The owner of a restaurant building had its claim for water damage from broken sub-floor waste pipes declined as gradual damage, and repaired the building for $73,163.03. AFCA found the FSP had not proved the leaks were long-standing or that all the damage was excluded, and ordered it to pay 50% of the repair cost, $36,581.52.

The insurer bears the onus of proving an exclusion such as gradual damage, and where that onus was not discharged and not all damage was covered, AFCA made a fair and reasonable 50% determination.

Issues

Subjects and remedies

small businesspay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

205569 Determination 1 of 7 DETERMINATION Case number: 205569 Small Business – insured peril – policy exclusions – onus of proof – fair and reasonable SUMMARY OF FACTS 1. A dispute has arisen following a claim lodged on 28 July 2009 under a business insurance policy that was issued in the name of a body corporate. The applicant is the owner of the building. 2. The building insured under the policy is a two-storey commercial property that was tenanted and used as restaurants on the ground floor. 3. The building was insured for the sum of $1,500,000 and was covered for loss and damage caused by insured perils as described in the policy as well as for accidental damage up to the sum insured of $50,000. 4. The damage was brought to the applicant‟s attention by one of the tenants when it was discovered that the floor was “cupping” or buckling. The cause of the damage, as identified by a property maintenance contractor appointed on behalf of the applicant, was that a waste pipe had broken and in turn filled the sub-floor with waste water and other contaminants. 5. Following attendance of the property by the FSP ‟s appointed loss adjuster and building consultant, the FSP wrote to the applicant on 6 November 2009 advising the claim was not one for acceptance as the loss was excluded by the policy as the pipes had been leaking for an extended period of time , and the damage was caused gradually. 6. The applicant did not accept the FSP‟s reasoning to deny the claim and requested a review of the denial of the claim. Following a review by its internal dispute resolution procedures (IDR) the FSP advised: “The Committee determined, based on all the available information, that the cause of the damage to your Building was as a result of water leaking unabated, over a lengthy period of time from at least three broken sub-floor waste water pipes that has led to the swelling and gradual deterioration of floor timbers, flooring and cabinets. They also determined that the waste pipe system did not meet the required standards. Following our review of all available information, it is the decision of the Committee that the decline is upheld. 7. The applicant has referred this matter to the Service seeking indemnity under the policy for the cost of repairs for the damage caused to the building. The applicant indicated that although the FSP building consultant estimated the cost of repairs at between $300,000 and $400,000, he has repaired the damage at a total cost of $73,163.03. 205569 Determination 2 of 7 ISSUES IN DISPUTE 8. Whether the damage caused to the building is covered under the terms and conditions of the policy. RELEVANT POLICY PROVISIONS Cover We will pay up to the sum insured in accordance with the Basis of Settlement for property shown in the schedule that is damaged at the premises during the period of insurance by any of the following insured perils : … 4. Storm, Hail and Water Storm, wind, hail, water including rainwater or snow. … This insured peril does not include damage: (a) caused by erosion, landslide, mudslide, rockslide or subsidence; (b) that occurs gradually; (c) … … Unless caused by or arising from direct consequences of an earthquake or seismological disturbance, volcanic eruption or water escaping from a water main owned by a water supply authority. Extensions of cover – A … 9. Accidental damage Cover is extended to include accident damage of property , not otherwise excluded by this cover section , at the premises or while temporarily located at any other premises in Australia. This cover is limited to $5,000 any one insured event unless specified otherwise in the schedule and is subject further to the following Accidental Damage exclusions. Accidental damage – Exclusions … (d) We will not pay for damage caused by or arising from: … (vi) pollution or contamination of property , except when caused by fire, lightning, explosion, impact by road vehicle or animal, aircraft or other aerial devices or articles dropped from them, falling communication masts, towers, antennae or dishes, falling buildings or structures or parts thereof, meteorite, riot, civil commotion, persons taking part in an industrial dispute, persons acting maliciously, earthquake, flood , storm, the bursting, overflowing and discharging of tanks, apparatus or pipes containing water or liquid of any kind, or sprinkler leakage; ” REASONS FOR DECISION 9. