an infestation by bees and insects and the Applicant was not permitted access by the FSP to arrange a pest control professional to attend to this. Honeycomb nests have allowed honey to dribble through walls and ceilings. 72. The sub-floor ventilation system had been disconnected by someone. Outside the home 73. The paving directly outside the home was damaged by the trades ‟ people during the course of the claims. The FSP ‟s representative agreed to replace the broken pavers when the pavers at the front door were redone. However, the front door area was tiled as opposed to using pavers and with this the pavers outside the home were not replaced as promised. 74. The gutters at the front of the home have been left damaged by trucks used by the FSP‟s appointed representatives. In addition, the mailbox was damaged by the FSP‟s representatives and then replaced by the Applicant at her own cost with a commitment to be reimbursed, this has not occurred. 75. The damaged fridge and hot water system removed by the FSP have been left at the front of the house and need to be removed. 76. The concrete laid around the drainage outside the home is already disintegrating. 77. The tradesman lost the controls to the garage and proceeded to remove the electrical wiring, which was on one occasion fixed, only to again have the wiring mechanism removed by the cleaners. The cleaning truck then disposed of the mechanism in error and the garage now needs to be repaired. In addition the garage door itself has been damaged during the course of the claims and in the Applicant‟s opinion will need to be replaced. 78. The Applicant‟s art equipment, stored inside the garage, has been damaged which has been extremely disastrous to opportunities for future employment. 79. Although changes to the drainage outside the front of the home was superfluous, the Applicant felt forced to agree because of the lengths the FSP‟s representative went to insist that it was a problem. The water under the home was not the result of the alleged inadequate drainage rather was and still is coming from the poorly patched up roof. Case No: 208628 Determination Page 9 of 29 Roof 80. The roof has never been properly repaired and needs to be attended to by the FSP as committed. It has only been patched up in some places and still allows water ingress in other places. The damage caused to the lining under the tiles in a number of places, including obvious damage caused by the FSP‟s representatives (foot holes through the lining), have only been tiled over without attending to the holes in the lining. Path down the side of the home 81. The path down the side of the home has been replaced by the FSP at a higher level than the original. This now covers the weep holes which are not recommended. Now worms and frogs enter her daughter‟s room. 82. This also allows water into the sub-floor area of the property in addition to the hole in the roof lining allowing water into the home over the previous three years. Entrance area 83. Front door damaged by tradesman; an attempt to repair it has been made but is not of a satisfactory standard. The panel to the right of the front door was removed and has not been replaced. 84. The stairwell banister has been significantly damaged by tradesman. It needs to be secured properly, sanded back and painted properly. The wall along/near the stairwell has been damaged and needs to be repaired and repainted. 85. A table that was placed in the entry foyer prior to the storm event has been removed and not returned. The tiles outside the front door and in the entry foyer area are not level. A professional‟s opinion will need to establish how this can be rectified. 86. The front door bell is no longer installed and the front and back door mats are also missing. There were two large terracotta pots at the entrance to the property which are also no longer there. Contents and personal possessions 87. The Applicant was promised that the insured contents would be thoroughly, carefully and accurately listed and packed by the service agents engaged by “ C ” . However, this was not the case as it took ten months for the Applicant to be provided with a list of the contents packed and placed in storage. These lists were vague, inadequate and inaccurate. 88. During the course of the claim the FSP lost details of where a portion of the Applicant‟s contents were actually stored. It took it a very long time to actually locate where the contents were. Case No: 208628 Determination Page 10 of 29 89. “R” made it very clear that he had intentionally given what he referred to as a very conservative estima te, for the contents that were stored at “CA”. The Applicant has made available photos as evidence of how and in what condition the contents were actually stored by the FSP. 90. A significant number of contents were damaged as a result of what would seem to be a case of a number of people whilst packing haphazardly grabbing contents from different rooms in the home and throwing them into boxes. According to advice she received many of the boxes were then stored directly under the sun for three years. 91. The Applicant was not provided any assistance in moving the contents in her possession back home by the FSP, which further exacerbated her back problem. The Applicant alleges that it was only after she, with the assistance of her children, had moved a majority of the contents, that she was then sent a letter offering assistance by the FSP. 92. A significant number of items were damaged and needed to be disposed of as they had been left in the garage. The FSP had committed to removal of these items however this has not occurred. 