Text of the determination
Case No: 208628 Determination Page 1 of 29
Case number: 208628
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
25 October 2011
Background
1. The insured property (building and contents) was covered under separate
Home Building and Home Contents Insurance policies (the policies) by the
Financial Services Provider (FSP). The policies were issued in the name of the
Applicant‟s ex - husband “SK” on 1 1 January 2005.
2. The insured property sustained significant building and contents damage on or
about 8 June 2007 as a result of a major hail storm experienced in the area.
The Applicant lodged a claim under the policies seeking indemnity for the loss/
damage arising from the insured event.
3. The FSP accepted the claim and proceeded to authorise the repairs and
replacement of the insured property. The initial estimate in respect to the time it
would take to complete the repairs was four to five weeks and during which
time the Applicant and her children would need to vacate the property.
4. Several issues developed between the concerned parties in relation to the
quality of repairs, repairers appointed, FSP representatives and time taken to
undertake the approved repairs and replacement of contents.
5. The FSP maintains it has done all possible to finalise the matter in line with its
obligations under the policy, however any outstanding work is due to the
Applicant‟s failure to co -operate with the FSP and its appointed representatives.
6. The Applicant remains dissatisfied with the outcome of the claim. She is
seeking a determination requiring the FSP to accept liability for the poor
workmanship, outstanding repair/replacement of damaged property, storage
costs, rectification of the policy details and compensation for the experience
she and her family had to endure.
Summary of Applicant’s Position
7. The Applicant refutes the constant and blatantly untrue accusations made
against her by the FSP. She maintains that no concerns in respect to her
alleged difficult attitude were raised by the FSP or its representatives until such
Determination
Case No: 208628 Determination Page 2 of 29
stage as she lodged the formal complaint in relation to the FSP‟s attitude, unfair
trading practices and management of the claim.
8. The Applicant has requested the FSP to make available evidence to support its
contention that she had made additional claims for work not included within the
allegedly approved scope of works. However, no such evidence has been
forthcoming from the FSP.
9. The Applicant maintains she was not aware of a scope of works agreed upon
by the parties nor has she been provided with a copy of the alleged scope of
works.
10. The Applicant cannot understand why it would be considered unreasonable for
her to expect hot water, heating, furniture or for the repairs to be undertaken to
an acceptable standard. Insisting on the repairs to be carried out to an
acceptable standard is, in the Applicant‟s opinion, not the same as being
considered demanding.
11. The FSP ‟s inaction and turning of a blind eye enabled its appointed
representatives to believe they were entitled to manipulate, deceive and use
trickery to gain financial advantage through the claim.
12. The Applicant was never asked or agreed to pay/contribute towards the cost of
repairs in the kitchen. The only costs she was responsible for were limited to
the upgrade of the kitchen bench top and glass splashback.
13. The decision by the FSP to replace the kitchen arose from the fact that the
house was left in a condition allowing water to leak in for over a year, due to the
neglect of the FSP‟s appointed representatives. This resulted in significant
mould infestation throughout their home.
14. The Applicant was originally referred to “VK” for the kitchen repairs, with whom
the Applicant was quite impressed. However, after “MW” left the company, the
newly appointed FSP representative “JP” advised the Applicant that she had to
agree for the repairs to be carried out by “HK” (a company she later discovered
was in receivership at the time).
15. “ JP ” made it very clear that it was his decision as to what would be or would not
be included within the scope of works. Further, he did not seem to care about
the obvious poor workmanship carried out under his supervision.
16. The Applicant believes that the poor repairs and ongoing issues with the scope
of works were intentionally allowed by the loss adjuster “AR” in partnership with
“ JP ” . The Applicant believes that this attitude was the result of the replacement
of two previous loss adjuster s by “C” (FSP‟s appointed loss adjusting
company), due to their negligence and poor service reported by the Applicant.
17. The Applicant contrary to the allegation of the FSP never signed off on a
document agreeing that all the repairs had been completed to her satisfaction.
The only document she signed was one agreeing the repairs be carried out in
the kitchen by “ HK ” .
Case No: 208628 Determination Page 3 of 29
18. The Applicant believes she was entitled to trust the FSP and its appointed
representatives to repair the home adequately and to do the right thing by her,
which unfortunately did not prove to be the case.
19. The Applicant was encouraged to choose upgrades and told she had to pay for
any such upgrades upfront. She chose to upgrade the kitchen bench top and
glass splashback, however, she then discovered the poor quality products and
workmanship, provided by the FSP‟s representatives.
20. The Applicant never expected the FSP and its representatives to repeatedly lie
and finds this quite shocking. The trades-people acted in accordance with their
instructions from the FSP and “ AR ” .
21. The Applicant was kept away from meetings by “ AR ” , either by not informing
her of times and places or informing other parties that she was too busy to
attend.
22. The disagreement regarding the cracks in the bench top was between the
electrician who installed the hotplates and the kitchen installers. As such, this is
irrelevant from the Applicant‟s point of view, as the damage was caused by a
service provider appointed by the FSP and therefore it‟s responsible to address
the issue.
23. Appointing a trades-person with mental health issues to work at the insured
property is nothing short of negligent. “MP” obviously had mental health issues
and the Applicant believes he was the one responsible for placing a dead rat in
her bag of clothes.
24. The Applicant was delivered many content items that did not belong to her and
she promptly informed the removalists, including but not limited to a glass turn
table that did not fit into her microwave, a matter which has yet to be rectified.
25. Work simply stopped, and there was no formal handing over of the property;
nor were warranties supplied for the items installed, as promised and
committed to by the FSP.
26. All complaints referred to the FSP were met with blanket and categorical denial
with no commitment whatsoever towards an investigation, let alone establishing
the truth.
27. To allow its representatives appointed to the claims to be left “unchecked” while
managing these claims over such an extended period of time, such as has
caused this degree of financial, emotional, physical and psychological harm to
her family establishes there is something fundamentally wrong with systems in
place at the FSP.
28. The Applicant in her submission to the Service has detailed her concerns with
the management and service provided by the FSP and its representatives
under the claims. These being:
Case No: 208628 Determination Page 4 of 29
Removing the Applicant as co-insured from the policies
29. The Applicant alleges that the FSP at the request of her ex-husband (SK) and
without her consent proceeded to remove her name from the policies. This has
resulted in the FSP now being reluctant to openly deal with her and requesting
authorisation from “ SK ” .
30. It is her position that the FSP has been provided with an authority from “ SK ”
and therefore the FSP should reinstate her name on the policies.
31. The Applicant maintains the FSP in attempting to raise concerns in respect to
authority under the policy regarding issuing of payments, a number of years
after the matter had already been resolved, is unreasonable.
Kitchen/Pantry repairs and fittings
32. The Applicant maintains that the builders in repairing the kitchen made use of
the wrong plasterboard. It should have used blue board, which is standard for
use in bathroom, laundry and kitchen wet areas.
