After a second heavy rain event flooded the applicant's home, the insurer denied the claim as flood from a watercourse. AFCA found the insurer had not proven a watercourse, ordered it to indemnify the loss, and ordered payment for household items it had authorised destroyed, with amounts left to be agreed.
The insurer's hydrologist did not show that the water escaped from a watercourse as the law defines it, so the flood exclusion did not apply.
Issues
- Claim denial primary · upheld
“the FSP has not discharged the significant burden of proof that rests upon it to demonstrate that the damage claimed by the applicant was proximately caused by floodwater as defined in its policy.”
- Poor claim handling secondary · upheld
“the FSP has no authority to authorise removal and destruction of household contents until such time as the claim is accepted.”
- Inadequate claim investigation secondary · upheld
“The methodology employed by the hydrologist in the report is brief, and in the Panel's opinion is unpersuasive.”
Subjects and remedies
natural disasterpay claimpay compensation
Text of the determination
206023 Determination 1 of 5
DETERMINATION
Case number: 206023
Home Building, Contents – flood – what constitutes a watercourse
SUMMARY OF FACTS
1. On 4 February 2010, the applicant’s home was inundated with water during
heavy rainstorms in the area. The Financial Services Provider (FSP) accepted
liability for a clam under her home insurance policy and indemnified the
applicant for the damage.
2. On 15 February 2010, the a pplicant’s home was again inundated with water
during heavy rainstorms. The FSP denied liability for damage arising from this
event on the grounds, that on this occasion, the damage was caused by water
which had escaped from a watercourse and was excluded from cover provided
by the policy.
3. The applicant contends the basis for the FSP’s denial of the claim was flawed
as the water which inundated her home was not from a creek as stated by a
hydrologist, but was from a natural drainage system, and was due to storm and
rainwater which is covered by the policy.
ISSUE IN DISPUTE
4. Whether the water which inundated the applicant’s property on 15 February
2010 was from the normal confines of a watercourse.
RELEVANT POLICY PROVISIONS
“E xclusions to your cover
We will NOT cover any loss or damage as a result of, or caused by:
…
flood
…
glossary of words with a special meaning
flood
the covering of normally dry land by water escaping or released from the normal confines of
a watercourse or lake, whether or not it is modified. Flood also includes water escaping from
the confines of any reservoir, channel, canal or dam.
REASONS FOR DECISION
5. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
The Applicant’s Submission
6. She had experienced two storms in two weeks. Water had flowed into her
home twice due to the bad road design. The first incident was minor with water
damaging the contents on the floor, bedroom, garage and verandas.
206023 Determination 2 of 5
7. The insurer removed the damaged items and sent cleaners to clean up the
mud.
8. On 15 February, a large storm occurred with heavy rain in a short period. The
council culvert could not handle the volume of water flowing in the short time
and banked up on the other side of the road. The water then poured over the
road, flowing across her property and entered her home. The damage this time
was extensive.
9. Cleaners came out again and emptied the house and she was placed in
temporary accommodation.
10. The expert engaged by the FSP provided incorrect information stating that
there was a creek on the property, when in fact it was an ill defined culvert.
11. She had established that there was no creek in the area or watercourse, and
the hydrologist has miss-described it to her detriment.
12. The FSP had changed its mind in relation to the contents damage. The FSP
said it would pay for the first inundation, but would only pay for one total loss.
The FSP ’s Submission
13. The applicant’s first claim for damage on 4 February 2010 has been accepted
and the claim was settled.
14. The inundation of the applicant’ s premises was due to flood water. The FSP
submits that a ‘creek’ can also be classified as a ‘watercourse’.
15. The water escaped from the normal confines of an altered or modified
watercourse.
16. The hydrologist determined the source of the inundation was water backing up
from the creek (watercourse) at the point where the culvert crossed under
Hawdons Road and flooded the applicant’s property.
17. Had there been the presence of storm water generated by local rainfalls, this
water was not the cause for the damage. Had there been stormwater mixed
with flood water this is classified as a flood.
Consideration of each party’s submission
18. The FSP seeks to rely on a clause in the policy to deny liability from the claim
and therefore has the burden of establishing on the balance of probabilities that
the relevant terms apply to defeat the claim.
19. The FSP commissioned an engineer to undertake a flooding assessment of the
applicant’s property. The engineer described the property as being located on a
street with no formal kerbing, guttering or any underground stormwater
drainage. The engineer went to state:
“There is a creek located adjacent to the property as shown on Figure 10. This
creek drains flow from the upstream forested catchment, under Hawdons Road
via a culvert with an approximate di ameter of 500mm.”
20. The major points in the engineer’s report of 12 March 2010 are:
- the area experienced a short duration intense rainfall event that was 10-
20 year Average Recurrence Interval event.
206023 Determination 3 of 5
- water from the upstream catchment flowed through the creek to the
culvert under Hawdons Road.
- the capacity for the culvert under Hawdons Road was exceeded and
water flowed over the low point (approx 20m from culvert) of the road
towards the property.
- flooding of the property was not the result of water from the creek
adjacent to the property breaking its banks.
21. The engineer concluded:
“Flooding at this property w as to an estimated depth of 0.23m in the house.
{Engineer] believe the flooding was primarily caused by water from the creek
flowing over the low point in Hawdons Road after the culvert capacity was
exceeded.”
22. A Schematic of Flooding map depicting the appl icant’s property and
surrounding areas shows a culvert travelling from the opposite side of Hawdons
Road to the applicant’s property, under Hawdons Road then onto the
applicant’s property. The flow of water in the culvert is shown towards the
applicant’s p roperty with water escaping from the culvert at the junction with
Hawdons Road then crossing Hawdons Road at the location of its low point.
