Floor repairs by the FSP's authorised repairer left colour mismatches, a dip, scratches and fumes. AFCA found the repairs defective and ordered rectification, three days of alternative accommodation, a cash reimbursement of $50, speaker and door work at the FSP's cost, and interest.
Policy requires reinstatement to new condition using materials as near to original as possible, and alternative accommodation is owed where a home is temporarily unliveable.
Issues
- Repairs or contractors primary · upheld
“The physical evidence at hand is accordingly inconsistent with MT's claim that repairs were of an acceptable standard. Indeed the photographs demonstrate a disastrous situation.”
- Poor communication secondary · upheld
“The FSP should have made arrangements to house the occupants elsewhere on a temporary basis, as a matter of policy obligation and good insurance practice.”
Subjects and remedies
home or building damagepay compensationpay interestprovide documentsrepair or rectify
Text of the determination
Case No: 208014 Determination Page 1 of 7
Case number: 208014
General Insurance – Domestic Insurance – Home Building – Water damage –
Repair quality – Damage during repairs – Terms of Reference 8.2
21 March 2011
Background
1. The Applicant‟s home was insured with the Financial Services Provider (FSP)
under a home policy.
2. She lodged a claim for water damage to her floor which was accepted by the
FSP. The repair was carried out by the FSP‟s authorised repairer.
3. The Applicant is dissatisfied with the quality of repair.
S ummary of Applicant’s Position
4. She has no particular knowledge or experience in timber floorings, and had no
idea what kempas was until the claim. She relied solely on the advice of the
FSP‟s building consultant “ MT ” on the matter.
5. “ MT ” insisted that she sign the authorisation, authorising him to replace the
damaged flooring with kempas material. She was reluctant to do so because
the sample she was initially provided with did not look similar to her existing
floors. Nonetheless, “ MT ” informed her that the timber would look darker after it
had been properly sanded and polished. She was also asked to trust his
judgment because of his experience in the field.
6. The floor colours are a complete mismatch. There are also skirtings missing
and an obvious dip on the living room floor.
7. The repairer also scratched her original flooring and had damaged her
television connection and walls during the course of repairs. The repairer also
left her front screen door dirty and had cut her surround sound speaker wires.
8. She was never informed that toxic chemicals would be used in the sanding and
polishing process until the day such works were due to commence. She had to
put up with the fumes which caused her headaches.
9. She had asked the FSP and its repairer to provide her with a piece of her
original flooring so that she may seek her own quotes. They have not obliged
her request to date.
Determination
Case No: 208014 Determination Page 2 of 7
10. She wants –
Her flooring replaced with a material that matches her original as close as
possible.
Replacement of her surround speakers ($99)
Resting television ($50)
Her front screen door cleaned or replaced
Reimbursement of Foxtel subscriptions ($79 a month)
Reimbursement for a night‟s accommodation at a hotel ($199(
Replacement of missing skirtings
Dents in walls repaired
Summary of FSP’s Position
11. “ MT ” had advised the Applicant that her existing flooring was no longer
available in the same length and consistency. The Applicant insisted on using
kempas although “ MT ” had recommended forest reds or jarrah timber. She had
signed an authorisation allowing kempas to be used.
12. The flooring has been professionally identified by a flooring and timber
specialist.
13. The new flooring has rejected the polyurethane finish. The repairer has
acknowledged this and has advised that the floor would require re-sanding and
re-coating with an anti-rejection agent.
14. The bowing of the living room floor was due to moisture in the concrete slab.
15. Its repairer cannot handpick every floor board to avoid a colour or grain
mismatch.
Issues
16. Whether repairs carried out by the FSP‟s authorised repairer were poor.
17. Whether the FSP‟s repairer had caused further damage to the Applicant‟s
home.
18. Whether the Applicant is entitled to have the defects in her home rectified by a
repairer of her choice, at the cost of the FSP.
Case No: 208014 Determination Page 3 of 7
Reasons for Decision
19. I am satisfied that the material has been exchanged and each party has had
the opportunity to respond to the issues raised by the other.