33. There is no plasterboard installed behind the kitchen bench and sink. Only a
piece of non wet area plasterboard has been slightly inserted behind the bench
top to give an illusion that the wall behind the bench top has been replaced.
34. The Applicant has submitted pictures which show bench top, power switches
and other fittings to be of poor quality and unacceptable.
35. The sink fitted is not the sink the Applicant had been shown and selected to be
installed. The sink shown to the Applicant was of better quality, slightly larger
and designed to fit underneath the bench top.
36. The sink was only adhered with silicone and has since dropped out of the
bench top. The Applicant believes it was never installed to remain in place. The
sink tap has not been installed correctly and therefore leaks from the
connection under the cupboard. Despite cleaning it every day the Applicant
cannot prevent the appearance of mould.
37. Holes in the bench top, kitchen cupboards and floor under the cupboard have
not been sealed. The left hand side of the sink does not sit flush with the bench
and allows water to get in under the sink and into the cupboard below.
38. There are cracks present around and behind the hotplates in the bench top due
to actions of the people responsible for installing the hotplates. When “ JP ”
came to install the filters in the range hood, he dropped the metal filters onto
the newly installed induction hot plates causing two chips.
39. There are gaps between the range hood and kitchen cupboards. The insides of
the cupboards are easily visible through these gaps. The cupboards have not
been installed evenly and do not sit flush with each other or other fittings. They
cannot be adjusted as they do not fit into their designated areas.
Case No: 208628 Determination Page 5 of 29
40. Large gaps have been left in the installation of the ovens. The structures
underneath the ovens are visible. These are self cleaning ovens; however
cleaners in an attempt to clean them after the mould infestation have used
strong chemicals, damaging the ovens.
41. The workmanship in the kitchen is nowhere near what one would expect from a
skilled tradesman. The corners of the cupboard doors are rough and have an
unprofessional finish. There are large gaps between the cupboard doors.
42. Cupboard doors have been left with scratches by tools used by the tradesman
and the cupboard under the sink has been drilled twice around the handle
fittings allowing movement of the handles, and are therefore not properly fitted.
The cupboard handle fittings have already begun to discolour and they cannot
be cleaned.
43. The shelving installed in the kitchen pantry has jagged edges, slices and chips.
There are gouges in the pantry cupboard doors and shelves due to poor
workmanship.
44. The pantry door is falling away from the rest of the cupboard as the screws
holding the door are coming away.
45. She believes that evidence made available by her establishes that the people
employed by the FSP to carry out the repairs in the kitchen did not have the
necessary skills or were unwilling to exercise that skill, when completing the
repairs.
46. There are excessive and unnecessary holes in the cupboards and shelving
which do not line up with the holes on the opposite side in order to allow
shelves to sit properly.
47. The pantry shelves although designed to be adjustable, cannot be adjusted as
they are poorly cut and jammed into place. Also, the holes cut are not in line as
stated above, except for the ones the shelves are currently sitting on. Further,
the shelves are not strong enough to hold food products and as a result they
bend.
48. The push lock door openers (stops) fall off all the time as they have been
adjusted to capacity in an effort to compensate for the poorly fitted cupboard
doors. She has submitted evidence showing that there are a number of
electrical fittings and other repairs left hanging and/or unattended.
49. She was advised that she was not allowed to install a splashback to the same
height as was originally installed and would have to accept installation of a
lower height splashback. The Applicant was of the understanding she was
entitled to have replaced, all that was present prior to the loss.
50. The Applicant maintains that this was the FSP‟s attitude in respect to all fixtures
in the home that were previously of high quality and she was advised they had
to be replaced with “standard stock” items.
Case No: 208628 Determination Page 6 of 29
51. The electrician forgot to install the power points in the kitchen before the
plasterboards were fitted. To address this they had to punch holes in the
plasterboard along the wall in an attempt to locate the spots where the power
points were originally fitted. The holes were then repaired/filled in very poorly.
52. Floorboards in the kitchen were never replaced as stated in the FSP‟s fourth
report submitted by “ MH ” , after the damage was assessed. In reality, what
happened was that the damaged floor boards were simply tiled over, which has
left the kitchen floor with a dip in it.
Laundry
53. Incorrect measurements of the laundry cupboards resulted in one of two entry
doors into the laundry (initially removed by the repairers) not being able to be
re-installed. The incorrect measurements meant there was not enough space
between the end of the cupboards and the door leading into the house. Due to
the lack of space the electrical light fittings and exhaust fan originally installed
in the laundry could not be reinstated.
54. The Applicant was advised by the FSP‟s representative that he would allow for
reinstallation of the cupboards and cater for the necessary adjustments by
adjusting the rest of the laundry design, which did not occur. He installed a
different style door opening into the home and also left out the second door to
the garage.
55. The cupboard originally located next to the washing machine was not replaced.
On raising this with the FSP‟s representative she was advised the replacement
cost would be deducted from the overall expense of the kitchen and laundry to
help offset the upgrades to the bench top and glass splashback for which the
Applicant was responsible, again this did not occur.
56. The FSP‟s representative suggested that the light switch be fi tted inside the
laundry cupboard due to the mismeasurements, which the Applicant found
unacceptable. She was then treated as if she was being exceedingly
uncooperative, and was offered to have the light switches placed on the door
frame. Ultimately, the light switches were installed on the wall outside the
laundry, which is again inconvenient.
57. The workmanship in respect to the cupboards is on par with the quality of
repairs completed in the kitchen. There are rough edges, doors do not fit and
cannot be adjusted or aligned properly due to incorrect size.
58. The laundry sink originally had a diverter designed to switch between the
installed shower and standard tap. However, now the diverter will not move and
consequently the tap cannot be used and only the shower head is available for
use. The shower head had a bracket which should have been installed which
makes the shower hands-free, but this had been left lying next to the sink and
has now gone.
Case No: 208628 Determination Page 7 of 29
59. The lower edges of the cupboards are bubbled and distorted; also the back of
the inside of the cupboard had been damaged while installing a power point
and this has been repaired using a cheap already scratched piece of laminate.
60. The washing drawers which originally had metal sides in order to allow the
drawers to hold the weight of clothes stored in them were not replaced with
metal sides and therefore are not strong enough to fulfil their intended purpose.
61. The front of the drawers and cupboard doors are damaged and poorly installed
while the clothes drying racks originally present have not been replaced at all.
62. Incorrect tiles have been installed in the laundry even though, at the request of
and accepted by the FSP‟s representat ives, she had made it clear what type of
tiles were to be installed.
63. On trying to have her concerns in relation to the laundry addressed by the FSP,
she was continuously advised to “deal with one area at a time”, and always
referred back to the kitchen. As a result, all concerns in respect to the laundry
were completely overlooked by the FSP due to the concerns relating to the
kitchen.
64. The washing machine was damaged as a result of it being left in the home for
such an extended period of time with water leaking into it, and the clothes dryer
also no longer works.
65. The ceiling light socket fitted in the laundry was broken and as a result, the
Applicant is unable to screw in a new light globe. The FSP had promised to
replace this however this did not occur.
