Determination 208294

Flood exclusion applied to storm water damage; roof damage refused for lack of storm-created opening

FirmFinancial Firm (Unknown - Insurer)
Decided2011-02-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a severe storm and flood at Roma, Queensland, in March 2010, the FSP refused the applicants' home building claim under the flood exclusion and for lack of a storm-created roof opening. The Panel found the FSP must indemnify damage to goods and other damage in the rear entertainment area but upheld refusal of the roof claim, with no dollar figure stated.

The FSP could not prove the flood exclusion applied to storm water entering the lower entertainment area at first, while the roof was in pre-existing disrepair and maintenance exclusions applied.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

208294 Determination 1 of 7 DETERMINATION Case number: 208294 Flood – exclusion – proximate cause – Insurance Contracts Act Section 35 – clearly inform – proof of policy dispatch SUMMARY OF FACTS 1. The applicants held a home building and contents policy with the Financial Services Provider (FSP). 2. In March 2010 the applicants lodged a claim following severe storm activity in Roma, Queensland. The FSP appointed a hydrologist to prepare a report on the event, and the claim was subsequently refused on the basis the property was inundated with floodwater, an event which is excluded under the policy. 3. The FSP also refused indemnity for damage to the ceiling caused by rain entering the roof as it found there was no storm created opening, which is required under the policy. 4. The applicants rejected the FSP’s decision, arguing the property was inundated with rainwater prior to the floodwater reaching the property, and noted they had not received a copy of the PDS. 5. The FSP’s internal disputes resolution department reviewed the claim at the request of the applicants. It maintained the decision to refuse indemnity and argued its records showed the PDS had been sent to the applicants. The applicants continue to disp ute the FSP’s position, arguing they did not receive the PDS, and rainwater entered the property before the floodwater. ISSUE IN DISPUTE 6. Whether the FSP is entitled to refuse indemnity under the terms and conditions of the policy. RELEVANT POLICY PROVISIONS “ ‘flood’ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents … Insured Events … 9. Storm, rainwater or run-off … 9. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. 208294 Determination 2 of 7 ‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground. ‘run - off’ means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: a. caused by flood, or flood water combined with run-off and/or rainwater; ‘flood’ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. b. caused by action of the sea, high water, tidal wave or tsunami; c. caused by: soil movement including erosion, landslide mudslide or subsidence, shrinkage or expansion of earth or land, or hydrostatic pressure; d. to retaining walls; e. to swimming pool and spa covers, their liners or their solar domes; f. to the external paintwork or other exterior coatings of the buildings caused by rainwater; g. caused by water seeping, percolating or otherwise penetrating into the buildings as a result of: structural defects, faulty design of the buildings, faulty workmanship in the construction of the buildings, or your failure to adequately maintain the buildings; h. caused by wind, rainwater, hail or snow entering the buildings through an open window or door or any opening not made by the storm, unless the loss or damage is caused by run-off; i. caused by water entering your buildings through an opening made for the purpose of alternations, extensions, renovations or repairs. … Parts A and B When we will not pay a claim under your policy 1. This policy does not cover loss, liability, injury or damage: … f. Wear and tear arising out of depreciation, gradual deterioration, wear and tear; … 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5; b. any loss or damage which is not caused directly by one of the insured events;” RELEVANT LAW Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of 208294 Determination 3 of 7 the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Section 69(2) provides where by reason of a provision of the Act, information with relation to a contract must be given before the contract is entered into, the provision shall be deemed to me complied with if the information is given in writing within 14 days of the day the contract was entered into. Section 77 of the Act provides that a notice or other document that is by the Act required or permitted to be given, may be given to a body corporate in any way in which documents may be served on that body corporate, and to a natural person, personally or by post to that person at his last known address. REASONS FOR DECISION 7. The Panel is satisfied that an exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant s’ Submission 8. They did not receive a PDS when they purchased the policy, and Section 35 of the Insurance Contract Act 1984 (“the Act”) dictates that standard cover should apply, which includes indemnity for loss resulting from flood. 9. Roma was declared a natural disaster area as the result of the worst weather event it has been subjected to in known history. 10. Rainwater runoff inundated the property above floor level before the floodwater came. The water from the initial inundation was clear, indicating it was not from the flood. They provide photographic evidence to support their submission. 11. The comments attrib uted to them in the hydrologist’s report are incorrect. The hydrologist has also failed to address the issues of water coming up through the drains. 