93. Batteries left in a number of items have, over time, leaked into the items rendering them unsalvageable. The Applicant believes as professional companies were appointed to undertake the packing and storing of the items, they should have known better and possessions should have been packed and stored to an acceptable standard. Other missing items or damage claimed 94. The Applicant has made available a very detailed and comprehensive room by room list of contents and damage she is claiming needs to be covered by the FSP. As this information has been exchanged between the parties, the Panel will limit reference to the rooms only, these being: Television room Master bedroom, ensuite and main bathroom [Applicant‟s daughter E‟s] bedroom [Applicant‟s son O‟s ] bedroom [Applicant‟s daughter C‟s] bedroom [Applicant‟s daughter I‟s] bedroom Dining room Gym room Office Studio Garage Kitchen Case No: 208628 Determination Page 11 of 29 The downstairs bathroom Storeroom Laundry Reimbursements and Compensation 95. The Applicant is seeking reimbursement and compensation for the following: For all out of pocket expenses, especially storage costs, that occurred because of the FSP‟s mismanagement of the claim. Her children will require ongoing trauma counselling and the expense so far has been crippling. Compensation for what the Applicant and her family have had to deal with as a result of the FSP allowing the claim to be managed in such a poor and unacceptable manner. The Applicant has been seriously disadvantaged by having to deal with this matter. She was unable to concentrate on her entitlement to the property portion of her settlement with her ex-husband and was left with a significantly reduced settlement. Their lives were devastated over this period and her children will never be able to recover their lost childhood due to the negligence by “ AR ” and “ C ” . Having to struggle financially over this period and manage on a disability pension and pay the ongoing storage fees and increased travel costs. The effect the past four years has had on her children‟s educa tion and social life. Summary of FSP’s Position 96. The FSP issued two policies i.e. Home Building and Home Contents covering the insured property. The policies were issued and were held in the Applicant‟s ex- husband‟s name (SK). 97. The FSP in its dealings with „ SK ‟ has never noted an objection on his behalf regarding the FSP dealing with the Applicant. However, the Applicant raised concerns in relation to the FSP dealing directly with “ SK ” , and therefore the FSP requested her to obtain a letter of authority from “ SK ” authorising it to deal with her. 98. On 13 June 2007, the Applicant contacted the FSP to lodge the claims for loss or damage arising from the insured event which occurred prior to, during and after the Queen‟s Birthday long weekend i.e. 9 -10 and 11 June 2007. 99. The FSP has sought to address the concerns raised by the Applicant in her submission to the Service. These have been summarised below: Case No: 208628 Determination Page 12 of 29 Removing the Applicant’s name from the policies 100. The FSP refutes the allegation it removed the Applicant‟s name from the policy. Over the years both SK and the Applicant had held several insurance policies with the FSP issued in both names. However, the policies were allowed to lapse on at least two occasions (15/3/2001 and 11/12/2004). 101. When the policies subject of this claim were incepted with the FSP, it was done on the application of SK alone and as such the Applicant was never listed as a joint policyholder on these policies. 102. The FSP maintains that since lodgement of the claims it has dealt extensively with the Applicant with respect to the claim. It is only with the proposed cash payment of contents directly to the Applicant that the issue of her not being on the policy was raised. 103. An annual review of the previous policies which had both SK and the Applicant as co-insureds, noted a hand written instruction purporting to be from SK and instructing the FSP to add the Applicant to both policies (….4883 and ….4884). The FSP fails to see the relevance of this document, as the policies in existence in 2001, had certainly lapsed before SK applied for the new policies. 104. The FSP is not disputing the Applicant‟s claim that she should be added to the policy, nor that the content cover payments should be paid directly to her, only that this be clarified with the policyholder (SK). 105. The FSP therefore maintains that it at no stage actually removed the Applicant‟s name from the policies in question. Putting the Applicant and her family’s health at risk – Ignoring information regarding mould build up in the home 106. The FSP maintains it wa s advised of the Applicant‟s concerns regarding complications relating to mould on 20 June 2007. 107. According to the Applicant‟s own notes she was taken to hospital sometime between 18-20 June 2007. This was the time the FSP had only just been advised of the family‟s health issues. 108. The FSP treated the Applicant‟s concerns seriously and paid her $2,500 on 28 June 2007 for alternative accommodation and a further $160,485 was spent on providing alternative accommodation to the Applicant over the course of the claims from 17 July 2007 - 16 March 2010. This amount being far in excess of the accommodation expenses covered under the policy. 109. In order to minimise the effects of the poor ventilation, the FSP gratuitously attended (not covered under the policy) to: Replacing the drainage at the front of the property to divert water away from under the home. Case No: 208628 Determination Page 13 of 29 Replaced the pebblecrete side path that abuts the outside wall which was built above the damp course. Arranged to have the upstairs rooms repainted on noting the Appli cant‟s concerns regarding mould and the time it took to resolve the claims. 110. The FSP attended to replacing two thirds of the kitchen, although this was not part of the original scope of works. However, noting the length of time it has taken to resolve the claim, the discovery of mould in this part of the h kitchen may, it acknowledges have been connected to the insured event. The Applicant had, however agreed to cover the cost of the remaining one third of the kitchen reinstatement, including cupboards and an upgrade of the kitchen bench top and glass splashback. 111. Due to the family‟s sensitivity to mould, the FSP (although not covered under the policy) arranged for removal of mould from the sub-floor area of the property. The FSP agreed to undertake the above works as it was unaware of the prevailing humidity levels in the sub-floor area prior to the insured event, given the pre-existing issue regarding drainage and pooling of moisture in this area. Length of time – told to pack for a four week period away from the home 112. The delay in settling the claim was caused ostensibly by the Applicant‟s refusal to co-operate with the builders by insisting some builders be removed from the project and by withdrawing access to the property. 