Ceilings/ Ceiling fixtures and Floors
66. The ceilings have spots left unpainted, ditches where electrical work was done
and due to the changes in moisture over the extended period of time, the
ceilings have also cracked. The ceilings now require significant rectification
work.
Swimming Pool and Surrounds
67. The swimming pool surrounds were supposed to be replaced by the FSP after
they were damaged by the storm/flood water only to be exacerbated by the
length of time they were neglected by the FSP after the event. The repairs to
the pool surrounds were also originally quoted to be repaired by the FSP
however this was later discarded.
68. The FSP was advised very early on in the management of the claims that if the
pool surrounds were not repaired in a timely manner, the damage would only
further increase to extend to the swimming pool itself. The Applicant maintains
that the main cause for the damage was the storm.
69. Due to the length of time it has taken the FSP to manage the claims and its
complete neglect, the swimming pool has now split down the (internal) side.
Case No: 208628 Determination Page 8 of 29
Swimming is an important activity for the Applicant‟s mobility (back problems)
and the FSP was made aware of this early on in the claims process.
Sub-floor area
70. Due to water being allowed to sit in the sub-floor area of the property over an
extended period of time whilst repairs were underway, the entrance door has
rotted away.
71. There is an infestation by bees and insects and the Applicant was not permitted
access by the FSP to arrange a pest control professional to attend to this.
Honeycomb nests have allowed honey to dribble through walls and ceilings.
72. The sub-floor ventilation system had been disconnected by someone.
Outside the home
73. The paving directly outside the home was damaged by the trades ‟ people
during the course of the claims. The FSP ‟s representative agreed to replace the
broken pavers when the pavers at the front door were redone. However, the
front door area was tiled as opposed to using pavers and with this the pavers
outside the home were not replaced as promised.
74. The gutters at the front of the home have been left damaged by trucks used by
the FSP‟s appointed representatives. In addition, the mailbox was damaged by
the FSP‟s representatives and then replaced by the Applicant at her own cost
with a commitment to be reimbursed, this has not occurred.
75. The damaged fridge and hot water system removed by the FSP have been left
at the front of the house and need to be removed.
76. The concrete laid around the drainage outside the home is already
disintegrating.
77. The tradesman lost the controls to the garage and proceeded to remove the
electrical wiring, which was on one occasion fixed, only to again have the wiring
mechanism removed by the cleaners. The cleaning truck then disposed of the
mechanism in error and the garage now needs to be repaired. In addition the
garage door itself has been damaged during the course of the claims and in the
Applicant‟s opinion will need to be replaced.
78. The Applicant‟s art equipment, stored inside the garage, has been damaged
which has been extremely disastrous to opportunities for future employment.
79. Although changes to the drainage outside the front of the home was
superfluous, the Applicant felt forced to agree because of the lengths the FSP‟s
representative went to insist that it was a problem. The water under the home
was not the result of the alleged inadequate drainage rather was and still is
coming from the poorly patched up roof.
Case No: 208628 Determination Page 9 of 29
Roof
80. The roof has never been properly repaired and needs to be attended to by the
FSP as committed. It has only been patched up in some places and still allows
water ingress in other places. The damage caused to the lining under the tiles
in a number of places, including obvious damage caused by the FSP‟s
representatives (foot holes through the lining), have only been tiled over without
attending to the holes in the lining.
Path down the side of the home
81. The path down the side of the home has been replaced by the FSP at a higher
level than the original. This now covers the weep holes which are not
recommended. Now worms and frogs enter her daughter‟s room.
82. This also allows water into the sub-floor area of the property in addition to the
hole in the roof lining allowing water into the home over the previous three
years.
Entrance area
83. Front door damaged by tradesman; an attempt to repair it has been made but is
not of a satisfactory standard. The panel to the right of the front door was
removed and has not been replaced.
84. The stairwell banister has been significantly damaged by tradesman. It needs
to be secured properly, sanded back and painted properly. The wall along/near
the stairwell has been damaged and needs to be repaired and repainted.
85. A table that was placed in the entry foyer prior to the storm event has been
removed and not returned. The tiles outside the front door and in the entry foyer
area are not level. A professional‟s opinion will need to establish how this can
be rectified.
86. The front door bell is no longer installed and the front and back door mats are
also missing. There were two large terracotta pots at the entrance to the
property which are also no longer there.
Contents and personal possessions
87. The Applicant was promised that the insured contents would be thoroughly,
carefully and accurately listed and packed by the service agents engaged by
“ C ” . However, this was not the case as it took ten months for the Applicant to
be provided with a list of the contents packed and placed in storage. These lists
were vague, inadequate and inaccurate.
88. During the course of the claim the FSP lost details of where a portion of the
Applicant‟s contents were actually stored. It took it a very long time to actually
locate where the contents were.
Case No: 208628 Determination Page 10 of 29
89. “R” made it very clear that he had intentionally given what he referred to as a
very conservative estima te, for the contents that were stored at “CA”. The
Applicant has made available photos as evidence of how and in what condition
the contents were actually stored by the FSP.
90. A significant number of contents were damaged as a result of what would seem
to be a case of a number of people whilst packing haphazardly grabbing
contents from different rooms in the home and throwing them into boxes.
According to advice she received many of the boxes were then stored directly
under the sun for three years.
91. The Applicant was not provided any assistance in moving the contents in her
possession back home by the FSP, which further exacerbated her back
problem. The Applicant alleges that it was only after she, with the assistance of
her children, had moved a majority of the contents, that she was then sent a
letter offering assistance by the FSP.
92. A significant number of items were damaged and needed to be disposed of as
they had been left in the garage. The FSP had committed to removal of these
items however this has not occurred.
93. Batteries left in a number of items have, over time, leaked into the items
rendering them unsalvageable. The Applicant believes as professional
companies were appointed to undertake the packing and storing of the items,
they should have known better and possessions should have been packed and
stored to an acceptable standard.
Other missing items or damage claimed
94. The Applicant has made available a very detailed and comprehensive room by
room list of contents and damage she is claiming needs to be covered by the
FSP. As this information has been exchanged between the parties, the Panel
will limit reference to the rooms only, these being:
Television room
Master bedroom, ensuite and main bathroom
[Applicant‟s daughter E‟s] bedroom
[Applicant‟s son O‟s ] bedroom
[Applicant‟s daughter C‟s] bedroom
[Applicant‟s daughter I‟s] bedroom
Dining room
Gym room
Office
Studio
Garage
Kitchen
Case No: 208628 Determination Page 11 of 29
The downstairs bathroom
Storeroom
Laundry
Reimbursements and Compensation
95. The Applicant is seeking reimbursement and compensation for the following:
For all out of pocket expenses, especially storage costs, that occurred
because of the FSP‟s mismanagement of the claim.
Her children will require ongoing trauma counselling and the expense so
far has been crippling.
Compensation for what the Applicant and her family have had to deal with
as a result of the FSP allowing the claim to be managed in such a poor
and unacceptable manner.
