Determination 208164
Pool and paving damage declined as soil movement and settlement, not an insured event
Summary
The applicants claimed for pool and surrounding paving damage after heavy rain, which the FSP declined as soil movement, settlement and an excluded pool movement. AFCA agreed the claim was properly declined.
Shifting or dislodging of a pool is covered only if caused by earthquake or impact, so the exclusion applied even though the rainfall was an insured storm event.
Issues
- Claim denial primary · not upheld“I determine that the FSP has correctly declined the claim for the damage to the pool.”
- Product terms interpretation secondary · not upheld“Moving or dislodging of a swimming pool is covered only if caused by earthquake or impact, so the rainfall storm event does not respond.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
208164 Determination 1 of 6
DETERMINATION
Case number: 208164
Home Building – damage to pool – cause – insured events – exclusion
SUMMARY OF FACTS
1. The applicants hold a Home Building policy with the Financial Services Provider
(FSP) covering the Home Building for complete replacement. The policy
commenced on 19 February 2008 and is subject to a total excess of $500.
2. The applicants contacted the FSP on 14 February 2010 to lodge a claim for
damage to the concrete surrounding their swimming pool and the swimming
pool itself.
3. The FSP engaged an expert to attend and the FSP submits that the cause and
extent of damage arose from soil movement and settlement, not the insured
event of rainwater as stated by the applicants.
4. The applicants then engaged a builder to provide a report and submitted that
the pool had overflowed due to recent storm events which caused the concrete
and the fibreglass shell to move and crack.
5. The FSP then obtained a further report from a second expert.
6. The FSP declined the claim on the basis that the damage to the pool did not
arise from an insured event of earthquake or impact, and was the result of an
incident excluded by the terms and conditions of the policy.
7. The applicants dispute the FSP declinature of the claim on the basis that the
damage arises from the event of storm damage and impact.
ISSUE IN DISPUTE
8. Whether the FSP has correctly declined the damage to the pool.
RELEVANT POLICY PROVISIONS
“ What we cover – insured events
...
Impact – sudden and unexpected impact of any:
Motor vehicle, aircraft, watercraft or space debris,
Object falling from a motor vehicle or aircraft,
Failing tree or part of a tree,
aerial, mast or satellite dish which breaks or collapses
...
Storm and rainwater including stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of
rain, snow or hail.
...
What we do not cover
– general exclusions
...
erosion or washing away of soil, earth or gravel,
208164 Determination 2 of 6
...
soil movement or settlement,
subsidence or landslide unless caused by the insured event of earthquake,
the moving, shifting or dislodging of any swimming pool or spa and their covers and liners, or
any septic tank or other inground structure unless caused by the insured events of
earthquake or impact,
RELEVANT LAW
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corporation Ltd
[1974] QB 57 , “i f a loss has two or more proximate or effective causes and at least one
caus e is excluded from cover the insurer is not liable”
REASONS FOR DECISION
9. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
The Applicants ’ Submission
10. The applicants submit that the cause of the damage to the pool and
surrounding areas is from storm damage/excess rainfall.
11. The applicants note that the original builder (“AJG”) who looked at the pool did
not conduct a proper examination and direct the Service‟s attention to the
engineer report.
12. The applicants consider that the engineer sent out by the FSP stated that the
cause of damage as excess rainfall.
13. The applicants submit that the FSP informed them that it did not cover storm
damage or pools generally and queries why the FSP sent out the engineer if
these items were not covered.
14. The applicants contend that the Product Disclosure Statement (PDS) is unclear
on when the damage would be covered.
15. The applicants seek the replacement/repair of damage caused by the storm.
The applicants submit that if the rainfall had not occurred then the damage
would not have occurred.
16. The applicants have an issue with the lack of communication from the FSP.
17. The applicants have enclosed a copy of the FSP‟s engineer‟s report from which
I note the following –
a) The locale of the applicants‟ property experienced a rainfall of 92.2mm in
a 24 hour period ending at 9.00am Saturday 6 February 2010. Further, a
total of 207.2mm of rain fell in the period from 9.00am on Tuesday 2
February to 9.00am on Tuesday 9 February 2010.
b) There is clear evidence of flotation which suggests that the pool shell has
elevated due to the imposition of external hydrostatic forces.
c) There is a clear indication that the filtration pipework has developed a
leak, as indicated by the air bubbles that are introduced into the pool
during the use of the filtration system when the „Kreepy - Krawley‟ is
attached.