113. The FSP had to engage two different building companies, three loss adjusting companies and a building consultant, to specifically assist the Applicant in understanding the re-building process. 114. The FSP notes the Applicant would agree in meetings to a certain course of action, acceptance of quality of repairs and responsibility for actions, only to later withdraw her consent. Extremely hard conditions to live in (alternative accommodation) 115. The FSP on a number of occasions asked the Applicant to return to her home, however she refused saying she was still concerned about her family‟s health. These requests took place in late 2008 and beginning of 2009 116. During an onsite visit, the Applicant agreed to move back if the FSP provided new beds and bedding. The FSP sourced suitable replacement of these items however these were rejected by the Applicant as being inferior. 117. The FSP obtained quotes for „top of the range‟ beds and bedding upon which it cash settled the Applicant on 18 August 2009. Other issues raised by the Applicant regarding returning to the property were: Health issues. Unresolved disputes regarding kitchen repairs. Case No: 208628 Determination Page 14 of 29 Inability to sort or deal with the concerns relating to the contents. 118. The FSP notes the Applicant‟s reference to having to travel long distances from the alternative accommodation and that this impacted her family. However, the FSP maintains that it offered to re-locate the Applicant to closer accommodation on at least two occasions (22/4/2008 and 4/6/2008). 119. The Applicant however refused the offers on the basis that this would be an unnecessary disruption to her family as they would eventually need to move again into their home. Exacerbation of back injury and disability 120. The FSP relies on its arguments in the two previous headings. 121. The FSP has no knowledge of the Applicant‟s claim that she was told she would be moved out and then back again by the FSP. However, it is open to any claims in this regard subject to submission of further and better details by the Applicant. Destruction and loss of property 122. The Applicant informed the FSP that the builders had damaged the upstairs bathroom. The FSP proceeded to replace all the tiles in the bathroom. 123. In respect to damaged or lost contents, the FSP acknowledged the Applicant‟s concerns and appointed specialist restoration services to assist with the identification and valuation of these contents. The Applicant has however been unable or unwilling to cooperate in this process. 124. Apart from issues identified in its letter to the Applicant dated 7 December 2009, the FSP is unaware of any other damage to the insured property arising out of the actions by the builders or other service providers. Drawing up contracts and dismissing them and/or refusing to provide the Applicant with a copy of written contracts 125. The Applicant has not made available further and better particulars of this complaint; as such the FSP is not in a position to respond. Misinformation, contrary information and distorting facts 126. The FSP refutes any improper behaviour on its part. 127. The Applicant has failed to make available further and better particulars of this complaint; as such the FSP is not in a position to respond. Case No: 208628 Determination Page 15 of 29 Blatant lying 128. The Applicant has failed to make available further and better particulars of this complaint; as such the FSP is not in a position to respond. Repetitive request for written lists of concerns 129. The FSP acknowledges it did request written lists at times due to the Applicant‟s concerns. 130. This however occurred in response to the Applicant moving away from agreements reached during meetings and failing to accept the quality of repairs. Bullying 131. The Applicant has failed to make available further and better particulars of this complaint; as such the FSP is not in a position to respond. Using exhaustive techniques and the Applicant’s disability to their adv antage and threat to contact her ex husband 132. The Applicant has failed to make available further and better particulars of this complaint; as such the FSP is not in a position to respond. Refusing to respond to the Applicant and justifying this by advising it had lost documents 133. The Applicant has failed to make available further and better particulars of this complaint; as such the FSP is not in a position to respond. Poor workmanship 134. The FSP refers to its letter to the Applicant dated 7 December 2009 and maintains: Moisture and damage issues had been satisfactorily attended to and there was no work required in this area. In relation to the tiles in the front foyer, the FSP has requested the Applicant to view and approve the alternative replacement tiles on more than one occasion. However, at the time of its submission to the Service, the Applicant had still not done so and the matter remains outstanding. In respect to the kitchen the only outstanding issue is in relation to the installation of the glass splashback. The FSP is prepared to undertake this; however the Applicant has failed to allow access to the property. The FSP is aware of the Applicant‟s concerns regarding the quality of the Caesar stone (or similar) kitchen bench top. The bench top was subject to a contract between the kitchen manufacturer and the Applicant. As such Case No: 208628 Determination Page 16 of 29 any dispute arising out of this contract is a matter for the parties to the contract and not the FSP. The Applicant had previously signed off that the outstanding kitchen issues (including the bench top) were complete to her satisfaction. Unfinished work 135. The FSP refers to its letter to the Applicant dated 7 December 2009 and maintains: The FSP awaits the Applicant‟s instruction and cooperation in this regard. The FSP maintains its position explained under the “Poor Workmanship” section. The Applicant has failed to view and where appropriate approve or provide a list of lost or damaged contents, submit quotations for (large) lost items and therefore these matters remain outstanding. The Applicant failed to view the attached list of damaged items held by “ CA ” and provide the FSP with the replacement cost of each item. The Applicant has failed to accept and/or provide replacement costs for the washing machine and clothes dryer. The FSP has not been provided with details for a suitable replacement heater as she rejected the heater offered by the FSP. In relation to the fitness equipment, the Applicant has failed to allow “SF” access to assess and if possible reassemble the fitness equipment. Reimbursement for loss of use of clothing that no longer fits the family due to the extended period it took to settle the claim and the clothes were in storage 136. The FSP maintains that a loss of this nature is not covered under the terms of the policy. Storage costs and other expenses 137. The FSP relies upon its letter sent to the Applicant dated 7 December 2009. 