The Applicant has been seriously disadvantaged by having to deal with
this matter. She was unable to concentrate on her entitlement to the
property portion of her settlement with her ex-husband and was left with a
significantly reduced settlement.
Their lives were devastated over this period and her children will never be
able to recover their lost childhood due to the negligence by “ AR ” and “ C ” .
Having to struggle financially over this period and manage on a disability
pension and pay the ongoing storage fees and increased travel costs.
The effect the past four years has had on her children‟s educa tion and
social life.
Summary of FSP’s Position
96. The FSP issued two policies i.e. Home Building and Home Contents covering
the insured property. The policies were issued and were held in the Applicant‟s
ex- husband‟s name (SK).
97. The FSP in its dealings with „ SK ‟ has never noted an objection on his behalf
regarding the FSP dealing with the Applicant. However, the Applicant raised
concerns in relation to the FSP dealing directly with “ SK ” , and therefore the
FSP requested her to obtain a letter of authority from “ SK ” authorising it to deal
with her.
98. On 13 June 2007, the Applicant contacted the FSP to lodge the claims for loss
or damage arising from the insured event which occurred prior to, during and
after the Queen‟s Birthday long weekend i.e. 9 -10 and 11 June 2007.
99. The FSP has sought to address the concerns raised by the Applicant in her
submission to the Service. These have been summarised below:
Case No: 208628 Determination Page 12 of 29
Removing the Applicant’s name from the policies
100. The FSP refutes the allegation it removed the Applicant‟s name from the policy.
Over the years both SK and the Applicant had held several insurance policies
with the FSP issued in both names. However, the policies were allowed to
lapse on at least two occasions (15/3/2001 and 11/12/2004).
101. When the policies subject of this claim were incepted with the FSP, it was done
on the application of SK alone and as such the Applicant was never listed as a
joint policyholder on these policies.
102. The FSP maintains that since lodgement of the claims it has dealt extensively
with the Applicant with respect to the claim. It is only with the proposed cash
payment of contents directly to the Applicant that the issue of her not being on
the policy was raised.
103. An annual review of the previous policies which had both SK and the Applicant
as co-insureds, noted a hand written instruction purporting to be from SK and
instructing the FSP to add the Applicant to both policies (….4883 and ….4884).
The FSP fails to see the relevance of this document, as the policies in
existence in 2001, had certainly lapsed before SK applied for the new policies.
104. The FSP is not disputing the Applicant‟s claim that she should be added to the
policy, nor that the content cover payments should be paid directly to her, only
that this be clarified with the policyholder (SK).
105. The FSP therefore maintains that it at no stage actually removed the
Applicant‟s name from the policies in question.
Putting the Applicant and her family’s health at risk – Ignoring information
regarding mould build up in the home
106. The FSP maintains it wa s advised of the Applicant‟s concerns regarding
complications relating to mould on 20 June 2007.
107. According to the Applicant‟s own notes she was taken to hospital sometime
between 18-20 June 2007. This was the time the FSP had only just been
advised of the family‟s health issues.
108. The FSP treated the Applicant‟s concerns seriously and paid her $2,500 on 28
June 2007 for alternative accommodation and a further $160,485 was spent on
providing alternative accommodation to the Applicant over the course of the
claims from 17 July 2007 - 16 March 2010. This amount being far in excess of
the accommodation expenses covered under the policy.
109. In order to minimise the effects of the poor ventilation, the FSP gratuitously
attended (not covered under the policy) to:
Replacing the drainage at the front of the property to divert water away
from under the home.
Case No: 208628 Determination Page 13 of 29
Replaced the pebblecrete side path that abuts the outside wall which was
built above the damp course.
Arranged to have the upstairs rooms repainted on noting the Appli cant‟s
concerns regarding mould and the time it took to resolve the claims.
110. The FSP attended to replacing two thirds of the kitchen, although this was not
part of the original scope of works. However, noting the length of time it has
taken to resolve the claim, the discovery of mould in this part of the h kitchen
may, it acknowledges have been connected to the insured event. The Applicant
had, however agreed to cover the cost of the remaining one third of the kitchen
reinstatement, including cupboards and an upgrade of the kitchen bench top
and glass splashback.
111. Due to the family‟s sensitivity to mould, the FSP (although not covered under
the policy) arranged for removal of mould from the sub-floor area of the
property. The FSP agreed to undertake the above works as it was unaware of
the prevailing humidity levels in the sub-floor area prior to the insured event,
given the pre-existing issue regarding drainage and pooling of moisture in this
area.
Length of time – told to pack for a four week period away from the home
112. The delay in settling the claim was caused ostensibly by the Applicant‟s refusal
to co-operate with the builders by insisting some builders be removed from the
project and by withdrawing access to the property.
113. The FSP had to engage two different building companies, three loss adjusting
companies and a building consultant, to specifically assist the Applicant in
understanding the re-building process.
114. The FSP notes the Applicant would agree in meetings to a certain course of
action, acceptance of quality of repairs and responsibility for actions, only to
later withdraw her consent.
Extremely hard conditions to live in (alternative accommodation)
115. The FSP on a number of occasions asked the Applicant to return to her home,
however she refused saying she was still concerned about her family‟s health.
These requests took place in late 2008 and beginning of 2009
116. During an onsite visit, the Applicant agreed to move back if the FSP provided
new beds and bedding. The FSP sourced suitable replacement of these items
however these were rejected by the Applicant as being inferior.
117. The FSP obtained quotes for „top of the range‟ beds and bedding upon which it
cash settled the Applicant on 18 August 2009. Other issues raised by the
Applicant regarding returning to the property were:
Health issues.
Unresolved disputes regarding kitchen repairs.
Case No: 208628 Determination Page 14 of 29
Inability to sort or deal with the concerns relating to the contents.
118. The FSP notes the Applicant‟s reference to having to travel long distances from
the alternative accommodation and that this impacted her family. However, the
FSP maintains that it offered to re-locate the Applicant to closer
accommodation on at least two occasions (22/4/2008 and 4/6/2008).
119. The Applicant however refused the offers on the basis that this would be an
unnecessary disruption to her family as they would eventually need to move
again into their home.
Exacerbation of back injury and disability
120. The FSP relies on its arguments in the two previous headings.
121. The FSP has no knowledge of the Applicant‟s claim that she was told she
would be moved out and then back again by the FSP. However, it is open to
any claims in this regard subject to submission of further and better details by
the Applicant.
Destruction and loss of property
122. The Applicant informed the FSP that the builders had damaged the upstairs
bathroom. The FSP proceeded to replace all the tiles in the bathroom.
123. In respect to damaged or lost contents, the FSP acknowledged the Applicant‟s
concerns and appointed specialist restoration services to assist with the
identification and valuation of these contents. The Applicant has however been
unable or unwilling to cooperate in this process.
124. Apart from issues identified in its letter to the Applicant dated 7 December
2009, the FSP is unaware of any other damage to the insured property arising
out of the actions by the builders or other service providers.