20. I consider the FOS Terms of Reference relevant to this dispute are:
“ 8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although
FOS will not be bound by these). ”
21. I have also given consideration to the following policy provisions:
“ Additional benefits Essential
Care
Quality Care Premier
Care
…
Emergency accommodation
We will cover the costs of similar
alternative accommodation for
you and any persons currently
permanently living in your home,
pr ovided your home is unliveable.
This expense will only be paid if
you actually pay for emergency
accommodation and only while
your home remains unliveable.
…
Up to 10% of
the current
building sum
insured
or
the cost of
accommodation
for up to 12
months from the
date of the
event,
whichever is the
smaller .
…
…
Repairing or replacing:
When we agree to pay your claim for loss or damage:
We may choose to pay the reasonable cost of repair, or
the reasonable costs of replacement to new condition
with property of the same size and specification or
with items as near to original as is currently possible,
or
…
Case No: 208014 Determination Page 4 of 7
We will pay the reasonable additional costs of repairing or
rebuilding caused by changes in building codes, by -
laws or ordinances
to match materials, item s or construction with those
that existed before the loss or damage occurred and
where that is not possible, with the nearest similar
materials, items or construction
only those costs that directly apply to part of your
property that has suffered the loss or damage.”
22. The Applicant has raised a number of issues in this dispute. For clarity, I will
deal with each separately.
Alternative accommodation
23. The FSP has not rebutted the complaint that the occupants of the home were
never advised to live elsewhere (while repairs were being carried out) until the
day repairs were actually due to commence. On this score, the unchallenged
evidence is that the occupants were made to bear noxious fumes coming from
the chemicals used in the course of repair.
24. I note that the policy provides the Applicant with cover for alternative
accommodation if the home is “unliveable”. In my view, the presence of noxious
fumes is sufficient to render a home temporarily unliveable, so I am satisfied
that the FSP should have made arrangements to house the occupants
elsewhere on a temporary basis both, as a matter of policy obligation and as a
matter of good insurance practice.
25. In my view, at least 3 days of alternative accommodation would have been fair
in all the circumstances to allow for repairs to be completed and for the fumes
to clear. Although the Applicant has only sought compensation for a night‟s
accommodation, I am satisfied that she should be entitled to reimbursement for
3 days of alternative accommodation at $199 a day. I am of the view the FSP
should not be entitled to benefit from its failure to act in accordance with the
policy or with good insurance practice generally.
Flooring
26. The evidence at hand indicates that there are still a number of defects with the
floor followin g repairs carried out by the FSP‟s contractors. On this score, the
photographs provided clearly show colour mismatches, disjointed skirtings,
scratches and poor coating at various parts of the floor. It is also not in dispute
that there is a dip in the living room floor. The physical evidence at hand is
accordingly inconsistent with “MT‟s” claim that repairs were of an acceptable
standard. Indeed the photographs demonstrate a disastrous situation.
27. The FSP has sought to blame the Applicant for the defects on the basis she
had insisted on kempas timber and polyurethrane coating being used. It also
Case No: 208014 Determination Page 5 of 7
sought blame the colour mismatches on its repairer‟s inability to control that
type of timber delivered to it by a supplier.
28. I find the excuses unacceptable for a number of reasons.
29. Indeed the Applicant‟s evidence (which I accept) is quite inconsistent with such
a conclusion.
30. No evidence has been provided to substantiate the assertion that the Applicant
had insisted on kempas being used despite being advised to the contrary.
There is also no evidence to substantiate the suggestion that the Applicant was
initially recommended forest reds or jarrah. Such assertions only arose after the
Applicant had complained. Also, the written authorisation she signed is silent on
such matters. In the absence of independent evidence to substantiate MT‟s
assertions on the matter, I am unable to attach much weight to his assertions.
31. Furthermore, t he FSP has not persuasively demonstrated that the Applicant‟s
original flooring was made of kempas timber to begin with, let alone
demonstrate that there are different types of kempas and the type currently
available in Australia differs from the original.
32. T he policy requires that the FSP to reinstate the floor to “new condition” . In
doing so, it may use materials of same kind as the original or as near to the
original as is currently possible. However, use of alternative materials is only
permissible where it was “ not possible ” to use the original material.