138. The FSP maintains the Applicant is yet to provide it with information quantifying her loss/costs in this respect. Payment for counselling costs 139. The FSP rejects the assertion that any of its actions are the cause of the family‟s psychological or other medical consequences. 140. The FSP maintains that a cost of this nature is not covered under the terms of the policy. Case No: 208628 Determination Page 17 of 29 141. The FSP is of the opinion that this matter can only proceed to resolution if and when the Applicant: A. Provides the FSP with the authority from SK. B. Attends to matters outlined in its letter to the Applicant dated 7 December 2009. C. Quantifies the expenses sought i.e. expenses relating to relocation and repairing the insured property. D. Makes available better and further details in respect to her claims/complaints made against the FSP. 142. The FSP requests that no inference be drawn from its request for better details in respect to various concerns raised by the Applicant. 143. The FSP has made available several statements from the various loss adjusters and builders to support its position in respect to the cause for the delay and the attitude of the Applicant. 144. Both the Applicant and the FSP have had sufficient opportunity to address and respond to the issues raised and as such the Service should be able to provide a determination without any further delay. 145. The FSP relies on the following policy provisions: BUILDING POLICY “SECTION 1 INSURED EVENTS CAUSING LOSS OR DAMAGE This policy insures you up to the amount of the sum insured or loss or damage to your home caused by an insured event listed below. … 1.12 Storm, Rain Or Flash Flood … SECTION 2 HOW WE SETTLE YOUR CLAIM 2.1 Repair, Rebuilding Or Replacement “When an insured event causes loss or damage to your home we will, if we accept your claim, pay to our option for the reasonable cost of repairing, rebuilding or replacing your home at the site  to its condition when new; or  to its condition when last renovated, altered or restored. We will not pay for the portion of these building costs which relate to the undamaged parts of your home. The maximum we will pay is:  the sum insured shown in the schedule; plus  the other benefits we have agreed to pay; less Case No: 208628 Determination Page 18 of 29  your excess; but we will not pay to upgrade your home if it is over-insured. … SECTION 3 OTHER BENEFITS This policy also insures you for other benefits set out in this Section. The cost of these other benefits is included in the sum insured for your home unless otherwise stated. … 3.3 Accommodation Costs Or Lost Rent When we have accepted a claim following damage to your home and we agree that your home is not fit to live in we will:  if you lived in your home at the time of the damage, pay the reasonable costs that you incur for similar accommodation while your home is being rebuilt, repaired or replaced; But the maximum we will pay for temporary accommodation or lost rent is for the lesser or:  the time it takes to repair or replace your home provided work commences as soon as practicable after the incident, OR  where you elect not to replace your home, the time it would have taken to repair or replace your home had you elected to do so, OR  12 months from the time of the damage or  10% of the sum insured. Where the repair or replacement of your home is delayed by you, we will deduct an amount equivalent for the period of delay. This benefit is in addition to the sum insured for your home. … SECTION 7 OTHER CONDITIONS Multiple Insureds We will treat any statement or act, omission or a claim by you or a family member as having been made by all of them. … CONTENTS POLICY SECTION 1 INSURED EVENTS CAUSING LOSS OR DAMAGE This policy insures you up to the amount of the sum insured or loss or damage to your home caused by an insured event listed below. … 1.12 Storm, Rain Or Flash Flood … SECTION 2 HOW WE SETTLE YOUR CLAIM 2.1 Repair, Rebuilding Or Replacement Case No: 208628 Determination Page 19 of 29 When an insured event causes loss or damage to your contents we will, if we accept your claim, at our option do one of the following in relation to each item. a) Repair We will pay the reasonable cost of repairing an item that can be economically repaired… b) Replace If an item cannot be economically repaired we will replace the item with a new one substantially the same, regardless of the age of the item. But if the item is:  …  A carpet, we will only replace the carpet in the room, hallway or passageway where the loss or damage occurred;  Computer equipment, we will not replace if it is over 10 years old but we will pay the market value;  Clothing, shoes and household linen, we will pay the amount it would cost us to replace the items less depreciation. c) When the item cannot be replaced (This does not apply to clothing, shoes and household linen) If we agree that the item cannot be replaced, we will pay the lesser of:  The retail value of the item, or … SECTION 7 OTHER CONDITIONS Multiple Insureds We will treat any statement or act, omission or a claim by you or a family member as having been made by all of them.” Issues 146. Whether the FSP is required to note the Applicant as a co-insured under the policy. 