Drawing up contracts and dismissing them and/or refusing to provide the
Applicant with a copy of written contracts
125. The Applicant has not made available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Misinformation, contrary information and distorting facts
126. The FSP refutes any improper behaviour on its part.
127. The Applicant has failed to make available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Case No: 208628 Determination Page 15 of 29
Blatant lying
128. The Applicant has failed to make available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Repetitive request for written lists of concerns
129. The FSP acknowledges it did request written lists at times due to the
Applicant‟s concerns.
130. This however occurred in response to the Applicant moving away from
agreements reached during meetings and failing to accept the quality of
repairs.
Bullying
131. The Applicant has failed to make available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Using exhaustive techniques and the Applicant’s disability to their adv antage
and threat to contact her ex husband
132. The Applicant has failed to make available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Refusing to respond to the Applicant and justifying this by advising it had lost
documents
133. The Applicant has failed to make available further and better particulars of this
complaint; as such the FSP is not in a position to respond.
Poor workmanship
134. The FSP refers to its letter to the Applicant dated 7 December 2009 and
maintains:
Moisture and damage issues had been satisfactorily attended to and there
was no work required in this area.
In relation to the tiles in the front foyer, the FSP has requested the
Applicant to view and approve the alternative replacement tiles on more
than one occasion. However, at the time of its submission to the Service,
the Applicant had still not done so and the matter remains outstanding.
In respect to the kitchen the only outstanding issue is in relation to the
installation of the glass splashback. The FSP is prepared to undertake
this; however the Applicant has failed to allow access to the property.
The FSP is aware of the Applicant‟s concerns regarding the quality of the
Caesar stone (or similar) kitchen bench top. The bench top was subject to
a contract between the kitchen manufacturer and the Applicant. As such
Case No: 208628 Determination Page 16 of 29
any dispute arising out of this contract is a matter for the parties to the
contract and not the FSP.
The Applicant had previously signed off that the outstanding kitchen
issues (including the bench top) were complete to her satisfaction.
Unfinished work
135. The FSP refers to its letter to the Applicant dated 7 December 2009 and
maintains:
The FSP awaits the Applicant‟s instruction and cooperation in this regard.
The FSP maintains its position explained under the “Poor Workmanship”
section.
The Applicant has failed to view and where appropriate approve or
provide a list of lost or damaged contents, submit quotations for (large)
lost items and therefore these matters remain outstanding.
The Applicant failed to view the attached list of damaged items held by
“ CA ” and provide the FSP with the replacement cost of each item.
The Applicant has failed to accept and/or provide replacement costs for
the washing machine and clothes dryer.
The FSP has not been provided with details for a suitable replacement
heater as she rejected the heater offered by the FSP.
In relation to the fitness equipment, the Applicant has failed to allow “SF”
access to assess and if possible reassemble the fitness equipment.
Reimbursement for loss of use of clothing that no longer fits the family due to
the extended period it took to settle the claim and the clothes were in storage
136. The FSP maintains that a loss of this nature is not covered under the terms of
the policy.
Storage costs and other expenses
137. The FSP relies upon its letter sent to the Applicant dated 7 December 2009.
138. The FSP maintains the Applicant is yet to provide it with information quantifying
her loss/costs in this respect.
Payment for counselling costs
139. The FSP rejects the assertion that any of its actions are the cause of the
family‟s psychological or other medical consequences.
140. The FSP maintains that a cost of this nature is not covered under the terms of
the policy.
Case No: 208628 Determination Page 17 of 29
141. The FSP is of the opinion that this matter can only proceed to resolution if and
when the Applicant:
A. Provides the FSP with the authority from SK.
B. Attends to matters outlined in its letter to the Applicant dated 7 December
2009.
C. Quantifies the expenses sought i.e. expenses relating to relocation and
repairing the insured property.
D. Makes available better and further details in respect to her
claims/complaints made against the FSP.
142. The FSP requests that no inference be drawn from its request for better details
in respect to various concerns raised by the Applicant.
143. The FSP has made available several statements from the various loss
adjusters and builders to support its position in respect to the cause for the
delay and the attitude of the Applicant.
144. Both the Applicant and the FSP have had sufficient opportunity to address and
respond to the issues raised and as such the Service should be able to provide
a determination without any further delay.
145. The FSP relies on the following policy provisions:
BUILDING POLICY
“SECTION 1 INSURED EVENTS CAUSING LOSS OR DAMAGE
This policy insures you up to the amount of the sum insured or loss or damage to your
home caused by an insured event listed below.
…
1.12 Storm, Rain Or Flash Flood
…
SECTION 2 HOW WE SETTLE YOUR CLAIM
2.1 Repair, Rebuilding Or Replacement
“When an insured event causes loss or damage to your home we will, if we accept
your claim, pay to our option for the reasonable cost of repairing, rebuilding or
replacing your home at the site
to its condition when new; or
to its condition when last renovated, altered or restored.
We will not pay for the portion of these building costs which relate to the undamaged
parts of your home.
The maximum we will pay is:
the sum insured shown in the schedule; plus
the other benefits we have agreed to pay; less
Case No: 208628 Determination Page 18 of 29
your excess;
but we will not pay to upgrade your home if it is over-insured.
…
SECTION 3 OTHER BENEFITS
This policy also insures you for other benefits set out in this Section.
The cost of these other benefits is included in the sum insured for your home unless
otherwise stated.
…
3.3 Accommodation Costs Or Lost Rent
When we have accepted a claim following damage to your home and we agree that
your home is not fit to live in we will:
if you lived in your home at the time of the damage, pay the reasonable costs
that you incur for similar accommodation while your home is being rebuilt,
repaired or replaced;
But the maximum we will pay for temporary accommodation or lost rent is for the
lesser or:
the time it takes to repair or replace your home provided work commences as
soon as practicable after the incident, OR
where you elect not to replace your home, the time it would have taken to
repair or replace your home had you elected to do so, OR
12 months from the time of the damage or
10% of the sum insured.
Where the repair or replacement of your home is delayed by you, we will deduct an
amount equivalent for the period of delay.
This benefit is in addition to the sum insured for your home.
…
SECTION 7 OTHER CONDITIONS
Multiple Insureds
We will treat any statement or act, omission or a claim by you or a family member as
having been made by all of them.
…
CONTENTS POLICY
SECTION 1 INSURED EVENTS CAUSING LOSS OR DAMAGE
This policy insures you up to the amount of the sum insured or loss or damage to your
home caused by an insured event listed below.
…
1.12 Storm, Rain Or Flash Flood
…
SECTION 2 HOW WE SETTLE YOUR CLAIM
2.1 Repair, Rebuilding Or Replacement
Case No: 208628 Determination Page 19 of 29
When an insured event causes loss or damage to your contents we will, if we accept
your claim, at our option do one of the following in relation to each item.
a) Repair
We will pay the reasonable cost of repairing an item that can be economically
repaired…
b) Replace
If an item cannot be economically repaired we will replace the item with a new one
substantially the same, regardless of the age of the item.