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Panel notes the extensive material submitted by the parties, but does believe it is necessary to recite all of the material unless it is necessary. The Applicant’s Submission 10. The applicant„s submission is summarised as follow s: 205569 Determination 3 of 7  The FSP has based its decision on hearsay and non scientific reports.  The FSP has ignored documents submitted to show the event happened in June or July 2009.  The FSP has ignored the fact of council approval for all plumbing work at the building.  The FSP has ignored the soil test as well as the maintenance reports for the building. The FSP’s Submission 11. The policy provides coverage for water damage sustained to the property. Cover is also extended to include accidental damage to the property, but this is limited to $50,000. 12. The policy does not provide cover for damage “that occurs gradually” . Whilst the policy does not define gradually the following definition is contained in the Concise Oxford Dictionary: “Gradual taking place by degrees, slowly progressive, not rapid, steep or abrupt…” 13. The Macquarie Dictionary contains the following definition: “Gradual taking place, changing, moving etc by degrees or little by little…” 14. It is the opinion of the building consultant that the waste water has been leaking for some time and opined that the waste water pipes had been leaking in excess of 2 years. 15. The building consultant‟s inspection of the cracked pipe revealed staining of the PVC pipe which demonstrates longstanding and gradual damage. 16. It submits one of the tenants has advised that a foul or rank smell had been experienced every morning for over 2 years when opening the restaurant. 17. It submits the building consultant considered the entire plumbing supply and waste system to be undersized and inappropriate for the level of trade waste produced by the various tenancies. 18. The building consultant also considered the entire plumbing supply and waste system was plagued by defective workmanship as it did not comply with the Building Code of Australia and the relevant Standards as the plumbing system was:  Improperly installed;  Not adequately supported; and  Did not provide appropriate slope to enable waste water to generate flow out of the building. 19. The building consultant based on his visual observations, including the staining of the crack around one of the offending sub-floor pipes, the well advanced timber rot and mould identified on the wall frame and also the floor and floor framing, expressed the opinion, the damage is strongly indicative of gradual deterioration over a period of time. 20. The FSP submits it believes that the expert evidence of the building consultant confirms that the damage to the property was “gradual”, having taken place by degrees, little by little and progressively, in that the damage occurred over time as opposed to instantaneously. 205569 Determination 4 of 7 21. The FSP submits it is unclear as to the relevant clause in the policy which the applicant is relying upon for the purpose of seeking coverage. It is unclear as to whether the applicant makes an alternative claim under the policy for the provision of Accidental Damage extension. 22. It submits accidental damage is sub -limited to $50,000, but the policy excludes cover for any accidental damage caused by or arising directly from:  “ gradually operating causes such as but not limited to, wear and tear”  “latent defects, faulty workmanship, faulty material, structural defects or faulty designs”  “ faults or defects known to you or any employer whose knowledge at law would be deemed to be knowledge and not disclosed to us at the time this insurance was arranged, extended, varied or renewed.” 23. It maintains the view that the policy does not respond to the applicant‟s claim for either the insured peril coverage, or the accidental damage cover having regard to the building consultant‟s report and relevant exclusions. Consideration of each party’s submission 24. The law requires the applicant to prove on the balance of probabilities he has suffered a loss caused by an event which is insured under the policy, which was in force at the time of the loss. Once the applicant has done so, the burden of proof then shifts to the FSP to demonstrate the loss falls within an exclusion or a condition of the policy which would entitle it to deny liability. 25. In this case, the policy covers the applicant for specified event coverage, as well as accidental damage cover, although the latter cover is limited to $50,000, which means the applicant needs to demonstrate the loss was caused b y an event covered by the policy. The onus then reverts to the FSP to demonstrate the application of any exclusion or condition on which it relies to deny liability for the damage caused to the property. 