147. Whether the FSP has fulfilled its obligations under the policy for the loss. 148. Whether the FSP is entitled to decline indemnity for the additional loss/damage claimed. Reasons for Decision 149. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. Case No: 208628 Determination Page 20 of 29 150. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 151. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in the insurance industry and a Panel member with extensive experience in consumer claims. 152. There are a significant number of concerns raised by the parties to this dispute concerning each other‟s conduct during the course of the claims process. The Panel has given these concerns due consideration, however, in the interests of brevity of this determination the Panel will limit its response to those matters which have been supported with probative evidence. 153. It is the Applicant‟s responsibility to prima facie establish that the loss claimed was, on the balance of probability, caused as a result of an event covered by the terms of the policy. If the Applicant succeeds in doing this, the onus shifts to the FSP to show that it is an excluded event under the terms of the policy. 154. The Panel is satisfied that there is no dispute between the parties that the event which gave rise to the claim was covered under the policy and an attempt has been made by the FSP to repair/replace the loss. 155. It is not in dispute that as a result of an extended delay in finalising the repairs the insured property sustained additional damage and mould infestation. 156. The Panel having reviewed the available evidence is satisfied the parties to this dispute have established a number of issues, which are subject to a determination by the Service. Removing the Applicant as a co-insured from the policies 157. The Applicant alleges that the FSP without her consent and at the request of “ SK ” proceeded to remove her as a co-insured from the policies. 158. The FSP rejects the allegation and maintains that although it is correct that the Applicant and “ SK ” had over years established various policies as co- insured‟s, this was not the case in respect to the policies in question. 159. It is the FSP‟s position that the policies held jointly by the Applicant and “ SK ” had been allowed to lapse on 15 March 2001 and then 11 December 2004. When the policies in question were re-established, this was on the application of “ SK ” only and as such, the Applicant was never added as a joint policyholder. 160. The FSP does not dispute the Applicant‟s claim that she should be included as a co-insured upon the policy, however maintains that in order to do this, it would require a request/authorisation from “ SK ” . Case No: 208628 Determination Page 21 of 29 161. Having reviewed the FSP‟s submission to the Service, the Panel notes that it has listed the two policies in question as bearing reference numbers “….4883 and ….4884”. 162. Within the supporting documents provided by the FSP is a copy of a “Annual Review Notice and Tax Invoice” issued in the name of both the Applicant and “ SK ” indicating a policy expiry date and time of 15 March 2001 at 4.00pm and bearing reference number “….8635”. 163. The Panel notes that written on this copy of the Annual Review Notice and Tax Invoice is a note from “ SK ” requesting that the Applicant be listed as a “co - owner” of the new (emphasis added ) policies “….4883 and ….4884”. 164. The Panel also notes that the FSP during the course of the claim has: Made payments directly to the Applicant on more than one occasion. In doing so ignored its own position in this regard. Having had the opportunity to seek further clarification of this from “ SK ” in this regard, failed to do so. 165. The FSP declined to seek authority from “ SK ” to record the Applicant‟s name on the policy and to settle the claim directly with her, due to the alleged objections of the Applicant. However as the policy is a contract between the FSP and “ SK ” it is entitled to, and should have sought such authority itself. 166. The Panel is not able to direct the FSP to record the name of the Applicant as a co-insured; however the FSP is required to seek the necessary authority directly from “ SK ” so that this issue can be resolved as a matter of urgency. Kitchen/Pantry/Laundry repairs and fittings 167. The Applicant maintains that the quality of repairs and material used in the FSP‟s unsuccessful attempt to repair the kitchen is not only completely unsatisfactory but in her opinion amounts to negligent and malicious damage by the FSP‟s appointed representatives. 168. The FSP maintains that: The kitchen has been repaired and the only outstanding issue is the installation of the glass splashback and the Applicant has failed to allow access to the builder to carry out the installation. In relation to the Caesar stone bench top, this was subject to a separate contract between the Applicant and the supplier. Therefore, any concerns in this respect remain between the contracting parties and is not the responsibility of the FSP. The Applicant failed to cooperate with the FSP in this regard, as well as, failing to accept or provide replacement costs for the washing machine and clothes dryer. Case No: 208628 Determination Page 22 of 29 169. The Panel has considered the available evidence and in addition to the various reports found the extensive photographic evidence made available by the Applicant to be of great assistance in establishing the quality of repairs undertaken in the kitchen, laundry and pantry. 170. The Panel finds the quality of repairs to be sub-standard and not of a quality that would be reasonably expected from professional repairers. The installation, detail and finishing is of a very unprofessional standard with electrical fittings left hanging in the sockets. 171. The FSP has referred to a separate contract between the kitchen installer and the Applicant in relation to an upgrade of the kitchen bench top. Although this may be the case, the Panel is not satisfied the FSP is in a position to dismiss the matter. 