Determination 207270

Partial claim decline for subsidence cracking to western wall and south west corner after laundry pipe leak

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a laundry pipe leak, the insurer accepted the north west corner damage but declined the west wall and south west corner cracking as foundation movement. AFCA found the leak also caused the west wall damage and ordered the insurer liable for those repairs and any damaged clay pipes.

On the balance of probabilities the leaking pipe water undermined the western foundations, and the insurer did not address earlier engineering opinions that attributed the damage to the leak.

Issues

Subjects and remedies

pay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

207270 Determination 1 of 6 DETERMINATION Case number: 207270 Home – water leak – proximate cause – policy exclusion SUMMARY OF FACTS 1. The applicant has held Home Building and Contents insurance with the Financial Services Provider (FSP) since 29 March 1976. 2. On 13 March 2008, the applicant lodged a claim for damage to a wall in the laundry which was possibly caused by a leaking pipe in the laundry. There were also further cracks to the brickwork in other areas of the premises. The FSP appointed an external builder to investigate the claim and report on its findings. The builder attended the premises on 17 June 2008 and requested a plumber conduct pressure testing to ensure no other leaks were present. 3. After a lengthy delay, on 28 July 2009, an engineer was appointed by the FSP to inspect the premises and report on his findings. He believed the proximate cause of the building cracking behind the laundry was localised wetting of the soil and he nominated two repair options. 4. The FSP appointed another engineer to obtain a second opinion on the proximate cause of the cracks to the brickwork throughout the premises. He reported his findings to the FSP on 13 October 2009. On 4 November 2009, the applicant was advised that the claim for the laundry cracks would be accepted, but liability for all other cracks was denied. 5. On 11 March 2010, the FSP wrote to the applicant with the final settlement amount of $7,933 for the claim. At the request of the applic ant, the FSP‟s internal dispute resolution (IDR) department investigated the claim. It maintained the decision to deny the claim. The applicant continues to dispute the FSP‟s position, arguing the leaking water pipe in the laundry is the cause of all cracking to the brickwork and the FSP has taken too long to process the claim. ISSUE IN DISPUTE 6. Whether the FSP is entitled to partially deny the claim. RELEVANT POLICY PROVISONS “ Types of cover you can choose (Page 15) ... Home Cover When we insure your Home, we will cover it for loss of or damage which:  is caused by an insured event and  happens in the period of insurance. ... What is not covered under any part of your policy (Page 47) 207270 Determination 2 of 6 ... Erosion, subsidence We do NOT cover loss or damage x caused by or as a result of erosion, vibration, subsidence, landslip, mudslide, collapse, shrinkage or any other earth movement but we will cover the following Insured Events and Optional covers: ...  Bursting, leaking, discharging or overflowing (Insured Event 7) ... How claims are paid (Page 53) Home, Contents, Personal effects or Landlord’s Fixtures and Fittings claims ... We will not: ... x fix a fault that existed before the loss or damage occurred ” REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 8. The claim started on 11 March 2008 and there were approximately five assessors over the next seven to eight months. After a complaint to the FSP over the length of time the claim was taking, an engineer came and made an assessment from outside the gate. As the applicant was not notified he was coming, he was unable to conduct an assessment of the internal damage. 9. A second engineer attended and conducted an internal and external assessment. He stated that the damage to the western wall was a result of the water leaking into the inside of the north western foundations causing them to become unstable. This was due to the fact the ground slopes south west and the water would travel down the inside of the foundations to drain. 10. Another engineer from a different company attended and reported that the water leak was over a period of two to three years, whereas the applicant says he knows it was over a period of seven to eight years. No damage had occurred to the external brickwork until the north western corner sank. 11. The applicants states that he complained to the FSP when it made demands for work to be carried out to three areas which had nothing to do with this claim. He says he was then advised by the claims manager that the three demands were only suggestions and the west wall would be pinned. When he asked for that to be put in writing, the FSP advised that it had made a mistake after repeated phone calls had been made. This led to the matter being referred to the internal dispute resolution process. 