12. Other insurers have been covering homes in the area. 13. The event has been extremely stressful and the FSP’s handling of the claim has been poor. The FSP’s Submission 14. The reports from the hydrologist indicate the rainwater would not have been high enough to inundate the property, given the property is 500mm above ground and the property was inundated with floodwater, which is excluded under the terms and conditions of the policy. 15. Its dispatch records indicate the PDS was sent to the applicants’ last known address, and therefore it has complied with its obligations under the Act and may rely on the terms and conditions of the policy. 16. The report on the roof indicates it was in a poor state, and there was no storm created opening. It is therefore entitled to refuse indemnity for the roof as the policy excludes loss or damage resulting from storm where there is no storm created opening and due to wear and tear. 208294 Determination 4 of 7 Panel processes 17. In order to fully inform itself in respect to the issues in dispute, representatives of the Panel attended the applicants’ property on Wednesday 8 December at Roma. Also in attendance were two hydrologists engaged by the FSP and the applicants. 18. The applicants indicated that by 6.30am on the morning of 2 March water was in the vicinity of the home. She stated that by approximately 9am, water started coming through the back of the property and the water was well above floor boards by between 9.30am and 9.45am and it first came into the front of the property. 19. The female applicant showed the persons present an area at the rear of the property which s he described as the “entertainment area” and she said water entered the property in that area at approximately 9am. This part of the property was much lower than the rest of the property, and was surrounded by flat land. The applicants stated that white goods which had been stored in this area had been damaged, notwithstanding that they were on a platform approximately 100mm above the floor level. It was noted that there was a significant variation between the floor levels in various parts of the property, and the Panel notes that the hydrologist stated that parts of the property were raised approximately 500mm above ground level. It was further noted the applicants stated that water came in the front of the property which was at a significantly higher level than the rear of the property including the entertainment area. Consideration of each party’s submission 20. The Panel has reviewed and considered the evidence provided by the parties. Section 35 of the Act 21. The applicants submit they did not receive a copy of the PDS, and argue they are therefore entitled to standard cover under the Insurance Contracts Regulations 1985 , which provides cover for flood. The FSP has provided evidence it submits establishes it sent the policy documentation to the applicants’ address as required under the Act. 22. The Panel has reviewed the evidence. It indicates documentation for the applicant s’ address was lodged with Australia Post on 11 August 2009. The associated reports also indicate there was no failure in relation to the production of the applicants’ documentation. On the balance of probabilities, the Panel accepts the FSP did send the documentation, including the PDS to the applicants’ address in close proximity to policy inception as per its obligation under Sections 35 and 77 of the Act, and therefore may rely on the terms and conditions of the policy, in response to the claim. Proximate Cause 23. The applicants argue rainwater runoff inundated the property before floodwater. The FSP argues the hydrologist’s report shows rainwater runoff did not inundate the property as the floor level sits 500mm above the ground and the inundation was caused by flood water. 208294 Determination 5 of 7 24. The hydrologist’s report, dated 07 April 2010, states: “ 5 OCCUPANT’S VERSION OF EVENTS The property owner [male applicant] provided the following version of events concerning water damage at the subject property: Water first came in through the roof at approximately 0830 hours on Tuesday 2 nd March. At approximately 0930 hours they evacuated the property as they were concerned the roof might collapse. The house was not inundated above floor level at this time. They returned to the property after the event (Wednesday 3 rd March) and there was still water underneath the house which remained there for over a week. 6 FINDINGS Our findings on water damage to the subject property are as follows: Damage to the roof of the house was caused by rainwater. There was a relatively small amount of water leaking into the house from the roof damage, however, this would not have caused major damage to the contents and floor coverings in the house. The inundation of the subject property above floor level was caused by water overflowing from Bungil Creek to the north of the subject property along the overflow path identified in Figure 1. At the peak of the event, floodwater from the overflow paths would have joined together with Bungil Creek to the east. Local runoff would not have caused damage at the subject property as there is no significant local catchment and the floor level of the house is raised approximately 500 mm above the ground level. Bungil Creek peaked within about 5-12 hours after the intense rainfall burst that caused the flood event. The 2 nd March 2010 flood was the largest on record for Bungil Creek at Roma. This flood inundated most of the eastern side of the Roma town area. 7 CONCLUSIONS Based on our site inspection and an assessment of available data for the subject site, it is concluded that the inundation of the subject property was caused by water overflowing from Bungil Creek.” 