26. It is not in dispute that a waste water pipe was discovered leaking under the sub-floor of the premises. In fact it was discovered that other pipes were cracked and leaking. The building has suffered extensive damage, which according to the FSP ‟s building consultant, would cost between $350,000 and $400,000 ( plus GST plus builder‟s margin ) to repair. However, the applicant has indicated that the actual cost to repair the damage was $73,163.03. 27. When the FSP initially denied liability, it was on the grounds the damage had occurred gradually, and there was no insured peril which provided cover. The FSP also advised that there was no cover available under “Accidental Damage” section of the policy by virtue of the operation of Exclusions contained in the policy. 28. The exclusions referred to by the FSP in its denial letter dated 6 November 2009 were as follows: … “insured perils” do not included: “damage:…(b) that occurs gradually;… unless caused by or arising from direct consequence of an earthquake or seismological disturbance, volcanic eruption or water escaping from a water main owned by a water supply authority…” … “9 Accidental Damage 205569 Determination 5 of 7 Cover is extended to include accidental damage of property, not otherwise included by the cover section, at the premises… … (f) we will not pay for damage caused directly by or arising from; … (ii) … gradual operating causes; … (iv)… faulty workmanship … or faulty design; 29. The Panel notes the applicant‟s material and his reply to the FSP‟s submission. The Panel has however some concern as to the information the FSP has relied in support of its denial of the claim. 30. The FSP‟s appointed building consultant has made reference in his report dated 30 April 2009 to the appropriateness and defectiveness of the plumbing system, as not according with various parts of the Building Code of Australia and numerous Australian Standards. The building consultant noted in a brief report dated 16 June 2010 as to „defective works‟ he observed during his initial inspection and made reference to Building Codes and Standards. 31. The FSP sought clarification from the building consultant to identify the particularly non compliant Australian Standards and Government Codes to which he was referring, and although the building consultant has referenced the various standards and codes in a letter of 23 June 2010, it does little to explain how the property is not compliant with those standards. 32. Furthermore, the consultant qualifies his response by indicating the attending consultant is familiar with the codes, but is not necessarily qualified as an expert in each of the Codes. 33. Nevertheless, the Panel is unsure if the reference to the Building Code and Australian Standards relates to current requirements or at the time of any plumbing installation although the FSP assumed in its submission the building consultant was referring to the later code. 34. The Panel noted an additional grease trap has been installed prior to the damage occurring. The grease trap was installed as a requirement due to changes in local council and water authority bylaws regarding the expulsion of waste water. 35. According to the applicant, the plumbing had been inspected by the council and the local water authority on many occasions, and there was no indication that there was a problem in this regard. 36. Nevertheless, the Panel noted there were issues with the backflow of waste water into the building prior to and following the installation of the additional grease trap. However, there is no indication that any backflow problem that occurred prior to or following was related to the cracked pipe that was atte nded to in July 2009. 37. The building consultant reported that the escaping of contaminant trade waste liquids under the sub-floor had existed for a period of not less than two years. The Panel notes that this opinion was probably based on a tenant allegedly indicating that when opening their premises, they experienced a rank smell every morning for over a two year period. The FSP has provided an unsigned statement from the tenant. The Panel has expressed opinions before regarding 205569 Determination 6 of 7 unsigned statements, and is of the view that signed statements carry considerably more weight as evidence in support of a party‟s submission . 38. The tenant is alleged to have verbally complained to the property manager of this problem. However, there is no record of such a complaint in the detailed record keeping by the property manager. The Panel notes from the record keeping, that when concerns were raised by a tenant, appropriate action was immediately undertaken by the property manager. There is no indication from other tenants of any issue with a rank smell permeating from the sub-floor, or that such a smell would escape the attention of local council and water authority officers during plumbing inspections. 