12. Since then, no resolution has been obtained. The applicant received a denial letter dated 25 May 2010 which stated he had to carry out the three demands that were supposed to be a suggestion from the claims manager. The applicant later received a cheque for $7,833.00 dated 4 June 2010. 207270 Determination 3 of 6 13. The FSP has made this claim unprofessional and stressful for reasons only known to it. The applicant suggested obtaining another engineer‟s report, but the FSP indicated this may not be accepted. The applicant questions whether he still needs another engineer‟s report. 14. The applicant considers the FSP should accept liability for all damage to the brickwork as it only occurred after the northwest corner shrank as a result of the laundry pipe water leak. The FSP’s Submission 15. It is an accepted principle of law that the onus rests with the applicant to prove, on the balance of probabilities, that the damage sustained to the insured premises has resulted from an insured event of the policy. Whilst the FSP accepts the damage to the northwest corner of the dwelling has resulted from the leaking pipe, it cannot agree that the damage to the south west of the premises has resulted from an insured event. The applicant has not submitted any evidence to support acceptance of this portion of the claim. 16. The FSP relies on the opinion provided by engineering company (XK), who provided a conclusive report that clearly shows the damage to the south west corner of the house has not resulted from the claimed insured event, or any other event as covered by the policy. Specifically, the report states: “... The extent of movement as a result of seasonal wetting and drying of foundation soils is seen by the general movement that has occurred at this dwelling, as witnessed by the crack that occurred soon after construction on the northern wall of the rear west wing, and minor cracking under the bedroom window on the eastern wall, and the movement that has occurred near the south west corner . It was seen that movement at the North West corner was approximately four times the movement seen at the other locations. For this reason I have concluded that the cracking and distress at the north west corner is primarily the result of differential foundation movement as a result of the plumbing leak and that the other minor movement in the dwelling is attributable to the long term foundation movements as a result of seasonal swell shrink cycles in the foundation of soils ...” 17. Based on the opinions provided by XK, the FSP considers it is evident that the house has undergone seasonal movement in the foundation soils which has resulted in subsidence to the premises over time. Such damage is evident in the south west corner of the premises and is not related to the leaking pipe event, or any other event of the policy. Such damage is excluded from the terms of the policy on Page 47. 18. The applicant has disputed the settlement amount of $7,933 for the accepted portion of the claim, but the FSP is unclear as to the applicant‟s reasons for this dispute. The FSP can surmise the dispute has arisen from the partial decline of the claim for the damage sustained to the south west aspect of the premises. 19. The offer of settlement to the applicant represents the amount that it would have paid to a qualified builder to fully reinstate the premises following the leaking pipe. This is in accordance with the policy terms and conditions and is fair and reasonable in the circumstances. 207270 Determination 4 of 6 20. The policy will only respond to a loss or damage that has occurred directly as a result of an insured event. It accepts the damage to the North West aspect of the premises was a result of the leaking pipe, but it does not agree the subsidence damage to the south west corner is related to the leaking pipe, or any other insured event of the policy. It submits that this damage is related to gradual subsidence due to seasonal moisture fluctuations in the subsoils, which is excluded by the terms of the policy. Consideration of each party’s submission 21. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy. 22. I am satisfied the leaking pipe in the laundry has caused the north west corner of the premises to shrink which, in turn, led to cracks appearing in the laundry interior walls and the exterior brickwork in the north west corner of the premises. 23. The issue in dispute is whether the proximate cause of the cracking along the western side and the south west corner of the premises was the leaking laundry pipe. The property is on a slope which runs down from the northwest corner to the south west corner. 