25. The applicants disputed the report, noting they did not make the comments referred to in the report. They make the following submissions: The initial inundation was clear water and not floodwater. The report does not refer to the extensive rain the night before the inundation. They provided several photographs, noting the rain is still evident. They left at 9:00am due to clear water entering the building. The water level dropped before the creek burst and the floodwater inundated the area. They had roof insulation installed the year before the storm and once this was inundated with water, it sagged and damaged the ceilings. The hydrologist did not ask about the water entering the property through the kitchen, bathroom and toilet drains. The local paper on 12 March 2010 carried a story indicating Bungil Creek peaked at 8.1 metres at 1:00pm and 6.4 metres at 7:00pm. 208294 Determination 6 of 7 26. The hydrologist provided a further response to the applicants’ submission. The report, dated 01 September 2010, states: Floodwater is not always muddy and the fact water may appear clear is not a reliable indicator of the source of water. Floodwater will not always leave muddy debris. Inundation above ground level from Bungil Creek would have occurred at approximately 7:30am and any water inundating the property after this time would have been floodwater. Water would have inundated the house above floor level at approximately 10:30am. The applicants’ photographs are dated and time stamped. Presuming the times are correct, Photographs 0255 (10:39am), 0240 (7:31am) and 0244 (7:52am) show the period floodwater first entered the property. The applicants are incorrect in their submission that the first inundation of the house was due to stormwater runoff. The hydrologist’s opinion that it was floodwater which inundated the property has not changed due to the additional evidence provided by the applicants. 27. The Panel has reviewed the photographs and is not satisfied it can rely on the date and time stamps as being accurate without any verification. It notes P1010688 (taken from a different camera to the photographs referred to above) is time stamped as being taken at 11:54pm, yet there is clear evidence of sunlight in the shot. 28. The hydrologist reports the floodwater would have inundated the property from 7:30am and inundated the building above floor level (over 500 mm) from 10:30am. The applicants submit the property was inundated above floor level with rainwater from 9:00am. 29. In the hydrologist’s first report, it is noted that the highest r ainfall recorded at Roma Airport was reported at just under 7.5mGH before 6:00am on 02 March 2010. The Bungil Creek level peaked at approximately at 8.1mGH at 1:00pm on 02 March 2010. 30. The applicants submit they did not make the statements attributed to them in the first hydrologist report. The Panel must therefore question why the hydrologist’s first report specifically notes water had not entered the property above floor level at 9:30am. The Panel finds it difficult to believe the hydrologist would deliberately misinterpret this issue. However, it accepts the notation could be the result of genuine misunderstanding as there are a number of timing disputes and inconsistencies in this case. 31. In this case there is a great deal of confusion about timing, both from the applicants and the hydrologist. In a report provided by the hydrologist in October 2010, the following statement appears:- “Bungil creek broke its banks to the north of the town (and east of the Roma airport) and flowed south along various defined drainage paths sometime before 0800 and that very few properties in Roma were inundated by flood water before 0800 and that inundation of a significant number of properties by flood water commenced before 1030.” 208294 Determination 7 of 7 The Panel finds difficulty in matching that statement with the statement contained in the hydrologist’s report with the effect that flood water would have inundated the property from 7.30am. 32. However, one thing that has not been satisfactorily canvassed by the FSP and its expert in this dispute is the differing levels in the property because in the Panel’s opinion, the entertainment area described above is in a much lower position than the front of the house which as stated above is set some 500mm above ground level. The area surrounding the entertainment area is also higher than the floor level in this area. In the Panel’s opinion, it is important in these disputes that different floor levels are considered in terms of the source of inundation. 33. The Panel is satisfied that the inundation of the entertainment area was caused at least initially by storm water and the applicants should be indemnified for the loss of goods in that area which she stated consisted of a number of small goods. The Panel is not persuaded that inundation coming from the front of the property was storm water and was on the balance of probabilities was flood water. 34. On the issue of the roof, the Panel accepts the roof was in a state of disrepair, and damage to the ceiling was evident before the storm, with the building report noting evidence of a bowed ceiling having been painted over. CONCLUSION 35. Based on the evidence presented, the Panel does not accept the FSP has established the flood exclusion fully applies to the claim, and the applicants are entitled to be indemnified for goods damaged and any other damage to the entertainment area of the property. Accordingly, it determines the FSP has an obligation to meet the claim to this extent. 36. The Panel accepts the roof was in a state of disrepair, with evidence of pre- existing damage and accordingly, determines the applicants have no prima facie claim for the roof damage as there is no evidence of a storm created opening. The further exclusion relating to property maintenance applies to the roof. 37. The Panel trusts the parties will co-operate in good faith in resolving that part of the claim that is to be paid.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.