The water is then shown travelling towards the applicant’s house.
23. Included in the captioned photographs of the appl icant’s property is a
photograph depicting flood debris on a fence looking at the property from
Hawdons Road. The flood debris is on the side of the fence nearest the road
clearly indicating the direction of flow of the water.
24. The applicant had informed the engineer that water was flooding down the
property from Hawdons Road at the top of the block and that it was flowing like
a river at the front of the property.
25. The Panel is therefore satisfied that the water which inundated the applicant’s
home came fr om the opposite side of the road to the applicant’s property, then
crossed Hawdons Road at its lowest point and onto the applicant’s property.
However, it is the source of water that is in dispute, and whether at any stage,
the water escaped from a watercourse as established by law.
26. The applicant argues that there was no creek on the property on the other side
of the Hawdons Road and asserts the water came from natural drainage due to
the storm and rainfall. The applicant submitted a photograph of a stump which
she claimed stopped the flow of the storm water. The applicant submitted maps
which do not identify any named creeks or watercourse in the proximity of her
property.
27. The engineer responded by confirming the waterway had a defined bed and
banks, and in her opinion, the waterway was a watercourse. She further noted
at the time of her site inspection there was no blockage present and the
applicant had not mentioned the tree stump during her interview.
28. The applicant further argues the engi neer’s report fails to analyse the capacity
of the culvert to move stormwater in litres/hour which when considered in
conjunction with the rainfall event would show an incorrect design in the
construction of the council road. The applicant also notes the stump had been
removed from the culvert prior to the engineer’s site inspection.
206023 Determination 4 of 5
29. The central issue for determination therefore is whether the source of the water
which inundated the applicant’s property was a watercourse , culvert, drain or
an ill defined depression in the ground.
30. The Panel has carefully examined the methodology employed in the
hydrologist ’s report, particularly in light of the applicant’s substantial challenges
to the hydrologist ’ s description of events and specifically, the particular place
from which the water escaped immediately prior to inundating the applicant ’ s
property. The FSP engaged a hydrologist who provided a report on the 12
March 2010. The hydrologist describes the water course from which the water
that inundated the property as a creek. She does so unequivocally and without
reservation. The methodology employed by the hydrologist in the report is brief,
and in the Panel’s opinion is unpersuasive. The hydrologist has attached a
number of photographs to her report, purporting to depict the creek. In the
Panel’s opinion, the photograph depicting the creek does not depict a creek or
any other body which carries water which could any sense fulfil the judicial
definition of a watercourse.
31. The judicial definition of a water course as described by the High Court,
requires that the watercourse is to have defined banks, and a bed, and that it
regularly conveys water from one place to another. The hydrologist has
assumed that it was a creek without providing any information as to why she
has reached this conclusion. In the Panel ’ s opinion, the photograph portrays an
ill defined depression of the ground. In the Panel’s opinion , if such a place can
legitimately be described as a watercourse, then there would literally be no
cover provided in most insurances policies where water flows from one place to
another over anything other than flat ground. The Panel is totally unpersuaded
by the description of relevant events contained in the hydrologists report, and
by the photographs which she relies on to support her position.
32. In these circumstances, the Panel is persuaded by the applicant ’s description of
the relevant events and is satisfied on the balance of probabilities, that from
wherever the source of water that inundated the property originated, it did not
come from a place described in the policy exclusion. The Panel also notes that
in a slightly lesser event, which occurred 11 days before the event giving rise to
the claim, the FSP was persuaded that the damage caused to the applicant ’ s
premises was covered by the policy.
33. The Panel has considered the applicant’s submission that the FSP arranged for
cleaners to attend the site and moved household contents from the home
during the claims process.
34. The applicant states the FSP gave permission for a number of her belongings
to be thrown out which included DVD players, printer, scanner, copier fax,
door, two rugs and a bean bag all of which the FSP now does not accept.
35. It is clear the FSP authorised removal of these items prior to accepting liability
for the claim. The Panel accepts that when informed of the damage, that an
FSP may initiate emergency repairs prior to investigation of the cause for the
damage. However, in the Panel’s opinion , the FSP has no authority to authorise
removal and destruction of household contents until such time as the claim is
accepted.
206023 Determination 5 of 5
36. The FSP states that the repairer confirmed that electrical items were
uneconomical to repair and had no salvage value, hence the applicant was not
prejudiced by its actions.
37. However the Panel has been provided with no evidence to support this
assertion. In any event, the applicant has been prevented from having the
opportunity to have the damage assessed and the possibility of repairing it. In
these circumstances, the Panel considers the applicant is entitled to payment
for the cost of the items which the FSP authorised be destroyed.
CONCLUSION
38. Having regard to the material provided by the parties, and the anal ysis of that
material set out above, the Panel is of the opinion that the FSP has not
discharged the significant burden of proof that rests upon it to demonstrate that
the damage claimed by the applicant was proximately caused by floodwater as
defined in its policy. The Panel therefore, determines that the FSP is to
indemnify the applicant for her loss.
39. The Panel has commented specifically on the items removed from the premises
by the FSP. The applicants claim is for damage is to the building and contents
for the second event as well as any outstanding items for which the FSP
accepted liability in the first event. The applicant has not provided any specific
amounts or sums the subject of the claim. In the event, that there is any
disagreement between the parties as to the sum payable pursuant to this
determination, either party may seek a further determination from the Panel on
this issue.