Home / Financial Firm (Unknown - Insurer) / Determination 208327

Determination 208327

Ceiling replacement claim refused

FirmFinancial Firm (Unknown - Insurer)
Decided2010-10-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$50,000
SourceAFCA PDF

Summary

The applicants claimed about $50,000 to replace all ceilings after a plasterboard ceiling collapsed, attributing the sagging to Cyclone Larry. AFCA accepted expert reports attributing the failure to faulty glue adhesion and design, and found the FSP entitled to deny the claim.

The policy excludes faulty workmanship, structural defects and faulty design, and the expert evidence shows these caused the ceiling failure.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

208327 Determination 1 of 3 DETERMINATION CASE NO: 208327 Home and contents – storm damage – proximate cause – policy exclusion SUMMARY OF FACTS 1. The applicants held a Home insurance policy with the Financial Services Provider (FSP) from 22 November 2002 to 10 December 2008. 2. A 4 square metre piece of plasterboard ceiling collapsed in the lounge room on or about 24 January 2008 and the applicants lodged a claim on 25 July 2008 for the total replacement of all ceilings throughout the property as all were showing signs of sagging. The cost for these works including electrical work is estimated at $50,000. 3. Reports submitted by both the FSP and the applicants indicate that the ceiling has sagged and partially collapsed due to the glue not adhering to the battens and the batten screws pulling through the plasterboard. 4. The FSP denied liability for the claim on the grounds that the collapse was due to faulty workmanship and defect in design in the application of glue to the battens during the construction of the ceilings. The FSP also noted that no insured event had occurred as required under the policy. 5. The FSP‟s internal disputes resolution department reviewed the claim at the request of the applicants. It maintained the FSP‟s denial of liability for the claim. The applicants continue to dispute the FSP‟s decision and believe that the problem commenced with cyclone Larry which struck on 20 March 2006 and should be covered under their policy. ISSUE IN DISPUTE 6. Whether the applicants are entitled to indemnity for the replacement of all the ceilings throughout their property. RELEVANT POLICY PROVISONS “ Section 1: Buildings and Contents What is covered Your buildings and/or your contents as set out in your schedule are covered if they are destroyed, lost or damaged. They are covered only if you own them, or are liable for them. .... What we will not pay for We will not cover your buildings and your contents for any accidental los s or accidental damage caused by: .... A defect in any item, faulty workmanship, structural defects or faulty design .... What Section 1 and 2 of the Policy do not cover General exclusions applying to this Policy .... 208327 Determination 2 of 3 We will not pay claims for loss, damage or liability arising from: .... Mildew, atmospheric or climatic conditions. Mould or fungi. ” REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants’ Submission 8. The problems with the ceiling commenced within a week or two of Cyclone Larry which struck a few years ago. ( Cyclone Larry crossed the Australian landfall on the morning of 20 March 2006. ) The torrential rain entered a gap in the roofing and soaked the pink insulation batts. The weight of the sodden pink batts caused the Gyprock ceiling to commence sagging throughout the entire residential part of the home. 9. A 4 square metre section of the lounge room ceiling collapsed as a result of the weight from the sodden pink batts in January 2008. The builder who repaired the ceiling and cornice advised that the entire ceiling in the residential part of the property will need to be replaced as it would ultimately collapse. 10. The FSP should accept the claim as the cause of the sagging ceiling and the partial collapse of the lounge room ceiling was originally due to Cyclone Larry. An offer has been made to remain in the property whilst repairs are performed in an attempt to minimise costs for the FSP. However, this offer has been rejected. The FSP’s Submission 11. On receipt of the applicants‟ claim, a loss assessor was appointed to investigate the ceiling damage. A building engineer was subsequently engaged to inspect and report on the state and structure of the ceiling. 12. The reports state that the cause of the sagging and partial collapse of the ceiling is the inadequate bonding of the glue which adheres the plasterboard ceiling to the roof battens and the design of the metal battens. There is no evidence of water entering through the roof in the manner suggested by the applicants. 13. Whilst the policy provides cover for accidental damage or loss sustained to the home, it specifically excludes damage caused by faulty workmanship, structural defects of faulty design. The faulty workmanship and structural defects may have been exacerbated by the humidity caused by the climatic conditions of the location of the insured property, but that is also excluded under the policy. Consideration of each party’s submission 14. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy. 15. The applicants have submitted a report from a director of a building company which states: “.... It is easy to see that the glue has not stuck to the battens and the sheeting has held up only by the screws. Over time, the screws have pulled through the sheeting and fallen down due to the weight. This will happen to the whole ceiling over time - this is evident by looking at the ceiling and the bowing present in each sheet. 208327 Determination 3 of 3 The only way to fix the fault is to remove the old ceiling and replace it with a new one. It would be advisable to test that the glue will stick to the old metal battens first. It is my opinion that the battens must have been still coated with milling oil when they were erected, thus causing the glue not to stick and bond .” 16. The FSP obtained reports from an independent loss assessor and a structural engineer. The loss assessor reported : “ During one night in January 2008, a 4sqm section of living room ceiling collapsed in the corner of the room. There was no water entry or known cause for the incident .” The engineer reported “... it is our opinion that the ceiling sheets in this dwelling have failed as a result of the combination of a mismatch of materials, and defective formation of glue daubs of the purpose made plasterboard adhesive owing to the poor/limited and effective (sic) surface offered by the type of metal ceiling batten used. ” 17. I note in an email to the FSP dated 6 January 2010, the applicants make the comment: “ On several occasions after the cyclone and prior to the collapse, I had rescrewed the gyprock to the battens in a few areas and re-plastered those sections. Those areas have held to this day and we had the entire house interior re-painted professionally including replastering in one area where extensive sagging occurred. This was completed not long before the cyclone .” 18. Taken as read, this comment indicates that sagging was present prior to the March 2006 cyclone that the applicants claim was the cause of the ceiling collapse. However, I assume the applicants incorrectly stated „before the cyclone‟ when they meant to state „before the collapse‟. Therefore, I will not take this comment into consideration. 19. Whilst the applicants claim that a gap in the roof allowed water to ingress into the pink batts and ceiling during the cyclone, one would also assume that this same gap would allow other rain water to also enter the roof cavity over a period of time. As the collapsed section of the lounge room ceiling was disposed of before the claim was lodged, the FSP has been unable to conduct an analysis of the ceiling material. However, I note the comment from the FSP‟s loss assessor that : “ There is no evidence of water entering the roof in the manner suggested by the applicants .” 20. The fact that there was not an insured event immediately prior to the partial ceiling collapse, together with the expert reports attributing the ceiling failure to the faulty adhesion of the plasterboard glue to the metal battens, indicates that the proximate cause of the sagging ceiling was a combination of faulty workmanship, structural defects and faulty design and is therefore not covered by the policy. CONCLUSION 21. Accordingly, I determine that the FSP is entitled to deny the claim for the replacement of the ceiling.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.