39. The applicant has maintained his position from the initial denial of the claim alleging that the damage did not occur gradually, and consequently the policy should respond. However, following lodgment of the dispute with the Service the FSP‟s building consultant arranged in mid June 2010 for the cracked PVC pipe to be provided to the pipe manufacturer for the purpose of obtaining a report to establish as to how long the pipe had been leaking based on the staining on the pipe. This report became available to the Panel, at the FSP‟s behest, subsequent to the Panel‟s formal consideration of the dispute. The Panel does not consider the technical data contained therein, is determinative of the disputed issue, namely as to the period of time the pipe had been cracked, and consequently whether the leaking was of long standing duration. 40. The applicant submits the nature of the damage, i.e. the buckling of the floor, combined with the fact there is a small space in which water can accumulate under the sub-floor is inconsistent with the suggestion that water has remained under the floor in excess of two years, and as a result extended pooling suddenly caused the floor to buckle. 41. The applicant has provided a letter from a building services company that stated: “In the event of water pooling in this central area, it has no means of escape, except evaporation. This moisture is absorbed by the timber, causing swelling then cupping. This cupping is due to a recent event. The water would not have sat under the floor with no apparent damage for years, and then suddenly caused cupping. In my opinion, the timber flooring would cup and buckle within days or weeks of water being trapped in the area under the floor.” 42. The building consultant was asked to respond to this comment, and in his report of 23 June 2010 advised: “We agree that water pooling in a central area with no means of escape except evaporation would be quickly absorbed by timber surfaces and buckling would occur quite quickly – in a matter of days. The timber floor was covered with carpet and vinyl. When the carpet and vinyl was lifted the cupping was evident. The vinyl in fact showed signs of cupping occurring underneath it for such a length of time that the vinyl was buckling and cracking in concert with the timber floor beneath it. The structure below the surface shows signs of aged rotting. We would not expect the above and below floor evidence to be visible after a recent „one off‟ incident of water escaping.” 43. In his initial report the FSP‟s building consultant reported that damage to the vinyl and carpet was caused by wear and tear, ageing and deterioration. 205569 Determination 7 of 7 44. The Panel notes that material has been provided by the FSP inviting a conclusion that the building has been undergoing enduring causes of damage; for example, old damage to the property as identified by the FSP‟s building consultant where the structure was rotted. 45. It has been identified that there were several leaks in the pipes in the sub -floor. No specific has been provided that defines the damage caused by the various leaks. 46. The policy does not provide cover under the insured perils of Storm, Hail and Water for damage that occurs gradually. Under the Accidental Damage cover, the policy provides protection from bursting leaking and discharging of apparatus or pipes containing water or liquid of any kind. Accidental damage cover however does not extend to provide cover for damage caused directly by or arising from ... “ gradually operating causes”. 47. Ultimately, the FSP is required to discharge its onus of proof, on a balance of probabilities, demonstrating the operation of an exclusion(s), in order to justify declinature of the total claim. After careful consideration of all the evidence and the expert opinions, the Panel is not convinced there is persuasive evidence at hand permitting it to find that the leaking water was of a long standing nature. However, the Panel is also not satisfied that the applicant has established that all of the damage, the subject of the claim has occurred recently and/or tha t it can be related directly to the insured event that is water damage as distinct from damage that has occurred over a period of time. In other words, despite the fact that the Panel is not satisfied that the FSP has discharged the significant onus of proof that rests with it in this instance, the Panel is also not satisfied that all of the damage claimed is due to an event covered by the policy. 48. The Panel has therefore determined that it should make a determination which is fair and reasonable in the circumstances. This is a complex claim in which the Panel has received a voluminous body of material. In all the circumstances, the Panel is of the opinion that the FSP should make a 50% contribution to the applicant‟s repair costs of $73,163.03. CONCLUSION 49. Accordingly the Panel determines the FSP indemnify the applicant in the sum of $36, 581.52 in full satisfaction of the claim.