172. There is no dispute that there was a separate contract and/or that the bench top installation was a Caesar stone bench top; rather the issue involves the poor installation and subsequent damage to the bench top. Although, there was a separate contract between the two parties, this does not change the fact that: It was the FSP‟s preferred repairer that had been appointed to the claim by the FSP and with whom the Applicant was instructed to deal. . The quality of the installation of the bench top remains the responsibility of the FSP. The subsequent damage to the bench top is alleged to be the result of the actions of representatives appointed by the FSP. 173. The Panel is not satisfied that the FSP has fulfilled its liability in relation to the repairs, replacement and installation of cupboards, bench top, electrical fittings and fixtures in the kitchen, laundry and pantry. 174. The Panel acknowledges that in the course of the claim the Applicant may at times have failed to cooperate with the FSP and its appointed representatives. However, the Panel is satisfied that it is unreasonable to expect an individual, in this case the Applicant, to continue to act in a cooperative manner over an extended period of time, after having been subjected to very real difficulties by the FSP‟s representatives. Swimming Pool and Surrounds 175. The Applicant maintains that the swimming pool and surrounding area was damaged as a result of the insured event. The damage was then further exacerbated by the FSP‟s neglect in addressing the damage over an extended period of time. She maintains the pool surrounds were originally quoted to be repaired by the FSP, this being prior to the cracking of the fibreglass shell. 176. The Applicant maintains the FSP was advised very early in the claim that if the swimming pool surrounds were not attended to in a timely manner, the damage would only continue to increase, which in fact is what actually occurred. Case No: 208628 Determination Page 23 of 29 177. The Panel notes the FSP having had the opportunity, has chosen not to respond to the issue relating to the swimming pool in its submission to the Service. 178. Having reviewed the supporting documentation provided with its submission, the Panel notes that it would seem the swimming pool aspect of the claim was declined on the basis that the damage arose due to water entering the soil surrounding the swimming pool causing settlement of the soil. 179. Reports submitted by the FSP‟s representative C have indicated that the source of the water which entered the surrounding soil of the swimming pool was a combination of rain falling directly onto the surrounding ground, run off, water escaping from overflowing gutters and water escaping the swimming pool. In its reports, C also referred the FSP‟s attention to previous determinations of the Service relating to loss arising in similar circumstances. 180. There is no dispute the Applicant is covered under the policy for loss or damage arising from storm. It has also not been established by the FSP that the swimming pool and surrounding areas were possibly damaged prior to the insured event. The reports submitted by C do also refer to an expert report obtained. However, this has not been made available to the Service for review and consideration. 181. In the absence of any evidence to the contrary, the Service is satisfied the swimming pool and surrounding areas were in an undamaged condition prior to the insured event. In addition to the FSP‟s failure to establish this loss/damage is excluded from cover, the Panel is satisfied (as has been determined in the past) that the FSP‟s reliance on soil settlement as the ca use of the damage is misconceived. The FSP has confused the resultant effect with the actual cause of the loss, the proximate cause being the storm. 182. Therefore, the Panel is satisfied the FSP was not entitled to refuse indemnity for the loss or damage to the swimming pool and surrounding area. Roof 183. The Applicant maintains that the damage to the roof was not properly repaired by the FSP‟s appointed representatives. It has only been patched up in some places and since the event has continued to allow water ingress into the home. She alleges that in addition to the damage to the roof lining caused by the storm, further damage was caused by the roof traffic of the repairers, which was covered up by the installation of new roof tiles. 184. The Panel notes the FSP has not submitted any substantiating evidence to the contrary in this respect. Having regard for the photos submitted by the Applicant, the Panel is satisfied that the dwelling ‟ s roof was not repaired appropriately. This has resulted in further water ingress into the home which over an extended period of time has caused additional damage and mould build up. Case No: 208628 Determination Page 24 of 29 185. On the basis of the available evidence the Panel is not satisfied the FSP has fulfilled its obligations under the policy in relation to repairing the roof of the insured property. Ceilings and walls 186. The Applicant has raised concerns in relation to the quality of repairs carried out by the FSP to the dwelling‟s internal walls, ceilings and electrical fittings. It is her contention that spots have been left unpainted and there are obvious ditches left where the electricians had carried out repairs. The ceilings have also cracked as a result of the change in moisture levels in the home over the extended period of time the FSP failed to finalise repairs. 187. The FSP in its submission to the Service has not addressed these concerns in any great detail and simply maintains that all moisture related issues have been satisfactorily attended to, and there was no further work required in this area. 188. Having reviewed the detailed evidence and supporting photos made available by the Applicant, the Panel is inclined to accept the Applicant‟s submission in this regard, to be the more plausible. There is clear evidence of extremely poor quality finishing in relation to the filling of holes and paintwork, in particular around wall and ceiling electrical fittings. 189. The Panel is not satisfied the FSP has fulfilled its obligations to restore the property to the condition it was in prior to the loss. The quality of these repairs cannot be considered to be reasonable and/or acceptable. Entrance area 190. The Applicant maintains and has provided evidence and photos to support her contention that: There is damage to front entry door and side panel. There is damage to the stairwell banister. There is damage to the wall along the stairwell. The tiles outside the front door and entry are not level. The front door bell has not been replaced The two large terracotta pots, a door mat and table from the front (entrance) are missing. 