208164 Determination 3 of 6
d) The rainfall intensity would have caused overflow of the roof gutters on
the northern side of the property would have contributed to the already
increased cross-surface flow of rainfall runoff that would also result from
such rainfall.
e) Surface water runoff would have accumulated around the northern end of
the pool and penetrated into the filling placed around the fibreglass
swimming pool at the time of installation. This in turn would have had the
potential to cause the swimming pool shell to float out from its containing
excavation and could also have caused any filling placed around the pool
to mobilise and settle into position beneath the swimming pool underside.
f) The accumulation of hydrostatic pressures on the pool walls can be
enough in these circumstances to cause the pool to lift as flotation forces
increase. This can in turn cause movement of the peripheral pavement
around the pool and movements at the junction of the perimeter paving
with the pool shell.
g) As the southern end of the pool is now at a lower level than the remainder
of the pool which has been shown by measurement to be 20mm lower
th an any other point on the pool‟s coping.
h) The engineer concluded that the swimming pool shell has floated out of
the excavation in which it has been installed as a result of an inundation at
the rear of the site.
i) The inundation is most likely to have been the result of a combination of
roof gutter overflow and cross-surface flow of rainfall runoff, both
occurring as a result of unusually heavy rainfall which occurred in the 24
hour period ending 9am on Saturday 6 February.
j) The flotation of the pool shell has elevated the pebble surfaced concrete
pavement, which is most likely to be connected to the pool shell around its
rim. Further, this movement would be sufficient o cause the observed
cracking in the perimeter paving. The elevation of the pavement has
c aused the fracture of the „Hebel‟ filter surround which the applicants
noticed on the same day that they noticed the cracking in the perimeter
pavement.
k) The elevation of the pavement is further indicated by the difference in
height between the pavement adjacent to the southern edge of the pool
and the base of the adjacent retaining wall. The distortion of the skimmer
box opening is a further indication that differential movements have
occurred along the length of the crack which passes on each side of the
skimmer box.
l) The flotation of the pool shell has also caused a fracture in some parts of
the filtration pipework.
The FSP ’s Submission
18. The FSP submits that the applicants have the onus of proving the loss or
damage is covered under the policy of insurance.
19. The FSP confirms its policy covers the insured event of storm which includes
rainwater run-off from areas surrounding the site. However, its policy provides
208164 Determination 4 of 6
no cover for loss or damage arising from or involving soil movement, or
settlement, subsidence, or landslide unless caused by the insured event of
earthquake, the moving, shifting or dislodging of any swimming pool or its cover
or linings, or other in-ground structure unless caused by the insured event of
earthquake or impact.
20. The FSP relies upon the engineer‟s report and in particular the following
findings –
a) The cracking in the perimeter of the pebble paving across the northern
end, the eastern side and the southern side of the pool existed prior to
the movement of the swimming pool. This damage was not consistent
with having occurred as a result of recent events.
b) There was cracking in the soil surface of the grassed area west of the
swimming pool fence (approximately 2 meters from the pool shell) and
the water level at the northern end of the pool was approximately 15-20
millimetres higher than the southern end of the pool.
c) There was cracking to previous repairs to the pool shell which indicated
ongoing movement had occurred since repairs undertaken by the
applicant.
d) The unusually high rainfall was likely to have caused the roof gutters to
overflow and this would have contributed to the already increased cross-
surface flow or rainfall run-off.
e) The high rainfall would have likely caused water run-off to accumulate
around the northern end of the pool and penetrated into the filling placed
around he fibreglass swimming pool at the time of its installation.
f) The run-off of rainwater would have caused the swimming pool shell to
float out from its containing excavation and could also have caused any
filling around the pool to mobilise and settle into a position beneath the
swimming pool underside. Further, this likely resulted in the elevated
pebble surface pavement and such movement would be sufficient to
cause the observed cracking.