24. The FSP has relied on a report by one of its engineers (XK) in forming its view that the cracks to the western wall and south west corner are due to foundation soil movement, rather than due to the leaking laundry pipe. I am concerned that the FSP has made no attempt to respond to earlier opinions which had been obtained and which tended to attribute the damage to the western wall and south west corner to the leaking from the pipe. 25. The applicant has stated that another engineer (AHS), who was appointed by the FSP, was of the opinion that the cracks to the interior plasterboard and the brickwork along the western side of the premises were all caused by the one event, namely the northwest corner shrinkage. In his report, the engineer stated: “... It is my opinion that the entire west wall of this property will require under pinning not just the northwest corner as suggested. ” 26. I note that these comments do not identify, or offer an opinion on, the proximate cause of the cracks to the west wall. The applicant submits that the engineer expressed his view verbally, but did not detail them in his report. 27. The property is approximately 35 years old and has been owned by the applicant since new. The applicant has stated the cracks to the plasterboard on the interior of the premises along the western wall were not present prior to the northwest corner shrinkage. It was only after the northwest corner dropped and cracked that the plasterboard cracks appeared. The applicant also states that the cracks to the western wall brickwork o nly appeared at the same time as the northwest corner cracked. 28. The property slopes from the northwest corner down to the south west corner. Any water escaping from the leaking water pipe in the laundry would saturate the ground below the laundry. Any surplus water would then travel along the western wall ‟s foundations in the direction of the south west corner. 207270 Determination 5 of 6 29. The report from the FSP‟s engineer, XK, as shown in part under point 16 above, attributes the cracking in the west wall (categorised as „other min or movement in the dwelling‟), to “...long term foundation movements as a result of seasonal swell shrink cycles in the foundation of soils”. This is the basis for the FSP‟s rejection of the second element of the claim. 30. I note the FSP has commented that the applicant has disputed the settlement amount of $7,933 for the accepted portion of the claim. That is not my understanding of the applicant‟s position in this matter. I understand that the applicant has not accepted the settlement as it does not cover the full claim, rather than disputing the amount of the settlement. On that basis, I will not treat the quantum as an issue in dispute. 31. The FSP‟s engineer has listed three points for the applicant to address as his responsibility for undertaking repairs to the dwelling. These can be found under section 6.0 REPAIRS TO THE DWELLING in the report dated 13 October 2009 and can be summarised as follows: a) In-ground plumbing to be checked and faults repaired. b) Establish one metre wide pathways around the premises. c) Conduct ground maintenance as per CSIRO instructions. 32. In this report, the engineer does not indicate whether there is a fault with the vitreous clay pipes. However, I do not accept that it is the applicant‟s responsibility to repair any pipes which have cracked due to the leaking laundry pipe. The FSP has already accepted liability for repairs caused by the leaking pipe and this should also include repairs to any damaged vitreous clay pipes. 33. The other two suggestions should be read as helpful advice to the applicant, rather than mandatory items requiring immediate attention. They do not constitute potential additional exclusions to the applicant‟s policy. 34. When I take into consideration the comments of the applicant regarding the timing of the appearance of the western wall cracks, coupled with the fact that only the west side of the property has suffered foundation soil movement, I am persuaded by the applicant‟s position in this matter. The engineer, AHS, has commented to the applicant that the water from the leaking pipe would have travelled downwards with the slope of the property, along the western wall foundations, in an attempt to escape. 35. The FSP‟s engineer, XK, has not offered a comment as to why the eastern wall has not exhibited the same type of cracking as the western wall. Therefore, on the balance of probabilities, I am satisfied that the water which leaked from the laundry pipe over a considerable period of time was also responsible for the undermining of the western wall as well as the northwest corner. CONCLUSION 36. Accordingly, I determine that the FSP is liable for the repairs to the cracks in the exterior brickwork along the west wall to the southwest corner and to the interior plasterboard along the west side of the premises. 207270 Determination 6 of 6 37. I further determine that the vitreous clay pipes should be inspected and repaired, should they be found to be damaged by the laundry water pipe leak.