191. The FSP maintains that in relation to the tiles in the front foyer, the Applicant has failed to cooperate with requests by the FSP to view and approve replacement tiles. It has not specifically addressed the concerns in relation to the damage to the stairwell banister, front door, the wall along the stairwell and/or the missing items. It has sought to rely on its general position that it has fulfilled its obligations under the policy and any and all outstanding issues are due to a lack of cooperation on behalf of the Applicant. Case No: 208628 Determination Page 25 of 29 192. The Panel has reviewed the evidence and position of the parties and is not satisfied the FSP has fulfilled its obligations under the policy to reinstate the property to the condition (or as close as possible) it was in prior to the loss. The quality of attempted repairs in this area does not meet a reasonable level. Outside and Front of property 193. The Applicant maintains the paving directly outside the property was damaged by the repairers during the course of the claims. The FSP accepted to replace these pavers when it was to attend to replacing the pavers outside the front door. However, as the terracotta pavers outside the front door were not replaced by the FSP, it failed to attend to the pavers outside the home as well. 194. The gutters outside the home were damaged as a result of the trucks used by the appointed repairers. The Applicant has not been reimbursed for the cost to replace the damaged mailbox although she was assured by the FSP that it would do so. The concrete laid around the drains is already beginning to disintegrate and items from inside the home (hot water system and fridge) which were removed as detritus were left at the front of the property. 195. Having considered the evidence made available by the parties, the Panel notes the FSP has not addressed these issues in any great detail and has maintained its general position that it has fulfilled its obligations under the terms of the policy. The Applicant on the other hand has made available detailed submissions and photos in this regard. 196. On the basis of the available evidence the Panel is not satisfied the FSP has fulfilled its obligations in line with the terms of the policy and as such, is responsible to provide indemnity to the Applicant in this regard. 197. The Applicant has submitted that the FSP‟s representatives have left the garage without the wiring mechanism, as this was removed and accidently disposed. The garage door has also been damaged during the course of the claim process and in the Applicant‟s opinion, will need to be replaced. 198. The FSP has not made a submission in this regard; therefore in the absence of any evidence to the contrary, the Panel is satisfied the FSP is obliged to return the garage door and electrics to the condition they were in prior to the loss. Side path along the property 199. The Applicant maintains the path down the side of the home has been replaced by the FSP at a higher level than the original. She maintains this has resulted in the path obscuring the weep holes (not recommended) which allows water into the sub-floor area, along with worms and frogs into h er daughter‟s bedroom (pictures provided). 200. The FSP does not accept the Applicant‟s position and maintains that although this portion of the repairs was not covered under the policy, it has gratuitously attended to replace the path which abutted the outside wall (built above the Case No: 208628 Determination Page 26 of 29 damp course) in an effort to attend to the effects of poor ventilation and a build up of moisture. 201. The Panel acknowledges the position and evidence made available by the parties to this dispute in this respect. It further notes that the FSP as a gesture of good faith undertook the above mentioned works. However, if these works have not been completed to the recommended specification or are allowing moisture into the property, the fact that it gratuitously attended to the work, does not relieve the FSP from the responsibility to attend to any of the shortfall in this work. 202. Therefore, the Panel is satisfied that if the Applicant is able to make available an expert opinion that establishes there are indeed issues with the pathway laid by the FSP, it is then obliged to provide indemnity for the cost to rectify the situation. Loss/Damaged/Missing Contents and Storage Costs 203. The Applicant maintains that she was assured that their personal possessions, contents and furniture would be thoroughly, carefully and accurately listed and packed away for storage while the repairs were undertaken at the insured property. 204. It is her position that this was not the case and it took ten months for the FSP to even provide her with a list of the property packed and placed in storage by the FSP. During the course of the claim the FSP also lost details of where a portion of her property was actually stored. 205. The FSP acknowledges the Applicant‟s concerns in this regard and maintains the matter remains outstanding as the Applicant, although requested several times, has failed to view and where appropriate, approve or provide a list of the lost or damaged contents. 