33. Although the FSP has arg ued that the Applicant‟s original floor was made of
kempas (and that the types of kempas available are purportedly of different
lengths and consistency), it has not provided persuasive evidence on such
matters. Whilst ” M ” T said that the original floor material was “professionally
identified” by a flooring and timber specialist, I am unable to find any report
from such specialist in the material exchanged. I also note that the “MT‟s” initial
or primary report was not provided for purposes of the dispute and there is no
explanation for the exclusion of such reports. In fact, I note that the FSP has
provided minimal information with respect to what had transpired prior to the
Applicant‟s complaint.
34. Based on the evidence presented, one would not be in the position to conclude
that the Applicant‟s original floor was in fact made of kempas timber (let alone
that there are different types of kempas available) unless one is prepared to
accept „MT‟s‟ bare assertions on the matter. Accordingly, if the Applicant was
provided with the same information I now have before me, it appears more
plausible that she was likely to have depended on “MT‟s” advice on the matter.
35. The nub of the matter is that there are clearly a number of defects with the
floor, and this establishes that the Applicant has not been properly indemnified
for her loss to date.
Case No: 208014 Determination Page 6 of 7
Television and speakers
36. I accept that the Applicant‟s speaker wires have been cut, and on balance,
were likely cut during the course of repair. The FSP has not suggested that the
Applicant has fraudulent intentions, so I see no reason why she would want to
cut the wires.
37. Be that as it may, I am not satisfied that she should be entitled to new speakers
as I am of the view that the matter can be rectified by replacing the cut wires. In
the circumstances, I am satisfied that the Applicant is only entitled to indemnity
for the cost in having the speaker connections reinstated.
38. Also, bearing in mind the delays th at have occurred in having the Applicant‟s
floor repaired, I find her claim for the costs to reinstate the television connection
and inability to utilise her cable television service fair and reasonable.
Front screen door
39. The FSP has not rebutted the complaint that saw dust generated during the
course of repair has adhered to her front screen door. Nor has it denied the
occurrence of the incident.
40. In the circumstances, I am satisfied that the Applicant is entitled to have the
door professional cleaned to re move the saw dust at the FSP‟s cost.
Dents in walls
41. I am unable to sight the claimed dents in the walls from the photographs
supplied.
42. In the circumstances, I am unable to make any Determination with respect to
this claim. However, I would encourage the Applicant to provide the FSP with
more details on the matter so it may decide whether it wishes to acknowledge
responsibility for such damage. I urge the FSP to quickly assess these details
so this issue can be resolved.
43. The Applicant is at liberty to file a fresh dispute with FOS if the FSP decides not
to acknowledge responsibility upon production of such evidence.
Determination
44. Accordingly, having carefully considered the matter, and in an attempt to bring
this dispute to a fair and reasonable resolution, I propose to determine the
matter as follows:
(a) The FSP is to reimburse the Applicant for 3 days worth of alternative
accommodation at $199 per day.
(b) The FSP is to reinstate speaker connections at its cost.
Case No: 208014 Determination Page 7 of 7
(c) The FSP is to reimburse the Applicant $50, being the cost of having her
television reconnected as well as for 2 month‟s worth of cable television
subscription.
(d) The FSP is to arrange for the Applicant‟s front screen door to be
professionally cleaned at its cost.
(e) The FSP is to provide the Applicant with evidence clearly identifying the
type of timber on her original floor, and upon provision of such evidence,
the Applicant may personally verify if the material is still available.
(f) If the original material is still available, the FSP is to reinstate the floor with
the original material in accordance with the terms of the policy.
(g) If the original material is unavailable, the FSP is permitted to reinstate the
floor using alternative material subject to the condition that the materials
ultimately used must match the originals as closely as possible.
(h) The FSP is to provide the occupants of the home with alternative
accommodation during the course of rectification works in the event that
noxious substances are likely to be used.
(i) The FSP is to pay interest on the amount stipulated in (a) above at the
statutory rate from the date the Applicant first incurred accommodation
costs.
(j) The FSP is to pay interest on the amount stipulated in (c) above at the
statutory rate from the date such costs were incurred.
(k) In the event the FSP wishes to settle any of the other matters stipulated in
this Determination in cash, it is to pay interest on such amount at the
statutory rate from the date of its IDR letter.
45. I determine accordingly.