21. The FSP notes that the applicants sought coverage under impact, but there has
been no known impact by any of the insured events (see the policy wording
above).
22. The FSP submits that in order for the applicants to be indemnified for the
shifting and dislodging of the swimming pool, it would need to have occurred as
a result of an impact as defined in the policy terms and conditions.
23. The FSP also contends that where there are two events causing a loss, that an
insurer is not liable when one of the causes of the loss falls within an exclusion
clause in the policy.
24. The FSP has enclosed a copy of the AJG report from which I note the
following –
a) AJG observed the pool was leaking water through a hairline crack in
previous repairs.
b) The cracking in the pebble paving had occurred due to settlement.
208164 Determination 5 of 6
c) The damage was not due to heavy rain but consistent with settlement and
movement.
25. The FSP has enclosed a copy of the applicants‟ builder‟s report form which I
note the following –
a) There has been significant ground movement to the backyard grassed
area of the property.
b) The movement has been caused by excessive rain overflowing the pool
and flooding the backyard.
c) The movement has impacted onto the swimming pool creating large
cracks to the concrete, fibreglass and surrounding structures.
Conside ration of each party’s submission
26. I have reviewed the submissions and documents provided by each party
together with the policy terms and conditions and applicable law.
27. I am satisfied that:
a) There was unusually heavy rainfall early in February 2010.
b) The pebble paving around the pool is now cracked and in some areas the
paving is now higher.
c) The pool has cracking in the pool shell and consequently the pool is
leaking.
d) The water level at the northern end of the pool is now lower than the
southern end of the pool.
28. In order to successfully claim under the policy, the applicant must show that the
loss arises from an insured event which is covered by the policy.
29. I have reviewed the engineer‟s report and consider the findings of the report are
as follows –
There is evidence of prior ground movement and settlement as evidence
by previous repairs.
The cause of the current damage resulted from an unusually heavy
rainfall which caused water run-off to accumulate around the northern end
of the pool and penetrated into the filling placed around he fibreglass
swimming pool at the time of its installation.
The run-off of rainwater would have caused the swimming pool shell to
float out from its containing excavation and could also have caused any
filling around the pool to mobilise and settle into a position beneath the
swimming pool underside.
This movement of the pool shell likely resulted in the elevated pebble
surface pavement and such movement would be sufficient to cause the
observed cracking.
30. I am satisfied from the engineer‟s report that the rainwater runoff has caused
the pool shell to lift and the subsequent cracking to the pavement, pipes and
shell. The rainwater has also caused the movement of the in-fill around the pool
shell to settle underneath.
208164 Determination 6 of 6
31. The policy terms and conditions do cover storm damage, however any
coverage provided by the policy terms and conditions is subject to any
exclusions listed in the policy.
32. A review of the exclusions applicable to all sections of cover under the policy
terms and conditions indicates that the following is not covered –
(i) Soil movement or settlement.
(ii) Subsidence or landslide unless caused by the insured event of
earthquake.
(iii) The moving, shifting or dislodging of any swimming pool or spa and their
covers and liners, or any septic tank or other inground structure unless
caused by the insured events of earthquake or impact.
33. I note that the cover for any moving, shifting or dislodging of any swimming pool
or their covers or liners is limited to the events of earthquake or impact. The
definition of impact is limited by the policy to any sudden and unexpected
impact of any, motor vehicle, aircraft, watercraft or space debris, object falling
from motor vehicle or aircraft, falling tree or part of a tree, aerial, mask or
satellite dish which breaks or collapses. I am satisfied that an impact
contemplated by the policy is not appropriate to this case.
34. There is no evidence before me to indicate that the locale of the pool has been
subjected to earthquake or impact. Accordingly, the exclusion will apply
because the damage to the pool was not caused by earthquake or impact.
35. The wording of the exclusion makes it irrelevant that the rainfall is an insured
event which caused the movement of the pool. This is because the policy does
not cover this item of property unless the damage is caused by earthquake or
impact.
CONCLUSION
36. I determine that the FSP has correctly declined the claim for the damage to the
pool.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.