206. Having reviewed the evidence made available by the parties, the Panel notes that the Applicant has submitted sufficient evidence to establish the poor manner in which the contents were packed for storage and ensuing damage of some of these contents. She has however not made available for consideration a list or breakdown of her loss. 207. The only evidence in relation to the extent of damaged contents packed and stored away (internally and in storage facilities) by the FSP are lists made available by the FSP. These lists establish that at the very least there were approximately 250 items (contents, furniture, personal property etc) either lost or damaged whilst in the care of the FSP. 208. The Panel has reviewed these lists together with the lists of missing and damaged items provided by the Applicant; unfortunately these lists do not assist in quantifying the loss in monetary terms. However having noted the number of items and the likely replacement cost for items listed, it is clear to the Panel that the replacement value and/or repair costs would be well in excess of $100,000. Case No: 208628 Determination Page 27 of 29 209. Having noted the contents sum insured is limited to $187,000, and having noted that through the life of the claims the FSP has already made payments to the Applicant in the amount of $81,769, the Panel determines that the FSP is to cash settle the Applicant for the balance of the contents sum insured. Reimbursement 210. The Applicant is seeking reimbursement for costs associated with out of pocket expenses and storage costs incurred as a result of the extended period of time the family remained without their home arising from the FSP mismanaging the claims. 211. The FSP does not essentially dispute an entitlement to such reimbursement however maintains that such loss would need to be established through submission of evidence by the Applicant. 212. The Panel accepts the FSP‟s position in this regard and in th e absence of supporting evidence made available by the Applicant , is not in a position to provide a finding in this regard. It is however, satisfied that on the Applicant making such evidence available, the FSP is obliged to reimburse her storage costs. Compensation 213. The Applicant has sought compensation from the FSP for the experience both her children and she have had to endure during the course of the claims. 214. The Panel considers the following FOS Terms of Reference (TOR) relevant to this dispute: 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interfe rence with the Applicant‟s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual‟s privacy rights - injury has occurred to the Applicant‟s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, In a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. Case No: 208628 Determination Page 28 of 29 215. Under 9.3(b) of the TOR there must be an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the A pplicant‟s expectation of enjoyment or peace of mind, before compensation for non-financial loss may be determined. 216. The FSP took close to three years more than the stipulated completion time advised to the Applicant. Although the Panel accepts a portion of this delay would be attributable to the Applicant‟s conduct, as previously noted such conduct on her behalf would not be considered unreasonable under the extreme circumstances she faced due to the mismanagement of the claim. 217. The Panel notes that there is no evidence made available by the FSP to establish that under such unusual and unacceptable circumstances, its senior management made any effort to directly deal with the Applicant and/or make any efforts to diffuse the situation over the several years this matter remained outstanding. 218. Having considered all the material before the Panel together with the relevant policy terms and TOR, the Panel is satisfied that as a result of the FSP‟s conduct and mismanagement of the claim, the repairs/replacement of lost or damaged property was grossly delayed. 219. The Panel is satisfied that such a delay has led to an usual degree of physical inconvenience and time taken to resolve the situation pursuant to clause 9.3(b) and that the Applicant is entitled to compensation for non-financial loss. 220. The Panel acknowledges the parties‟ positions in relation to each other‟s attitude and actions during the course of the claim. The Panel is satisfied having considered the available evidence as a whole that this favours the Applican t‟s contention that there has been a gross mismanagement of the claims and an absence of quality control in relation to a majority of repairs undertaken by the FSP‟s appointed representatives. 221. The Panel is also mindful of the fact that the sum insured amounts may be exceeded in pursuit of the settlement of this matter. However, the Panel is satisfied this is the direct consequence of the FSP‟s mismanagement of the claim and as such, any reference to the limits of the policy in terms of the sum insured should not necessarily be used by the FSP to resist further payments for issues deemed still outstanding. Determination 222. On the basis of the available information the Panel determines that: In respect to the lost, damaged and missing contents portion of the claim the FSP is to cash settle the Applicant for the balance of the contents sum insured, taking into account the payments already made by the FSP. The FSP is required to pay interest on the amount of the balance of the contents sum insured at the statutory rate from 21 September 2009 (being Case No: 208628 Determination Page 29 of 29 the date on which a catalogued list of items was completed for the FSP) to the date of settlement. In respect to the building portion of the claim (including the roof, swimming pool and its surrounds), the Applicant within one month of this determination is to obtain a scope of works from an appropriately qualified and experienced builder or building contractor. The scope of works must be strictly limited to the repair and/or replacement of the damage to the home building which resulted from the initial storm and the subsequent damage which has resulted from the sub- standard repairs by the FSP‟s builders. The Applicant is required to provide the scope of works to the FSP for review which it must complete within 14 days of its receipt. On acceptance of the scope of works, each party is to obtain a costing of the works. The parties are then required to agree to a final costing which will form the basis of a cash settlement. This amount is then to be cash settled by the FSP within 5 working days of agreement. The FSP, in line with the relevant TOR, is to pay to the Applicant $3,000 being compensation for non-financial loss. 223. The Panel urges the parties to work together cooperatively to finalise this dispute, settlement of which is not to be unreasonably delayed by either party. 224. Should the parties confront any further issues in complying with this determination they may seek further assistance from the Service.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.