But if the item is:
…
A carpet, we will only replace the carpet in the room, hallway or passageway
where the loss or damage occurred;
Computer equipment, we will not replace if it is over 10 years old but we will
pay the market value;
Clothing, shoes and household linen, we will pay the amount it would cost us to
replace the items less depreciation.
c) When the item cannot be replaced (This does not apply to clothing, shoes and
household linen)
If we agree that the item cannot be replaced, we will pay the lesser of:
The retail value of the item, or
…
SECTION 7 OTHER CONDITIONS
Multiple Insureds
We will treat any statement or act, omission or a claim by you or a family member as
having been made by all of them.”
Issues
146. Whether the FSP is required to note the Applicant as a co-insured under the
policy.
147. Whether the FSP has fulfilled its obligations under the policy for the loss.
148. Whether the FSP is entitled to decline indemnity for the additional loss/damage
claimed.
Reasons for Decision
149. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
Case No: 208628 Determination Page 20 of 29
150. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
151. This decision has been made by a Panel consisting of an Ombudsman, a Panel
member with extensive experience in the insurance industry and a Panel
member with extensive experience in consumer claims.
152. There are a significant number of concerns raised by the parties to this dispute
concerning each other‟s conduct during the course of the claims process. The
Panel has given these concerns due consideration, however, in the interests of
brevity of this determination the Panel will limit its response to those matters
which have been supported with probative evidence.
153. It is the Applicant‟s responsibility to prima facie establish that the loss claimed
was, on the balance of probability, caused as a result of an event covered by
the terms of the policy. If the Applicant succeeds in doing this, the onus shifts to
the FSP to show that it is an excluded event under the terms of the policy.
154. The Panel is satisfied that there is no dispute between the parties that the event
which gave rise to the claim was covered under the policy and an attempt has
been made by the FSP to repair/replace the loss.
155. It is not in dispute that as a result of an extended delay in finalising the repairs
the insured property sustained additional damage and mould infestation.
156. The Panel having reviewed the available evidence is satisfied the parties to this
dispute have established a number of issues, which are subject to a
determination by the Service.
Removing the Applicant as a co-insured from the policies
157. The Applicant alleges that the FSP without her consent and at the request of
“ SK ” proceeded to remove her as a co-insured from the policies.
158. The FSP rejects the allegation and maintains that although it is correct that the
Applicant and “ SK ” had over years established various policies as co- insured‟s,
this was not the case in respect to the policies in question.
159. It is the FSP‟s position that the policies held jointly by the Applicant and “ SK ”
had been allowed to lapse on 15 March 2001 and then 11 December 2004.
When the policies in question were re-established, this was on the application
of “ SK ” only and as such, the Applicant was never added as a joint
policyholder.
160. The FSP does not dispute the Applicant‟s claim that she should be included as
a co-insured upon the policy, however maintains that in order to do this, it
would require a request/authorisation from “ SK ” .
Case No: 208628 Determination Page 21 of 29
161. Having reviewed the FSP‟s submission to the Service, the Panel notes that it
has listed the two policies in question as bearing reference numbers “….4883
and ….4884”.
162. Within the supporting documents provided by the FSP is a copy of a “Annual
Review Notice and Tax Invoice” issued in the name of both the Applicant and
“ SK ” indicating a policy expiry date and time of 15 March 2001 at 4.00pm and
bearing reference number “….8635”.
163. The Panel notes that written on this copy of the Annual Review Notice and Tax
Invoice is a note from “ SK ” requesting that the Applicant be listed as a “co -
owner” of the new (emphasis added ) policies “….4883 and ….4884”.
164. The Panel also notes that the FSP during the course of the claim has:
Made payments directly to the Applicant on more than one occasion.
In doing so ignored its own position in this regard.
Having had the opportunity to seek further clarification of this from “ SK ” in
this regard, failed to do so.
165. The FSP declined to seek authority from “ SK ” to record the Applicant‟s name
on the policy and to settle the claim directly with her, due to the alleged
objections of the Applicant. However as the policy is a contract between the
FSP and “ SK ” it is entitled to, and should have sought such authority itself.
166. The Panel is not able to direct the FSP to record the name of the Applicant as a
co-insured; however the FSP is required to seek the necessary authority
directly from “ SK ” so that this issue can be resolved as a matter of urgency.
Kitchen/Pantry/Laundry repairs and fittings
167. The Applicant maintains that the quality of repairs and material used in the
FSP‟s unsuccessful attempt to repair the kitchen is not only completely
unsatisfactory but in her opinion amounts to negligent and malicious damage
by the FSP‟s appointed representatives.
168. The FSP maintains that:
The kitchen has been repaired and the only outstanding issue is the
installation of the glass splashback and the Applicant has failed to allow
access to the builder to carry out the installation.
In relation to the Caesar stone bench top, this was subject to a separate
contract between the Applicant and the supplier. Therefore, any concerns
in this respect remain between the contracting parties and is not the
responsibility of the FSP.
The Applicant failed to cooperate with the FSP in this regard, as well as,
failing to accept or provide replacement costs for the washing machine
and clothes dryer.
Case No: 208628 Determination Page 22 of 29
169. The Panel has considered the available evidence and in addition to the various
reports found the extensive photographic evidence made available by the
Applicant to be of great assistance in establishing the quality of repairs
undertaken in the kitchen, laundry and pantry.
170. The Panel finds the quality of repairs to be sub-standard and not of a quality
that would be reasonably expected from professional repairers. The installation,
detail and finishing is of a very unprofessional standard with electrical fittings
left hanging in the sockets.
171. The FSP has referred to a separate contract between the kitchen installer and
the Applicant in relation to an upgrade of the kitchen bench top. Although this
may be the case, the Panel is not satisfied the FSP is in a position to dismiss
the matter.
172. There is no dispute that there was a separate contract and/or that the bench
top installation was a Caesar stone bench top; rather the issue involves the
poor installation and subsequent damage to the bench top. Although, there was
a separate contract between the two parties, this does not change the fact that:
It was the FSP‟s preferred repairer that had been appointed to the claim
by the FSP and with whom the Applicant was instructed to deal. .
The quality of the installation of the bench top remains the responsibility of
the FSP.
The subsequent damage to the bench top is alleged to be the result of the
actions of representatives appointed by the FSP.
173. The Panel is not satisfied that the FSP has fulfilled its liability in relation to the
repairs, replacement and installation of cupboards, bench top, electrical fittings
and fixtures in the kitchen, laundry and pantry.
174. The Panel acknowledges that in the course of the claim the Applicant may at
times have failed to cooperate with the FSP and its appointed representatives.
However, the Panel is satisfied that it is unreasonable to expect an individual,
in this case the Applicant, to continue to act in a cooperative manner over an
extended period of time, after having been subjected to very real difficulties by
the FSP‟s representatives.
Swimming Pool and Surrounds
175. The Applicant maintains that the swimming pool and surrounding area was
damaged as a result of the insured event. The damage was then further
exacerbated by the FSP‟s neglect in addressing the damage over an extended
period of time. She maintains the pool surrounds were originally quoted to be
repaired by the FSP, this being prior to the cracking of the fibreglass shell.
176. The Applicant maintains the FSP was advised very early in the claim that if the
swimming pool surrounds were not attended to in a timely manner, the damage
would only continue to increase, which in fact is what actually occurred.
Case No: 208628 Determination Page 23 of 29
177. The Panel notes the FSP having had the opportunity, has chosen not to
respond to the issue relating to the swimming pool in its submission to the
Service.
178. Having reviewed the supporting documentation provided with its submission,
the Panel notes that it would seem the swimming pool aspect of the claim was
declined on the basis that the damage arose due to water entering the soil
surrounding the swimming pool causing settlement of the soil.
179. Reports submitted by the FSP‟s representative C have indicated that the
source of the water which entered the surrounding soil of the swimming pool
was a combination of rain falling directly onto the surrounding ground, run off,
water escaping from overflowing gutters and water escaping the swimming
pool. In its reports, C also referred the FSP‟s attention to previous
determinations of the Service relating to loss arising in similar circumstances.
180. There is no dispute the Applicant is covered under the policy for loss or
damage arising from storm. It has also not been established by the FSP that
the swimming pool and surrounding areas were possibly damaged prior to the
insured event. The reports submitted by C do also refer to an expert report
obtained. However, this has not been made available to the Service for review
and consideration.
181. In the absence of any evidence to the contrary, the Service is satisfied the
swimming pool and surrounding areas were in an undamaged condition prior to
the insured event. In addition to the FSP‟s failure to establish this loss/damage
is excluded from cover, the Panel is satisfied (as has been determined in the
past) that the FSP‟s reliance on soil settlement as the ca use of the damage is
misconceived. The FSP has confused the resultant effect with the actual cause
of the loss, the proximate cause being the storm.
182. Therefore, the Panel is satisfied the FSP was not entitled to refuse indemnity
for the loss or damage to the swimming pool and surrounding area.
Roof
183. The Applicant maintains that the damage to the roof was not properly repaired
by the FSP‟s appointed representatives. It has only been patched up in some
places and since the event has continued to allow water ingress into the home.
She alleges that in addition to the damage to the roof lining caused by the
storm, further damage was caused by the roof traffic of the repairers, which
was covered up by the installation of new roof tiles.
184. The Panel notes the FSP has not submitted any substantiating evidence to the
contrary in this respect. Having regard for the photos submitted by the
Applicant, the Panel is satisfied that the dwelling ‟ s roof was not repaired
appropriately. This has resulted in further water ingress into the home which
over an extended period of time has caused additional damage and mould
build up.
Case No: 208628 Determination Page 24 of 29
185. On the basis of the available evidence the Panel is not satisfied the FSP has
fulfilled its obligations under the policy in relation to repairing the roof of the
insured property.
Ceilings and walls
186. The Applicant has raised concerns in relation to the quality of repairs carried
out by the FSP to the dwelling‟s internal walls, ceilings and electrical fittings. It
is her contention that spots have been left unpainted and there are obvious
ditches left where the electricians had carried out repairs. The ceilings have
also cracked as a result of the change in moisture levels in the home over the
extended period of time the FSP failed to finalise repairs.
187. The FSP in its submission to the Service has not addressed these concerns in
any great detail and simply maintains that all moisture related issues have been
satisfactorily attended to, and there was no further work required in this area.
188. Having reviewed the detailed evidence and supporting photos made available
by the Applicant, the Panel is inclined to accept the Applicant‟s submission in
this regard, to be the more plausible. There is clear evidence of extremely poor
quality finishing in relation to the filling of holes and paintwork, in particular
around wall and ceiling electrical fittings.
189. The Panel is not satisfied the FSP has fulfilled its obligations to restore the
property to the condition it was in prior to the loss. The quality of these repairs
cannot be considered to be reasonable and/or acceptable.
Entrance area
190. The Applicant maintains and has provided evidence and photos to support her
contention that:
There is damage to front entry door and side panel.
There is damage to the stairwell banister.
There is damage to the wall along the stairwell.
The tiles outside the front door and entry are not level.
The front door bell has not been replaced
The two large terracotta pots, a door mat and table from the front
(entrance) are missing.
191. The FSP maintains that in relation to the tiles in the front foyer, the Applicant
has failed to cooperate with requests by the FSP to view and approve
replacement tiles. It has not specifically addressed the concerns in relation to
the damage to the stairwell banister, front door, the wall along the stairwell
and/or the missing items. It has sought to rely on its general position that it has
fulfilled its obligations under the policy and any and all outstanding issues are
due to a lack of cooperation on behalf of the Applicant.
Case No: 208628 Determination Page 25 of 29
192. The Panel has reviewed the evidence and position of the parties and is not
satisfied the FSP has fulfilled its obligations under the policy to reinstate the
property to the condition (or as close as possible) it was in prior to the loss. The
quality of attempted repairs in this area does not meet a reasonable level.
Outside and Front of property
193. The Applicant maintains the paving directly outside the property was damaged
by the repairers during the course of the claims. The FSP accepted to replace
these pavers when it was to attend to replacing the pavers outside the front
door. However, as the terracotta pavers outside the front door were not
replaced by the FSP, it failed to attend to the pavers outside the home as well.
194. The gutters outside the home were damaged as a result of the trucks used by
the appointed repairers. The Applicant has not been reimbursed for the cost to
replace the damaged mailbox although she was assured by the FSP that it
would do so. The concrete laid around the drains is already beginning to
disintegrate and items from inside the home (hot water system and fridge)
which were removed as detritus were left at the front of the property.
195. Having considered the evidence made available by the parties, the Panel notes
the FSP has not addressed these issues in any great detail and has maintained
its general position that it has fulfilled its obligations under the terms of the
policy. The Applicant on the other hand has made available detailed
submissions and photos in this regard.
196. On the basis of the available evidence the Panel is not satisfied the FSP has
fulfilled its obligations in line with the terms of the policy and as such, is
responsible to provide indemnity to the Applicant in this regard.
197. The Applicant has submitted that the FSP‟s representatives have left the
garage without the wiring mechanism, as this was removed and accidently
disposed. The garage door has also been damaged during the course of the
claim process and in the Applicant‟s opinion, will need to be replaced.
198. The FSP has not made a submission in this regard; therefore in the absence of
any evidence to the contrary, the Panel is satisfied the FSP is obliged to return
the garage door and electrics to the condition they were in prior to the loss.
Side path along the property
199. The Applicant maintains the path down the side of the home has been replaced
by the FSP at a higher level than the original. She maintains this has resulted in
the path obscuring the weep holes (not recommended) which allows water into
the sub-floor area, along with worms and frogs into h er daughter‟s bedroom
(pictures provided).
200. The FSP does not accept the Applicant‟s position and maintains that although
this portion of the repairs was not covered under the policy, it has gratuitously
attended to replace the path which abutted the outside wall (built above the
Case No: 208628 Determination Page 26 of 29
damp course) in an effort to attend to the effects of poor ventilation and a build
up of moisture.
201. The Panel acknowledges the position and evidence made available by the
parties to this dispute in this respect. It further notes that the FSP as a gesture
of good faith undertook the above mentioned works. However, if these works
have not been completed to the recommended specification or are allowing
moisture into the property, the fact that it gratuitously attended to the work,
does not relieve the FSP from the responsibility to attend to any of the shortfall
in this work.
202. Therefore, the Panel is satisfied that if the Applicant is able to make available
an expert opinion that establishes there are indeed issues with the pathway laid
by the FSP, it is then obliged to provide indemnity for the cost to rectify the
situation.
Loss/Damaged/Missing Contents and Storage Costs
203. The Applicant maintains that she was assured that their personal possessions,
contents and furniture would be thoroughly, carefully and accurately listed and
packed away for storage while the repairs were undertaken at the insured
property.
204. It is her position that this was not the case and it took ten months for the FSP to
even provide her with a list of the property packed and placed in storage by the
FSP. During the course of the claim the FSP also lost details of where a portion
of her property was actually stored.
205. The FSP acknowledges the Applicant‟s concerns in this regard and maintains
the matter remains outstanding as the Applicant, although requested several
times, has failed to view and where appropriate, approve or provide a list of the
lost or damaged contents.
206. Having reviewed the evidence made available by the parties, the Panel notes
that the Applicant has submitted sufficient evidence to establish the poor
manner in which the contents were packed for storage and ensuing damage of
some of these contents. She has however not made available for consideration
a list or breakdown of her loss.
207. The only evidence in relation to the extent of damaged contents packed and
stored away (internally and in storage facilities) by the FSP are lists made
available by the FSP. These lists establish that at the very least there were
approximately 250 items (contents, furniture, personal property etc) either lost
or damaged whilst in the care of the FSP.
208. The Panel has reviewed these lists together with the lists of missing and
damaged items provided by the Applicant; unfortunately these lists do not
assist in quantifying the loss in monetary terms. However having noted the
number of items and the likely replacement cost for items listed, it is clear to the
Panel that the replacement value and/or repair costs would be well in excess of
$100,000.
Case No: 208628 Determination Page 27 of 29
209. Having noted the contents sum insured is limited to $187,000, and having
noted that through the life of the claims the FSP has already made payments to
the Applicant in the amount of $81,769, the Panel determines that the FSP is to
cash settle the Applicant for the balance of the contents sum insured.
Reimbursement
210. The Applicant is seeking reimbursement for costs associated with out of pocket
expenses and storage costs incurred as a result of the extended period of time
the family remained without their home arising from the FSP mismanaging the
claims.
211. The FSP does not essentially dispute an entitlement to such reimbursement
however maintains that such loss would need to be established through
submission of evidence by the Applicant.
212. The Panel accepts the FSP‟s position in this regard and in th e absence of
supporting evidence made available by the Applicant , is not in a position to
provide a finding in this regard. It is however, satisfied that on the Applicant
making such evidence available, the FSP is obliged to reimburse her storage
costs.
Compensation
213. The Applicant has sought compensation from the FSP for the experience both
her children and she have had to endure during the course of the claims.
214. The Panel considers the following FOS Terms of Reference (TOR) relevant to
this dispute:
9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial
Services Provider compensate the Applicant for consequential financial loss or
damage up to a maximum amount of $3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial
Services Provider compensate the Applicant for non-financial loss but only
where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interfe rence with the Applicant‟s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual‟s privacy rights - injury
has occurred to the Applicant‟s feelings or humiliation has been suffered
by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
In a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
Case No: 208628 Determination Page 28 of 29
215. Under 9.3(b) of the TOR there must be an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
A pplicant‟s expectation of enjoyment or peace of mind, before compensation
for non-financial loss may be determined.
216. The FSP took close to three years more than the stipulated completion time
advised to the Applicant. Although the Panel accepts a portion of this delay
would be attributable to the Applicant‟s conduct, as previously noted such
conduct on her behalf would not be considered unreasonable under the
extreme circumstances she faced due to the mismanagement of the claim.
217. The Panel notes that there is no evidence made available by the FSP to
establish that under such unusual and unacceptable circumstances, its senior
management made any effort to directly deal with the Applicant and/or make
any efforts to diffuse the situation over the several years this matter remained
outstanding.
218. Having considered all the material before the Panel together with the relevant
policy terms and TOR, the Panel is satisfied that as a result of the FSP‟s
conduct and mismanagement of the claim, the repairs/replacement of lost or
damaged property was grossly delayed.
219. The Panel is satisfied that such a delay has led to an usual degree of physical
inconvenience and time taken to resolve the situation pursuant to clause 9.3(b)
and that the Applicant is entitled to compensation for non-financial loss.
220. The Panel acknowledges the parties‟ positions in relation to each other‟s
attitude and actions during the course of the claim. The Panel is satisfied
having considered the available evidence as a whole that this favours the
Applican t‟s contention that there has been a gross mismanagement of the
claims and an absence of quality control in relation to a majority of repairs
undertaken by the FSP‟s appointed representatives.
221. The Panel is also mindful of the fact that the sum insured amounts may be
exceeded in pursuit of the settlement of this matter. However, the Panel is
satisfied this is the direct consequence of the FSP‟s mismanagement of the
claim and as such, any reference to the limits of the policy in terms of the sum
insured should not necessarily be used by the FSP to resist further payments
for issues deemed still outstanding.
Determination
222. On the basis of the available information the Panel determines that:
In respect to the lost, damaged and missing contents portion of the claim
the FSP is to cash settle the Applicant for the balance of the contents sum
insured, taking into account the payments already made by the FSP.
The FSP is required to pay interest on the amount of the balance of the
contents sum insured at the statutory rate from 21 September 2009 (being
Case No: 208628 Determination Page 29 of 29
the date on which a catalogued list of items was completed for the FSP) to
the date of settlement.
In respect to the building portion of the claim (including the roof, swimming
pool and its surrounds), the Applicant within one month of this
determination is to obtain a scope of works from an appropriately qualified
and experienced builder or building contractor. The scope of works must
be strictly limited to the repair and/or replacement of the damage to the
home building which resulted from the initial storm and the subsequent
damage which has resulted from the sub- standard repairs by the FSP‟s
builders.
The Applicant is required to provide the scope of works to the FSP for
review which it must complete within 14 days of its receipt. On acceptance
of the scope of works, each party is to obtain a costing of the works. The
parties are then required to agree to a final costing which will form the
basis of a cash settlement. This amount is then to be cash settled by the
FSP within 5 working days of agreement.
The FSP, in line with the relevant TOR, is to pay to the Applicant $3,000
being compensation for non-financial loss.
223. The Panel urges the parties to work together cooperatively to finalise this
dispute, settlement of which is not to be unreasonably delayed by either party.
224. Should the parties confront any further issues in complying with this
determination they may seek further assistance from the Service.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.